A rapid casting construction method for water plant pools to improve impermeability

CN122304521APending Publication Date: 2026-06-30SHENZHEN SHENSHUI LONGHUA WATER CO LTD +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
SHENZHEN SHENSHUI LONGHUA WATER CO LTD
Filing Date
2026-04-03
Publication Date
2026-06-30

AI Technical Summary

Technical Problem

The existing water tanks in water plants have insufficient anti-seepage performance, especially in weak areas such as joints and construction joints, where leakage is easy. Moreover, the construction efficiency is low, making it difficult to meet the needs of rapid construction. Traditional maintenance methods cannot be dynamically adjusted and cannot effectively cope with the risk of cracking caused by environmental changes.

Method used

An adaptive feedback control algorithm is used to calculate the cracking risk index R. The curing parameters are adjusted based on real-time monitoring of concrete temperature, humidity and stress. Combined with an intelligent temperature control curing system, including temperature sensors, humidity sensors and stress sensors, dynamic adjustments are achieved through spraying and heating devices to form a comprehensive seepage barrier.

Benefits of technology

This approach combines rapid construction with high impermeability, reduces the risk of cracking, improves the overall impermeability and durability of the water tank, optimizes the construction process, shortens the construction period, and increases construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122304521A_ABST
    Figure CN122304521A_ABST
Patent Text Reader

Abstract

This application provides a rapid pouring construction method for water plant tanks to improve their impermeability, relating to the fields of water plant process treatment and civil construction technology. The method includes: after the tank body is constructed, monitoring the curing parameters of the tank body, calculating the cracking risk index R based on real-time data collected through an adaptive feedback control algorithm, and adjusting the curing regime according to the cracking risk index R. This construction method, by introducing an intelligent temperature-controlled curing system, achieves closed-loop adaptive control of the concrete curing process, effectively solving the problems of single impermeability systems and easy leakage at weak points in traditional construction; it also optimizes the construction process, improves pouring efficiency, shortens the construction period, and ensures the compatibility of materials and processes, providing a reliable guarantee for the rapid and high-quality construction of water plant tanks.
Need to check novelty before this filing date? Find Prior Art