Technical Problem

针对“即装即采”场景,即设备刚上电、档案尚未在营销系统正式流转完成时的自动识别、临时建档和即时采集技术,尚缺乏完善的解决方案

Benefits of technology

[0066] 1. This invention breaks the limitation of traditional processes that require waiting for the marketing system to archive data before issuing data collection tasks. By automatically searching meters upon power-on of the intelligent metering switch, and having STAs actively connect to the network and report downstream equipment information, the data collection system can detect the presence of new equipment the instant it is put into operation (within minutes). The system immediately initiates meter reading and debugging through a self-built "temporary file," ensuring that newly installed equipment generates valid data on the day of installation. This completely eliminates the data vacuum period, ensuring that electricity data from market-oriented customers can be used promptly for electricity billing, while also ensuring the completeness and accuracy of distribution area line loss calculations, providing real-time data support for lean power grid management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122512628A_ABST
    Figure CN122512628A_ABST
Patent Text Reader

Abstract

The application relates to a smart measurement switch installation and acquisition method, and belongs to the technical field of electric power metering and data acquisition. The application comprises the following steps: after the smart measurement switch is powered on, a meter searching operation is automatically performed to generate a list of devices to be hung down, and the list is actively reported to a concentrator after the smart measurement switch is connected to a network through an STA; the concentrator identifies the newly-added device and reports an event; after asset information is checked by a cross-platform acquisition system, a temporary file is automatically built, parameters are immediately issued, and remote debugging is initiated; the result is fed back to a field terminal in real time; after a marketing process is completed, the temporary file is smoothly upgraded to an official file; and a topological identification technology is used to dynamically optimize the IOT relationship. Through the temporary-official dual-state file mechanism and the device active reporting technology, the application realizes automatic discovery, instant filing and remote debugging of newly-installed metering devices, completely eliminates data acquisition lag caused by an approval process, guarantees the timeliness of electricity settlement and the accuracy of line loss calculation, and significantly improves operation and maintenance efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a smart measurement switch that allows for immediate data acquisition upon installation, belonging to the field of power metering and data acquisition technology. Background Technology

[0002] With the deepening of power market reform and the advancement of new power system construction, higher requirements have been placed on the real-time performance, accuracy, and completeness of metering data. In existing business processes, the installation or replacement of metering devices (such as smart meters, concentrators, data collectors, and smart metering switches) typically follows this pattern: after on-site personnel complete the equipment installation, they manually create a file in the marketing business system, and then push the file information to the electricity consumption information collection system (hereinafter referred to as the "collection system"). Only after receiving the file can the collection system issue collection point parameters and collection tasks. However, because the change of metering devices involves multi-department and multi-system process approvals (such as asset registration, scheme approval, on-site construction confirmation, and file review), there is often a long time cycle (several days or even weeks) from the completion of on-site installation to the final archiving in the system.

[0003] This sequential approach of "install first, archive later, then collect" leads to a severe "data vacuum period." During this time, newly installed or replaced metering equipment cannot report data, directly causing the following technical problems:

[0004] Impact on market-based transaction settlement: For customers participating in electricity market transactions, missing or delayed electricity data can lead to inaccurate electricity bill settlement, triggering trade disputes and affecting market fairness.

[0005] Distortion in line loss calculation: Line loss calculation for distribution areas relies on synchronized data from power supply and sales. If data from some metering devices is missing, it can lead to significant fluctuations or anomalies in the calculated line loss rate for distribution areas, masking actual power grid operation problems and hindering loss reduction efforts.

[0006] Low operation and maintenance efficiency: On-site installation and commissioning rely on manual verification and data entry, which is not only labor-intensive but also prone to human error, leading to repeated on-site verification and increasing operation and maintenance costs.

[0007] While some automated data collection methods exist in existing technologies, most rely on the pre-establishment of complete archives. For "install-and-collect" scenarios—where equipment is powered on but archives have not yet been formally transferred within the marketing system—there is a lack of comprehensive solutions for automatic identification, temporary archiving, and real-time data collection. Particularly for smart metering switches integrating downstream energy meter management functions, how to leverage their communication capabilities to proactively report topology relationships and achieve rapid access and debugging without formal archives is a pressing technical challenge that needs to be addressed. Summary of the Invention

[0008] Based on the problems described in the background, the problem to be solved by the present invention is to provide an intelligent measurement switch that can be installed and used immediately to solve the problems mentioned above.

[0009] To achieve the above objectives, the present invention provides the following technical solution: a method for instant measurement using an intelligent measurement switch, comprising the following steps:

[0010] S1. After the intelligent measurement switch is installed and powered on at the site, it performs a meter search operation on the downstream devices through the RS485 communication interface, generating a list of downstream device information containing the communication address, STA address and communication protocol type of the energy meter.

[0011] S2, STA module obtains the address of the smart measurement switch and sends a network access application request to CCO;

[0012] After S3 and STA successfully join the network, they request the list of connected devices from the smart measurement switch and actively report the list of connected devices to the concentrator.

[0013] S4. After receiving the reported device information, the concentrator performs a local file comparison. If it is determined to be a newly added device, an unknown energy meter discovery event is generated and the event is reported to the data acquisition system.

[0014] S5. After receiving the event of discovering an unknown electricity meter reported by the concentrator, the data acquisition system will verify it with the electricity meter asset file in the marketing system and the smart metering switch asset file in the metering smart industrial control platform to obtain the corresponding asset information.

[0015] S6. The data acquisition system builds a temporary file based on the acquired asset information, stores the connection relationship between the concentrator, smart metering switch and energy meter, notifies the front-end machine and updates the cache, then generates and sends meter reading parameters, initiates the debugging process, sends time calibration instructions to the smart metering switch and energy meter, and after successful time calibration, the data acquisition system feeds back the debugging results to the mobile phone clip and marketing system of the on-site operators.

[0016] S7. The marketing system pushes complete user information and electricity meter information to the data collection system through the business expansion or meter replacement process. After receiving the complete information, the data collection system updates the self-built temporary file into a formal file and sends the formal file to the concentrator.

[0017] S8. The data acquisition system uses physical topology identification technology or HPLC identification technology to adjust and optimize the IoT relationship of the equipment.

[0018] Preferably, step S1 includes the following steps:

[0019] S1.1 After the intelligent measurement switch is powered on and initialized, it starts the built-in RS485 communication module and sends a table search command message according to the preset broadcast address or a specific address range.

[0020] S1.2 After receiving the meter search command message, the connected energy meter replies with a response message containing its own communication address, supported communication protocol version and STA module address;

[0021] S1.3 The intelligent measurement switch collects all response messages, parses and organizes them to form a list of information of the connected devices, and stores the list in local non-volatile memory for the STA module to call at any time.

[0022] Preferably, step S2 includes the following steps:

[0023] S2.1 The STA module reads the unique device identifier of the intelligent measurement switch as the switch address through the internal communication interface;

[0024] S2.2 The STA module constructs a network access application message, which carries the switch address, the MAC address of the STA module itself, and the network type identifier.

[0025] S2.3 The STA module sends the network access application message to the CCO module in the concentrator via power line carrier or low-power wireless method;

[0026] After receiving the network access application message, the S2.4 and CCO modules perform network access verification. If the verification is successful, a network key and communication time slot are allocated to complete the STA network access.

[0027] Preferably, step S4 includes the following steps:

[0028] S4.1 The concentrator parses the received list of downstream device information and extracts the communication address of the electricity meter.

[0029] S4.2 The concentrator queries the existing archive database stored locally to determine whether there is an archive record that matches the communication address of the energy meter;

[0030] S4.3 If no matching record exists, the electricity meter is determined to be a newly added device.

[0031] S4.4 If a matching file record exists but the associated smart measurement switch address is inconsistent, it is determined to be a device change;

[0032] S4.5 When it is determined that a new device or a device change has been made, the concentrator generates a "Discover Unknown Energy Meter" event containing the device address, reporting time, and event type, and uploads the event to the data acquisition system through the remote communication module.

[0033] Preferably, step S5 includes the following steps:

[0034] S5.1 The data acquisition system extracts the communication address of the electricity meter from the event, sends an asset query request to the marketing system, and obtains the asset number, model and user information of the electricity meter.

[0035] S5.2 The data acquisition system extracts the STA address or associated switch address from the event, sends an asset query request to the intelligent industrial control platform for metering, and obtains the asset number, installation location and commissioning time of the intelligent measurement switch.

[0036] S5.3 If the marketing system or the intelligent industrial control platform for metering returns that no information about this device can be found, the data collection system will generate an abnormal file alarm and suspend the subsequent automatic file creation process, waiting for manual intervention.

[0037] S5.4 If both parties return valid asset information, the data acquisition system will merge the multi-source information to form the basic data of the equipment to be archived.

[0038] Preferably, in step S6, creating a temporary file to store the connection relationship between the concentrator, the smart metering switch, and the energy meter specifically includes the following steps:

[0039] S6.1 The data acquisition system creates a temporary file record, which includes the concentrator logic address, the smart meter physical address, the energy meter logic address, and the hierarchical relationship between the three.

[0040] S6.2 The temporary files are marked as "pending formalization" and are only used for the execution of the current data collection task, and do not directly participate in marketing billing and settlement;

[0041] S6.3 The data acquisition system generates meter reading task parameters based on the temporary files. The parameters include the meter reading cycle, data item identifier, and communication rate.

[0042] S6.4 The data acquisition system sends the meter reading task parameters to the concentrator, which then collects data from the smart metering switch and the connected energy meter based on the parameters.

[0043] Preferably, in step S6, the debugging process is initiated by sending a time synchronization command to the smart metering switch and the energy meter, which specifically includes the following steps:

[0044] S6.5 The data acquisition system generates a standard time message, which is then forwarded to the intelligent measurement switch via the concentrator;

[0045] S6.6 The intelligent measurement switch receives the standard time message, calibrates its own clock, and broadcasts the standard time to the downstream energy meter through the RS485 interface.

[0046] S6.7 The electricity meter receives the time calibration command, updates the local clock, and returns a time calibration success response;

[0047] S6.8 The intelligent measurement switch collects the time synchronization response of the energy meter, summarizes it and reports it to the concentrator, and finally the concentrator feeds back to the acquisition system.

[0048] S6.9 If time synchronization fails, the acquisition system will retry the time synchronization command. If the number of retries exceeds the preset threshold, the device will be marked as malfunctioning.

[0049] Preferably, in step S6, the data acquisition system feeds back the debugging results to the mobile phone clip of the on-site operator, specifically including the following steps:

[0050] S6.10 The acquisition system encapsulates the debugging results into a data packet supported by the Bluetooth communication protocol. The data packet contains the device debugging status, time synchronization results, and signal strength information.

[0051] S6.11. On-site operators establish a Bluetooth connection with the data acquisition system's front-end unit or mobile operation terminal via a mobile phone clip.

[0052] S6.12 The mobile phone back clip receives the data packet and informs the operator whether the debugging is successful through sound and light prompts or screen display;

[0053] S6.13. If the debugging is successful, the operator can confirm the completion on the back clip of the mobile phone and trigger the subsequent file push process.

[0054] Preferably, step S7 includes the following steps:

[0055] S7.1 The data acquisition system receives complete user information and electricity meter information pushed by the marketing system and verifies the completeness and accuracy of the information;

[0056] S7.2 After verification, the data collection system will change the status of the temporary file to "official" and associate it with the marketing user ID;

[0057] S7.3 The data acquisition system will synchronize the updated official files to the metering intelligent industrial control platform to achieve file consistency among multiple systems;

[0058] S7.4 The acquisition system sends an update command to the concentrator. The concentrator overwrites the old temporary files locally, stores the new official files, and restarts the acquisition task to ensure that the latest parameters are used.

[0059] Preferably, step S8 includes the following steps:

[0060] S8.1 The acquisition system periodically initiates topology identification tasks, and the concentrator sends characteristic signals through the HPLC module;

[0061] S8.2 The intelligent measuring switch and energy meter receive characteristic signals, measure the characteristic values ​​of the signals, and report them to the concentrator;

[0062] S8.3 The concentrator calculates the electrical distance and phase relationship between the equipment and the transformer in the distribution area based on the signal characteristic values;

[0063] S8.4 The data acquisition system analyzes the area to which the equipment belongs based on the calculation results. If it finds that the actual operating area of ​​the equipment is inconsistent with the area recorded in the archive, it automatically generates an adjustment suggestion work order for the area.

[0064] S8.5 After confirmation, the data acquisition system automatically updates the transformer area affiliation information in the equipment file to ensure the accuracy of line loss calculation.

[0065] The beneficial effects of this invention are:

[0066] 1. This invention breaks the limitation of traditional processes that require waiting for the marketing system to archive data before issuing data collection tasks. By automatically searching meters upon power-on of the intelligent metering switch, and having STAs actively connect to the network and report downstream equipment information, the data collection system can detect the presence of new equipment the instant it is put into operation (within minutes). The system immediately initiates meter reading and debugging through a self-built "temporary file," ensuring that newly installed equipment generates valid data on the day of installation. This completely eliminates the data vacuum period, ensuring that electricity data from market-oriented customers can be used promptly for electricity billing, while also ensuring the completeness and accuracy of distribution area line loss calculations, providing real-time data support for lean power grid management.

[0067] 2. This invention automates the entire process from equipment discovery, file comparison, temporary file creation, parameter distribution, remote debugging, to result feedback. It eliminates the need for manual pre-entry of cumbersome equipment relationships into the system. The system automatically acquires the topology via RS485 table search and HPLC communication, automatically matching the marketing asset library and industrial control platform asset library to generate temporary files. Simultaneously, the system automatically initiates debugging commands such as time synchronization and parameter distribution, and provides real-time feedback to the mobile phone clips of on-site operators. Operators do not need to wait for manual backend operations; they can complete the work and leave the site after confirming successful debugging, significantly shortening the operation time per user and reducing manual intervention costs and error rates.

[0068] 3. Addressing the characteristic of incomplete marketing processes in "install-and-collect" scenarios, this invention innovatively designs a dual-state management mechanism of "temporary files" and "formal files." Before the marketing process is completed, the system uses temporary files to maintain data collection and monitoring, ensuring uninterrupted data flow. Once the marketing system completes the business expansion or form replacement process and pushes complete user information, the system automatically and smoothly upgrades the temporary files to formal files and synchronously updates the concentrator's local database. This mechanism satisfies the timeliness requirements of data collection while strictly adhering to the compliance processes of marketing operations, avoiding the management risks associated with ownerless data existing in the production system for extended periods.

[0069] 4. This invention combines physical topology identification technology and HPLC-based transformer area identification technology. Based on immediate data collection upon installation, the system continuously monitors the actual electrical topology of the equipment. If a discrepancy is detected between the actual transformer area to which the equipment belongs and the recorded data (e.g., incorrect cross-transformer area wiring), the system can automatically identify the discrepancy and generate adjustment suggestions. This not only solves the connection problem for newly installed equipment but also further improves the accuracy of transformer area line loss calculation by dynamically correcting the Internet of Things relationships, helping power grid companies accurately locate high-loss transformer areas and suspected electricity theft.

[0070] 5. This method uses a smart metering switch as the core node, which is not only applicable to the connection of the switch itself, but also effectively manages various electricity meters connected to it (including electricity meters of different protocol types). Through a unified communication protocol conversion and information reporting mechanism, it realizes unified management and plug-and-play functionality of heterogeneous devices in the data acquisition system, providing a replicable technical paradigm for the large-scale connection of new metering devices such as distributed photovoltaics and energy storage in the future. Attached Figure Description

[0071] Figure 1 This is a schematic diagram of the method flow of the present invention. Detailed Implementation

[0072] The embodiments of the present invention will be further described below with reference to the accompanying drawings:

[0073] Example 1

[0074] like Figure 1 As shown, the present invention provides a method for instant measurement of intelligent measurement switches, comprising the following steps:

[0075] S1. After the intelligent measurement switch is installed and powered on at the site, it performs a meter search operation on the downstream devices through the RS485 communication interface, generating a list of downstream device information containing the communication address, STA address and communication protocol type of the energy meter.

[0076] S2, STA module obtains the address of the smart measurement switch and sends a network access application request to CCO;

[0077] After S3 and STA successfully join the network, they request the list of connected devices from the smart measurement switch and actively report the list of connected devices to the concentrator.

[0078] S4. After receiving the reported device information, the concentrator performs a local file comparison. If it is determined to be a newly added device, an unknown energy meter discovery event is generated and the event is reported to the data acquisition system.

[0079] S5. After receiving the event of discovering an unknown electricity meter reported by the concentrator, the data acquisition system will verify it with the electricity meter asset file in the marketing system and the smart metering switch asset file in the metering smart industrial control platform to obtain the corresponding asset information.

[0080] S6. The data acquisition system builds a temporary file based on the acquired asset information, stores the connection relationship between the concentrator, smart metering switch and energy meter, notifies the front-end machine and updates the cache, then generates and sends meter reading parameters, initiates the debugging process, sends time calibration instructions to the smart metering switch and energy meter, and after successful time calibration, the data acquisition system feeds back the debugging results to the mobile phone clip and marketing system of the on-site operators.

[0081] S7. The marketing system pushes complete user information and electricity meter information to the data collection system through the business expansion or meter replacement process. After receiving the complete information, the data collection system updates the self-built temporary file into a formal file and sends the formal file to the concentrator.

[0082] S8. The data acquisition system uses physical topology identification technology or HPLC identification technology to adjust and optimize the IoT relationship of the equipment.

[0083] Among them, the proactive reporting mechanism in steps S1-S4 enables minute-level perception after the equipment is installed and powered on, completely solving the data lag problem caused by the long approval process, and ensuring that market-based settlement and line loss calculation are based on evidence from the first day of operation.

[0084] The system transforms the multiple steps that originally required manual cross-system operations (file creation, parameter distribution, and debugging) into actions that are executed automatically, significantly reducing the cost of manual intervention and the rate of human error.

[0085] The update mechanism of "temporary file" in step S6 and "official file" in step S7 resolves the contradiction between business compliance and data real-time performance, satisfying the need for immediate data collection while ensuring the legal validity of the final file.

[0086] Step S1 includes the following steps:

[0087] S1.1 After the intelligent measurement switch is powered on and initialized, it starts the built-in RS485 communication module and sends a table search command message according to the preset broadcast address or a specific address range.

[0088] S1.2 After receiving the meter search command message, the connected energy meter replies with a response message containing its own communication address, supported communication protocol version and STA module address;

[0089] S1.3 The intelligent measurement switch collects all response messages, parses and organizes them to form a list of information of the connected devices, and stores the list in local non-volatile memory for the STA module to call at any time.

[0090] By automatically identifying and uniformly encapsulating reports from electricity meters with different protocol types, the differences in underlying devices are masked, allowing the upper-layer data acquisition system to operate without needing to know the specific meter model, achieving "plug and play." Simultaneously, the complex tasks of meter searching and protocol parsing are offloaded to the edge (smart metering switches), avoiding communication congestion caused by large-scale blind scanning by the main station system and improving network efficiency. Furthermore, a clear "switch-meter" connection is established directly at the source, laying a solid data foundation for subsequent accurate calculation of distribution area line losses.

[0091] Step S2 includes the following steps:

[0092] S2.1 The STA module reads the unique device identifier of the intelligent measurement switch as the switch address through the internal communication interface;

[0093] S2.2 The STA module constructs a network access application message, which carries the switch address, the MAC address of the STA module itself, and the network type identifier.

[0094] S2.3 The STA module sends the network access application message to the CCO module in the concentrator via power line carrier or low-power wireless method;

[0095] After receiving the network access application message, the S2.4 and CCO modules perform network access verification. If the verification is successful, a network key and communication time slot are allocated to complete the STA network access.

[0096] Among them, it achieves "zero configuration" network access, eliminating the need for on-site personnel to manually configure communication parameters. The device can automatically obtain network keys and time slots upon power-up, greatly shortening on-site debugging time.

[0097] By binding the STA to the unique identifier of the smart metering switch, unauthorized devices are prevented from accessing the power grid, thus improving the security of the data acquisition network. This ensures that the data transmission channel is established before the data archive is formally created, providing physical support for the subsequent proactive reporting of large amounts of data.

[0098] Step S4 includes the following steps:

[0099] S4.1 The concentrator parses the received list of downstream device information and extracts the communication address of the electricity meter.

[0100] S4.2 The concentrator queries the existing archive database stored locally to determine whether there is an archive record that matches the communication address of the energy meter;

[0101] S4.3 If no matching record exists, the electricity meter is determined to be a newly added device.

[0102] S4.4 If a matching file record exists but the associated smart measurement switch address is inconsistent, it is determined to be a device change;

[0103] S4.5 When it is determined that a new device or a device change has been made, the concentrator generates a "Discover Unknown Energy Meter" event containing the device address, reporting time, and event type, and uploads the event to the data acquisition system through the remote communication module.

[0104] This system allows for precise triggering of business processes, ensuring that only devices confirmed as "added" or "changed" trigger reporting events, thus avoiding redundant uploading of normal meter reading data and saving communication bandwidth. Furthermore, it can instantly detect anomalies such as unauthorized meter replacements or wiring errors (e.g., matching addresses but inconsistent switches), enhancing anti-electricity theft and maintenance monitoring capabilities. Additionally, preliminary filtering is performed before the main station receives data, allowing the data acquisition system to focus on processing genuine business change events and improving system response speed.

[0105] Step S5 includes the following steps:

[0106] S5.1 The data acquisition system extracts the communication address of the electricity meter from the event, sends an asset query request to the marketing system, and obtains the asset number, model and user information of the electricity meter.

[0107] S5.2 The data acquisition system extracts the STA address or associated switch address from the event, sends an asset query request to the intelligent industrial control platform for metering, and obtains the asset number, installation location and commissioning time of the intelligent measurement switch.

[0108] S5.3 If the marketing system or the intelligent industrial control platform for metering returns that no information about this device can be found, the data collection system will generate an abnormal file alarm and suspend the subsequent automatic file creation process, waiting for manual intervention.

[0109] S5.4 If both parties return valid asset information, the data acquisition system will merge the multi-source information to form the basic data of the equipment to be archived.

[0110] In particular, cross-validation of marketing assets (user side) and industrial control assets (equipment side) ensures the consistency of "accounts, cards, and objects" and prevents asset information mismatch; if any system cannot find the device, the process is immediately suspended and an alarm is issued, which effectively prevents erroneous files from entering the production system and avoids tedious error correction work later; fragmented information scattered in different systems is integrated into a complete equipment profile, providing rich data support for subsequent refined management.

[0111] In step S6, a temporary file is created to store the connection relationship between the concentrator, the smart metering switch, and the energy meter. This specifically includes the following steps:

[0112] S6.1 The data acquisition system creates a temporary file record, which includes the concentrator logic address, the smart meter physical address, the energy meter logic address, and the hierarchical relationship between the three.

[0113] S6.2 The temporary files are marked as "pending formalization" and are only used for the execution of the current data collection task, and do not directly participate in marketing billing and settlement;

[0114] S6.3 The data acquisition system generates meter reading task parameters based on the temporary files. The parameters include the meter reading cycle, data item identifier, and communication rate.

[0115] S6.4 The data acquisition system sends the meter reading task parameters to the concentrator, which then collects data from the smart metering switch and the connected energy meter based on the parameters.

[0116] This step achieved a breakthrough in business continuity, legally and compliantly initiating meter reading tasks during the "window period" before the marketing process was completed, thus achieving seamless data collection. Furthermore, the "pending formalization" status was clearly marked to ensure that this data would not be incorrectly included in electricity billing, mitigating legal and financial risks. Targeted meter reading parameters were generated instantly from the temporary files, eliminating the need to wait for complete user data and enabling agile parameter distribution and dynamic parameter adaptation.

[0117] In step S6, the debugging process is initiated by sending a time synchronization command to the smart meter and the energy meter, which specifically includes the following steps:

[0118] S6.5 The data acquisition system generates a standard time message, which is then forwarded to the intelligent measurement switch via the concentrator;

[0119] S6.6 The intelligent measurement switch receives the standard time message, calibrates its own clock, and broadcasts the standard time to the downstream energy meter through the RS485 interface.

[0120] S6.7 The electricity meter receives the time calibration command, updates the local clock, and returns a time calibration success response;

[0121] S6.8 The intelligent measurement switch collects the time synchronization response of the energy meter, summarizes it and reports it to the concentrator, and finally the concentrator feeds back to the acquisition system.

[0122] S6.9 If time synchronization fails, the acquisition system will retry the time synchronization command. If the number of retries exceeds the preset threshold, the device will be marked as malfunctioning.

[0123] This step changes the inefficient past method of synchronizing the time of each individual transformer on-site. By broadcasting the time and relaying it hierarchically, clock synchronization of the entire transformer area can be completed within minutes, ensuring that the time base of all newly installed equipment is consistent. This is crucial for line loss calculations (especially time-of-use power statistics) that require strict time synchronization. Moreover, the automatic retry and anomaly marking functions guarantee a high success rate for commissioning and reduce on-site rework.

[0124] In step S6, the data acquisition system feeds back the debugging results to the mobile phone clip on the field operator's phone, specifically including the following steps:

[0125] S6.10 The acquisition system encapsulates the debugging results into a data packet supported by the Bluetooth communication protocol. The data packet contains the device debugging status, time synchronization results, and signal strength information.

[0126] S6.11. On-site operators establish a Bluetooth connection with the data acquisition system's front-end unit or mobile operation terminal via a mobile phone clip.

[0127] S6.12 The mobile phone back clip receives the data packet and informs the operator whether the debugging is successful through sound and light prompts or screen display;

[0128] S6.13. If the debugging is successful, the operator can confirm the completion on the back clip of the mobile phone and trigger the subsequent file push process.

[0129] Among these features, operators can know the progress and results of the background debugging in real time without the need for telephone communication and confirmation, realizing "maintenance at your fingertips"; and after successful debugging, they can directly confirm the completion on their mobile phones and trigger subsequent processes, which significantly shortens the transit time of a single user's business. Through detailed information such as signal strength, it helps on-site personnel quickly locate the cause of poor communication (such as poor location or strong interference) and guide on-site rectification.

[0130] Step S7 includes the following steps:

[0131] S7.1 The data acquisition system receives complete user information and electricity meter information pushed by the marketing system and verifies the completeness and accuracy of the information;

[0132] S7.2 After verification, the data collection system will change the status of the temporary file to "official" and associate it with the marketing user ID;

[0133] S7.3 The data acquisition system will synchronize the updated official files to the metering intelligent industrial control platform to achieve file consistency among multiple systems;

[0134] S7.4 The acquisition system sends an update command to the concentrator. The concentrator overwrites the old temporary files locally, stores the new official files, and restarts the acquisition task to ensure that the latest parameters are used.

[0135] This step ensures that the final settlement files fully comply with marketing business specifications, completing a perfect transition from "technology first" to "business compliance" and achieving a closed loop of business compliance. At the same time, the upgrade process retains historical data collected during the temporary file period, ensuring the integrity of user electricity data, avoiding data gaps, and simultaneously updating the collection system, industrial control platform, and concentrator local database at one time, eliminating data silos and time differences between multiple systems.

[0136] Step S8 includes the following steps:

[0137] S8.1 The acquisition system periodically initiates topology identification tasks, and the concentrator sends characteristic signals through the HPLC module;

[0138] S8.2 The intelligent measuring switch and energy meter receive characteristic signals, measure the characteristic values ​​of the signals, and report them to the concentrator;

[0139] S8.3 The concentrator calculates the electrical distance and phase relationship between the equipment and the transformer in the distribution area based on the signal characteristic values;

[0140] S8.4 The data acquisition system analyzes the area to which the equipment belongs based on the calculation results. If it finds that the actual operating area of ​​the equipment is inconsistent with the area recorded in the archive, it automatically generates an adjustment suggestion work order for the area.

[0141] S8.5 After confirmation, the data acquisition system automatically updates the transformer area affiliation information in the equipment file to ensure the accuracy of line loss calculation.

[0142] Among these features, the line loss calculation in this step is highly accurate, automatically correcting errors in transformer substation affiliation caused by complex on-site wiring or incorrect data entry. This fundamentally improves the accuracy of transformer substation line loss calculation and can adapt to dynamic changes in power grid operation modes (such as load cut-off and line upgrades). It automatically updates IoT relationships, maintains the timeliness of data, and automatically generates adjustment suggestion work orders, transforming "passive complaint handling" into "proactive governance" and significantly improving the lean management level of the power grid company.

Claims

1. An intelligent metering switch plug and play method, characterized in that, Includes the following steps: S1. After the intelligent measurement switch is installed and powered on at the site, it performs a meter search operation on the downstream devices through the RS485 communication interface, generating a list of downstream device information containing the communication address, STA address and communication protocol type of the energy meter. S2, STA module obtains the address of the smart measurement switch and sends a network access application request to CCO; After S3 and STA successfully join the network, they request the list of connected devices from the smart measurement switch and actively report the list of connected devices to the concentrator. S4. After receiving the reported device information, the concentrator performs a local file comparison. If it is determined to be a newly added device, an unknown energy meter discovery event is generated and the event is reported to the data acquisition system. S5. After receiving the event of discovering an unknown electricity meter reported by the concentrator, the data acquisition system will verify it with the electricity meter asset file in the marketing system and the smart metering switch asset file in the metering smart industrial control platform to obtain the corresponding asset information. S6. The data acquisition system builds a temporary file based on the acquired asset information, stores the connection relationship between the concentrator, smart metering switch and energy meter, notifies the front-end machine and updates the cache, then generates and sends meter reading parameters, initiates the debugging process, sends time calibration instructions to the smart metering switch and energy meter, and after successful time calibration, the data acquisition system feeds back the debugging results to the mobile phone clip and marketing system of the on-site operators. S7. The marketing system pushes complete user information and electricity meter information to the data collection system through the business expansion or meter replacement process. After receiving the complete information, the data collection system updates the self-built temporary file into a formal file and sends the formal file to the concentrator. S8. The data acquisition system uses physical topology identification technology or HPLC identification technology to adjust and optimize the IoT relationship of the equipment.

2. The intelligent measurement switch instant measurement method according to claim 1, characterized in that, Step S1 includes the following steps: S1.1 After the intelligent measurement switch is powered on and initialized, it starts the built-in RS485 communication module and sends a table search command message according to the preset broadcast address or a specific address range. S1.2 After receiving the meter search command message, the connected energy meter replies with a response message containing its own communication address, supported communication protocol version and STA module address; S1.3 The intelligent measurement switch collects all response messages, parses and organizes them to form a list of information of the connected devices, and stores the list in local non-volatile memory for the STA module to call at any time.

3. The intelligent measurement switch instantaneous measurement method according to claim 1, characterized in that, Step S2 includes the following steps: S2.1 The STA module reads the unique device identifier of the intelligent measurement switch as the switch address through the internal communication interface; S2.2 The STA module constructs a network access application message, which carries the switch address, the MAC address of the STA module itself, and the network type identifier. S2.3 The STA module sends the network access application message to the CCO module in the concentrator via power line carrier or low-power wireless method; After receiving the network access application message, the S2.4 and CCO modules perform network access verification. If the verification is successful, a network key and communication time slot are allocated to complete the STA network access.

4. The intelligent measurement switch instant measurement method according to claim 1, characterized in that, Step S4 includes the following steps: S4.1 The concentrator parses the received list of downstream device information and extracts the communication address of the electricity meter. S4.2 The concentrator queries the existing archive database stored locally to determine whether there is an archive record that matches the communication address of the energy meter; S4.3 If no matching record exists, the electricity meter is determined to be a newly added device. S4.4 If a matching file record exists but the associated smart measurement switch address is inconsistent, it is determined to be a device change; S4.5 When it is determined that a new device or a device change has been made, the concentrator generates a "Discover Unknown Energy Meter" event containing the device address, reporting time, and event type, and uploads the event to the data acquisition system through the remote communication module.

5. The intelligent measurement switch instantaneous measurement method according to claim 1, characterized in that, Step S5 includes the following steps: S5.1 The data acquisition system extracts the communication address of the electricity meter from the event, sends an asset query request to the marketing system, and obtains the asset number, model and user information of the electricity meter. S5.2 The data acquisition system extracts the STA address or associated switch address from the event, sends an asset query request to the intelligent industrial control platform for metering, and obtains the asset number, installation location and commissioning time of the intelligent measurement switch. S5.3 If the marketing system or the intelligent industrial control platform for metering returns that no information about this device can be found, the data collection system will generate an abnormal file alarm and suspend the subsequent automatic file creation process, waiting for manual intervention. S5.4 If both parties return valid asset information, the data acquisition system will merge the multi-source information to form the basic data of the equipment to be archived.

6. The intelligent measurement switch instantaneous measurement method according to claim 1, characterized in that, In step S6, a temporary file is created to store the connection relationship between the concentrator, the smart metering switch, and the energy meter. This specifically includes the following steps: S6.1 The data acquisition system creates a temporary file record, which includes the concentrator logic address, the smart meter physical address, the energy meter logic address, and the hierarchical relationship between the three. S6.2 The temporary files are marked as "pending formalization" and are only used for the execution of the current data collection task, and do not directly participate in marketing billing and settlement; S6.3 The data acquisition system generates meter reading task parameters based on the temporary files. The parameters include the meter reading cycle, data item identifier, and communication rate. S6.4 The data acquisition system sends the meter reading task parameters to the concentrator, which then collects data from the smart metering switch and the connected energy meter based on the parameters.

7. The intelligent measurement switch instantaneous measurement method according to claim 1, characterized in that, In step S6, the debugging process is initiated by sending a time synchronization command to the smart meter and the energy meter, which specifically includes the following steps: S6.5 The data acquisition system generates a standard time message, which is then forwarded to the intelligent measurement switch via the concentrator; S6.6 The intelligent measurement switch receives the standard time message, calibrates its own clock, and broadcasts the standard time to the downstream energy meter through the RS485 interface. S6.7 The electricity meter receives the time calibration command, updates the local clock, and returns a time calibration success response; S6.8 The intelligent measurement switch collects the time synchronization response of the energy meter, summarizes it and reports it to the concentrator, and finally the concentrator feeds back to the acquisition system. S6.9 If time synchronization fails, the acquisition system will retry the time synchronization command. If the number of retries exceeds the preset threshold, the device will be marked as malfunctioning.

8. The intelligent measurement switch instant measurement method according to claim 1, characterized in that, In step S6, the data acquisition system feeds back the debugging results to the mobile phone clip on the field operator's phone, specifically including the following steps: S6.10 The acquisition system encapsulates the debugging results into a data packet supported by the Bluetooth communication protocol. The data packet contains the device debugging status, time synchronization results, and signal strength information. S6.

11. On-site operators establish a Bluetooth connection with the data acquisition system's front-end unit or mobile operation terminal via a mobile phone clip. S6.12 The mobile phone back clip receives the data packet and informs the operator whether the debugging is successful through sound and light prompts or screen display; S6.

13. If the debugging is successful, the operator can confirm the completion on the back clip of the mobile phone and trigger the subsequent file push process.

9. The intelligent measurement switch instantaneous measurement method according to claim 1, characterized in that, Step S7 includes the following steps: S7.1 The data acquisition system receives complete user information and electricity meter information pushed by the marketing system and verifies the completeness and accuracy of the information; S7.2 After verification, the data collection system will change the status of the temporary file to "official" and associate it with the marketing user ID; S7.3 The data acquisition system will synchronize the updated official files to the metering intelligent industrial control platform to achieve file consistency among multiple systems; S7.4 The acquisition system sends an update command to the concentrator. The concentrator overwrites the old temporary files locally, stores the new official files, and restarts the acquisition task to ensure that the latest parameters are used.

10. The intelligent measurement switch instantaneous measurement method according to claim 1, characterized in that, Step S8 includes the following steps: S8.1 The acquisition system periodically initiates topology identification tasks, and the concentrator sends characteristic signals through the HPLC module; S8.2 The intelligent measuring switch and energy meter receive characteristic signals, measure the characteristic values ​​of the signals, and report them to the concentrator; S8.3 The concentrator calculates the electrical distance and phase relationship between the equipment and the transformer in the distribution area based on the signal characteristic values; S8.4 The data acquisition system analyzes the area to which the equipment belongs based on the calculation results. If it finds that the actual operating area of ​​the equipment is inconsistent with the area recorded in the archive, it automatically generates an adjustment suggestion work order for the area. S8.5 After confirmation, the data acquisition system automatically updates the transformer area affiliation information in the equipment file to ensure the accuracy of line loss calculation.