Dispatching simulation method and system for unmanned mine car, electronic device and readable storage medium

CN122390201APending Publication Date: 2026-07-14北京路凯智行科技有限公司

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
北京路凯智行科技有限公司
Filing Date
2026-03-30
Publication Date
2026-07-14

AI Technical Summary

Technical Problem

Existing simulation methods for scheduling unmanned mining trucks consume excessive computational resources and have low simulation efficiency in scenarios involving large-scale mines, multiple trucks and shovels, complex road networks, and random failures. They cannot support multi-parameter combinations and long-term rapid simulations, and lack flexibility and realism, making it difficult to efficiently evaluate and optimize scheduling strategies.

Method used

An event-driven scheduling simulation method is adopted. By constructing a mining area scenario configuration module, a map deconstruction module, a mine car scheduling module, and an efficiency analysis module, fault simulation and dynamic scheduling are integrated. A discrete event advancement mechanism is used to realize the leap-like advancement of the simulation timeline, and multi-dimensional efficiency analysis and visualization are supported.

Benefits of technology

It significantly reduces computing resource consumption, improves simulation efficiency, supports rapid multi-parameter scheduling simulation, enhances simulation realism and reliability, provides multi-dimensional visualization reports, and helps optimize mine production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122390201A_ABST
    Figure CN122390201A_ABST
Patent Text Reader

Abstract

The application provides a scheduling simulation method and system for unmanned mine cars, an electronic device and a readable storage medium, and belongs to the technical field of unmanned mine car simulation. The method comprises the following steps: constructing a scheduling simulation platform, including a mine area scene configuration module, a mine area map deconstruction module, a mine car scheduling module, an event promotion module and a scheduling simulation efficiency analysis module; initializing scheduling simulation parameters through the mine area scene configuration module; obtaining a mine area topology graph with nodes, edges and regions and corresponding attributes through the mine area map deconstruction module; generating scheduling instructions based on the mine area topology graph and the scheduling strategy through the mine car scheduling module; using a discrete event promotion mechanism to drive the scheduling simulation process through the event promotion module; and calculating and outputting the mine car production efficiency index based on the event records in the scheduling simulation process through the efficiency analysis module. The application greatly reduces meaningless calculation and state query, significantly improves the scheduling simulation efficiency and restoration degree.