Rock stratum artificial hole digging pile rapid hole forming device and construction method thereof
By combining surface trusses and breaking devices, efficient, safe, and quality-controllable construction of manually excavated bored piles in rock strata is achieved, solving the problems of low efficiency and high risk in traditional construction.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- NANJING FORESTRY UNIV
- Filing Date
- 2026-02-05
- Publication Date
- 2026-06-26
AI Technical Summary
Existing technologies for manually excavated bored pile construction in rock formations are characterized by low efficiency, high risk, and uncontrollable quality.
Vertical rotary excavation is carried out using surface trusses and vertical crushing devices to form a ring-shaped trench. Combined with radial crushing devices, radial extrusion force is applied to the rock mass at the center of the pile hole to fracture the rock mass. The rock mass is then lifted out by mechanized means to complete the pile hole excavation.
It significantly improves construction efficiency, reduces safety risks, ensures the quality of pile hole formation, adapts to different pile depths and diameters, reduces labor costs, and avoids hole collapse and other safety hazards.