Integrated treatment and construction method for settlement of a formed shield tunnel
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CHINA RAILWAY 11TH BUREAU GRP CORP LTD
- Filing Date
- 2026-03-12
- Publication Date
- 2026-06-30
AI Technical Summary
During their service, shield tunnels experience settlement due to multiple factors, leading to structural defects. Existing treatment technologies are not targeted enough, and the control effects are prone to recurrence. Furthermore, construction in core urban areas is difficult, affecting the normal use of the tunnel and the safety of surrounding facilities.
The integrated treatment method for settlement of the pre-formed shield tunnel is adopted, including on-site investigation and data verification, saturated grouting behind the shield segment wall and construction of engineering piles at the bottom of the tunnel. The dense grout coating layer is formed by the grouting behind the wall and the engineering piles are reinforced, and the settlement treatment and structural protection are achieved in synergy.
It significantly enhances the tunnel's resistance to deformation, slows down settlement, ensures the stability and safety of the tunnel structure, reduces the impact on normal operation, and improves the scientific and economic efficiency of the treatment.