Construction method of curtain wall operation with hanging basket suspension fixing device

CN122428765BActive Publication Date: 2026-09-15SHANDONG JINCHENG DECORATION ENG CO LTD +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202610888368.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2026-06-18
Publication Date
2026-09-15
Estimated Expiration
2046-06-18

AI Technical Summary

Technical Problem

该专利中将钢杆通过预埋固定和焊接固定的方式连接,操作复杂,需要对墙体造成破坏,且调节能力较低,不能根据施工进程进行调整

Benefits of technology

本发明采用了螺纹钢和钢杆配合多个组件连接的方式设置,提高了吊篮悬挂平台的连接强度,防止吊篮悬挂平台悬停在空中产生前后位移,同时通过直接传递部分荷载至墙体,显著增强悬挂装置抵抗前倾力矩的能力,降低因配重不足或荷载不均导致的倾覆风险,保证了安全性和可靠性,本发明能够在无论是否使用幕墙龙骨的情况下使用,大大提高了本发明使用范围。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122428765B_ABST
    Figure CN122428765B_ABST
Patent Text Reader

Abstract

The present application belongs to the field of building construction technology, and particularly relates to a construction method of a hanging basket suspension fixing device for curtain wall operation, comprising the following steps: A1, placing the hanging basket suspension platform at a positioning position; A2, clamping the rear end fixing assembly onto the hanging basket suspension platform, and connecting the middle end adjusting assembly with the rear end fixing assembly through the telescopic rod; A3, penetrating the front end connecting assembly into the middle end adjusting assembly, and fixing the front end connecting assembly on both sides of the window for connection; A4, fastening the front end connecting assembly, then fastening the middle end adjusting assembly and the telescopic rod after adjusting the length of the telescopic rod, and completing the installation; A5, after the installation is completed, checking the hanging basket suspension platform to ensure that it is firmly installed and does not deviate. The present application adopts the mode of setting multiple assembly connections by cooperation of screw-threaded steel and steel poles, improves the connection strength of the hanging basket suspension platform, and prevents the hanging basket suspension platform from generating front and back displacement when suspended in the air.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of building construction technology, and specifically relates to a construction method for a suspended and fixed device for curtain wall construction. Background Technology

[0002] Electric suspended platforms are construction machinery used for high-altitude operations, widely used in exterior wall construction, maintenance, and cleaning. As building shapes become increasingly aesthetically pleasing and complex, the lifting and lowering of the suspended platform during exterior wall construction can be affected by the building's shape, preventing it from reaching the ground and causing the platform to suspend in the air, increasing safety hazards.

[0003] Conventional practices include: 1. When there is no curtain wall keel, the suspended platform is normally lowered onto the building or suspended in the air, using its own weight to prevent displacement. However, normally lowering the suspended platform onto the building or suspending it in the air is a violation of regulations. In windy weather, the suspended platform will sway continuously in the air, and in strong winds, it may be blown into the air, creating a significant safety hazard. If workers climb into the suspended platform through a window, the swaying will cause them to lose their footing and hold on, posing a significant safety risk. 2. When there is a curtain wall keel, the method for suspending the electric suspended platform is as follows: The suspended platform is normally lowered onto the building or suspended in the air, and then tied to the curtain wall keel with ropes to ensure its stability. The suspended platform and the curtain wall keel must be secured together with ropes. If soft ropes are used for tying, they will pull the suspended platform outwards, but they will have no effect when the platform moves inwards. In windy weather, the suspended platform will collide with the curtain wall keel, causing damage to both. If steel wire ropes are used for tying, they can play a certain role when the platform is tied to the curtain wall keel, but the tying is relatively troublesome. When dismantling, the steel wire ropes cannot be reused, and may even be cut, resulting in economic losses.

[0004] Chinese patent CN205382699U discloses a suspended platform for shotcreting construction of building exterior walls. The platform includes a platform with railings around its perimeter. Both ends of the platform are connected to the front ends of a roof-suspended cantilever beam via steel wire ropes. The rear end of the roof-suspended cantilever beam passes through a pre-embedded anchor ring in the roof and is welded and fixed to the pre-embedded anchor ring. The suspended platform also includes a first connecting steel rod, a second connecting steel rod, and a pre-embedded connecting sleeve. The pre-embedded connecting sleeve is embedded in the exterior wall. One end of the second connecting steel rod is connected to the pre-embedded connecting sleeve, and the other end of the second connecting steel rod is connected to one end of the first connecting steel rod via a hook. The other end of the first connecting steel rod is welded and fixed to both ends of the front side of the suspended platform. This patent connects the steel rods through pre-embedding and welding, which is complex, requires damage to the wall, and has limited adjustability, preventing adjustments based on the construction progress. Summary of the Invention

[0005] In view of the shortcomings of the prior art, the technical problem to be solved by the present invention is to provide a construction method for a suspension and fixing device for curtain wall construction, which is applicable to curtain wall construction scaffolds and prevents displacement of the electric scaffold suspension platform from the influence of the ground and building shape when it is suspended in the air.

[0006] The technical solution adopted by this invention to solve its technical problem is: The construction method of the suspended and fixed device for curtain wall construction as described in this invention includes the following steps: A1. Based on the window positions on the building wall, locate the suspended platform of the suspended scaffold, and then place the suspended platform of the suspended scaffold in the location position using the suspension mechanism and steel wire rope; A2. Place the rear fixing component onto the suspended platform of the basket, and then fix it according to the height position of the window. Connect the middle adjustment component to the rear fixing component through the telescopic rod. A3. Insert the front-end connecting component into the middle-end adjusting component. Adjust the angles of the front-end connecting component and the middle-end adjusting component according to the position of the suspended platform of the basket. The front-end connecting component extends into the window and is connected to the side wall of the window through a set of mountain-shaped clips inside the front-end connecting component. A4. Tighten the front connecting component, then adjust the length of the telescopic rod and tighten the middle adjusting component and telescopic rod to complete the installation; A5. After installation, inspect the suspended platform to ensure it is securely installed and does not shift.

[0007] in: In step A1, the suspended platform of the suspended basket is flush with the window and is in a horizontal state.

[0008] When the rear-end fixing component is inserted in step A2, the U-shaped clip in the rear-end fixing component is first placed on the top of the suspended platform of the basket. Then, the U-shaped clip is passed through the steel sheet and fixed with a nut. A C-shaped adjustment plate is welded to the bottom of the steel sheet. Support bolts are installed on the left and right sides of the opening of the C-shaped adjustment plate. At the same time, the suspension nut is fitted onto the support bolt in the middle of the C-shaped adjustment plate, and the telescopic rod is welded to the suspension nut.

[0009] In step A2, the telescopic rod includes a metal sleeve with a threaded steel bar inside. Both the metal sleeve and the threaded steel bar have several holes spaced apart. Connecting bolts pass through the holes to fix the metal sleeve and the threaded steel bar. The threaded steel bar is welded to the suspension nut.

[0010] In step A3, the mid-end adjustment component includes a fixed plate with a strip groove in the middle. Slanted nuts are provided on both the left and right sides of the strip groove, and metal sleeves are threaded into the slanted nuts.

[0011] In step A3, the front-end connecting component includes a threaded screw, and a set of U-shaped clips are fitted onto the threaded screw. The U-shaped clips are rotatably set perpendicular to the threaded screw. Then, fixing nuts are fixed on the inner and outer sides of the U-shaped clips away from the middle adjustment component, and adjusting nuts are set on the outer side of the U-shaped clips near the middle adjustment component, and fixing nuts are set on the inner side. The threaded screw passes through the strip groove and is fixed by the connecting nut and the limiting nut.

[0012] In step A3, adjusting the angles of the front-end connecting component and the middle-end adjusting component includes adjusting the threaded rod in the front-end connecting component to be perpendicular to the window, and adjusting the fixing plate in the middle-end adjusting component to be perpendicular to the threaded rod and parallel to the building wall.

[0013] In step A3, the position of the mountain-shaped clip near the middle adjustment component is adjusted according to the thickness of the window sidewall. The mountain-shaped clip is fixed by the adjusting nuts and fixing nuts on both sides.

[0014] In step A4, the telescopic rod is adjusted according to the distance between the building and the suspended platform, so that the building and the suspended platform are parallel.

[0015] After the construction is completed, the suspension and fixing device for the curtain wall operation scaffold is disassembled. The specific steps are as follows: B1. Loosen the adjusting nut and fixing nut on the front connecting component, remove the mountain-shaped clip from the window, loosen the limiting nut and connecting nut on the middle adjusting component, and remove the threaded rod. B2. Flip down the middle adjustment component, telescopic rod and rear fixing component to the outside of the suspended platform, with the telescopic rod parallel to the suspended platform in the vertical direction; then the suspended platform is used in conjunction with the suspension mechanism and wire rope.

[0016] When using curtain wall keel construction, this invention can adjust the height of the suspended platform of the scaffold according to the position of the construction keel, fix the front end connecting component to the keel, and adjust the position of the mountain-shaped card according to the thickness of the keel for fixation.

[0017] The beneficial effects of this invention are: This invention employs a combination of threaded steel bars and steel rods with multiple components for connection, which improves the connection strength of the suspended platform and prevents it from shifting forward and backward while suspended in the air. At the same time, by directly transferring part of the load to the wall, it significantly enhances the suspension device's ability to resist forward tilting moments, reduces the risk of overturning due to insufficient counterweight or uneven load, and ensures safety and reliability. This invention can be used regardless of whether a curtain wall keel is used, greatly expanding its scope of application.

[0018] In the front-end connecting assembly, a set of U-shaped clips is secured to the window sidewall by adjusting nuts on the threaded rod. Then, fixing nuts stabilize the U-shaped clip structure inside, preventing slippage and allowing adjustment of the U-shaped clip spacing. This allows for adjustment and fixation based on different window positions and thicknesses or keels, ensuring usability for window sidewalls and keels of varying positions and thicknesses, greatly improving the adaptability of the invention and enhancing its stability. The threaded rod passes through a slot and can be adjusted left and right within the slot for fine-tuning. The distance of the threaded rod can also be adjusted using limit nuts. The middle adjustment assembly connects two telescopic rods, forming a triangular structure, which adjusts the stability of the middle adjustment assembly and the suspended platform. Support bolts are sequentially tightened through a C-shaped adjustment plate and a suspension nut, ensuring the suspension nut can rotate along the support bolts.

[0019] This invention allows for telescopic adjustment at three points: between the window and the front connecting component, between the front connecting component and the middle adjusting component, and at the telescopic rod. This adjusts the position of the suspended platform, making it suitable for complex working conditions involving various distances and angles between the suspended platform and the building, as well as wall and keel thicknesses. During use, the front connecting component can be fixed at different positions on the window sidewall, facilitating construction by adjusting the suspended platform's position. Furthermore, the distance between the building and the middle adjusting component, and the distance between the middle adjusting component and the rear fixing component, can be adjusted using the telescopic rod. This multi-stage adjustment method ensures that the distance between the suspended platform and the building can be adjusted during construction, both indoors and on the suspended platform itself. This ensures the correct position of the suspended platform for both close-range and long-range construction, solving the problem that existing suspended platforms can only be adjusted based on the suspension mechanism and wire rope position, and can only be vertically positioned. The suspension mechanism and wire rope cannot adjust the platform's position or the angle between the platform and the connecting component in a timely manner during construction.

[0020] Easy to use, the device is freely flipped during operation. It is flipped using a suspension nut, and when needed, it is flipped to the appropriate angle with the suspended platform. This prevents slippage, beam torsion, or fulcrum sinking of the suspension device under long cantilevered or heavy loads, ensuring the suspended platform remains in its designated working position. After use, it is flipped back to a vertically parallel position with the suspended platform, without occupying any space. Under different working conditions, after one project is completed, the device can be used normally for the next project, achieving cyclical reuse. Attached Figure Description

[0021] Figure 1 This is a schematic diagram of the structure of the present invention; Figure 2 This is a top view of the structure of the present invention; Figure 3 This is a schematic diagram of the front-end connection component structure of the present invention; Figure 4 This is a schematic diagram of the structure of the mid-range adjustment component of the present invention; Figure 5 This is a schematic diagram of the telescopic rod structure of the present invention; Figure 6 This is a schematic diagram of the back-end fixed component structure of the present invention. Figure 1 ; Figure 7 This is a schematic diagram of the back-end fixed component structure of the present invention. Figure 2 ; Figure 8 This is a schematic diagram of the structure of the present invention in its idle state; In the diagram: 1. Building; 2. Suspension mechanism; 3. Steel wire rope; 4. Front-end connecting assembly; 5. Mid-end adjusting assembly; 6. Telescopic rod; 7. Rear-end fixing assembly; 8. Suspended platform; 9. Window; 401. Threaded rod; 402. Fixing nut; 403. U-shaped clamp; 404. Adjusting nut; 501. Fixing plate; 502. Slanted hole nut; 503. Limiting nut; 504. Strip groove; 505. Connecting nut; 601. Threaded steel bar; 602. Hole; 603. Metal sleeve; 604. Connecting bolt; 701. U-shaped clamp; 702. Steel sheet; 703. Suspension nut; 704. C-shaped adjusting plate; 705. Support bolt. Detailed Implementation

[0022] The embodiments of the present invention will be further described below with reference to the accompanying drawings.

[0023] Example 1 like Figure 1-8 As shown, the construction method of the suspended and fixed device for curtain wall construction according to the present invention includes the following steps: A1. Based on the position of window 9 on the wall of building 1, position the suspended platform 8 of the suspended basket, and then place the suspended platform 8 in the position using the suspension mechanism 2 and the steel wire rope 3; the suspended platform 8 is flush with window 9 and is in a horizontal state. A2. Place the rear fixing component 7 onto the suspended platform 8 of the suspended basket. When placing the rear fixing component 7, first place the U-shaped clip 701 in the rear fixing component 7 on the top of the suspended platform 8 of the suspended basket. Then, pass the U-shaped clip 701 through the steel plate 702 and fix it with a nut. A C-shaped adjusting plate 704 is welded to the bottom of the steel plate 702. Support bolts 705 are installed on the left and right sides of the opening of the C-shaped adjusting plate 704. At the same time, the suspension nut 703 is sleeved on the support bolt 705 in the middle of the C-shaped adjusting plate 704. Then, fix it according to the height position of the window 9. Connect the middle adjusting component 5 to the rear fixing component 7 through the telescopic rod 6. The telescopic rod 6 includes a metal sleeve 603, inside which a threaded steel bar 601 is fitted. Several holes 602 are provided at intervals on both the metal sleeve 603 and the threaded steel bar 601. A connecting bolt 604 passes through the holes 602 to fix the metal sleeve 603 and the threaded steel bar 601. The threaded steel bar 601 is welded to the suspension nut 703. A3. The front-end connecting component 4 includes a fully threaded screw 401. A set of U-shaped clips 403 are fitted onto the fully threaded screw 401, and the U-shaped clips 403 are rotatably mounted perpendicular to the fully threaded screw 401. Then, fixing nuts 402 are fixed on the inner and outer sides of the U-shaped clips 403 away from the middle adjustment component 5. Adjusting nuts 404 are set on the outer side of the U-shaped clips 403 near the middle adjustment component 5, and fixing nuts 402 are set on the inner side. The middle adjustment component 5 includes a fixing plate 501. A strip groove 504 is opened in the middle of the fixing plate 501. The fully threaded screw 401 passes through the strip groove 504 and is connected by a connecting nut 505 and a limiting nut. 503 is fixed, and the left and right sides of the strip groove 504 are provided with inclined hole nuts 502. The inclined hole nuts 502 are internally threaded with metal sleeves 603. According to the position of the suspended platform 8 of the basket, the angles of the front end connecting component 4 and the middle end adjusting component 5 are adjusted, including adjusting the threaded rod 401 in the front end connecting component 4 to be perpendicular to the window 9, the fixing plate 501 in the middle end adjusting component 5 to be perpendicular to the threaded rod 401, the fixing plate 501 to be parallel to the wall of the building 1, the front end connecting component 4 extends into the window 9, and the front end connecting component 4 is connected to the side wall of the window 9 through a set of mountain-shaped clips 403 in the front end connecting component 4. Adjust the position of the mountain-shaped clip 403 near the middle adjustment component 5 according to the thickness of the side wall of window 9. The mountain-shaped clip 403 is fixed by the adjusting nuts 404 and the fixing nuts 402 on both sides.

[0024] A4. Adjust the telescopic rod 6 according to the distance between building 1 and suspended platform 8. Make building 1 parallel to wire rope 3, tighten the front end connecting component 4, then adjust the length of telescopic rod 6 and tighten the middle adjustment component 5 and telescopic rod 6 to complete the installation. A5. After installation, check the suspended platform 8 to ensure it is securely installed and does not shift.

[0025] After construction is completed, the suspension and fixing devices for the curtain wall work scaffolding will be dismantled. The specific steps are as follows: B1. Loosen the adjusting nut 404 and fixing nut 402 on the front connecting component 4, remove the mountain-shaped clip 403 from the window 9, loosen the limiting nut 503 on the middle adjusting component 5, and remove the threaded screw 401. B2. Flip down the middle adjustment component 5, the telescopic rod 6 and the rear fixing component 7 to the outside of the suspended platform 8, with the telescopic rod 6 parallel to the suspended platform 8 in the vertical direction; then the suspended platform 8 is used in conjunction with the suspension mechanism 2 and the wire rope 3.

Claims

1. A construction method for a suspended and fixed device for curtain wall construction, characterized in that, Includes the following steps: A1. Based on the position of the window (9) on the wall of the building (1), the suspended platform (8) is positioned, and then the suspended platform (8) is placed in the positioning position by means of the suspension mechanism (2) and the wire rope (3); A2. Place the rear fixing component (7) onto the suspended platform (8) of the basket, and then fix it according to the height position of the window (9). Connect the middle adjustment component (5) to the rear fixing component (7) through the telescopic rod (6). A3. Insert the front-end connecting component (4) into the middle-end adjusting component (5). Adjust the angle of the front-end connecting component (4) and the middle-end adjusting component (5) according to the position of the suspended platform (8). The front-end connecting component (4) extends into the window (9) and is connected to the side wall of the window (9) through a set of mountain-shaped clips (403) inside the front-end connecting component (4). A4. Tighten the front end connecting component (4), then adjust the length of the telescopic rod (6) and tighten the middle adjustment component (5) and the telescopic rod (6) to complete the installation; A5. After installation, check the suspended platform (8) to ensure that it is securely installed and does not shift. When the rear-end fixing component (7) is inserted in step A2, the U-shaped clip (701) in the rear-end fixing component (7) is first placed on the top of the suspended platform (8) of the hanging basket. Then, the U-shaped clip (701) is passed through the steel plate (702) and fixed with a nut. A C-shaped adjusting plate (704) is welded to the bottom of the steel plate (702). Support bolts (705) are installed on both sides of the opening of the C-shaped adjusting plate (704). At the same time, the suspension nut (703) is sleeved on the support bolt (705) in the middle of the C-shaped adjusting plate (704). The telescopic rod (6) is welded to the suspension nut (703). In step A2, the telescopic rod (6) includes a metal sleeve (603), inside which a threaded steel bar (601) is fitted. Several holes (602) are provided at intervals on both the metal sleeve (603) and the threaded steel bar (601). A connecting bolt (604) passes through the holes (602) to fix the metal sleeve (603) and the threaded steel bar (601). The threaded steel bar (601) is welded to the suspension nut (703). In step A3, the mid-end adjustment component (5) includes a fixing plate (501), a strip groove (504) is provided in the middle of the fixing plate (501), and oblique hole nuts (502) are provided on both the left and right sides of the strip groove (504). A metal sleeve (603) is threaded inside the oblique hole nut (502).

2. The construction method of the suspended and fixed device for curtain wall construction as described in claim 1, characterized in that, In step A1, the suspended platform (8) of the suspended basket is level with the window (9), and the suspended platform (8) of the suspended basket is in a horizontal state.

3. The construction method of the suspended and fixed device for curtain wall construction according to claim 1, characterized in that, In step A3, the front-end connecting component (4) includes a threaded screw (401), and a set of mountain-shaped clips (403) are fitted onto the threaded screw (401). The mountain-shaped clips (403) are rotated perpendicular to the threaded screw (401). Then, fixing nuts (402) are fixed on the inner and outer sides of the mountain-shaped clips (403) away from the middle adjustment component (5). Adjusting nuts (404) are set on the outer side of the mountain-shaped clips (403) close to the middle adjustment component (5), and fixing nuts (402) are set on the inner side. The threaded screw (401) passes through the strip groove (504) and is fixed by the connecting nut (505) and the limiting nut (503).

4. The construction method of the suspended and fixed device for curtain wall construction according to claim 3, characterized in that, In step A3, the angles of the front-end connecting component (4) and the middle-end adjusting component (5) are adjusted, including adjusting the threaded screw (401) in the front-end connecting component (4) to be perpendicular to the window (9), the fixing plate (501) in the middle-end adjusting component (5) to be perpendicular to the threaded screw (401), and the fixing plate (501) to be parallel to the wall of the building (1).

5. The construction method of the suspended and fixed device for curtain wall construction according to claim 3, characterized in that, In step A3, the position of the mountain-shaped clip (403) near the middle adjustment component (5) is adjusted according to the thickness of the side wall of the window (9). The mountain-shaped clip (403) is fixed by the adjusting nuts (404) and the fixing nuts (402) on both sides.

6. The construction method of the suspended and fixed device for curtain wall construction according to claim 1, characterized in that, In step A4, the telescopic rod (6) is adjusted according to the distance between the building (1) and the suspended platform (8), so that the building (1) and the suspended platform (8) are parallel.

7. The construction method of the suspended and fixed device for curtain wall construction according to claim 1, characterized in that, After construction is completed, the suspension and fixing devices for the curtain wall work scaffolding will be dismantled. The specific steps are as follows: B1. Loosen the adjusting nut (404) and fixing nut (402) on the front connecting component (4), remove the mountain-shaped clip (403) from the window (9), loosen the limiting nut (503) and connecting nut (505) on the middle adjusting component (5), and remove the threaded screw (401). B2. Flip the mid-end adjustment component (5), telescopic rod (6) and rear-end fixing component (7) to the outside of the suspended platform (8), with the telescopic rod (6) parallel to the suspended platform (8) in the vertical direction; then the suspended platform (8) is used along with the suspension mechanism (2) and the wire rope (3).

Citation Information

Patent Citations

  • A hanging flower basket for skin shotcrete construction

    CN205382699U

  • Bridge hanging basket

    CN212477457U

  • Fixing device for hanging basket in outer wall construction

    CN220539182U