面向管道预制的项目主数据驱动式生产质量闭环管理方法

By constructing a project master database for status compatibility analysis and closed-loop coordination, the problem of insufficient verification of workpiece or weld status in pipeline prefabrication projects was solved, achieving stability and reliability of closed-loop management of production quality and avoiding delays in node status judgment and release errors.

CN122243304BActive Publication Date: 2026-07-17GUANGDONG POWER ENG +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
GUANGDONG POWER ENG
Filing Date
2026-05-20
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Existing technologies lack multi-state consistency verification for the same workpiece or weld in pipeline prefabrication projects, resulting in delayed production node judgment, duplicate inspection tasks, omission of rework status, failure to promptly participate in release judgment with re-inspection results, and misjudgment of quality release conditions, which affects the integrity and reliability of closed-loop management of production quality.

Method used

A project master database is constructed with the workpiece list and welding list as unique indexes. Status compatibility analysis is performed through workpiece code and weld code to generate timestamped version snapshots, synchronously update the production node status, and perform closed-loop coordination to identify abnormal process status, thereby realizing the dynamic correlation between workpiece status, weld status and production process status.

Benefits of technology

It achieves dynamic correlation between workpiece status, weld status and production process status, ensuring consistency in status judgment at each business node, avoiding duplicate inspections, missed rework, and misjudgment of release, and improving the integrity and reliability of closed-loop management of production quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122243304B_ABST
    Figure CN122243304B_ABST
Patent Text Reader

Abstract

本发明公开了面向管道预制的项目主数据驱动式生产质量闭环管理方法,涉及管道预制项目质量管理技术领域。该方法通过构建以工件清单和焊接清单为唯一索引的项目主数据库,并基于工件编码及焊口编码对管道预制项目中的各类数据进行状态兼容性分析,获取项目主数据;当工件或焊口状态变更时,对项目主数据进行状态匹配校验并生成带时间戳的版本快照,更新对应的生产节点状态,并进行有效性监管,当异常发生时闭环协调工件、焊口及质量状态;基于闭环协调结果进行闭环状态分析,识别异常工序状态并生成生产质量闭环管理结果。实现了对同一工件或焊口状态的多状态一致性校验及数据驱动同步流转,确保生产、检测、返修及放行节点状态统一。