Method for installing and removing a construction operation platform for a rooflight resting on a main beam
CN122148041APending Publication Date: 2026-06-05CHINA MCC22 GROUP CORP LTD
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CHINA MCC22 GROUP CORP LTD
- Filing Date
- 2026-03-31
- Publication Date
- 2026-06-05
Smart Images

Figure CN122148041A_ABST
Abstract
The present application relates to the technical field of building construction, and particularly relates to a method for installing and removing a main beam resting type daylighting roof construction operation platform, comprising the following steps: S1, marking the opening center line position; S2, cutting the opening in the parapet wall; S3, installing the auxiliary cross beam on the parapet wall; S4, installing the main beam; S5, moving the auxiliary cross beam to the installation position of the next main beam; S6, the end portions of the plurality of main beams are fixed by welding the second angle steel; S7, a plurality of secondary beams are arranged between the two adjacent main beams; S8, the double-layer protection system is laid on the main beam; S9, the three-stage loading pretest is implemented; S10, the platform covering layer is removed; S11, the main beam and the auxiliary beam are synchronously separated along the axial direction, and the remaining main beams are sequentially removed. The method does not need to occupy other operation surfaces in the building, is beneficial to flexible arrangement of the site, and the material consumption is far lower than that of the traditional scaffold, so that the cost is effectively reduced. The installation and fixing process of the main beam and the main structure is simple, and the construction speed is faster.
Need to check novelty before this filing date? Find Prior Art