Control method and device of three-phase CHB circuit, CHB circuit and power supply equipment

CN122553758APending Publication Date: 2026-08-11KEHUA DATA CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-05-28
Publication Date
2026-08-11

AI Technical Summary

Technical Problem

[0004]本申请实施例提供了一种三相CHB电路的控制方法、装置、CHB电路及电源设备,以解决CHB电路的漏电流较大,导致电磁干扰较强的问题

Benefits of technology

[0017]第七方面,本申请实施例提供了一种计算机程序产品,包括计算机程序,该计算机程序被处理器执行时实现如上第一方面或第一方面的任一种可能的实现方式中的三相CHB电路的控制方法。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122553758A_ABST
    Figure CN122553758A_ABST
Patent Text Reader

Abstract

This application provides a control method, apparatus, CHB circuit, and power supply device for a three-phase CHB circuit, relating to the field of power supply technology. Each phase of the CHB circuit includes a series branch formed by 2N H-bridge units, which are paired in pairs to form N H-bridge pairs. The method includes: obtaining the target voltage vector corresponding to the three-phase H-bridge pair group; determining the target basic vector required to synthesize the target voltage vector, wherein the common-mode voltage of the target basic vector is zero; determining the total control signal corresponding to each individual H-bridge pair of each phase based on the target basic vector; determining the control signal corresponding to each H-bridge unit of each phase according to the total control signal; and controlling each H-bridge unit of each phase according to the control signal corresponding to each H-bridge unit of each phase. This application can achieve zero common-mode control of the CHB circuit, thereby alleviating or eliminating leakage current caused by common-mode voltage in the CHB circuit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of power supply technology, and in particular to a control method, device, CHB circuit, and power supply equipment for a three-phase CHB circuit. Background Technology

[0002] In the field of power electronic conversion, the CHB (Cascaded H-Bridge) circuit, comprising multiple H-bridge units connected in series, is a highly modular and scalable multilevel power electronic topology. The modular structure of the CHB circuit facilitates expansion of the number of levels, and the consistent structure of each H-bridge unit facilitates mass production, redundant configuration, and fault replacement. CHB circuits are widely used in medium- and high-voltage high-power frequency converters, power quality management devices, and new energy grid-connected systems.

[0003] In related technologies, control methods for CHB circuits often suffer from problems such as large leakage current, leading to strong electromagnetic interference. Therefore, solving the problem of large leakage current in CHB circuits is an urgent issue to be addressed. Summary of the Invention

[0004] This application provides a control method, apparatus, CHB circuit, and power supply device for a three-phase CHB circuit to solve the problem of large leakage current in the CHB circuit, which leads to strong electromagnetic interference.

[0005] In a first aspect, embodiments of this application provide a control method for a three-phase CHB circuit. For each phase of the three-phase CHB circuit, the phase circuit includes a series branch formed by 2N H-bridge units. The 2N H-bridge units are paired in pairs to form N H-bridge pairs; N is a positive integer. The method includes: Obtain the target voltage vector corresponding to the three-phase H-bridge pair group; wherein, one H-bridge pair is selected from each of the three phases to form a three-phase H-bridge pair group; Determine the target fundamental vector required to synthesize the target voltage vector, where the common-mode voltage of the target fundamental vector is zero; Based on the target fundamental vector, determine the total control signal corresponding to each individual H-bridge pair in each phase; Based on the total control signal corresponding to each individual H-bridge pair in each phase, the control signal corresponding to each H-bridge unit in each phase is determined; wherein, the control signals of the two H-bridge units in the same H-bridge pair are combined to form the total control signal of the H-bridge pair, and the control signals of the two H-bridge units in the same H-bridge pair are different. The control signals corresponding to each H-bridge unit of each phase are used to control each H-bridge unit of each phase.

[0006] In one possible implementation, the number of level switching of the total control signal of a single H-bridge pair of the first phase in one cycle is the first number, and the number of level switching of the total control signal of a single H-bridge pair of the second and third phases in one cycle is the second number, and the first number is twice the second number; The first, second, and third phases are different phases, and are randomly assigned to phases A, B, and C. The sum of the number of level switching times of the control signals of the two H-bridge units of the same H-bridge pair within one cycle is equal to the total number of level switching times of the control signals of the H-bridge pair within one cycle.

[0007] In one possible implementation, the control signals corresponding to each H-bridge unit in each phase are determined based on the total control signals corresponding to each individual H-bridge pair in each phase, including: Acquire the modulation wave, first carrier, and second carrier of each phase; wherein, for each phase, the first carrier and second carrier of that phase have the same frequency and are out of phase; the frequency of the first carrier of the first phase is twice the frequency of the first carrier of the second and third phases; the phase difference between the first carrier of the second phase and the first carrier of the third phase is 90 degrees; the first, second, and third phases are different phases and are randomly assigned to be phase A, phase B, and phase C. The modulated wave of each phase is compared with the first carrier wave to generate the first control signal for each phase; The modulated wave of each phase is compared with the second carrier wave to generate the second control signal for each phase; Among them, the first control signal and the second control signal of each phase are the control signals corresponding to the two H-bridge units of the same H-bridge pair of each phase, respectively.

[0008] In one possible implementation, if the total control signal of a single H-bridge pair in the first phase is switching between level P and level O, and the current flow direction of the first phase is current flowing into the CHB circuit, then the duty cycle of the control signal level P of the H-bridge unit with smaller DC voltage in a single H-bridge pair of the first phase is greater than the duty cycle of the control signal level P of the H-bridge unit with larger DC voltage. If the total control signal of a single H-bridge pair in the first phase is switching between level P and level O, and the current flow direction of the first phase is the current flowing out of the CHB circuit, then the duty cycle of the control signal level P of the H-bridge unit with a larger DC voltage in the single H-bridge pair of the first phase is greater than the duty cycle of the control signal level P of the H-bridge unit with a smaller DC voltage. If the total control signal of a single H-bridge pair in the first phase switches between level N and level O, and the current flow direction of the first phase is current flowing into the CHB circuit, then the duty cycle of level N of the control signal of the H-bridge unit with larger DC voltage in a single H-bridge pair in the first phase is greater than the duty cycle of level N of the control signal of the H-bridge unit with smaller DC voltage. If the total control signal of a single H-bridge pair in the first phase switches between levels N and O, and the current flow direction of the first phase is outflow from the CHB circuit, then the duty cycle of level N of the control signal of the H-bridge unit with smaller DC voltage in a single H-bridge pair of the first phase is greater than the duty cycle of level N of the control signal of the H-bridge unit with larger DC voltage.

[0009] In one possible implementation, the duty cycles of the same level of the control signals of the two H-bridge units in a single H-bridge pair of the first phase are different; The duty cycle of the same level of the control signal of the two H-bridge units in a single H-bridge pair of the second phase is the same; The duty cycle of the same level of the control signals of the two H-bridge units in a single H-bridge pair of the third phase is the same.

[0010] In one possible implementation, the first phase is the phase with the minimum current, the phase with the maximum current, or the phase with unbalanced DC voltage between two H-bridge units in a single H-bridge pair.

[0011] In one possible implementation, determining the target fundamental vector required to synthesize the target voltage vector includes: Obtain the first target region where the target voltage vector is located; The target fundamental vectors required to determine the synthesized target voltage vector are the three fundamental voltage vectors corresponding to the first target region where the common-mode voltage is zero. Among them, the points where the six non-zero basic voltage vectors with zero common-mode voltage are located are used as vertices to form a first spatial vector hexagon; based on the zero basic voltage vector with zero common-mode voltage, the first spatial vector hexagon is divided into six first triangles; the first target region is the region where one of the first triangles is located.

[0012] Secondly, embodiments of this application provide a control device for a three-phase CHB circuit. For each phase of the three-phase CHB circuit, the phase circuit includes a series branch formed by 2N H-bridge units. The 2N H-bridge units are paired in pairs to form N H-bridge pairs; N is a positive integer. The device includes: The acquisition module is used to acquire the target voltage vector corresponding to the three-phase H-bridge pair group; wherein, one H-bridge pair is selected from each of the three phases to form a three-phase H-bridge pair group. The target fundamental vector determination module is used to determine the target fundamental vector required to synthesize the target voltage vector. The common-mode voltage of the target fundamental vector is zero. The total control signal determination module is used to determine the total control signal corresponding to each individual H-bridge pair in each phase based on the target basic vector. The partitioning module is used to determine the control signals corresponding to each H-bridge unit of each phase based on the total control signals corresponding to each individual H-bridge pair of each phase; wherein, the control signals of the two H-bridge units of the same H-bridge pair are combined to form the total control signal of the H-bridge pair, and the control signals of the two H-bridge units of the same H-bridge pair are different. The control module is used to control each H-bridge unit of each phase according to the control signals corresponding to each H-bridge unit of each phase.

[0013] Thirdly, embodiments of this application provide a control device, including a memory and a processor. The memory stores a computer program, and the processor executes the computer program to implement the control method for the three-phase CHB circuit as described in the first aspect or any possible implementation of the first aspect.

[0014] Fourthly, embodiments of this application provide a CHB circuit, including circuits corresponding to each of the three phases and a control device as described in the third aspect; For each phase of the CHB circuit, the phase circuit includes a series branch formed by 2N H-bridge units. These 2N H-bridge units are paired up to form N H-bridge pairs; N is a positive integer. The circuits corresponding to each of the three phases are all controlled by the control equipment.

[0015] Fifthly, embodiments of this application provide a power supply device including the CHB circuit as described in the fourth aspect.

[0016] In a sixth aspect, embodiments of this application provide a computer-readable storage medium storing a computer program that, when executed by a processor, implements the control method for a three-phase CHB circuit as described in the first aspect or any possible implementation thereof.

[0017] In a seventh aspect, embodiments of this application provide a computer program product, including a computer program that, when executed by a processor, implements the control method for a three-phase CHB circuit as described in the first aspect or any possible implementation of the first aspect.

[0018] In this embodiment of the application, the H-bridge units in each phase of the CHB circuit are paired up to form an H-bridge pair. By controlling the two H-bridge units in each H-bridge pair, the total control signal of a single H-bridge pair of the three phases is constructed based on the target fundamental vector with zero common-mode voltage. This enables zero common-mode control of a single H-bridge pair of the three phases, and each H-bridge pair of the three phases can achieve zero common-mode control, thereby enabling zero common-mode control of the three-phase CHB circuit. This can alleviate or eliminate leakage current caused by common-mode voltage in the three-phase CHB circuit, reduce electromagnetic interference, and reduce the possibility of electromagnetic interference affecting the normal operation of the three-phase CHB circuit. Attached Figure Description

[0019] To more clearly illustrate the technical solutions in the embodiments of this application, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0020] Figure 1 This is a schematic diagram of the CHB circuit provided in the embodiments of this application; Figure 2 This is a flowchart illustrating the implementation of the control method for the three-phase CHB circuit provided in the embodiments of this application; Figure 3 This is a spatial vector diagram of the three-phase H-bridge pair provided in the embodiments of this application; Figure 4 This is a schematic diagram of the total control signals corresponding to each individual H-bridge pair of each phase provided in the embodiments of this application; Figure 5 This is a schematic diagram of the total control signal of a single H-bridge pair of each phase, the control signal of each H-bridge unit, the first carrier and the second carrier provided in the embodiments of this application; Figure 6 This is a schematic diagram of the first spatial vector hexagon and the first triangle provided in the embodiments of this application; Figure 7 This is a schematic diagram of the structure of the control device for the three-phase CHB circuit provided in the embodiments of this application; Figure 8 This is a schematic diagram of the control device provided in the embodiments of this application. Detailed Implementation

[0021] In the following description, specific details such as particular system architectures and techniques are set forth for illustrative purposes and not for limitation, in order to provide a thorough understanding of the embodiments of this application. However, those skilled in the art will understand that this application can also be implemented in other embodiments without these specific details. In other instances, detailed descriptions of well-known systems, apparatuses, circuits, and methods have been omitted so as not to obscure the description of this application with unnecessary detail.

[0022] To make the objectives, technical solutions, and advantages of this application clearer, the following description will be provided in conjunction with the accompanying drawings and specific embodiments.

[0023] See Figure 1 This illustrates a schematic diagram of the CHB circuit provided in an embodiment of this application. Figure 1As shown, the CHB circuit can also be called a three-phase CHB circuit, which includes circuits corresponding to each of the three phases. For each phase of the three-phase CHB circuit, this phase circuit includes a series branch formed by 2N H-bridge units, where N is a positive integer. Each H-bridge unit includes four switching transistors, and the connection relationship of each switching transistor is as follows... Figure 1 As shown, further details will not be repeated. This application does not impose specific restrictions on the type of switching transistor; any feasible type is acceptable.

[0024] CHB circuits are used to convert between AC and DC power. They can perform unidirectional conversion, such as converting only DC to AC or only AC to DC; or they can perform bidirectional conversion, such as converting DC to AC or AC to DC.

[0025] like Figure 1 As shown, A0, B0, and C0 represent the AC terminals of phase A, phase B, and phase C of the CHB circuit, respectively, with O as the midpoint. DCA1+ and DCA1- are the positive and negative DC terminals of the first H-bridge unit of phase A, respectively; DCA2+ and DCA2- are the positive and negative DC terminals of the second H-bridge unit of phase A, respectively; ..., DCA2N+ and DCA2N- are the positive and negative DC terminals of the 2Nth H-bridge unit of phase A, respectively. Similarly, DCB1+ and DCB1- are the positive and negative DC terminals of the first H-bridge unit of phase B, respectively; DCB2+ and DCB2- are the positive and negative DC terminals of the second H-bridge unit of phase B, respectively; ..., DCB2N+ and DCB2N- are the positive and negative DC terminals of the 2Nth H-bridge unit of phase B, respectively. DCC1+ and DCC1- are the positive and negative DC terminals of the first H-bridge unit of phase C, respectively; DCC2+ and DCC2- are the positive and negative DC terminals of the second H-bridge unit of phase C, respectively; ..., DCC2N+ and DCC2N- are the positive and negative DC terminals of the 2Nth H-bridge unit of phase C, respectively.

[0026] See Figure 1 For each phase of a three-phase CHB circuit, the AC terminals of the 2N H-bridge units in that phase are connected in series. The first terminal of the series connection of the AC terminals of the 2N H-bridge units is the AC terminal of that phase, and the second terminal of the series connection of the AC terminals of the 2N H-bridge units is connected to the midpoint O.

[0027] When the three-phase CHB circuit is in rectification mode, that is, when AC power is converted to DC power, the AC terminals of each phase can be used to connect to an AC power source, and the positive and negative DC terminals of each H-bridge unit can be used to connect to a DC load or a DC power source; when the three-phase CHB circuit is in inverter mode, that is, when DC power is converted to AC power, the AC terminals of each phase can be used to connect to an AC load, and the positive and negative DC terminals of each H-bridge unit can be used to connect to a DC power source.

[0028] In the control method for the three-phase CHB circuit provided later, to achieve zero common-mode control, for each phase of the three-phase CHB circuit, the 2N H-bridge units included in that phase are paired up to form N H-bridge pairs. For example, the 2N H-bridge units of each phase can be paired up in series or randomly; no specific restrictions are placed here. For instance, the first and second H-bridge units can form one H-bridge pair, the third and fourth H-bridge units another, and so on, up to the (2N-1)th and 2Nth H-bridge units; or, the first and third H-bridge units another, the second and fourth H-bridge units another, and so on, up to the (2N-2)th and 2Nth H-bridge units; and so on. However, it should be noted that each H-bridge unit cannot be paired repeatedly; that is, each H-bridge pair must contain two different H-bridge units.

[0029] See Figure 2 The diagram illustrates the implementation flowchart of the control method for the three-phase CHB circuit provided in this application embodiment. As mentioned earlier, each phase of the three-phase CHB circuit includes a series branch formed by 2N H-bridge units. These 2N H-bridge units are paired in pairs to form N H-bridge pairs; N is a positive integer. For a structural description of the three-phase CHB circuit, please refer to the foregoing. Figure 1 The corresponding implementation examples will not be described in detail.

[0030] See Figure 2 The control method for the three-phase CHB circuit is detailed below: In S201, the target voltage vector corresponding to the three-phase H-bridge pair group is obtained; wherein, one H-bridge pair is selected from each of the three phases to form a three-phase H-bridge pair group.

[0031] One H-bridge pair is selected from each of the three phases (A, B, and C) to form a three-phase H-bridge pair group. The entire three-phase CHB circuit can be divided into N three-phase H-bridge pair groups. Each three-phase H-bridge pair group is equivalent to a small three-phase CHB circuit with its own target voltage vector. Different three-phase H-bridge pair groups can have the same target voltage vector.

[0032] The target voltage vector corresponding to the three-phase H-bridge pair can be understood as the expected voltage vector of the three-phase H-bridge pair, which can be determined based on the voltage vector corresponding to the expected three-phase voltage of the three-phase CHB circuit and the value of N. For example, the target voltage vector corresponding to the three-phase H-bridge pair can be the ratio of the voltage vector corresponding to the expected three-phase voltage of the three-phase CHB circuit to N.

[0033] In S202, the target base vector required to synthesize the target voltage vector is determined, and the common-mode voltage of the target base vector is zero.

[0034] Figure 3 The spatial vector diagram of the three-phase H-bridge pair is shown; see [link / reference]. Figure 3 There are 27 basic voltage vectors for a single H-bridge pair in three phases, namely PPP, OOO, NNN, POO, PPO, OPO, OPP, OOP, POP, ONN, OON, NON, NOO, NNO, ONO, PON, OPN, NPO, NOP, ONP, PNO, PNN, PPN, NPN, NPP, NNP, and PNP. These 27 basic voltage vectors include 3 zero vectors, 12 small vectors, 6 medium vectors, and 6 large vectors. The 3 zero vectors are PPP, OOO, and NNN; the 12 small vectors are POO, PPO, OPO, OPP, OOP, POP, ONN, OON, NON, NOO, NNO, and ONO; the 6 medium vectors are PON, OPN, NPO, NOP, ONP, and PNO; and the 6 large vectors are PNN, PPN, NPN, NPP, NNP, and PNP.

[0035] Among them, small vectors can also be called short vectors, and large vectors can also be called long vectors.

[0036] The spatial vector map is divided into six sectors at 60° intervals. Figure 3 The sectors are I, II, III, IV, V, and VI, with each sector having an angle of 60°.

[0037] The common-mode voltages of the 27 basic voltage vectors mentioned above can be positive, negative, or zero. There are 7 basic voltage vectors with zero common-mode voltage: PON, OPN, NPO, NOP, ONP, PNO, and OOO, which includes six medium-mode vectors and one zero-mode vector.

[0038] In order to achieve zero common-mode control of the three-phase CHB circuit, the embodiments of this application require zero common-mode control of each individual H-bridge pair of the three phases. Therefore, it is necessary to use the basic voltage vector with zero common-mode voltage to synthesize the target voltage vector corresponding to the individual H-bridge pair of the three phases.

[0039] In this embodiment, the basic voltage vector required to synthesize the target voltage vector is referred to as the target basic vector. The number of target basic vectors is typically three.

[0040] In S203, based on the target fundamental vector, the total control signal corresponding to each individual H-bridge pair in each phase is determined.

[0041] The embodiments of this application can determine the total control signal corresponding to each individual H-bridge pair in each phase based on the target basic vector required for synthesizing the target voltage vector. This process is a mature technology in related fields and will not be described in detail here.

[0042] For example, assuming the target basic vectors required to synthesize the target voltage vector are PON, OOO, and PNO, then the total control signals corresponding to individual H-bridge pairs in each phase (phases A, B, and C) (i.e., the total control signals of individual H-bridge pairs in phase A, phase B, and phase C) are as follows: Figure 4 As shown, they are POPOP, OONOO, and NOOON, respectively.

[0043] In S204, the control signals corresponding to each H-bridge unit of each phase are determined according to the total control signals corresponding to each individual H-bridge pair of each phase; wherein, the control signals of the two H-bridge units of the same H-bridge pair are combined to form the total control signal of the H-bridge pair, and the control signals of the two H-bridge units of the same H-bridge pair are different.

[0044] This application embodiment can synthesize the total control signal of an H-bridge pair based on the control signals of two H-bridge units within the same H-bridge pair, and the control signals of the two H-bridge units within the same H-bridge pair are different. Based on the total control signal corresponding to each individual H-bridge pair in each phase, the control signal corresponding to each H-bridge unit in each phase is determined. Specifically, synthesizing the total control signal of an H-bridge pair from the control signals of two H-bridge units within the same H-bridge pair can be understood as obtaining the total control signal of the H-bridge pair by superimposing the control signals of the two H-bridge units within the same H-bridge pair.

[0045] For a given H-bridge pair within the same phase, the control signals of its two H-bridge units correspond one-to-one with the control signals of the two H-bridge units in other H-bridge pairs within the same phase. For example, assuming an H-bridge pair includes a first H-bridge unit and a second H-bridge unit, the control signals of the first H-bridge units in all H-bridge pairs within the same phase can be the same, and the control signals of the second H-bridge units in all H-bridge pairs within the same phase can also be the same. However, the control signals of the H-bridge units in different H-bridge pairs across different phases are typically different.

[0046] This application does not impose specific limitations on the means of determining the control signals corresponding to each H-bridge unit of each phase based on the total control signals corresponding to each individual H-bridge pair of each phase; any feasible means are acceptable.

[0047] In S205, each H-bridge unit of each phase is controlled according to the control signal corresponding to each H-bridge unit of each phase.

[0048] Based on the control signals corresponding to each H-bridge unit of each phase determined in the aforementioned steps, the corresponding H-bridge units of each phase can be controlled to achieve zero common-mode control of the three-phase CHB circuit.

[0049] In the embodiments of this application, the H-bridge units in each phase of the CHB circuit are paired up to form H-bridge pairs. By controlling the two H-bridge units in each H-bridge pair, the total control signal of a single H-bridge pair of the three phases is constructed based on the target fundamental vector with zero common-mode voltage. This enables zero common-mode control of a single H-bridge pair of the three phases, and each H-bridge pair of the three phases can achieve zero common-mode control, thereby enabling zero common-mode control of the three-phase CHB circuit. This can alleviate or eliminate leakage current caused by common-mode voltage in the three-phase CHB circuit, reduce electromagnetic interference, reduce the possibility of electromagnetic interference affecting the normal operation of the three-phase CHB circuit, and reduce electromagnetic compatibility (EMC) costs.

[0050] The foregoing embodiments have introduced the overall implementation process of the control method for a three-phase CHB circuit. The following will further define or expand the steps or related content.

[0051] In some embodiments, the number of level switching of the total control signal of a single H-bridge pair of the first phase in one cycle is the first number, and the number of level switching of the total control signal of a single H-bridge pair of the second and third phases in one cycle is the second number, and the first number is twice the second number; The first, second, and third phases are different phases, and are randomly assigned to phases A, B, and C. The sum of the number of level switching times of the control signals of the two H-bridge units of the same H-bridge pair within one cycle is equal to the total number of level switching times of the control signals of the H-bridge pair within one cycle.

[0052] In the embodiments of this application, the first phase, the second phase, and the third phase are different phases, and are randomly assigned to phases A, B, and C. For example, the first phase is phase A, the second phase is phase B, and the third phase is phase C; or, the first phase is phase A, the second phase is phase C, and the third phase is phase B; or, the first phase is phase B, the second phase is phase A, and the third phase is phase C; or, the first phase is phase B, the second phase is phase C, and the third phase is phase A; or, the first phase is phase C, the second phase is phase A, and the third phase is phase B; and so on.

[0053] For example, see Figure 5 It provides an example of the total control signal for a single H-bridge pair in each phase and the control signals for the two H-bridge units included in that single H-bridge pair. Among them, Figure 5 The total control signal of each phase's individual H-bridge pair shown is... Figure 4 Same. Figure 5 In the diagram, X1 is the total control signal for a single H-bridge pair in the first phase, and X11 and X12 are the control signals corresponding to the two H-bridge units included in the single H-bridge pair in the first phase, respectively; X2 is the total control signal for a single H-bridge pair in the second phase, and X21 and X22 are the control signals corresponding to the two H-bridge units included in the single H-bridge pair in the second phase, respectively; X3 is the total control signal for a single H-bridge pair in the third phase, and X31 and X32 are the control signals corresponding to the two H-bridge units included in the single H-bridge pair in the third phase, respectively.

[0054] It should be noted that, Figure 5 This is merely an example of the total control signal for a single H-bridge pair in each phase and the control signals for the two H-bridge units included in that single H-bridge pair. The total control signal for a single H-bridge pair in each phase can also be derived in other ways to obtain the control signals for the two H-bridge units it includes. For example, Figure 5 The control signals of the two H-bridge units corresponding to X1 (POPOPPOPOP) can also be POPOOPOPOO and OOOOPOOOOP, or OOPOPOOPOP and POOOOPOOOO, or POPOPOOOOO and OOOOOPOPOP, etc. Figure 5 The control signals for the two H-bridge units corresponding to X3 (NOOONNOOON) can also be NOOONOOOOO and OOOOONOOON, or NOOOONOOOO and OOOONOOOON, etc.

[0055] like Figure 5As shown, the total number of level switching of the control signal for a single H-bridge pair in the first phase is 4 times in one cycle, i.e., the first count is 4; the total number of level switching of the control signal for a single H-bridge pair in the second and third phases is 2 times in one cycle, i.e., the second count is 2. The first count is twice the second count.

[0056] The total control signal level of a single H-bridge pair in the first phase changes 4 times in one cycle. The control signals of the two H-bridge units within the same H-bridge pair in the first phase each change 2 times in one cycle. Therefore, the sum of the level changes of the control signals of the two H-bridge units within the same H-bridge pair in the first phase within one cycle equals the total level change of the control signal of that H-bridge pair in the first phase within one cycle. Similarly, the total control signal level of a single H-bridge pair in the second phase changes 2 times in one cycle. The control signals of the two H-bridge units within the same H-bridge pair in the second phase change 0 times and 2 times in one cycle, respectively. Therefore, the sum of the level changes of the control signals of the two H-bridge units within the same H-bridge pair in the second phase within one cycle equals the total level change of the control signal of that H-bridge pair in the second phase within one cycle. The total control signal level switching count of a single H-bridge pair in the third phase is 2 times in one cycle. The control signals of the two H-bridge units contained in the single H-bridge pair in the third phase are each switched once in one cycle. Therefore, the sum of the level switching counts of the control signals of the two H-bridge units contained in the same H-bridge pair in the third phase in one cycle is equal to the total level switching count of the control signal of the H-bridge pair in the third phase in one cycle.

[0057] Therefore, regardless of the phase, the sum of the number of level switching times of the control signals of the two H-bridge units of the same H-bridge pair within one cycle is equal to the total number of level switching times of the control signals of the H-bridge pair within one cycle.

[0058] In this embodiment, the number of level switching times of the total control signal of a single H-bridge pair in the first phase within one cycle is twice the number of level switching times of the total control signal of a single H-bridge pair in the second or third phase within one cycle. Furthermore, the sum of the level switching times of the control signals of the two H-bridge units within the same H-bridge pair within one cycle equals the total level switching times of the total control signal of that H-bridge pair within one cycle. This allows for precise allocation and transfer of switching losses among the three phases and between the two H-bridge units within the same H-bridge pair, enabling centralized management of switching losses. For example, high switching frequencies can be concentrated on specific phases or specific units, laying the foundation for subsequent system-level efficiency optimization based on current magnitude. Additionally, the sum of the level switching times of the control signals of the two H-bridge units within one cycle equals the total level switching times of the total control signal of that H-bridge pair within one cycle. This means that the total control signal is shared by the two H-bridge units, which significantly reduces switching losses and improves efficiency compared to directly using the total control signal to control two H-bridge units in related technologies.

[0059] In some embodiments, in S204, determining the control signal corresponding to each H-bridge unit of each phase based on the total control signal corresponding to each individual H-bridge pair of each phase includes: Acquire the modulation wave, first carrier, and second carrier of each phase; wherein, for each phase, the first carrier and second carrier of that phase have the same frequency and are out of phase; the frequency of the first carrier of the first phase is twice the frequency of the first carrier of the second and third phases; the phase difference between the first carrier of the second phase and the first carrier of the third phase is 90 degrees; the first, second, and third phases are different phases and are randomly assigned to be phase A, phase B, and phase C. The modulated wave of each phase is compared with the first carrier wave to generate the first control signal for each phase; The modulated wave of each phase is compared with the second carrier wave to generate the second control signal for each phase; Among them, the first control signal and the second control signal of each phase are the control signals corresponding to the two H-bridge units of the same H-bridge pair of each phase, respectively.

[0060] See Figure 5 In this context, the two triangular waves of each phase are the first and second carrier waves of that phase. For example... Figure 5 As shown, the first and second carriers of the same phase have the same frequency, and the first and second carriers of the same phase are out of phase, that is, they are 180 degrees out of phase.

[0061] The frequency of the first carrier of the first phase is twice the frequency of the first carrier of the second phase, and also twice the frequency of the first carrier of the third phase. The frequency of the first carrier of the second phase is the same as the frequency of the first carrier of the third phase. Since the frequencies of the first and second carriers of the same phase are the same, the frequency of the second carrier of the first phase is twice the frequency of the second carrier of the second phase, and also twice the frequency of the second carrier of the third phase. The frequency of the second carrier of the second phase is the same as the frequency of the second carrier of the third phase. In other words, the period of the first carrier of the first phase is half the period of the first carrier of the second phase, and also half the period of the first carrier of the third phase; the period of the second carrier of the first phase is half the period of the second carrier of the second phase, and also half the period of the second carrier of the third phase; the period of the first carrier of the second phase is the same as the period of the first carrier of the third phase, and the period of the second carrier of the second phase is the same as the period of the second carrier of the third phase.

[0062] The phase difference between the first carrier of the second phase and the first carrier of the third phase is 90 degrees (i.e., π / 2), and the phase difference between the second carrier of the second phase and the second carrier of the third phase is 90 degrees (i.e., π / 2).

[0063] Wherein, the modulation wave of the first phase is M1=Msinwt, the modulation wave of the second phase is M2=Msin(wt+2*π / 3), and the modulation wave of the third phase is M3=Msin(wt-2*π / 3), where M is the modulation ratio, w is the angular frequency, and t is the time.

[0064] After the modulated wave of each phase is compared with the first carrier wave of each phase, a first control signal for each phase is generated. After the modulated wave of each phase is compared with the second carrier wave of each phase, a second control signal for each phase is generated. The first and second control signals of each phase are the control signals corresponding to the two H-bridge units of the same H-bridge pair for each phase.

[0065] In other words, the modulated wave of the first phase is compared with the first carrier wave of the first phase to generate the first control signal of the first phase, and the modulated wave of the first phase is compared with the second carrier wave of the first phase to generate the second control signal of the first phase. For each H-bridge pair of the first phase, the control signals corresponding to the two H-bridge units are the first control signal and the second control signal of the first phase, respectively. Similarly, the modulated wave of the second phase is compared with the first carrier wave of the second phase to generate the first control signal of the second phase, and the modulated wave of the second phase is compared with the second carrier wave of the second phase to generate the second control signal of the second phase. For each H-bridge pair of the second phase, the control signals corresponding to the two H-bridge units are the first control signal and the second control signal of the second phase, respectively. Likewise, the modulated wave of the third phase is compared with the first carrier wave of the third phase to generate the first control signal of the third phase, and the modulated wave of the third phase is compared with the second carrier wave of the third phase to generate the second control signal of the third phase. For each H-bridge pair of the third phase, the control signals corresponding to the two H-bridge units are the first control signal and the second control signal of the third phase, respectively.

[0066] It should be noted that the relationship between the carriers of the above phases can be determined by synthesizing the total control signal of the H-bridge pair based on the control signals of the two H-bridge units of the same H-bridge pair, and the control signals of the two H-bridge units of the same H-bridge pair are different.

[0067] Furthermore, this application provides a specific implementation method for determining the control signals corresponding to each H-bridge unit of each phase based on the total control signals corresponding to each individual H-bridge pair of each phase. However, in related technologies, any feasible method can be used to implement the above-mentioned method of determining the control signals corresponding to each H-bridge unit of each phase based on the total control signals corresponding to each individual H-bridge pair of each phase, and no specific limitations are imposed here.

[0068] This embodiment of the application, by making the carrier frequency of the first phase twice that of the other two phases, and by using a 90-degree phase difference between the second and third phase carriers, and employing anti-phase carrier pairs, can accurately generate control signals for controlling each H-bridge unit that meet the switching frequency requirements and have good synchronization. This method has clear logic, is easy to implement with a digital processor, and can guarantee the symmetry of the output waveform and harmonic quality without increasing hardware complexity.

[0069] In some embodiments, the duty cycles of the same level of the control signals of the two H-bridge units in a single H-bridge pair of the first phase are different; The duty cycle of the same level of the control signal of the two H-bridge units in a single H-bridge pair of the second phase is the same; The duty cycle of the same level of the control signals of the two H-bridge units in a single H-bridge pair of the third phase is the same.

[0070] Specifically, if the total control signal of a single H-bridge pair in the first phase switches between level P and level O, then the duty cycles of the control signals of the two H-bridge units in the single H-bridge pair in the first phase are different, and the duty cycles of the control signals of the two H-bridge units in the single H-bridge pair in the first phase are different; if the total control signal of a single H-bridge pair in the first phase switches between level N and level O, then the duty cycles of the control signals of the two H-bridge units in the single H-bridge pair in the first phase are different, and the duty cycles of the control signals of the two H-bridge units in the single H-bridge pair in the first phase are different.

[0071] If the total control signal for a single H-bridge pair in the second phase switches between levels P and O, then the duty cycles of the control signals at levels P and O of the two H-bridge units in the single H-bridge pair in the second phase are the same. If the total control signal for a single H-bridge pair in the second phase switches between levels N and O, then the duty cycles of the control signals at levels N and O of the two H-bridge units in the single H-bridge pair in the second phase are the same.

[0072] If the total control signal for a single H-bridge pair in the third phase switches between levels P and O, then the duty cycles of the control signals at levels P and O of the two H-bridge units in the single H-bridge pair in the third phase are the same. If the total control signal for a single H-bridge pair in the third phase switches between levels N and O, then the duty cycles of the control signals at levels N and O of the two H-bridge units in the single H-bridge pair in the third phase are the same.

[0073] For example, see Figure 5 In the first phase, the control signals X11 and X12 of the two H-bridge units in a single H-bridge pair have different duty cycles at the same level. That is, X11 and X12 switch between levels P and O, with different duty cycles for both levels P and O. In the second phase, the control signals X21 and X22 of the two H-bridge units in a single H-bridge pair have the same duty cycle at the same level. That is, X21 and X22 switch between levels N and O, with the same duty cycle for both levels N and O. In the third phase, the control signals X31 and X32 of the two H-bridge units in a single H-bridge pair have the same duty cycle at the same level. That is, X31 and X32 switch between levels N and O, with the same duty cycle for both levels N and O.

[0074] This application further refines the configuration principle of the duty cycle of the control signals for the two H-bridge units within a three-phase H-bridge: the duty cycles of the two H-bridge units are different only in the first phase, which switches frequently, while the duty cycles of the other two phases, which switch less frequently, remain the same. This differentiated configuration decouples or coordinates the impact of duty cycle adjustment (such as the redistribution of conduction losses) with the allocation strategy of switching frequency. While achieving centralized switching losses, it simplifies the control complexity of the second and third phases and allows for targeted adjustment of the conduction losses of the two H-bridge units within the first phase, achieving more refined thermal management.

[0075] In some embodiments, if the total control signal of a single H-bridge pair in the first phase is switching between level P and level O, and the current flow direction of the first phase is current flowing into the CHB circuit, then the duty cycle of the control signal level P of the H-bridge unit with smaller DC voltage in the single H-bridge pair of the first phase is greater than the duty cycle of the control signal level P of the H-bridge unit with larger DC voltage. If the total control signal of a single H-bridge pair in the first phase is switching between level P and level O, and the current flow direction of the first phase is the current flowing out of the CHB circuit, then the duty cycle of the control signal level P of the H-bridge unit with a larger DC voltage in the single H-bridge pair of the first phase is greater than the duty cycle of the control signal level P of the H-bridge unit with a smaller DC voltage. If the total control signal of a single H-bridge pair in the first phase switches between level N and level O, and the current flow direction of the first phase is current flowing into the CHB circuit, then the duty cycle of level N of the control signal of the H-bridge unit with larger DC voltage in a single H-bridge pair in the first phase is greater than the duty cycle of level N of the control signal of the H-bridge unit with smaller DC voltage. If the total control signal of a single H-bridge pair in the first phase switches between levels N and O, and the current flow direction of the first phase is outflow from the CHB circuit, then the duty cycle of level N of the control signal of the H-bridge unit with smaller DC voltage in a single H-bridge pair of the first phase is greater than the duty cycle of level N of the control signal of the H-bridge unit with larger DC voltage.

[0076] As mentioned earlier, the duty cycles of the same level of the control signals of the two H-bridge units in a single H-bridge pair of the first phase are different. Therefore, the duty cycle of level P or level N of which H-bridge unit in the H-bridge pair is larger can be controlled based on the current flow direction of the first phase and the magnitude of the DC voltage of the two H-bridge units in the single H-bridge pair. Because if the DC voltages of the two H-bridge units are different, but the switching signals are still distributed in an average manner, it will lead to a serious imbalance in the DC power of the two H-bridge units. Therefore, the DC power of the two H-bridge units can be balanced in the above manner.

[0077] In this circuit, the alternating current in each phase has a direction. Based on the alternating current of the first phase, we can determine whether the current flow in the first phase is into or out of the CHB circuit. The direction of the current flow in the first phase can be understood as the direction of the alternating current in the first phase. A current flow into the CHB circuit means the alternating current flows from the AC terminal of the first phase to the H-bridge unit contained in the first phase of the CHB circuit; a current flow out of the CHB circuit means the alternating current flows from the H-bridge unit contained in the first phase of the CHB circuit to the AC terminal of the first phase.

[0078] Specifically, if the total control signal for a single H-bridge pair in the first phase switches between levels P and O, and the current flow in the first phase is into the CHB circuit, then the duty cycle of the control signal level P of the H-bridge unit with the smaller DC voltage in the single H-bridge pair of the first phase is greater than the duty cycle of the control signal level P of the H-bridge unit with the larger DC voltage. Figure 5 For example, the duty cycle of level P of X11 is greater than the duty cycle of level P of X12. Therefore, under this operating condition, the control signal of the H-bridge unit with smaller DC voltage in the single H-bridge pair of the first phase is X11, and the control signal of the H-bridge unit with larger DC voltage in the single H-bridge pair of the first phase is X12.

[0079] In this embodiment, the total control signal for a single H-bridge pair in the first phase switches between levels P and O, and the current flow in the first phase is into the CHB circuit, indicating that the AC side is charging the DC side. At this time, the duty cycle of the control signal level P of the H-bridge unit with the smaller DC voltage is greater than the duty cycle of the control signal level P of the H-bridge unit with the larger DC voltage. In other words, the duration of level P of the H-bridge unit with the smaller DC voltage in one cycle is longer than the duration of level P of the H-bridge unit with the larger DC voltage in one cycle. This is equivalent to the H-bridge unit with the smaller DC voltage charging the DC side for a longer period of time in one cycle, resulting in a much higher DC side voltage. This makes it easier to maintain a balance with the DC voltage of the H-bridge unit with the larger DC voltage, thereby achieving DC side power balance between the two H-bridge units.

[0080] If the total control signal for a single H-bridge pair in the first phase switches between levels P and O, and the current flow in the first phase is outflow from the CHB circuit, then the duty cycle of the control signal level P of the H-bridge unit with the larger DC voltage in the single H-bridge pair of the first phase is greater than the duty cycle of the control signal level P of the H-bridge unit with the smaller DC voltage. Figure 5 For example, the duty cycle of level P of X11 is greater than the duty cycle of level P of X12. Therefore, under this operating condition, the control signal of the H-bridge unit with a larger DC voltage in the single H-bridge pair of the first phase is X11, and the control signal of the H-bridge unit with a smaller DC voltage in the single H-bridge pair of the first phase is X12.

[0081] In this system, the total control signal for a single H-bridge pair in the first phase switches between levels P and O, and the current flow in the first phase is out of the CHB circuit, indicating that the DC side is discharging. At this time, the duty cycle of the control signal level P of the H-bridge unit with a larger DC voltage is greater than that of the control signal level P of the H-bridge unit with a smaller DC voltage. In other words, the duration of level P of the H-bridge unit with a larger DC voltage in one cycle is longer than that of the H-bridge unit with a smaller DC voltage in one cycle. This means that the H-bridge unit with a larger DC voltage discharges on the DC side for a longer period of time in one cycle, and its DC side voltage drops more, making it easier to maintain a balance with the DC voltage of the H-bridge unit with a smaller DC voltage, thereby achieving DC side power balance between the two H-bridge units.

[0082] Similarly, if the total control signal for a single H-bridge pair in the first phase switches between levels N and O, and the current flow in the first phase is into the CHB circuit, then this is the opposite of the case where the total control signal for a single H-bridge pair in the first phase switches between levels P and O, and the current flow in the first phase is into the CHB circuit. In this case, the duty cycle of level N of the control signal for the H-bridge unit with the larger DC voltage in the single H-bridge pair of the first phase is greater than the duty cycle of level N of the control signal for the H-bridge unit with the smaller DC voltage. That is, the duration of level N of the H-bridge unit with the larger DC voltage in one cycle is longer than the duration of level N of the H-bridge unit with the smaller DC voltage in one cycle, so as to achieve DC-side power balance between the two H-bridge units.

[0083] If the total control signal for a single H-bridge pair in the first phase switches between levels N and O, and the current flow in the first phase is out of the CHB circuit, then this is the opposite of the case where the total control signal for a single H-bridge pair in the first phase switches between levels P and O, and the current flow in the first phase is out of the CHB circuit. In this case, the duty cycle of level N of the control signal for the H-bridge unit with the smaller DC voltage in the single H-bridge pair of the first phase is greater than the duty cycle of level N of the control signal for the H-bridge unit with the larger DC voltage. That is, the duration of level N of the H-bridge unit with the smaller DC voltage in one cycle is longer than the duration of level N of the H-bridge unit with the larger DC voltage in one cycle, so as to achieve DC-side power balance between the two H-bridge units.

[0084] The embodiments of this application can optimize the energy distribution among different H-bridge units through the above method, avoid a certain H-bridge unit reaching its power limit or voltage imbalance too early, and effectively balance the DC-side load of each H-bridge unit, thereby improving overall reliability.

[0085] In some embodiments, the first phase is the phase with the minimum current, the phase with the maximum current, or the phase where the DC voltage of the two H-bridge units in a single H-bridge pair is unbalanced.

[0086] In this embodiment, the phase with the lowest current, the phase with the highest current, or the phase with the DC voltage imbalance between two H-bridge units in a single H-bridge pair can be selected as the phase with the most switching times in one cycle, i.e., the first phase. The number of switching times in one cycle can be understood as the number of times O and P are switched or the number of times O and N are switched in one cycle. Here, the cycle can be the switching cycle.

[0087] In one implementation, the phase with the lowest current among the three phases can be selected as the first phase. Since a larger current results in greater switching losses, selecting the phase with the lowest current as the phase that switches the most times in one cycle (i.e., the first phase) can reduce switching losses and achieve optimal efficiency. The aforementioned phase with the lowest current can be the phase with the smallest instantaneous current value among the three phases.

[0088] In another implementation, the phase with the highest current among the three phases can be selected as the phase with the most switching times in one cycle (i.e., the first phase). This minimizes the current ripple of that phase, thereby optimizing the quality of the output current. Specifically, the point of maximum current ripple amplitude is usually at the current peak value, and the phase with the highest current has a larger ripple due to the high saturation of the magnetic powder core inductance. Therefore, selecting the phase with the highest current as the phase with the most switching times in one cycle can optimize the current ripple of that phase, thereby optimizing the quality of the output current. The aforementioned phase with the highest current can be the phase with the largest instantaneous current value among the three phases.

[0089] In another embodiment, the phase with unbalanced DC voltages between the two H-bridge units in a single H-bridge pair can be selected as the first phase. Unbalanced DC voltages between the two H-bridge units in a single H-bridge pair can be understood as the DC voltages of the two H-bridge units being unequal or the absolute value of the difference being greater than a certain value. As mentioned earlier, the duty cycles of the same level of the control signals of the two H-bridge units in the first phase's single H-bridge pair are different. Based on the current flow direction of the first phase and the magnitude of the DC voltages of the two H-bridge units in the single H-bridge pair, the duty cycle of which H-bridge unit's level P or level N is larger can be controlled to balance the DC voltages of the two H-bridge units. Therefore, in this embodiment, the phase with unbalanced DC voltages between the two H-bridge units in a single H-bridge pair can be selected as the first phase to achieve DC voltage balance among the H-bridge units.

[0090] The specific choice of the phase with the largest current, the phase with the smallest current, or the phase with the unbalanced DC voltage between the two H-bridge units in a single H-bridge pair as the first phase can be determined based on actual needs.

[0091] In some embodiments, determining the target base vector required to synthesize the target voltage vector in S202 includes: Obtain the first target region where the target voltage vector is located; The target fundamental vectors required to determine the synthesized target voltage vector are the three fundamental voltage vectors corresponding to the first target region where the common-mode voltage is zero. Among them, the points where the six non-zero basic voltage vectors with zero common-mode voltage are located are used as vertices to form a first spatial vector hexagon; based on the zero basic voltage vector with zero common-mode voltage, the first spatial vector hexagon is divided into six first triangles; the first target region is the region where one of the first triangles is located.

[0092] As mentioned earlier, there are seven basic voltage vectors with zero common-mode voltage: PON, OPN, NPO, NOP, ONP, PNO, and OOO, which include six intermediate vectors and one zero vector. The six intermediate vectors are the six non-zero basic voltage vectors with zero common-mode voltage, and the zero vector is the zero basic voltage vector with zero common-mode voltage.

[0093] See Figure 6 , Figure 6 The spatial vector diagram shown is Figure 3 The difference between the spatial vector diagrams shown is that... Figure 6 The spatial vector diagram in the image shows 25 basic voltage vectors. Figure 6 The zero vector in the middle only contains OOO, and the zero vectors PPP and NNN are removed. That is, only the zero vector with a common-mode voltage of 0 is retained among the three zero vectors. Figure 6 The A-axis, B-axis, and C-axis in the figure are the three coordinate axes of the three-phase stationary coordinate system.

[0094] See Figure 6 The six non-zero fundamental voltage vectors with zero common-mode voltage, i.e., the six median vectors, serve as six vertices, forming the first spatial vector hexagon. That is, the first spatial vector hexagon is a hexagon with the aforementioned six median vectors with zero common-mode voltage as its vertices. The first spatial vector hexagon is a regular hexagon, and its center point is the aforementioned zero vector OOO with zero common-mode voltage.

[0095] Based on the zero fundamental voltage vector OOO, where the common-mode voltage is zero, the first spatial vector hexagon is divided into six first triangles by dividing it into 60-degree segments. Each first triangle has three vertices: two adjacent vertices of the first spatial vector hexagon and the center point OOO. The six first triangles are: the triangle with PON, OPN, and OOO as three vertices; the triangle with NPO, OPN, and OOO as three vertices; the triangle with NPO, NOP, and OOO as three vertices; the triangle with NOP, ONP, and OOO as three vertices; the triangle with ONP, PNO, and OOO as three vertices; and the triangle with PNO, PON, and OOO as three vertices.

[0096] In this embodiment, the region where the target voltage vector is located within the aforementioned first spatial vector hexagon is referred to as the first target region. The first target region can be any region containing a first triangle, determined based on the position of the target voltage vector. The three basic voltage vectors corresponding to the first target region with zero common-mode voltage are the basic voltage vectors corresponding to the three vertices of the first triangle corresponding to the first target region.

[0097] For example, assuming the first target region is a triangle with PON, OPN, and OOO as its three vertices, then the three basic voltage vectors with zero common-mode voltages corresponding to the first target region are PON, OPN, and OOO; assuming the first target region is a triangle with NPO, OPN, and OOO as its three vertices, then the three basic voltage vectors with zero common-mode voltages corresponding to the first target region are NPO, OPN, and OOO; assuming the first target region is a triangle with PNO, PON, and OOO as its three vertices, then the three basic voltage vectors with zero common-mode voltages corresponding to the first target region are PNO, PON, and OOO; and so on.

[0098] This application's embodiments utilize all fundamental vectors with zero common-mode voltage to construct a dedicated first spatial vector hexagon, and divide it into triangular target regions. This method transforms the complex common-mode voltage suppression problem into simple geometric positioning within a subspace, enabling rapid and accurate determination of the three target fundamental vectors required to synthesize the target voltage vector. It ensures that the common-mode voltage is always strictly clamped to zero during dynamic processes, while simultaneously ensuring that voltage utilization and modulation accuracy are not reduced. The method is simple and easy to implement in engineering.

[0099] It should be understood that the sequence number of each step in the above embodiments does not imply the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of this application.

[0100] The following are device embodiments of this application. For details not described in detail, please refer to the corresponding method embodiments described above.

[0101] Figure 7 A schematic diagram of the control device for a three-phase CHB circuit provided in an embodiment of this application is shown. For ease of explanation, only the parts related to the embodiment of this application are shown, and are described in detail below: For each phase of a three-phase CHB circuit, the phase circuit includes a series branch formed by 2N H-bridge units. These 2N H-bridge units are paired up to form N H-bridge pairs; N is a positive integer. For example... Figure 7 As shown, the control device 4 of the three-phase CHB circuit includes: an acquisition module 41, a target basic vector determination module 42, a total control signal determination module 43, a division module 44, and a control module 45.

[0102] The acquisition module 41 is used to acquire the target voltage vector corresponding to the three-phase H-bridge pair group; wherein, one H-bridge pair is selected from each of the three phases to form a three-phase H-bridge pair group; The target fundamental vector determination module 42 is used to determine the target fundamental vector required to synthesize the target voltage vector, and the common-mode voltage of the target fundamental vector is zero; The total control signal determination module 43 is used to determine the total control signal corresponding to each individual H-bridge pair in each phase based on the target basic vector. The partitioning module 44 is used to determine the control signal corresponding to each H-bridge unit of each phase based on the total control signal corresponding to each individual H-bridge pair of each phase; wherein, the control signals of the two H-bridge units of the same H-bridge pair are combined to form the total control signal of the H-bridge pair, and the control signals of the two H-bridge units of the same H-bridge pair are different. The control module 45 is used to control each H-bridge unit of each phase according to the control signals corresponding to each H-bridge unit of each phase.

[0103] In one possible implementation, the number of level switching of the total control signal of a single H-bridge pair of the first phase in one cycle is the first number, and the number of level switching of the total control signal of a single H-bridge pair of the second and third phases in one cycle is the second number, and the first number is twice the second number; The first, second, and third phases are different phases, and are randomly assigned to phases A, B, and C. The sum of the number of level switching times of the control signals of the two H-bridge units of the same H-bridge pair within one cycle is equal to the total number of level switching times of the control signals of the H-bridge pair within one cycle.

[0104] In one possible implementation, module 44 is specifically used for: Acquire the modulation wave, first carrier, and second carrier of each phase; wherein, for each phase, the first carrier and second carrier of that phase have the same frequency and are out of phase; the frequency of the first carrier of the first phase is twice the frequency of the first carrier of the second and third phases; the phase difference between the first carrier of the second phase and the first carrier of the third phase is 90 degrees; the first, second, and third phases are different phases and are randomly assigned to be phase A, phase B, and phase C. The modulated wave of each phase is compared with the first carrier wave to generate the first control signal for each phase; The modulated wave of each phase is compared with the second carrier wave to generate the second control signal for each phase; Among them, the first control signal and the second control signal of each phase are the control signals corresponding to the two H-bridge units of the same H-bridge pair of each phase, respectively.

[0105] In one possible implementation, if the total control signal of a single H-bridge pair in the first phase is switching between level P and level O, and the current flow direction of the first phase is current flowing into the CHB circuit, then the duty cycle of the control signal level P of the H-bridge unit with smaller DC voltage in a single H-bridge pair of the first phase is greater than the duty cycle of the control signal level P of the H-bridge unit with larger DC voltage. If the total control signal of a single H-bridge pair in the first phase is switching between level P and level O, and the current flow direction of the first phase is the current flowing out of the CHB circuit, then the duty cycle of the control signal level P of the H-bridge unit with a larger DC voltage in the single H-bridge pair of the first phase is greater than the duty cycle of the control signal level P of the H-bridge unit with a smaller DC voltage. If the total control signal of a single H-bridge pair in the first phase switches between level N and level O, and the current flow direction of the first phase is current flowing into the CHB circuit, then the duty cycle of level N of the control signal of the H-bridge unit with larger DC voltage in a single H-bridge pair in the first phase is greater than the duty cycle of level N of the control signal of the H-bridge unit with smaller DC voltage. If the total control signal of a single H-bridge pair in the first phase switches between levels N and O, and the current flow direction of the first phase is outflow from the CHB circuit, then the duty cycle of level N of the control signal of the H-bridge unit with smaller DC voltage in a single H-bridge pair of the first phase is greater than the duty cycle of level N of the control signal of the H-bridge unit with larger DC voltage.

[0106] In one possible implementation, the duty cycles of the same level of the control signals of the two H-bridge units in a single H-bridge pair of the first phase are different; The duty cycle of the same level of the control signal of the two H-bridge units in a single H-bridge pair of the second phase is the same; The duty cycle of the same level of the control signals of the two H-bridge units in a single H-bridge pair of the third phase is the same.

[0107] In one possible implementation, the first phase is the phase with the minimum current, the phase with the maximum current, or the phase with unbalanced DC voltage between two H-bridge units in a single H-bridge pair.

[0108] In one possible implementation, the target base vector required for synthesizing the target voltage vector is determined in the total control signal determination module 43, including: Obtain the first target region where the target voltage vector is located; The target fundamental vectors required to determine the synthesized target voltage vector are the three fundamental voltage vectors corresponding to the first target region where the common-mode voltage is zero. Among them, the points where the six non-zero basic voltage vectors with zero common-mode voltage are located are used as vertices to form a first spatial vector hexagon; based on the zero basic voltage vector with zero common-mode voltage, the first spatial vector hexagon is divided into six first triangles; the first target region is the region where one of the first triangles is located.

[0109] Figure 8 This is a schematic diagram of the control device provided in an embodiment of this application. Figure 8 As shown, the control device 5 in this embodiment includes a processor 50 and a memory 51. The memory 51 stores a computer program 52. When the processor 50 executes the computer program 52, it implements the steps in the various method embodiments described above. Alternatively, when the processor 50 executes the computer program 52, it implements the functions of each module / unit in the various device embodiments described above.

[0110] For example, computer program 52 may be divided into one or more modules / units, which are stored in memory 51 and executed by processor 50 to complete this application. The one or more modules / units may be a series of computer program instruction segments capable of performing a specific function, which describe the execution process of computer program 52 in control device 5.

[0111] The control device 5 may include, but is not limited to, a processor 50 and a memory 51. Those skilled in the art will understand that... Figure 8 This is merely an example of control device 5 and does not constitute a limitation on control device 5. It may include more or fewer components than shown, or combine certain components, or different components. For example, control device 5 may also include input / output devices, network access devices, buses, etc.

[0112] The processor 50 can be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor can be a microprocessor or any conventional processor.

[0113] The memory 51 can be an internal storage unit of the control device 5, such as a hard disk or RAM of the control device 5. The memory 51 can also be an external storage device of the control device 5, such as a plug-in hard disk, Smart Media Card (SMC), Secure Digital (SD) card, or Flash Card equipped on the control device 5. Furthermore, the memory 51 can include both internal and external storage units of the control device 5. The memory 51 is used to store the computer program 52 and other programs and data required by the control device 5. The memory 51 can also be used to temporarily store data that has been output or will be output.

[0114] For the sake of simplicity and clarity, only the above-described functional modules / units are used as examples. In practical applications, the functions described above can be assigned to different functional modules / units as needed. These modules / units can be implemented in hardware, software, or a combination of both.

[0115] This application embodiment also provides a CHB circuit, including circuits corresponding to the three phases and the control device as described above; For each phase of the CHB circuit, the phase circuit includes a series branch formed by 2N H-bridge units. These 2N H-bridge units are paired up to form N H-bridge pairs; N is a positive integer. The circuits corresponding to each of the three phases are all controlled by the control equipment.

[0116] This application also provides a power supply device including the CHB circuit described above.

[0117] This application also provides a computer-readable storage medium storing a computer program. When the computer program is executed by a processor, it implements the methods described in the above-described method embodiments.

[0118] This application also provides a computer program product, including a computer program. When the computer program is executed by a processor, it implements the methods in the above-described method embodiments.

[0119] Computer programs include computer program code, which can be in the form of source code, object code, executable files, or certain intermediate forms. Computer-readable media can include: any entity or device capable of carrying computer program code, recording media, USB flash drives, portable hard drives, magnetic disks, optical disks, computer memory, read-only memory (ROM), random access memory (RAM), electrical carrier signals, telecommunication signals, and software distribution media, etc.

[0120] In the above embodiments, the descriptions of each embodiment have their own emphasis. Parts not detailed or described in a particular embodiment can be referred to in the relevant descriptions of other embodiments. Unless otherwise specified or in conflict with logic, the terminology and / or descriptions between different embodiments are consistent and can be referenced interchangeably. Technical features in different embodiments can be combined to form new embodiments based on their inherent logical relationships.

[0121] The above-described embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this application, and should all be included within the protection scope of this application.

Claims

1. A control method of a three-phase CHB circuit, characterized by, For each phase of the three-phase CHB circuit, the phase circuit includes a series branch formed by 2N H-bridge units, which are paired up to form N H-bridge pairs; N is a positive integer; the method includes: Obtain the target voltage vector corresponding to the three-phase H-bridge pair group; wherein, one H-bridge pair is selected from each of the three phases to form the three-phase H-bridge pair group; Determine the target base vector required to synthesize the target voltage vector, wherein the common-mode voltage of the target base vector is zero; Based on the target basic vector, determine the total control signal corresponding to each individual H-bridge pair in each phase; Based on the total control signal corresponding to each individual H-bridge pair in each phase, the control signal corresponding to each H-bridge unit in each phase is determined; wherein, the control signals of the two H-bridge units in the same H-bridge pair are combined to form the total control signal of the H-bridge pair, and the control signals of the two H-bridge units in the same H-bridge pair are different. The control signals corresponding to each H-bridge unit of each phase are used to control each H-bridge unit of each phase.

2. The control method of a three-phase CHB circuit according to claim 1, characterized by, The number of level switching of the total control signal of a single H-bridge pair in the first phase within one cycle is the first count, and the number of level switching of the total control signal of a single H-bridge pair in the second and third phases within one cycle is the second count. The first count is twice the second count. The first phase, the second phase, and the third phase are different phases, and are randomly assigned to be phase A, phase B, and phase C. The sum of the number of level switching times of the control signals of the two H-bridge units of the same H-bridge pair within one cycle is equal to the total number of level switching times of the control signals of the H-bridge pair within one cycle.

3. The control method of a three-phase CHB circuit according to claim 1, characterized by, The step of determining the control signal corresponding to each H-bridge unit of each phase based on the total control signal corresponding to each individual H-bridge pair of each phase includes: The modulation wave, first carrier, and second carrier of each phase are acquired; wherein, for each phase, the first carrier and second carrier of that phase have the same frequency and are out of phase; the frequency of the first carrier of the first phase is twice the frequency of the first carrier of the second and third phases; the phase difference between the first carrier of the second phase and the first carrier of the third phase is 90 degrees; the first phase, the second phase, and the third phase are different phases and are randomly assigned to phase A, phase B, and phase C. The modulated wave of each phase is compared with the first carrier wave to generate the first control signal for each phase; The modulated wave of each phase is compared with the second carrier wave to generate the second control signal for each phase; Among them, the first control signal and the second control signal of each phase are the control signals corresponding to the two H-bridge units of the same H-bridge pair of each phase, respectively.

4. The control method of a three-phase CHB circuit according to claim 2, characterized by, If the total control signal of a single H-bridge pair in the first phase is switching between level P and level O, and the current flow direction of the first phase is current flowing into the CHB circuit, then the duty cycle of the control signal level P of the H-bridge unit with smaller DC voltage in a single H-bridge pair of the first phase is greater than the duty cycle of the control signal level P of the H-bridge unit with larger DC voltage. If the total control signal of a single H-bridge pair in the first phase is switching between level P and level O, and the current flow direction of the first phase is the current flowing out of the CHB circuit, then the duty cycle of the control signal level P of the H-bridge unit with a larger DC voltage in the single H-bridge pair of the first phase is greater than the duty cycle of the control signal level P of the H-bridge unit with a smaller DC voltage. If the total control signal of a single H-bridge pair in the first phase switches between level N and level O, and the current flow direction of the first phase is current flowing into the CHB circuit, then the duty cycle of level N of the control signal of the H-bridge unit with larger DC voltage in a single H-bridge pair of the first phase is greater than the duty cycle of level N of the control signal of the H-bridge unit with smaller DC voltage. If the total control signal of a single H-bridge pair in the first phase switches between levels N and O, and the current flow direction of the first phase is outflow from the CHB circuit, then the duty cycle of level N of the control signal of the H-bridge unit with smaller DC voltage in a single H-bridge pair of the first phase is greater than the duty cycle of level N of the control signal of the H-bridge unit with larger DC voltage.

5. The control method of a three-phase CHB circuit according to claim 2, characterized by, The duty cycles of the same level of the control signals of the two H-bridge units in a single H-bridge pair of the first phase are different; The duty cycle of the same level of the control signal of the two H-bridge units in a single H-bridge pair of the second phase is the same; The duty cycle of the same level of the control signals of the two H-bridge units in a single H-bridge pair of the third phase is the same.

6. The control method of a three-phase CHB circuit according to claim 2, characterized by, The first phase is the phase with the minimum current, the phase with the maximum current, or the phase where the DC voltage of the two H-bridge units in a single H-bridge pair is unbalanced.

7. The control method for a three-phase CHB circuit according to any one of claims 1 to 6, characterized in that, Determining the target base vector required to synthesize the target voltage vector includes: Obtain the first target region where the target voltage vector is located; The target basic vectors required to synthesize the target voltage vector are determined to be the three basic voltage vectors corresponding to the first target region where the common-mode voltage is zero. The six non-zero basic voltage vectors with zero common-mode voltage are used as vertices to form a first spatial vector hexagon. Based on the zero basic voltage vector with zero common-mode voltage, the first spatial vector hexagon is divided into six first triangles. The first target region is the region where one of the first triangles is located.

8. A control device for a three-phase CHB circuit, characterized in that, For each phase of the three-phase CHB circuit, the phase circuit includes a series branch formed by 2N H-bridge units, which are paired up to form N H-bridge pairs; N is a positive integer; the device includes: The acquisition module is used to acquire the target voltage vector corresponding to the three-phase H-bridge pair group; wherein, one H-bridge pair is selected from each of the three phases to form the three-phase H-bridge pair group. A target fundamental vector determination module is used to determine the target fundamental vector required to synthesize the target voltage vector, wherein the common-mode voltage of the target fundamental vector is zero; The total control signal determination module is used to determine the total control signal corresponding to each individual H-bridge pair in each phase based on the target basic vector. The partitioning module is used to determine the control signals corresponding to each H-bridge unit of each phase based on the total control signals corresponding to each individual H-bridge pair of each phase; wherein, the control signals of the two H-bridge units of the same H-bridge pair are combined to form the total control signal of the H-bridge pair, and the control signals of the two H-bridge units of the same H-bridge pair are different. The control module is used to control each H-bridge unit of each phase according to the control signals corresponding to each H-bridge unit of each phase.

9. A CHB circuit, characterized in that, This includes the circuits and control equipment corresponding to each of the three phases; For each phase of the CHB circuit, the phase circuit includes a series branch formed by 2N H-bridge units, which are paired up to form N H-bridge pairs; N is a positive integer. The control device is used to execute the control method for the three-phase CHB circuit as described in any one of claims 1 to 7; the circuits corresponding to the three phases are all controlled by the control device.

10. A power supply device, characterized in that, Includes the CHB circuit as described in claim 9.