A smart space construction and whole life cycle management method and system

By constructing a demand library, equipment library, and strategy library, and adopting a three-level matching mechanism and digital twin model, the problems of multi-source information fusion and full-process management in the construction of smart spaces have been solved. This has enabled high-precision modeling and refined management throughout the entire life cycle, improving the rationality of the solution and the consistency of construction.

CN122155219APending Publication Date: 2026-06-05HITACHI BUILDING TECH GUANGZHOU CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
HITACHI BUILDING TECH GUANGZHOU CO LTD
Filing Date
2026-02-28
Publication Date
2026-06-05

Smart Images

  • Figure CN122155219A_ABST
    Figure CN122155219A_ABST
Patent Text Reader

Abstract

The application relates to a smart space construction and whole life cycle management method and system, which comprises the following steps: constructing a requirement library, a device library and a strategy library; acquiring and structurally processing initial multi-source information and user demand information; performing multi-modal consistency fusion and conflict resolution to obtain unified space model data; performing function, device and strategy matching through a three-level matching mechanism, and synchronously detecting and resolving logic and resource conflicts; performing multi-objective optimization and three-dimensional scoring on complex conflicts to determine an optimal balance scheme; generating a visual preview scheme and confirming the same; outputting a complete scheme containing a digital twin model, cost accounting and an implementation plan; synchronizing progress and dynamically scheduling in implementation; and dynamically optimizing strategies in the running stage. The scheme provided by the application can improve the precision, efficiency and economy of smart space construction, and realize whole-process closed-loop management from design, implementation to operation and maintenance.
Need to check novelty before this filing date? Find Prior Art