A comprehensive wiring method and system for fabricated utility tunnel
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- 艾奕康设计与咨询(深圳)有限公司
- Filing Date
- 2026-02-11
- Publication Date
- 2026-06-26
AI Technical Summary
Existing prefabricated integrated utility tunnel cabling technology ignores the transmission effect of pipeline space conflicts and the influence of climate environment, resulting in pipeline compression, insufficient maintenance space, reduced cabling construction efficiency and shortened service life of cables and pipeline structures.
By identifying pipeline spatial conflicts through BIM collision detection, constructing a geometric constraint dataset, obtaining climate and environmental parameters to construct an environmental constraint dataset, using an association rule algorithm to determine the associated constraint dataset, combining a graph neural network model to construct a cable constraint model, filtering the target path set, and determining the installation sequence parameters based on pipeline type and laying rules.
Accurate identification of pipeline space conflicts avoids pipeline compression and insufficient maintenance space, improves wiring construction efficiency, extends the service life of cables and pipeline structures, and ensures the stable operation of prefabricated integrated utility tunnels.