A reinforcing steel rotating pay-off device
By introducing correction and adjustment components into the rebar laying device, the stability problems caused by eccentric tilting and uneven ground are solved, achieving stability and safety in the rebar laying process and adapting to different diameters and ground conditions.
CN122403202APending Publication Date: 2026-07-17
Patent Information
- Application Number
- CN202610765261.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Filing Date
- 2026-05-29
- Publication Date
- 2026-07-17
AI Technical Summary
Technical Problem
Existing rebar marking tools are prone to tipping over due to eccentricity during construction, posing safety hazards, and have poor stability on uneven ground at construction sites.
Method used
It employs correction and adjustment components, including connecting rods, sleeves, bearing rods, support rollers, and cylinders, to achieve uniform support and stable laying of reinforcing bars through mechanical drive and pneumatic system, adapting to different diameters and uneven ground, and avoiding eccentric tipping.
Benefits of technology
This ensures stability and safety during the rebar layout process, preventing device tilting caused by eccentric tilting and uneven ground, thus improving construction efficiency and safety.
✦ Generated by Eureka AI based on patent content.
Smart Images

Figure CN122403202A_ABST
Abstract
本发明属于立式钢筋放线器技术领域,公开了一种钢筋旋转放线装置,包括底座以及转动设于底座上转盘,还包括设于转盘上的支撑架和纠偏组件,纠偏组件的数量为多组,且均沿转盘的圆周方向间隔设置,纠偏组件包括:衔接杆,衔接杆固定设于转盘上;套筒,套筒与衔接杆同轴转动连接;承载杆,承载杆的一端与套筒固定连接,承载杆的数量不少于两根,且均沿套筒周向间隔设置,其中一根承载杆用于承接放入支撑架内的成卷钢筋,其中一根承载杆的自由端向上延伸设置,用于随套筒转动至与成卷钢筋的内侧相抵接;本方案通过多组纠偏组件在成卷钢筋周向形成多点均匀的内侧径向支撑,能部分抵消成卷钢筋的偏心;本发明解决了现有钢筋放线器偏心倾倒的问题。
Need to check novelty before this filing date? Find Prior Art
Citation Information
Patent Citations
Novel vertical wire rod steel bar pay-off device with pre-straightening function
CN119549612A