A method for rapidly reinforcing the end wall of a side crushing chamber of an underground ore bin

By laying steel rails and binding steel mesh inside the crushing chamber and then pouring concrete to form a reinforced concrete structure, the problems of long construction period and safety hazards of traditional reinforcement methods are solved, and rapid and safe reinforcement of the end wall of the crushing chamber is achieved.

CN122148338APending Publication Date: 2026-06-05SANSHANDAO GOLD MINE SHANDONG GOLD MINING LAIZHOU

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
SANSHANDAO GOLD MINE SHANDONG GOLD MINING LAIZHOU
Filing Date
2026-04-23
Publication Date
2026-06-05

Smart Images

  • Figure CN122148338A_ABST
    Figure CN122148338A_ABST
Patent Text Reader

Abstract

The application is a kind of method for quickly reinforcing the end wall of a side broken chamber of an underground ore bin, which comprises the following steps: vertically laying a row of steel rails near the end wall of the side broken chamber of the ore bin; pouring three sections of micro-arched reinforced concrete walls and two reinforced concrete columns from the floor to the roof along the full width direction of the end wall of the broken chamber; the micro-arched reinforced concrete walls are arranged at intervals with the reinforced concrete columns, and the micro-arched reinforced concrete walls are connected into a whole through the reinforced concrete columns. The method for reinforcing the end wall of the broken chamber is safe and efficient, has large supporting strength, and the micro-arched supporting structure of the end wall can withstand greater impact damage, thereby ensuring the normal operation of the broken chamber.
Need to check novelty before this filing date? Find Prior Art