一种预注气预注浆复合桩施工方法
By simultaneously injecting compressed air and grout into the drill rod, the problems of long rest periods and limited friction caused by pore water pressure in precast pile construction were solved, enabling rapid soil solidification and improving the bearing capacity and construction efficiency of the pile foundation.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- HUNAN QIYAN ZHUCHUANG ENGINEERING TECHNOLOGY CO LTD
- Filing Date
- 2026-04-30
- Publication Date
- 2026-07-17
AI Technical Summary
The existing precast pile construction suffers from problems such as long rest periods due to pore water pressure and limited improvement of pile foundation friction, especially in areas with high groundwater levels where grout cannot deeply replace the soil.
Compressed air is injected synchronously through the drill rod to displace pore water and expand the pores. Grout is then injected, and the combined action of high-pressure air and grout promotes grout penetration and solidifies the soil to form a composite pile.
It shortened the rest period, improved the bearing capacity and friction of the pile foundation, and enhanced construction efficiency and pile foundation performance.
Smart Images

Figure CN122406743A_ABST