小水电集群管理方法、装置、设备和存储介质
By constructing a feasible domain for small hydropower clusters and generating operational boundary parameters, the operational safety problem of small hydropower clusters under weak communication conditions was solved, and the autonomous operation and security of the clusters were realized.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CHINA SOUTHERN POWER GRID DIGITAL GRID GRP CO LTD
- Filing Date
- 2026-04-24
- Publication Date
- 2026-07-17
AI Technical Summary
Existing technologies cannot effectively solve the overall operational safety problem of small hydropower clusters under weak communication conditions, especially in mountainous and remote areas where communication links are unstable, latency is uncontrollable, and interruptions are frequent, failing to meet cluster management needs.
By constructing a feasible region for a small hydropower cluster, cluster-level constraint information is generated using the vertex enumeration method or constraint projection method. This generates a feasible region represented in half-space, which is then parameterized and decomposed into the operating boundary parameters of each hydropower station, enabling autonomous operation.
In weak communication environments, this ensures that small hydropower clusters do not require global power flow status and inter-station communication coordination, enabling safe and robust autonomous operation and avoiding operational status breaches due to communication instability.
Smart Images

Figure CN122118968B_ABST