A full-process ai construction system and method for modular buildings

The end-to-end AI construction system utilizes intelligent construction cloud and edge computing nodes to achieve intelligent management of the entire process of modular buildings, solving the problems of data isolation and high labor costs, and improving construction efficiency and intelligence.

CN122335477APending Publication Date: 2026-07-03BAIXIN INTELLIGENT MANUFACTURING TECHNOLOGY (WUXI) CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
BAIXIN INTELLIGENT MANUFACTURING TECHNOLOGY (WUXI) CO LTD
Filing Date
2026-04-09
Publication Date
2026-07-03

Smart Images

  • Figure CN122335477A_ABST
    Figure CN122335477A_ABST
Patent Text Reader

Abstract

The application relates to a full-process AI construction system and method of a modular building, and the system comprises an intelligent construction cloud, a plurality of edge computing nodes and terminal equipment, the intelligent construction cloud deploys a core AI large model, a digital twin simulation model, a multi-modal data storage library and a self-learning iteration library; the edge computing nodes are deployed in a construction process of the modular building, the edge computing nodes are connected with intelligent sensing equipment and intelligent execution equipment of a construction link through an industrial Internet of Things interface; the edge computing nodes and the terminal equipment are both provided with lightweight AI modules, each AI module is connected with the intelligent construction cloud to establish a real-time bidirectional data interaction link, and the intelligent construction cloud is used for providing centralized computing power and data management services for each AI module. According to the application, the modular building process is designed to be participated in and dominated by AI intelligence, the advantages of the modular building are fully brought into play, installation precision and construction efficiency are improved, human cost is reduced, and changes and work delays are reduced.
Need to check novelty before this filing date? Find Prior Art