A construction supervision visual management method and system

CN122243401APending Publication Date: 2026-06-19GUANGDONG HONGYE ENG PROJECT MANAGEMENT CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
GUANGDONG HONGYE ENG PROJECT MANAGEMENT CO LTD
Filing Date
2026-03-19
Publication Date
2026-06-19

AI Technical Summary

Technical Problem

In existing technologies, the supervision and management of construction progress in building construction projects relies on manual inspections, resulting in opaque progress monitoring, error judgment relying on manual operation, and difficulty in adapting to the complexity and dynamic changes of modern industrial construction scenarios. Progress data also lacks unified quantitative standards.

Method used

A visualization image processing system is adopted, which combines image data analysis and reported data. A real-time construction model is constructed through binocular visual stereo matching and point cloud reconstruction algorithms. Combined with the engineering quantity ratio method and the process progress accumulation algorithm, a unified quantitative management of construction progress is achieved.

Benefits of technology

It improved the accuracy and transparency of construction progress management, reduced human error, and achieved unified quantification and efficient management of construction progress.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122243401A_ABST
    Figure CN122243401A_ABST
Patent Text Reader

Abstract

This invention discloses a method and system for visualized management of construction supervision, relating to the field of construction information management technology. The method includes: preprocessing collected image data; converting the real-time construction image data into visualized real-time construction model data based on binocular vision stereo matching and point cloud reconstruction algorithms; importing preset construction target drawings into the visualized model system to obtain target model data; comparing the real-time construction model data with the target model data using pixel comparison and feature point matching algorithms to obtain real-time construction progress data; obtaining estimated construction progress data based on the acquired construction reporting data using a combination of the quantity percentage method and the process progress accumulation algorithm; and comparing and evaluating the real-time construction progress data with the estimated construction progress data. Through image data analysis and comparative analysis of the reported data, the visualized model achieves unified quantification of construction progress, improving the accuracy of construction progress management.