Method for installing water beam of walking beam furnace

By using a cold-installation method, the distance at the water beam connection is pre-calculated and adjusted to compensate for thermal expansion, which solves the problems of high installation difficulty, high cost, and high safety risks in walking beam furnaces, and achieves fast, low-cost, and high-precision installation results.

CN122384484APending Publication Date: 2026-07-14PANGANG GRP ENG TECH

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
PANGANG GRP ENG TECH
Filing Date
2026-05-22
Publication Date
2026-07-14

AI Technical Summary

Technical Problem

Existing technologies present challenges in the installation of water beams for walking beam furnaces, including high installation difficulty, high cost, high safety risks, and difficulty in precision control. In particular, it is difficult to achieve efficient and high-quality installation in high-temperature environments.

Method used

A cold-installation method is adopted. By applying force to the second column under cold conditions to deflect it, the distance between it and the first column is shortened in advance. This ensures the expansion of the water beam under hot conditions. The extension is calculated using a formula. When prefabricating the water beam, the distance at the connection is adjusted to compensate for thermal expansion. The columns are then installed and welded step by step.

Benefits of technology

This technology enables efficient, high-quality, and low-cost installation of water beams, simplifies the operation process, reduces safety risks, and improves installation accuracy and service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122384484A_ABST
    Figure CN122384484A_ABST
Patent Text Reader

Abstract

The present application relates to the field of heating furnace, disclose a kind of installation method of water beam of step-by-step heating furnace, comprising: install multiple columns, wherein multiple columns are arranged along the longitudinal direction and include first column and multiple second columns;The upper end of first column is welded with water beam;Under cold conditions, the upper end of second column is forced to be offset towards first column, so that the distance between the upper end of second column and the upper end of first column is shortened, and the extension amount of the part of water beam between second column and first column due to thermal expansion under hot working condition corresponds;The upper end of the second column after offset is welded with water beam.The present application can realize the high-quality, efficient and low-cost installation of water beam.