Bridge merging section splicing construction method
By setting steel supports on the top of the cap beam at the bridge merging section as track supports for the double-beam bridge erecting machine, the problems of long construction time and high cost in the existing technology are solved, and rapid and low-cost construction of the bridge merging section is realized.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- GUIZHOU ROAD & BRIDGE GRP
- Filing Date
- 2026-04-24
- Publication Date
- 2026-06-19
AI Technical Summary
In existing technologies, when widening bridge sections merging into other roads, conventional single-beam bridge erecting machines cannot be used, resulting in long construction times, complex procedures, and high costs, necessitating the customization of specialized bridge erecting machines.
Steel supports are installed on the top of the cap beam of the newly built widened bridge. The steel supports are used as the track support base of the double-guide beam bridge erecting machine to form the transverse width and support structure. The double-guide beam bridge erecting machine is used to complete the overall erection of the bridge into the road section. The operation channel is formed by temporarily occupying the emergency lane and slow lane.
It simplifies the construction process, shortens the construction time, reduces construction costs, and avoids the need for custom-made bridge erecting machines.