海上风电导管架带千斤顶支撑的总装焊接方法
By using jack support and a segmented welding method, the problems of low welding quality and efficiency of offshore wind turbine jackets were solved, achieving a high-precision and high-efficiency welding process.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- ZHONGHAI FULU HEAVY IND CO LTD
- Filing Date
- 2026-04-30
- Publication Date
- 2026-07-17
AI Technical Summary
The welding quality of existing offshore wind turbine jackets is poor and the efficiency is low. In particular, during vertical welding, the crane is affected by wind speed, resulting in inaccurate positioning and requiring repeated adjustments.
The assembly and welding method using jacks is employed, with alignment assisted by annular assembly plates and shims. Welding is carried out in sections and rigorous testing is performed, including step-by-step welding of the inner ring, outer ring, and intersecting welds. Hydraulic lines and support structures are used to improve alignment accuracy and stability.
It improves welding quality and efficiency, reduces the impact of thermal stress, ensures the stability and precision of the welding process, and increases equipment utilization.
Smart Images

Figure CN122184526B_ABST