一种中厚稳固矿体沿走向房柱阶梯式水平分层充填采矿法

By using the step-and-pillar horizontal layered filling mining method along the strike, the problems of limited stope size and large engineering workload in the mining of medium-thick and stable ore bodies have been solved, improving production efficiency and resource recovery rate, and ensuring mining safety.

CN122407192APending Publication Date: 2026-07-17JIAOJIA GOLD MINE OF SHANDONG GOLD MINING (LAIZHOU) CO LTD +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
JIAOJIA GOLD MINE OF SHANDONG GOLD MINING (LAIZHOU) CO LTD
Filing Date
2026-06-01
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Existing mining technologies for medium-thick, stable ore bodies suffer from problems such as limited stope size, large amount of preparatory and cutting work, low production efficiency, and difficulty in balancing resource recovery rate and operational safety.

Method used

The step-and-pillar horizontal layered filling mining method along the strike is adopted, which includes the steps of stope division and structural parameter design, preparatory engineering layout, stope mining, rock drilling, blasting and ventilation and ore filling. By dividing the stope and pillars along the strike of the ore body, the number of connecting roadways is reduced. The bottom-up horizontal layered mining method is adopted, combined with pressure-drainage mixed ventilation and filling technology.

Benefits of technology

This has resulted in the expansion of the mining area, increased production capacity, reduced pre-cutting work, shortened mining cycle, improved resource utilization efficiency, and enhanced safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122407192A_ABST
    Figure CN122407192A_ABST
Patent Text Reader

Abstract

本发明公开了一种中厚稳固矿体沿走向房柱阶梯式水平分层充填采矿法,属于地下金属矿开采技术领域,涉及相应的回采,爆破,通风,出矿,充填开采等步骤。针对厚度为15~25m的中厚稳固矿体传统的上向水平分层与进路采矿法作业效率低下,采切工程量大,无法对此类矿体进行高效开采等问题,本发明将采场沿走向布置,延长采场的作业面走向长度,同时在采场两端布置两条分层联络道,分别回采矿房矿柱,实现房柱阶梯式水平分层开采,从而解决单采场长度短、作业规模有限,机械化程度低,进路采切工程量大的问题。
Need to check novelty before this filing date? Find Prior Art