Management system based on ai-assisted decision production model algorithms
By using AI-assisted decision-making production models and feedback verification mechanisms, the problem of inaccurate reflection of node load status in enterprise management systems under highly volatile order environments has been solved. Steady-state task scheduling schemes are generated, reducing the damage to on-site stability caused by frequent changes and improving execution stability and delivery safety.
Patent Information
- Application Number
- CN202610637090.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-05-11
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2046-05-11
AI Technical Summary
Existing enterprise management systems struggle to accurately reflect the true load status of resource allocation nodes in highly volatile order environments, leading to frequent changes in scheduling plans and increasing the risk of node out-of-order behavior and order defaults.
The management system adopts an AI-assisted decision-making production model. Through data acquisition terminals and decision servers, it uses feature extraction networks and fully connected layer computing node load indices to generate steady-state task scheduling schemes. It also introduces feedback verification mechanisms and default risk judgment to adjust the scheduling schemes to avoid frequent changes.
It enables precise quantification of the load status of resource allocation nodes, reduces the damage to on-site stability caused by frequent changes, reduces the risk of order default, and improves the execution stability and delivery security of enterprises in highly volatile environments.
Smart Images

Figure CN122198548B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the fields of enterprise management information systems and artificial intelligence-assisted decision-making technology, specifically a management system based on an AI-assisted decision-making production model algorithm. Background Technology
[0002] With the development of flexible manufacturing and intelligent enterprise management technologies, resource allocation and task scheduling in the face of highly volatile order environments have become an important research direction in the field of enterprise management. In order to achieve effective management and collaborative control of production nodes, testing nodes, packaging nodes and material kitting nodes, higher requirements are placed on the dynamic decision-making and steady-state scheduling capabilities of enterprise management systems.
[0003] In enterprise scheduling management, data-driven intelligent decision-making technology demonstrates good applicability due to its strong status recognition and solution generation capabilities. However, when faced with frequent order changes, repeated task insertions, node execution delays, and distorted on-site data, existing enterprise management systems often rely on static rules or single business logs as the basis for decision-making, making it difficult to accurately reflect the true load status of resource allocation nodes. Especially in high-fluctuation production scenarios, generating scheduling solutions solely based on task requirements can easily overlook the destructive impact of frequent scheduling changes on on-site execution stability. Furthermore, when execution status data is inconsistent with on-site physical feedback, the system may continuously reschedule based on erroneous data, further amplifying the risks of node disorder and order default.
[0004] Therefore, effectively acquiring and verifying the execution status of resource allocation nodes, and establishing an intelligent decision-making mechanism that can characterize the true load level of nodes by combining task requirement data, adjusting the scheduling scheme to steady-state constraints when the node load exceeds the risk boundary, and further judging the default risk corresponding to the scheduling scheme to form a visualized and executable target task scheduling scheme, is crucial to ensuring the stable execution and delivery security of enterprises in a highly volatile demand environment. Summary of the Invention
[0005] To address the aforementioned technical problems, this invention provides a management system based on an AI-assisted decision-making production model algorithm. Specifically, the technical solution of this invention includes: Data acquisition terminals and decision servers; among them, The data acquisition terminal is used to acquire the execution status data and task requirement data of the resource allocation node, and send the execution status data and task requirement data to the decision server; The decision server is used to input the execution status data into a pre-trained AI-assisted decision production model, and output the node load index of the resource allocation node through the AI-assisted decision production model; The decision server is also used to generate an initial task scheduling plan based on the task requirement data; The decision server is also used to compare the node load index with a preset danger threshold; If the node load index is less than or equal to the danger threshold, the decision server will output the initial task scheduling scheme as the target task scheduling scheme. If the node load index is greater than the danger threshold, the decision server obtains a preset scheduling lock time parameter, adjusts the initial task scheduling scheme, extracts and calculates the number of task switching times per unit time based on the initial task scheduling scheme as the task switching frequency, so that the task switching frequency is less than or equal to the maximum frequency threshold, generates an adjusted task scheduling scheme, uses the adjusted task scheduling scheme as the target task scheduling scheme, and sends it to the corresponding resource allocation node for task scheduling; wherein the maximum frequency threshold is the ratio of the preset allowed number of task switching times to the scheduling lock time parameter.
[0006] Optionally, the pre-trained AI-assisted decision-making production model includes a feature extraction network and a fully connected layer; The decision server inputs the execution status data into a pre-trained AI-assisted decision-making production model, and outputs the node load index of the resource allocation node through the AI-assisted decision-making production model, specifically including: The feature extraction network extracts task change frequency data and execution delay data from the execution status data. The system deviation of the resource allocation node is output by performing feature-weighted calculation on the task change frequency data and the execution delay data through the fully connected layer. The system deviation is used as the node load index.
[0007] Optionally, the training process of the pre-trained AI-assisted decision-making production model includes: Obtain historical execution status data and corresponding historical node load indices as training samples; The historical execution status data is input into the initial model to obtain the predicted node load index; the initial model refers to the network topology structure of the above feature extraction network and fully connected layer that has been constructed, but the weight matrix and bias terms of each layer have not been converged and iterated through historical data, but are assigned values by random initialization or pre-trained weights. A loss function is calculated based on the predicted node load index and the historical node load index. The parameters of the initial model are adjusted based on the loss function until the preset convergence condition is met, thereby obtaining the pre-trained AI-assisted decision production model.
[0008] Optionally, the decision server is further configured to: Determine the total number of tasks in the target task scheduling scheme, and use the product of the node load index and the total number of tasks as the default risk contribution rate of the target task scheduling scheme; Obtain the preset failure boundary threshold from the storage space of the decision server; If the default risk contribution rate is greater than the failure boundary threshold, an early warning instruction is generated. If the default risk contribution rate is less than or equal to the failure boundary threshold, the target task scheduling scheme is determined to be in a safe state.
[0009] Optionally, the system further includes a feedback verification terminal; The feedback verification terminal is used to obtain the physical feedback data of the resource allocation node; The feedback verification terminal is used to compare the physical feedback data with the execution status data; If the physical feedback data is inconsistent with the execution status data, the feedback verification terminal generates a data correction instruction and sends the data correction instruction to the decision server. If the physical feedback data is consistent with the execution status data, the feedback verification terminal sends a data confirmation command to the decision server.
[0010] Optionally, the decision server is further configured to: Receive the data correction instruction; Based on the data correction instruction, the execution status data is corrected to generate corrected execution status data; The corrected execution status data is input into the pre-trained AI-assisted decision-making production model, the node load index is re-output, and the node load index is re-compared with the preset danger threshold to update the target task scheduling scheme.
[0011] Optionally, the data acquisition terminal includes: Environmental monitoring module and system log extraction module; The environmental monitoring module is used to collect the physical environmental parameters of the resource allocation node. The system log extraction module is used to extract the operation record logs of the resource allocation node; The physical environment parameters and the operation log are used to constitute the execution status data.
[0012] Optionally, the system further includes an execution terminal; The decision server is also used to send the target task scheduling plan to the execution terminal; The execution terminal is used to visualize the target task scheduling scheme.
[0013] Compared with the prior art, the present invention has the following beneficial effects: 1. This system utilizes a pre-trained AI-assisted decision-making production model to extract task change frequency and execution latency data from execution status data using a feature extraction network. A fully connected layer then performs feature weighting to calculate a node load index, accurately quantifying the actual deviation and stress state of resource allocation nodes. Based on this, when the node load index exceeds a preset danger threshold, the decision server proactively acquires scheduling lock-in time parameters, constraining the task switching frequency within the maximum frequency threshold and generating an adjusted task scheduling plan. This mechanism effectively compensates for the shortcomings of traditional scheduling, which relies solely on task requirements and static rules, avoiding the disruption to on-site stability caused by frequent scheduling changes. It achieves a shift from simply pursuing response speed to ensuring overall steady-state execution.
[0014] 2. This system introduces a feedback verification mechanism and a default risk assessment mechanism. On the one hand, the system compares the acquired physical feedback data with the execution status data through the feedback verification terminal. When inconsistencies are found, a data correction instruction is generated. The decision server corrects the execution status data and re-outputs the node load index, realizing closed-loop correction of on-site status distortion and avoiding continuous rescheduling based on erroneous data. On the other hand, the system multiplies the node load index by the total number of tasks in the target task scheduling plan to obtain the default risk contribution rate. When it exceeds the failure boundary threshold, an early warning instruction is generated. This comprehensively considers the execution risk of a single node with the overall task scale, enabling amplified assessment and early control of the enterprise's actual delivery pressure and concentrated default risk. Attached Figure Description
[0015] Other features, objects, and advantages of the invention will become more apparent from the following detailed description of non-limiting embodiments with reference to the accompanying drawings: Figure 1 This is a structural diagram of the system of the present invention. Detailed Implementation
[0016] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to specific embodiments.
[0017] like Figure 1As shown, the management system based on the AI-assisted decision-making production model algorithm is used to manage resource allocation nodes, including: a data acquisition terminal and a decision server; wherein, the data acquisition terminal is used to acquire the execution status data and task requirement data of the resource allocation nodes, and send the execution status data and task requirement data to the decision server; The decision server is used to input execution status data into a pre-trained AI-assisted decision production model, and outputs the node load index of the resource allocation node through the AI-assisted decision production model. The decision server is also used to generate an initial task scheduling plan based on task requirement data; The decision server is also used to compare the node load index with a preset danger threshold; If the node load index is less than or equal to the danger threshold, the decision server will output the initial task scheduling plan as the target task scheduling plan. If the node load index exceeds the danger threshold, the decision server obtains the preset scheduling lock time parameter, adjusts the initial task scheduling scheme, extracts and calculates the number of task switches per unit time based on the initial task scheduling scheme as the task switch frequency, so that the task switch frequency is less than or equal to the maximum frequency threshold, generates the adjusted task scheduling scheme, uses the adjusted task scheduling scheme as the target task scheduling scheme, and sends it to the corresponding resource allocation node for task scheduling; where the maximum frequency threshold is the ratio of the preset allowed number of task switches to the scheduling lock time parameter.
[0018] This embodiment provides a scheduling steady-state control mechanism for flexible manufacturing enterprises facing highly volatile order environments. Specifically, the main scenario is set as a manufacturing plant for high-voltage connectors and control modules for new energy vehicles. This plant simultaneously handles customized orders from multiple OEMs, and customers allow adjustments to terminal specifications, housing colors, and testing standards within 24 hours before delivery. The resource allocation nodes within the plant include stamping units, injection molding units, assembly lines, online testing stations, packaging stations, and key material fulfillment nodes. The data acquisition terminal continuously collects execution status data and task requirement data from each node and sends them to the decision server. The decision server then decides, under highly volatile conditions, whether to continue using high-response scheduling or proactively switch to a stable scheduling with low change frequency. Specifically, execution status data is not limited to equipment on / off status, but reflects whether a node is in a stable and operational production state. For example, although an assembly line is still running, if it continuously receives order insertions, work order changes, tooling replacements, and secondary confirmations from personnel, then the assembly line is approaching an unstable zone at the organizational execution level. Task requirement data includes order priority, delivery window, process route, material availability constraints, and customer change records. The decision server forms an initial task scheduling plan based on the task requirement data. This plan is typically used to adapt the set delivery time parameters to the expected equipment uptime parameters. The decision server inputs the execution status data into the pre-trained AI-assisted decision-making production model to obtain the node load index. This index is used to characterize the comprehensive execution pressure currently borne by the resource allocation node, reflecting both the switching load at the equipment level and the execution fatigue and process coordination resistance at the team level. The preset danger threshold is a safety lower boundary value determined by the system through statistical analysis based on the node load index characteristics in the early stages of large-scale abnormal rework or line stoppage events in historical production logs, or a fixed value manually set by the on-site production supervisor based on the maximum physical switching frequency of the equipment. When the node load index does not exceed the danger threshold, it means that although the current node is under high load, the scheduling changes have not exceeded the preset maximum capacity threshold. The system directly outputs the initial task scheduling plan to maintain a rapid response capability to demand fluctuations. Conversely, when the node load index exceeds the danger threshold, the system no longer pursues the theoretically optimal real-time output, but instead obtains the preset scheduling lock time parameter and adjusts the initial task scheduling plan accordingly. The scheduling lock time parameter can be understood as a stable window in which the schedule is no longer frequently rewritten within a certain period of time. For example, the main task sequence of a certain assembly line will no longer be repeatedly changed within the next four hours. Furthermore, the specific value of the preset scheduling lock time parameter is calculated by the decision server by comprehensively adding the standard tooling replacement time, the first piece test verification time, and the preset physical buffer time of the corresponding resource allocation node, so as to ensure that the locked time period is sufficient to complete a single complete steady-state production switchover and efficiency recovery. The maximum frequency threshold is determined by the preset number of allowed task switching and the corresponding lock time parameter. Its function is to limit the number of task switching allowed within the scheduling lock time parameter, so that the scheduling switches from high response mode to steady-state execution mode. After adjustment, an adjusted task scheduling scheme is generated and output as the target task scheduling scheme. To facilitate understanding, an example of a specific scheduling scenario will be used for illustration. Suppose that at 08:00 on a certain day, assembly line L1 receives three task segments T1, T2, and T3, where T1 is a priority order, T2 is a regular replenishment order, and T3 is a customer-subjected change order. The initial scheduling will alternate between T1, T3, and T2 to balance urgency and equipment availability. However, execution status data shows that L1 has undergone multiple model changes in the previous two hours, and the on-site log also shows waiting for first-piece confirmation and repeated rework. At this point, the AI model outputs a node load index that exceeds the preset danger threshold. Based on this, the decision server will no longer allow T1, T3, and T2 to alternate multiple times in a short period of time. Instead, it will lock the future time sequence to complete the main sequence of T1 first, then process T3, and then process T2 to reduce the switching frequency. As an exception handling mechanism, if key fields are missing from the task requirement data, such as the delivery window not being uploaded or the material completeness status not being reported, the decision server can temporarily suspend the generation of the formal target task scheduling plan, output the pending confirmation status first, and retain the previous version of the stable schedule to prevent blind rescheduling when information is incomplete. If the execution status data is obviously abnormal, such as nodes not updating for a long time, the data collection terminal being offline, or timestamps being disordered, the decision server can use a status snapshot within the most recent reliable time period for temporary judgment and limit scheduling adjustments to only within the preset constraint range to avoid the system triggering changes exceeding the maximum frequency threshold due to abnormal data. If the node load index is in the boundary range near the danger threshold, the system can further combine the priority of the task corresponding to the node to prioritize the process of high-priority orders, while ordinary orders are automatically postponed to be executed outside the stable window. Amidst fluctuations in copper and chip deliveries due to regional logistics disruptions, the factory received specification adjustment notifications from two OEMs in the morning. Data acquisition terminals revealed that assembly line L2 had undergone multiple line changes within three hours, test batches were piling up at test station Q1, and packaging stations were repeatedly paused due to label version changes. Based on this, the decision server determined that the node load indexes of L2 and Q1 exceeded the danger threshold. Therefore, it abandoned the initial scheduling that was optimized on a minute-by-minute basis and instead locked the work order sequence for the next six hours, retaining only the single-insertion permission for key orders. As a result, although the completion time of some ordinary orders was delayed within a preset tolerance period, the rhythm of tooling switching, first-piece confirmation, and material replenishment on-site stabilized again, and the workshop execution layer was able to restore its ability to follow instructions. The technical effect of the above mechanism is that, in enterprise management scenarios with drastic fluctuations in demand, the system not only considers the order response speed, but also the destructive effect of scheduling changes on the stability of resource allocation nodes, thereby achieving early intervention in organizational execution pressure and reducing the risk of loss of control on site due to frequent rescheduling. In this embodiment, the pre-trained AI-assisted decision-making production model includes a feature extraction network and a fully connected layer; The decision server inputs execution status data into a pre-trained AI-assisted decision-making production model, which then outputs the node load index of the resource allocation nodes, specifically including: The feature extraction network extracts task change frequency data and execution delay data from the execution status data; The system deviation of resource allocation nodes is output by performing feature-weighted calculation on task change frequency data and execution latency data through a fully connected layer. The system deviation is used as the node load index.
[0019] This embodiment provides a feature extraction mechanism for node load index. Specifically, in the aforementioned mainline factory, judging node risk solely based on whether equipment is running or orders are backlogged easily overlooks the core factors leading to system instability. The core factors causing production nodes to deviate from the preset stable state are usually not a single absolute workload, but rather the system deviation caused by the superposition of frequent task changes and actual execution delays. Therefore, this embodiment refines the AI-assisted decision-making production model into a feature extraction network and a fully connected layer. By identifying task change frequency data and execution delay data, it outputs the system deviation degree and uses this system deviation degree as the node load index. Specifically, task change frequency data reflects how frequently schedules are reissued, inserted, canceled, changed, or reordered within a short time window. For flexible manufacturing, task changes themselves are not inherently negative, but when they exceed the coordination limits of on-site teams, tooling, and material delivery, operators will frequently wait, repeatedly confirm, or temporarily switch programs, causing discontinuities in the execution chain. Execution delay data reflects the time difference between planned actions and on-site completed actions. For example, the plan is to complete the first piece confirmation at 10:00, but it is actually completed at 11:00; the plan is to complete the test switch within one hour, but it is delayed due to a lag in program version confirmation. When these two types of data are combined, they can more accurately describe whether a node is in a state of high load but stable and controllable, or in a state of deviating from order due to frequent changes. The feature extraction network specifically adopts neural network architectures suitable for processing time-series data, such as long short-term memory networks, gated recurrent units, or one-dimensional convolutional neural networks; the feature extraction network can slice the execution status data according to time windows; for example, the four most recent time slices are denoted as W1, W2, W3, and W4, and the number of work order reassignments, tooling change records, number of first-piece re-examinations, node waiting time, and timeout completion flags are read in each time slice respectively. Suppose that in W1 to W4, the task switching of a certain test node is characterized by being in the first preset interval, the second preset interval, and the third preset interval, while the execution latency is characterized by low, medium, high, and high. Then, the feature extraction network can form two compact sequence features: one set describing the change trend and the other set describing the latency trend. The fully connected layer is not simply a mechanical addition, but rather, based on the weight relationship formed during training, it identifies two different but dangerous scenario patterns: frequent changes followed by latency and latency followed by repeated rearrangement. Finally, it outputs the system deviation. In the specific execution process of the fully connected layer, the feature weighting calculation follows a defined network operation rule. Specifically, the fully connected layer is configured with a first weight vector corresponding to the task change frequency data and a second weight vector corresponding to the execution delay data. The system multiplies the extracted frequency features and delay features by their corresponding weight vectors and sums them, then adds a bias term. Through an activation function, such as a sigmoid or linear rectified function, the linear summation result is nonlinearly mapped to a preset numerical range, such as between 0 and 1, to obtain the system deviation. This structured calculation method can objectively quantify the contribution ratio of different types of risk features to the overall disorder of nodes. To facilitate understanding, a specific application scenario can be used for illustration. Suppose that a certain assembly line has 1, 1, 4, and 5 task reassignment records in four consecutive windows, with corresponding timeout records of 0, 1, 2, and 3. The feature extraction network first extracts the trends of increasing reassignments and increasing timeouts, without directly generating a judgment result. The fully connected layer then judges, based on the pattern established by historical training, that the node is no longer a single surge in task volume, but has shown a chain change from scheduling jitter to execution delay. Thus, it outputs a system deviation degree greater than the preset deviation threshold. Conversely, if a node has a large workload, but the number of reassignments is stable and the delay does not increase significantly, the system deviation degree will not be raised. Furthermore, if a node only has task change frequency data but lacks execution delay data, such as a newly launched workstation that has not yet generated complete delay logs, the system can temporarily make a preliminary assessment based on the available features and mark the result as low confidence, and then update it with more logs later. If there is a significant conflict between the two types of data, such as logs showing frequent changes, but on-site timestamps indicating that execution is always on time, the system can list the node as pending verification to avoid misjudging scheduling flexibility as a risk of disorder. If a node has no changes or delays for a long period of time, the model can output a low system deviation, but still retain the ability to reassess sudden order insertions. During the aforementioned logistics fluctuations, test node Q1 could still complete routine verification as planned before 9:00 AM. However, after 9:00 AM, due to the customer updating the pressure resistance standard, the system continuously issued program switching and batch reordering. The feature extraction network captured the short-cycle repetitive behavior of program version update - task rollback - re-booting from the logs. At the same time, it identified from the execution results that the first piece passing time was delayed and the dwell time in the test queue was increased. After the fully connected layer merged these two types of features, it output the system deviation degree which was greater than the preset deviation threshold, indicating that although the node did not stop, it had deviated from the stable production track. The technical effect of the above mechanism is that it transforms the abstract scheduling pressure into on-site disorder characteristics that can be identified by the system, thereby achieving a fine characterization of the actual load status of nodes and avoiding misjudgments based solely on output or uptime. In this embodiment, the training process of the pre-trained AI-assisted decision-making production model includes: Obtain historical execution status data and corresponding historical node load indices as training samples; Historical execution status data is input into the initial model to obtain the predicted node load index. The initial model refers to the network topology structure of the above feature extraction network and fully connected layer that has been constructed, but the weight matrix and bias terms of each layer have not been converged and iterated through historical data. Instead, a neural network model is assigned values by random initialization or pre-trained weights. The loss function is calculated based on the predicted node load index and the historical node load index. The parameters of the initial model are adjusted based on the loss function until the preset convergence condition is met, thus obtaining a pre-trained AI-assisted decision-making production model.
[0020] This embodiment provides a model training mechanism for flexible manufacturing scenarios. Specifically, in the aforementioned factory, if the node load index is set entirely based on human experience, it will often be distorted due to shift differences, product differences, and changes in order structure. For example, frequent line changes are normal in a multi-variety, small-batch order week, but may indicate anomalies in a large-batch, stable production week. Therefore, this embodiment trains the model using historical execution status data and corresponding historical node load indices, enabling the model to distinguish between normal flexibility and dangerous disorder. Specifically, historical execution status data can come from the linked records of the Enterprise Resource Planning System, Manufacturing Execution System, Warehouse Management System, and equipment logs, covering scheduling rescheduling, work order execution trajectory, material arrival time, tooling preparation time, number of test returns, and production line pause records within multiple cycles. The corresponding historical node load index is not randomly set without basis, but can be marked based on whether the node at that time has experienced large-scale delays, frequent waiting, abnormal rework, increased data supplementation by work teams, and an increase in the number of times production supervisors have manually taken over. In other words, the training label reflects whether the node has entered a risk zone where it is difficult to execute stably at that time. During training, the system inputs historical execution state data into the initial model to obtain the predicted node load index, then compares it with historical labeled values, and adjusts the model parameters according to the magnitude of the deviation. This parameter adjustment is not just to unilaterally reduce the calculated value of the loss function, but to allow the model to gradually converge and extract the correlation rules between multi-dimensional state characteristics and system stability in flexible manufacturing. For example, more orders are not necessarily dangerous, but if they are accompanied by material delays and increased rework, nodes are more likely to become unstable. Similarly, short-term delays may not be dangerous if they are quickly recovered, but if they accumulate across shifts, the risk is significantly amplified. As parameters are continuously adjusted, the model's predictions of historical samples tend to stabilize. Once the preset convergence condition is met, a pre-trained AI-assisted decision-making production model can be formed. When calculating the loss function, the system can use a mean squared error algorithm to quantify the prediction bias. Specifically, the system calculates the loss function value for the current batch of samples. Its calculation formula can be expressed as: This formula is obtained by accumulating the first... Given n samples, where i is the predicted node load index of the summation index of positive integers from 1 to N. Corresponding historical node load index The square of the difference, multiplied by the number of training samples in the batch. To achieve this, use the reciprocal; This function allows the model to accurately capture the degree of deviation between the predicted value and the actual labeled historical value, and uses this as a direct basis for adjusting the network parameters based on the gradient descent method, ensuring that the model training converges stably to the optimal solution. To facilitate understanding, a specific application scenario can be used for illustration. Let the training set contain samples A, B, and C. Sample A corresponds to a stable production week; although order volume is high, task reassignment is low and delays are manageable, thus it is labeled as low load. Sample B corresponds to a week with frequent customer order changes; task reassignment is high and testing involves multiple rollbacks, thus it is labeled as high load. Sample C corresponds to a week with material shortages; although reassignment is low, waiting and inter-shift delays are caused by waiting and replenishment, thus it is labeled as medium-high load. During the initial training, the model may incorrectly equate high order volume directly with high risk, thus overestimating sample A. After multiple rounds of adjustments, the model gradually establishes a feature mapping: the load on a node is not determined by a single level of busyness or idleness, but by the comprehensive relationship between changes, delays, and recovery capabilities. In addition, if there is significant contamination in the historical data, such as manual supplementation of some shifts later than the actual completion time, or missing logs due to system upgrades during a certain period, these samples can be processed with low weight or removed before training to avoid the model establishing incorrect associations. If the historical label distribution is too simplistic, such as having only safe samples and lacking high-risk samples for a long period, the sample time span can be extended to include data during periods of sudden supply fluctuations to enhance the model's ability to identify extreme working conditions. If the model's performance on the validation set is unstable for a long period during training, convergence can be stopped and the model can be reverted to the previous stable parameter version to prevent overfitting. The factory experienced several production phases over the past year, including a surge in orders, chip supply disruptions, concentrated customer upgrades, and peak delivery periods. The system extracted historical records of multiple resource allocation nodes from these phases and used factors such as whether the supervisor manually froze the schedule, whether there was a risk of delivery exceeding 48 hours, and whether there was widespread rework waiting as criteria for historical load labeling. Through continuous training, the model gradually extracted and identified certain early signs, such as frequent program switching at test nodes and waiting for reflow at assembly nodes. These combined patterns often indicate that the node load is about to increase. The technical effect of the above mechanism is that it makes the model's judgment based on the company's real production history rather than static rules, thereby enabling scenario-based training and continuous calibration of the node load index and improving the credibility of subsequent scheduling decisions. In this embodiment, the decision server is also used for: Determine the total number of tasks in the target task scheduling scheme, and use the product of the node load index and the total number of tasks as the default risk contribution rate of the target task scheduling scheme. Retrieve the preset failure boundary threshold from the storage space of the decision server; If the contribution rate of default risk exceeds the failure boundary threshold, an early warning instruction is generated. If the contribution rate of default risk is less than or equal to the failure boundary threshold, the target task scheduling scheme is determined to be in a safe state.
[0021] This embodiment provides a risk amplification judgment mechanism for order default boundaries. Specifically, judging whether a single node is under pressure is not enough to support enterprise-level scheduling, because the same node load may be controllable when carrying a small number of tasks, but will be rapidly amplified into concentrated default risk when carrying a large number of tasks. Therefore, this embodiment further introduces a default risk contribution rate, which combines the node load index with the total number of tasks in the target task scheduling scheme to evaluate whether the scheduling scheme is close to the enterprise's preset failure boundary. Specifically, the total number of tasks represents the actual scale of tasks that the node needs to undertake in the target scheduling plan, including work orders to be produced, work orders to be switched, batches to be tested, and insert tasks that must be completed within a limited window; the node load index reflects the node's pressure status, and the total number of tasks reflects the amount of pressure. When the two are combined, the system can identify a common but easily overlooked scenario: although a single node is not completely unstable, too many tasks are gathered in a short period of time. Once a partial interruption occurs, it will affect multiple order delivery windows. The decision server reads the failure boundary threshold from the storage space. This threshold can be set according to the enterprise's tolerance for default by core customers. For example, the risk limit corresponding to the overdue of key orders exceeding 48 hours can be used as the control boundary. It should be noted that before calculating the default risk contribution rate, the decision server can normalize the total number of tasks in advance to eliminate the calculation bias caused by the difference in units. For example, the system can use a maximum-minimum normalization method. Specifically, the system obtains the minimum number of tasks of the node in the historical statistical period as the baseline and obtains the historical peak number of tasks as the upper limit. The total number of tasks undertaken by the current node is subtracted from the baseline to obtain the task difference, and the upper limit is subtracted from the baseline to obtain the range. The task difference is divided by the range to strictly map the total number of tasks to a dimensionless interval of 0 to 1, and then multiplied by the node load index, which is also in the normalized interval. To prevent calculation errors caused by division by zero due to a range of zero, if the upper limit is equal to the base number, the system directly sets the normalization result to 1. This structured processing method ensures that the output default risk contribution rate falls within a defined comparison range, effectively avoiding the problem of direct overflow of calculation results caused by excessive differences in the absolute task base of different resource allocation nodes, and ensuring the scientificity and consistency of failure boundary judgment. To facilitate understanding, a specific application scenario is used for illustration. Two scheduling schemes, P1 and P2, are provided, both corresponding to the same test node. In P1, the node's load index exceeds a preset danger threshold, but it only undertakes key verification tasks with a quantity below the first threshold. In P2, the node's load level is similar, but it is assigned ordinary orders with a quantity exceeding the second threshold and multiple temporary orders. Although the two appear similar from a node load perspective, if P2 becomes unstable, it will affect a wider range of orders, thus contributing more to the default risk. Based on this, the system can issue a warning to P2 while allowing P1 to continue execution under enhanced monitoring. As an anomaly handling mechanism, if the total number of tasks in the target task scheduling plan is incomplete, such as some outsourced rework tasks not yet returned to the system, the decision server can mark the plan status as pending completion and not immediately output a safety conclusion. If the failure boundary threshold is adjusted due to enterprise strategy updates, such as a decrease in tolerance for delays in key orders during the quarterly delivery sprint, the system should prioritize using the latest version of the threshold and retain the old version for audit traceability. If the default risk contribution rate is close to the threshold, the system can generate tiered warnings instead of binary judgments, such as prompting production supervisors to prepare alternative workstations in advance, increase quality inspection resources, or lock in key materials. On the day of the aforementioned customer order rescheduling, although assembly line L2 had reduced its switching frequency after locking the schedule, it still took on multiple high-voltage connector orders and two emergency repair batches in the following six hours. When the decision server was analyzing the scheduling plan for this target task, it found that L2's default risk contribution rate was still greater than the preset failure boundary threshold. Although the site was temporarily stable, the system still judged that its default risk contribution rate was approaching the failure boundary set by the enterprise based on the node load and total task volume. Therefore, it sent an early warning to the planning manager and delivery manager, prompting them to transfer some ordinary orders to the backup production line in advance and to prioritize the testing and packaging channels for key orders. The technical effect of the above mechanism is that it incorporates node risks and task scale into default prediction in a simultaneous manner, thereby amplifying the assessment of the actual delivery pressure on enterprises and avoiding misjudgments that nodes may seem controllable but the whole is already close to the default boundary. In this embodiment, the system also includes a feedback verification terminal; The feedback verification terminal is used to obtain physical feedback data from resource allocation nodes; The feedback verification terminal is used to compare physical feedback data with execution status data; If the physical feedback data is inconsistent with the execution status data, the feedback verification terminal generates a data correction instruction and sends the data correction instruction to the decision server. If the physical feedback data matches the execution status data, the feedback verification terminal sends a data confirmation command to the decision server.
[0022] This embodiment provides a feedback verification mechanism for verifying the actual status of the site. Specifically, the aforementioned solution can assess node risks based on execution status data. However, in high-pressure production environments, if frontline personnel experience execution fatigue due to frequent schedule changes, there may be delays in data entry, supplementary data entry, or even inconsistent status reports with the actual site conditions. In this case, relying solely on system logs will further deviate the decision-making from the actual physical execution status. Therefore, this embodiment introduces a feedback verification terminal, which obtains physical feedback data and compares it with execution status data to determine whether the data is reliable. Specifically, physical feedback data can come from production line edge gateways, workstation barcode scanners, fixture occupancy sensors, automated guided vehicle arrival records, test equipment completion signals, electronic tag status, or packaging off-line counts. Its core significance lies in directly reflecting whether a node has actually executed a work order in the physical world, rather than merely reflecting whether it is registered as executed in the system. When the feedback verification terminal compares the two types of data, it can establish verification relationships based on work order number, process status, start time, completion time, equipment occupancy status, and physical flow direction. For example, if the MES log shows that work order M7 has completed testing, but the test equipment has not generated a corresponding completion message, and the downstream packaging station has not received the batch barcode, then there is a data inconsistency. To facilitate understanding, a specific application scenario can be used for illustration. Suppose that the execution status data of a certain node indicates that work orders A, B, and C have all entered assembly in the current shift, with A and B completed and C in progress. However, the physical feedback obtained by the feedback verification terminal from the barcode scanner and equipment signals shows that only A has completed its exit, B is still in the rework buffer, and C has not yet been officially put into operation. At this time, the terminal can generate a data correction instruction based on the inconsistency between the status of B and the inconsistency between the start time of C and send it to the decision server. If the two sets of data match in terms of work order status and time sequence, a data confirmation instruction is sent, allowing the server to continue to use the current status for scheduling. Furthermore, if the physical feedback data itself is incomplete, such as a barcode scanner being offline or a test device experiencing a communication interruption, the feedback verification terminal can perform tiered verification according to the data source's trust level, only identifying inconsistencies when the core evidence chain is complete. If there is a slight time delay difference between the execution status data and the physical feedback data, such as the data just being completed on-site but not yet refreshed by the system, the terminal can set a buffer comparison window to avoid misjudging normal transmission delays as abnormalities. If multiple physical feedback sources contradict each other, the feedback source directly related to the physical flow can be prioritized, such as outbound barcode scanning or equipment completion signals, and that node can be listed as pending manual review. During the aforementioned period of frequent temporary change requests, in order to meet the delivery deadline, the L2 assembly line operators manually marked some work orders as pending completion in order to trigger subsequent material flow instructions in advance. The feedback verification terminal found from the test equipment messages and packaging barcode scanning records that these work orders had not actually been completed, so it generated a data correction instruction. Based on this, the system determined that the current execution status data had been contaminated, and avoided continuing to schedule the next batch of emergency inserts based on the error completion rate. The technical effect of the above mechanism is that it provides the decision server with an on-site verification channel independent of business logs, thereby enabling timely detection of state distortion and reducing continuous misscheduling driven by erroneous data. In this embodiment, the decision server is also used for: Receive data correction instructions; Based on the data correction instruction, the execution status data is corrected to generate corrected execution status data; The corrected execution status data is input into the pre-trained AI-assisted decision-making production model, the node load index is re-output, and the node load index is compared with the preset danger threshold to update the target task scheduling plan.
[0023] This embodiment provides a dynamic correction mechanism based on verification results. Specifically, if the system can only detect data inconsistencies but cannot correct and recalculate accordingly, the node load index will remain on the erroneous basis, and subsequent scheduling may still deviate from the actual situation. Therefore, in this embodiment, based on the feedback verification terminal, the decision server further receives data correction instructions, generates corrected execution status data, and re-outputs the node load index. Specifically, the data correction instruction can include the work order identifier to be corrected, the field to be corrected, the trusted source, and the suggested status; for example, changing a batch from "test completed" to "test interrupted and awaiting re-inspection", or changing a workstation from "idle and available for order taking" to "fixture occupied and unavailable for order taking"; after receiving the data, the decision server does not simply overwrite the original data, but prioritizes retaining the correction trajectory to form a traceable state version chain; considering that the aforementioned AI-assisted decision-making production model is based on extracting sequence features from time window slices, if the physical event to be corrected occurs in a historical time slice, when generating the corrected execution status data, the decision server will overwrite the data in the corresponding historical time slice according to the physical timestamp in the data correction instruction; The decision server triggers a sliding window reconstruction operation, re-extracts complete frequency and delay features based on time series slices containing corrected data, and re-feeds them into the AI-assisted decision production model. Through the above time series alignment process, feature time series disorder caused by feedback lag is effectively avoided, and the node load index is strictly aligned with the actual on-site state. To facilitate understanding, a specific application scenario will be used for illustration. Suppose that the initial state of a test node is set, and work orders D1 and D2 are marked as passed. Therefore, the system determines that the backlog of tasks on the node is lower than the preset backlog threshold and outputs a load index within the preset safe range. After feedback verification, it is found that D1 is still waiting for retesting, and D2 was returned due to a program version error. Based on this, the decision server rewrites the status of D1 and D2 to incomplete, and adds rework waiting and program reload events. After re-entering the model, the node load index increases, and the system then abandons adding ordinary orders to the node, instead prioritizing subsequent resources for key batches that have expired. As an exception handling mechanism, if a data correction instruction conflicts with the original record but the chain of evidence is insufficient, such as only a single human terminal claiming a status error without any device signal or barcode scanning record to corroborate it, the decision server can first perform a soft correction, that is, reduce the confidence level of the field instead of directly overwriting it; if the execution status data still has missing fields after correction, the server can add a confidence level mark when re-outputting the node load index for subsequent risk assessment; if the same work order receives conflicting correction instructions in a short period of time, the system can temporarily freeze the work order for automatic scheduling, and then restore it after confirmation by a human supervisor. During the period of high tension between assembly line L2 and test node Q1, the system initially determined that Q1 had released its capacity and could accept new batches from L2. However, after feedback verification, it was found that there were actually two version change batches in Q1 waiting for re-inspection. Based on this, the decision server corrected the execution status data and recalculated the node load index. The result showed that Q1 was approaching the danger zone. The system then stopped adding ordinary work orders to Q1 and transferred some subsequent batches from L2 to the backup test position to avoid a chain imbalance where the upstream continued to release materials and the downstream actually became congested. The technical effect of the above mechanism is that it enables the system to close the loop and repair the decision-making basis after discovering data distortion, thereby realizing real-time correction of node load index and improving the consistency between automatic scheduling and the actual on-site state. In this embodiment, the data acquisition terminal includes: Environmental monitoring module and system log extraction module; Among them, the environmental monitoring module is used to collect the physical environmental parameters of the resource allocation nodes; The system log extraction module is used to extract operation logs of resource allocation nodes; Physical environment parameters and operation logs are used to construct execution status data.
[0024] This embodiment provides a data acquisition mechanism oriented towards execution status construction. Specifically, in the aforementioned factory, if the execution status data only comes from the business system logs, the system can only obtain execution instructions at the planning level, but cannot obtain the specific reasons for execution blockages at the physical level. For example, the decrease in efficiency of the assembly node may not be due to unreasonable scheduling, but rather due to changes in physical conditions such as changes in ambient temperature, excessive humidity in the testing room, or congestion in the material storage area. Therefore, this embodiment uses an environmental monitoring module and a system log extraction module to jointly construct execution status data, making the node load judgment closer to the actual on-site operating mechanism. Specifically, the environmental monitoring module can collect physical environmental parameters around the node, such as temperature and humidity, cleanliness, noise, vibration, workstation occupancy, buffer zone fullness, automated guided vehicle (AGV) traffic congestion, and power fluctuations. For flexible manufacturing, these parameters are directly related to the node's execution capability. For example, the assembly and testing of high-voltage connectors are sensitive to temperature and humidity. If the environment is close to the process limit, the probability of first-piece confirmation and retesting will increase. If the main channel of the AGV is congested, even if the materials have been released from the system, they may not arrive at the workstation on time, which will also manifest as execution delays. The system log extraction module is used to extract operation logs such as work order reception, task reassignment, equipment start-up and shutdown, program switching, process version updates, quality inspection returns, manual intervention, and abnormal shutdowns. When the two are combined, the execution status data includes not only the action results but also the action environment. To facilitate understanding, let's illustrate with a specific application scenario. Suppose that the log of a certain assembly node shows only two task changes in the past hour, seemingly stable. However, the environmental monitoring module simultaneously detects that the node's buffer zone is nearing full capacity, and the average dwell time of the automated guided vehicle in this area has significantly increased. The system can interpret this as follows: a low log change frequency does not necessarily mean the node is under low load, but may be due to obstructed material flow, temporarily preventing the site from switching over. Conversely, if the log shows frequent reassignments, but environmental parameters are normal, workstation switching is smooth, and there is no obvious congestion, it may be an organized, flexible adjustment rather than a dangerous disorder. As an anomaly handling mechanism, if the environmental monitoring module fails locally, such as a temperature and humidity probe in a certain area malfunctions, the system can temporarily use the environmental parameters of adjacent nodes and the built-in status of the equipment as alternative references, but the weight of environmental features should be reduced; if the system log extraction module experiences a delay, the environmental monitoring data can be used first to determine whether the current stable schedule needs to be maintained, rather than immediately triggering a large-scale rescheduling; if the two types of data contradict each other, such as the log showing that the equipment is idle but the environmental monitoring finds that the workstation is still occupied, the contradiction can be regarded as a potential state distortion signal and handed over to the feedback verification link for further verification. Against the backdrop of the aforementioned supply fluctuations, the log records of test node Q1 appeared to show only a small increase in retest tasks. However, the environmental monitoring module detected that the temperature and humidity in the test room were continuously approaching the process control boundary, while the space occupied by the test buffer rack was continuously increasing. Based on this, the system determined that Q1 was not simply experiencing a single increase in task load, but was in a state of superposition of physical environment and task pressure. If orders were to be added again, it would be very likely to cause a larger range of delays. Therefore, when generating the schedule, the decision server actively limited the frequency of new switching for this node. The technical effect of the above mechanism is that by integrating physical environment parameters and operation logs, more complete execution status data is formed, thereby achieving a multi-dimensional characterization of the actual operating status of resource allocation nodes and reducing the bias caused by a single data source. In this embodiment, the system further includes an execution terminal; The decision server is also used to send target task scheduling plans to the execution terminals; The execution terminal is used to visualize the scheduling plan for the target task.
[0025] This embodiment provides a visualized delivery mechanism for on-site execution. Specifically, in highly volatile flexible manufacturing, even if the system has derived a more stable target task scheduling plan, if the schedule is only issued in the form of abstract data packets, on-site teams and managers still cannot obtain the specific technical basis for triggering the scheduling locking mechanism, why some ordinary orders are postponed, or why a certain node cannot insert orders. This weakens execution consistency. Therefore, this embodiment sets up an execution terminal, where the decision server sends the target task scheduling plan to the execution terminal for visualization. Specifically, execution terminals can be deployed on workshop dashboards, team tablets, planning supervisor workstation terminals, or mobile management terminals. The visualized display content includes not only the work order sequence and start and end times, but also node load status, whether it is in a locked window, the boundary for allowing order insertion, the reason for task adjustment, pending anomalies, and warning levels. For flexible manufacturing scenarios, an interpretable display method is itself an important component of stable execution. It allows the site to understand that the current schedule is not arbitrarily changed by the system, but a steady-state adjustment based on node load, task scale, and data verification results. To facilitate understanding, a specific application scenario will be used for illustration. Assume that in the execution terminal interface, assembly line L2 displays the work order sequence for the next six hours as J1, J2, and J3. J1 is marked as locked for execution, J2 as a priority task, and J3 as a regular order to be postponed. Test node Q1 displays a high load, restricting new additions and switching. If the planning supervisor attempts to insert a regular order K1 within the locked window, the terminal can directly indicate that the node is in stable scheduling mode, allowing only high-priority tasks to be inserted during this period, thereby reducing manual communication costs and the frequency of repeated confirmations. As an exception handling mechanism, if the execution terminal is temporarily offline, the decision server can send the target task scheduling plan to the local edge device in a cached manner and automatically refresh it after the network is restored. If different terminals display inconsistent versions, the version most recently issued and signed by the decision server should be used to prevent the execution of the old schedule on site. If a terminal user has insufficient permissions, for example, a regular workstation can only view the schedule of its own workstation and adjacent workstations and should not display enterprise-level sensitive order information, but can still retain the lock status and switching restriction description related to its own workstation. On the aforementioned production day when the customer continuously revised the order, the decision server sent the locked target task scheduling plan to the large screen in the assembly workshop and the tablet of the team leader. The large screen displayed the work order sequence for each production line for the next few hours in a timeline format, and used a prominent identification to distinguish between three states: stable execution, allowing single order insertion, and awaiting material confirmation. The team leader could thus clearly see that the delay of some ordinary orders was not due to system failure, but to ensure the timely delivery of key orders and reduce line changeover disruptions. Because the displayed information was intuitive, the on-site staff no longer frequently asked whether another switch was needed, and the consistency of execution was significantly improved. The technical effect of the above mechanism is that it transforms the target task scheduling plan into an operational view that is understandable, verifiable, and executable on-site, thereby achieving stable transmission of decision results to the workshop execution level and reducing secondary disturbances caused by information asymmetry.
[0026] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit it. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention.
Claims
1. A management system based on an AI-assisted decision-making production model algorithm, used to manage resource allocation nodes, characterized in that: include: Data acquisition terminals and decision servers; among them, The data acquisition terminal is used to acquire the execution status data and task requirement data of the resource allocation node, and send the execution status data and task requirement data to the decision server; The decision server is used to input the execution status data into a pre-trained AI-assisted decision production model, and output the node load index of the resource allocation node through the AI-assisted decision production model; The decision server is also used to generate an initial task scheduling plan based on the task requirement data; The decision server is also used to compare the node load index with a preset danger threshold; If the node load index is less than or equal to the danger threshold, the decision server will output the initial task scheduling scheme as the target task scheduling scheme. If the node load index is greater than the danger threshold, the decision server obtains a preset scheduling lock time parameter, adjusts the initial task scheduling scheme, extracts and calculates the number of task switches per unit time based on the initial task scheduling scheme as the task switch frequency, so that the task switch frequency is less than or equal to the maximum frequency threshold, generates an adjusted task scheduling scheme, uses the adjusted task scheduling scheme as the target task scheduling scheme, and sends it to the corresponding resource allocation node for task scheduling; wherein the maximum frequency threshold is the ratio of the preset allowed number of task switches to the scheduling lock time parameter; The pre-trained AI-assisted decision-making production model includes a feature extraction network and a fully connected layer; The decision server inputs the execution status data into a pre-trained AI-assisted decision-making production model, and outputs the node load index of the resource allocation node through the AI-assisted decision-making production model, specifically including: The feature extraction network extracts task change frequency data and execution delay data from the execution status data. The system deviation of the resource allocation node is output by performing feature-weighted calculation on the task change frequency data and the execution delay data through the fully connected layer. The system deviation is used as the node load index; The system also includes a feedback verification terminal; The feedback verification terminal is used to obtain the physical feedback data of the resource allocation node; The feedback verification terminal is used to compare the physical feedback data with the execution status data; If the physical feedback data is inconsistent with the execution status data, the feedback verification terminal generates a data correction instruction and sends the data correction instruction to the decision server. If the physical feedback data is consistent with the execution status data, the feedback verification terminal sends a data confirmation command to the decision server; The decision server is also used for: Receive the data correction instruction; Based on the data correction instruction, the execution status data is corrected to generate corrected execution status data; The corrected execution status data is input into the pre-trained AI-assisted decision-making production model, the node load index is re-output, and the node load index is re-compared with the preset danger threshold to update the target task scheduling scheme. The data acquisition terminal includes: Environmental monitoring module and system log extraction module; The environmental monitoring module is used to collect the physical environmental parameters of the resource allocation node. The system log extraction module is used to extract the operation record logs of the resource allocation node; The physical environment parameters and the operation log are used to constitute the execution status data.
2. The management system based on the AI-assisted decision-making production model algorithm according to claim 1, characterized in that, The training process of the pre-trained AI-assisted decision-making production model includes: Obtain historical execution status data and corresponding historical node load indices as training samples; The historical execution status data is input into the initial model to obtain the predicted node load index; the initial model refers to the network topology structure of the above feature extraction network and fully connected layer that has been constructed, but the weight matrix and bias terms of each layer have not been converged and iterated through historical data, but are assigned values by random initialization or pre-trained weights. A loss function is calculated based on the predicted node load index and the historical node load index. The parameters of the initial model are adjusted based on the loss function until the preset convergence condition is met, thereby obtaining the pre-trained AI-assisted decision production model.
3. The management system based on the AI-assisted decision-making production model algorithm according to claim 1, characterized in that, The decision server is also used for: Determine the total number of tasks in the target task scheduling scheme, and use the product of the node load index and the total number of tasks as the default risk contribution rate of the target task scheduling scheme; Obtain the preset failure boundary threshold from the storage space of the decision server; If the default risk contribution rate is greater than the failure boundary threshold, an early warning instruction is generated. If the default risk contribution rate is less than or equal to the failure boundary threshold, the target task scheduling scheme is determined to be in a safe state.
4. The management system based on the AI-assisted decision-making production model algorithm according to any one of claims 1-3, characterized in that, The system also includes an execution terminal; The decision server is also used to send the target task scheduling plan to the execution terminal; The execution terminal is used to visualize the target task scheduling scheme.
Citation Information
Patent Citations
Dynamic scheduling method for intelligent manufacturing system
CN120471406A
Numerical control machining order priority ranking and production scheduling intelligent management system
CN121032159A