A method, system and device for redundant upgrade of an auxiliary power ECS system, and a storage medium
By setting transformation constraints in the plant power ECS system, deploying dual servers and dual gateways, replacing them with a paired dual-machine structure, configuring redundant switching parameters and load balancing rules, and adding a security equipment screen, the problems of difficult-to-fix transformation boundaries and lack of consistent configuration in the existing technology were solved, and the simultaneous implementation of high availability redundancy reconstruction and security protection was achieved.
CN122437240APending Publication Date: 2026-07-21YUNNAN HUADIAN ZHENXIONG POWER CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- YUNNAN HUADIAN ZHENXIONG POWER CO LTD
- Filing Date
- 2026-04-23
- Publication Date
- 2026-07-21
Smart Images

Figure CN122437240A_ABST
Abstract
The application discloses a kind of plant electricity ECS system redundancy upgrading reconstruction method, system, equipment and storage medium, it is related to power monitoring system redundancy reconstruction technical field, including field confirming the station control layer, communication management layer and interval layer layered structure and interconnection of ECS, solidification original screen reconstruction, external wiring immobile and the implementation boundary of communication line unchanged;Under the boundary, complete station control layer main and backup replacement, deploy double server and double gateway and install system database and synchronous configuration, implement cabinet in reconnection after completing port protocol binding and information point definition, station control layer real-time and historical measuring point modeling and completing external point table mapping on double gateway side;Add secondary security equipment screen to complete security double network connection, host reinforcement and operation and maintenance audit initialization.The application realizes replacement, double network redundancy and safety collaborative configuration under the condition of not changing external wiring and cable, reduces reconstruction involvement and configuration fragmentation risk.