A construction supervision visual management method and system
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- GUANGDONG HONGYE ENG PROJECT MANAGEMENT CO LTD
- Filing Date
- 2026-03-19
- Publication Date
- 2026-06-19
AI Technical Summary
In existing technologies, the supervision and management of construction progress in building construction projects relies on manual inspections, resulting in opaque progress monitoring, error judgment relying on manual operation, and difficulty in adapting to the complexity and dynamic changes of modern industrial construction scenarios. Progress data also lacks unified quantitative standards.
A visualization image processing system is adopted, which combines image data analysis and reported data. A real-time construction model is constructed through binocular visual stereo matching and point cloud reconstruction algorithms. Combined with the engineering quantity ratio method and the process progress accumulation algorithm, a unified quantitative management of construction progress is achieved.
It improved the accuracy and transparency of construction progress management, reduced human error, and achieved unified quantification and efficient management of construction progress.
Smart Images

Figure CN122243401A_ABST