一种隧道施工污水快速识别及分流处理方法
By using a rapid identification and diversion treatment method for tunnel construction wastewater, and by utilizing intelligent diversion wells and a central control system to determine water quality, the wastewater in the tunnel can be diverted and treated, reducing energy consumption and operating costs, ensuring stable operation of the treatment facilities, and maintaining stable effluent quality.
CN122403535APending Publication Date: 2026-07-17THE NO 3 ENG LTD OF CHINA RAILWAY 22TH BUREAU GRP +1
View PDF 0 Cites 0 Cited by
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- THE NO 3 ENG LTD OF CHINA RAILWAY 22TH BUREAU GRP
- Filing Date
- 2026-05-20
- Publication Date
- 2026-07-17
Smart Images

Figure CN122403535A_ABST
Abstract
本申请公开一种隧道施工污水快速识别及分流处理方法,识别及分流处理方法具体包括以下步骤:S1、隧道各点污水汇入智能分流井,进行实时水质监测;S2、中央控制系统根据监测数据来对水质进行判定;S3、较清洁水导入清洁水通道;浑浊水导入浑浊水通道;污染水导入污染水通道;S4、达标后的污水进行回收或排放。本申请使得约60%—80%的“清洁水、浑浊水”通过低能耗的三级沉淀池处理,仅20%—40%的“污染水”进入高能耗的污水处理站,整体能耗药耗降低30%—50%;并且避免高浊度污水对污水处理站各装置冲击,保障各处理装置在最佳工况运行,出水水质更稳定;砂粒等易沉物在沉淀池阶段大量去除,减轻了后续污水处理站管路堵塞与设备磨损问题。