一种风电机组塔筒的组装工装及组装方法

By integrating auxiliary carriages and boom structures with an intelligent control system, the alignment accuracy and coaxiality issues during high-altitude docking of wind turbine towers have been resolved, achieving automation and efficiency in tower assembly and improving safety and testing accuracy.

CN122106827BActive Publication Date: 2026-07-17SICHUAN NENGTOU MEIGU NEW ENERGY DEV CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
SICHUAN NENGTOU MEIGU NEW ENERGY DEV CO LTD
Filing Date
2026-04-27
Publication Date
2026-07-17

Smart Images

  • Figure CN122106827B_ABST
    Figure CN122106827B_ABST
Patent Text Reader

Abstract

本发明涉及风电机组塔筒组装技术领域,具体为一种风电机组塔筒的组装工装及组装方法。包括两个对称设置的基架,两个基架之间安装有两个对称设置的电动束紧架,每个基架上均安装有组装机构,组装机构,包括固装在基架顶部的半弧轨道架和固装在基架下部的爬升平台,半弧轨道架上安装有自走平台,自走平台上设有可直线位移的检架,检架上分别固定安装有光纤激光焊接头、电磁敲击器、弹性杆和检测校准单元,电磁敲击器的输出端安装有敲击头,弹性杆的端部安装有振动信号采集元件,基架的下部安装有可直线位移的辅助滑架。本发明的有益效果是:通过集成化的辅助滑架与抱臂结构,解决了现有技术中塔筒高空对接时对位精度差、同轴度误差大的问题。