A method of manufacturing a crane girder
By adopting a pentagonal structure design with the cover plate below the center and a bending process in the crane beam, the problems of large welding volume and difficult deformation are solved, which improves production efficiency and equipment life, reduces dust and rainwater accumulation, and facilitates cleaning.
CN122401004APending Publication Date: 2026-07-17HUNAN CHINA RAILWAY WUXIN HEAVY IND CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- HUNAN CHINA RAILWAY WUXIN HEAVY IND CO LTD
- Filing Date
- 2023-01-16
- Publication Date
- 2026-07-17
Smart Images

Figure CN122401004A_ABST
Abstract
本申请公开的一种起重机梁体的制造方法,包括以下步骤:S1、材料配置;S2、点焊组件;S3、盖板预处理;S4、隔板点装;S5、同侧腹板点装;S6、预装筋板;S7、盖板折弯;S8、筋板固定;S9、对侧腹板点装;S10、梁体封闭。本申请公开的起重机梁体的制造方法,相较于现有技术而言,该制造方法能减少焊接量、控制梁体变形、提高生产效率、降低制造成本,使雨水、尘灰不易堆积于梁体盖板上,便于清扫,提高设备的使用寿命。
Need to check novelty before this filing date? Find Prior Art