Underwater coral sand foundation grouting method based on diffusion state identification and dynamic regulation

CN122147856APending Publication Date: 2026-06-05SANYA SCI & EDUCATION INNOVATION PARK WUHAN UNIV OF TECH
0 Cites -1 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
SANYA SCI & EDUCATION INNOVATION PARK WUHAN UNIV OF TECH
Filing Date
2026-05-09
Publication Date
2026-06-05

Smart Images

  • Figure CN122147856A_ABST
    Figure CN122147856A_ABST
Patent Text Reader

Abstract

The present application relates to a kind of underwater coral sand foundation grouting methods based on diffusion state identification and dynamic control, comprising: obtaining the underwater coral sand foundation characteristics of the region to be treated, and dividing grouting subarea;Determine grouting target;Select grouting material;Carry out simulation grouting experiment;The diffusion state of slurry in each grouting subarea is pre-judged and divided;Matching grouting strategy;Lay out monitoring system in the region to be treated, implement grouting action, and real-time acquisition of field formation information is carried out through monitoring system;Based on field formation information, the grouting sequence, grouting stage, grouting rhythm and grouting mode are dynamically adjusted;When reaching grouting target, stop grouting action.The present application can extract response law through simulation experiment before construction, and diffusion state is identified and dynamically matched grouting strategy in construction combined with monitoring information, so that slurry can effectively push and displace pore water in underwater coral sand foundation, and also form continuous, stable and load-bearing reinforced body.
Need to check novelty before this filing date? Find Prior Art