一种预注气预注浆复合桩施工方法

By simultaneously injecting compressed air and grout into the drill rod, the problems of long rest periods and limited friction caused by pore water pressure in precast pile construction were solved, enabling rapid soil solidification and improving the bearing capacity and construction efficiency of the pile foundation.

CN122406743APending Publication Date: 2026-07-17HUNAN QIYAN ZHUCHUANG ENGINEERING TECHNOLOGY CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
HUNAN QIYAN ZHUCHUANG ENGINEERING TECHNOLOGY CO LTD
Filing Date
2026-04-30
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

The existing precast pile construction suffers from problems such as long rest periods due to pore water pressure and limited improvement of pile foundation friction, especially in areas with high groundwater levels where grout cannot deeply replace the soil.

Method used

Compressed air is injected synchronously through the drill rod to displace pore water and expand the pores. Grout is then injected, and the combined action of high-pressure air and grout promotes grout penetration and solidifies the soil to form a composite pile.

Benefits of technology

It shortened the rest period, improved the bearing capacity and friction of the pile foundation, and enhanced construction efficiency and pile foundation performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122406743A_ABST
    Figure CN122406743A_ABST
Patent Text Reader

Abstract

本发明公开了一种预注气预注浆复合桩施工方法,其包括以下步骤:1)、利用钻杆钻孔,同步通过钻杆向钻头底部注入压缩空气,整个钻孔过程中不使用护筒;2)、向钻孔中注入浆液;3)、将预制桩沿着钻孔压入到预定的深度,预制桩的桩径大于钻孔的孔径。本发明的预制桩施工方法不但能节省工期(休止期),还具有较高的承载力性能。