动车组网络关键设备的测试管理方法及综合检测试验台
By constructing a multi-dimensional environmental dynamic stress factor and performance degradation index, the problems of false alarms and missed detections in the testing of EMU network equipment are solved, enabling refined management and safety assurance of equipment status.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CHINA STATE RAILWAY GRP CO LTD
- Filing Date
- 2026-03-09
- Publication Date
- 2026-07-17
AI Technical Summary
Existing testing methods for key equipment in high-speed train networks cannot effectively distinguish between normal delays caused by environmental stress and equipment failure delays, and lack the ability to assess the sub-health status of equipment, leading to false alarms and missed detection of hidden faults, which affects maintenance efficiency and train operation safety.
By constructing a multidimensional environmental dynamic stress factor, calculating the performance degradation index, evaluating the equipment status using actual response time, network load rate, and voltage deviation, and employing a dynamic threshold determination method combined with a stress reproduction mechanism, the health status of the equipment is identified.
Significantly reduce false alarm rate, improve the ability to identify hidden faults, ensure equipment quality upon deployment, and enhance maintenance efficiency and driving safety.
Smart Images

Figure CN122420164A_ABST