Technical Problem

[0003]本发明提供了一种超长玻璃幕墙单元体安装结构的施工方法,用以解决超大玻璃幕墙单元体的辅助架设置、便捷吊装以及整体性安装等技术问题

Benefits of technology

1)本发明通过辅助安装架的设置,保证吊装时超长玻璃幕墙单元体不发生弯折,且通过底挡件和侧挡件的设置利于保证吊装时超长玻璃幕墙单元体随着辅助安装架一同齐声,且不发生侧向或底部的错位;

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122565256A_ABST
    Figure CN122565256A_ABST
Patent Text Reader

Abstract

This invention discloses a construction method for an ultra-long glass curtain wall unit installation structure. The glass curtain wall is an ultra-long glass curtain wall, which is hoisted by setting up a targeted auxiliary installation frame with double lifting points and double hooks, and a reinforcing plate is installed inside the curtain wall unit. The invention ensures that the ultra-long glass curtain wall unit does not bend during hoisting by using the auxiliary installation frame, and the bottom and side supports ensure that the ultra-long glass curtain wall unit moves in tandem with the auxiliary installation frame during hoisting, without lateral or bottom misalignment. The double lifting points and double hooks facilitate the initial hoisting of the auxiliary installation frame and the simultaneous lifting of the glass curtain wall unit, followed by the individual hoisting of the curtain wall unit to vertical position before detaching it from the auxiliary installation frame. This ensures reasonable stress distribution on the curtain wall unit in its ultra-long state after verticalization and facilitates the easy removal of the auxiliary installation frame. The reinforcing plate enhances the overall rigidity and integrity of the installed curtain wall unit during use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of glass curtain wall installation technology, and in particular to a construction method for an ultra-long glass curtain wall unit installation structure. Background Technology

[0002] Glass curtain walls are a common building envelope in modern architecture due to their aesthetics, energy efficiency, and safety. Typical glass curtain walls are constructed as unitized panels and installed via hoisting. Common unitized panel dimensions are generally around 1.5m wide and under 6m high, with simple beam connections. However, to achieve visual spaciousness and interior design effects, ultra-long glass curtain walls are now appearing; and when encountering multi-level areas, to ensure a unified indoor and outdoor effect, they also require design as large multi-level unitized structures. Therefore, ensuring the safe and convenient hoisting of ultra-long glass curtain walls and meeting overall rigidity requirements after installation necessitates targeted design. Summary of the Invention

[0003] This invention provides a construction method for an ultra-long glass curtain wall unit installation structure, which solves technical problems such as the setting of auxiliary frames, convenient hoisting, and overall installation of ultra-large glass curtain wall units.

[0004] To achieve the above objectives, the present invention adopts the following technical solution: A construction method for an ultra-long glass curtain wall unit installation structure, wherein the glass curtain wall is an ultra-long glass curtain wall with a length of not less than 10m, and the specific steps are as follows: Step 1: The curtain wall unit to be installed includes a glass curtain wall and a main frame set on the glass curtain wall. The main frame is composed of column assemblies, connecting assemblies and beams connected to the column assemblies. The column assembly includes a main column and a reinforcing plate set inside the main column. The joint between adjacent curtain wall units is provided with a first main column and a corresponding second main column; both the first and second main columns are fitted with reinforcing plates. Step 2: Fabricate auxiliary mounting brackets according to the dimensions of the curtain wall units, wherein the length and width of the auxiliary mounting brackets shall not be less than the length and width of the glass curtain wall; Step 3: When making the auxiliary installation frame, a bottom stop should be installed at least at one end along the longitudinal direction, and side stops should be installed at intervals along the longitudinal direction; the installation of the bottom stop and side stops will ensure that the curtain wall unit does not slip during hoisting. Step 4: After the auxiliary mounting bracket is fabricated, place the curtain wall unit with the main frame installed on top of it; set the first suspension point on the auxiliary mounting bracket, with the first suspension point located at the opposite end of the bottom support; set the second suspension point on the glass curtain wall, with the second suspension point also located at the opposite end of the bottom support. Step 5: During hoisting, the first hook first lifts the auxiliary installation frame, slowly lifting and moving the curtain wall unit to a near-vertical position. Then, the second hook begins to lift and bear the force, making the curtain wall unit stand upright and stable in the air. After stabilization, the first hook begins to slowly lower, and the auxiliary installation frame slowly falls to the ground. The first hook is removed, and the curtain wall unit is lifted to the installation position using the second hook. Step Six: The column components of the curtain wall unit are connected to the main structure by a docking component. Connecting brackets are pre-embedded on the main structure, and the connecting brackets are adjustable to the docking components. The first and second parent columns of adjacent curtain wall units are connected by plugging in. The joints between adjacent curtain wall units are filled with sealant, thus completing the construction of the ultra-long glass curtain wall unit installation structure.

[0005] Furthermore, the connecting bracket is an L-shaped piece with an elongated hole on its horizontal part, through which it is connected to the main structure by bolts; the vertical part of the connecting bracket is connected to the docking assembly. The docking components are provided in at least two sets. Each set of docking components includes a first docking piece and a second docking piece. The first docking piece is an L-shaped piece, and the second docking piece is a U-shaped piece with a vertical connecting plate. The U-shaped opening is connected to the horizontal part of the first docking piece, and the vertical connecting plate is connected to the vertical column.

[0006] Furthermore, both the first and second vertical pillars are provided with cavities, and an insert plate is provided on one side of the first vertical pillar, while the second vertical pillar is provided with a notch corresponding to the insert plate; a reinforcing plate is inserted into the cavity.

[0007] Furthermore, the reinforcing plate is a rigid plate with strength adapted to resist the bending strength of the glass curtain wall, and the reinforcing plate is usually installed within the height range of the glass curtain wall; the reinforcing plate is connected to the corresponding vertical column by screws and bolts.

[0008] Furthermore, the reinforcing plate includes a first reinforcing plate and a second reinforcing plate. The first reinforcing plate is inserted into the cavity of the first vertical column, and the second reinforcing plate is inserted into the cavity of the second vertical column. The first and second reinforcing plates are connected to the corresponding columns and docking components by bolts on the side of the first and second reinforcing plates adjacent to the main structure. One end of the first and second reinforcing plates is also connected to the corresponding vertical column by screws.

[0009] Furthermore, the auxiliary mounting bracket includes an auxiliary frame body, a bottom stop provided in the width direction of the auxiliary frame body, and a side stop provided in the length direction of the auxiliary frame body; the bottom stop is usually provided in the width direction of the auxiliary frame body, and the bottom stop is an L-shaped part, with its horizontal part detachably connected to the auxiliary frame body.

[0010] Furthermore, the side blocks are spaced apart along the length of the auxiliary frame, and the side blocks are detachably connected to the auxiliary frame; the height of the side blocks and the bottom blocks is not less than the thickness of the curtain wall unit, and the side blocks and the bottom blocks are also provided with a buffer pad or shock-absorbing pad on the side adjacent to the curtain wall unit.

[0011] Furthermore, the auxiliary frame includes parallel main frames and secondary frames connected between the two main frames and spaced apart; wherein, the secondary frames are connected to both ends of the main frames, and a bottom stop is connected to one end of the secondary frame; the width of the secondary frame is not less than the width of the curtain wall unit; A frame extension rod is also installed on the side of the main frame away from the bottom support. The sum of the lengths of the main frame and the frame extension rod is greater than the length of the curtain wall unit.

[0012] Furthermore, the auxiliary frame is also a frame component, which is formed by setting frame columns and frame bottom frames below the two main frames, with the bottom frames corresponding to the main frames and secondary frames; the application of frame components ensures that the rigidity and strength of the frame meet the design requirements when the curtain wall is too long during construction.

[0013] The beneficial effects of this invention are reflected in: 1) The present invention ensures that the ultra-long glass curtain wall unit does not bend during hoisting by setting up an auxiliary installation frame, and the setting of bottom and side baffles helps to ensure that the ultra-long glass curtain wall unit moves together with the auxiliary installation frame during hoisting without lateral or bottom misalignment. 2) The present invention uses a double lifting point and double hook setup, which facilitates the lifting of the auxiliary installation frame in the early stage and the lifting of the glass curtain wall unit together. In the middle stage, the curtain wall unit is lifted separately to make it vertical and then removed from the auxiliary installation frame. This not only ensures the reasonable stress of the curtain wall unit in the ultra-long state after it is vertical, but also facilitates the convenient removal of the auxiliary installation frame. 3) By setting up reinforcing plates, this invention helps to improve the overall rigidity and integrity of the curtain wall unit during use after installation; Therefore, this application solves the technical problems of auxiliary frame setting, convenient hoisting, and overall installation of ultra-large glass curtain wall units. Other features and advantages of the invention will be set forth in the following description, and will be apparent in part from the description, or may be learned by practicing the invention; the main objectives and other advantages of the invention can be realized and obtained by means of the methods particularly pointed out in the description. Attached Figure Description

[0014] Figure 1 This is a schematic diagram of the installation structure of an ultra-long glass curtain wall unit; Figure 2 This is a partial schematic diagram of the installation structure of an ultra-long glass curtain wall unit; Figure 3 This is a schematic diagram of the column assembly, glass curtain wall and their connection structure; Figure 4 This is a schematic diagram of the first main column and its connecting structure; Figure 5 This is a schematic diagram of the second main column and its connecting structure; Figure 6 This is a schematic diagram showing the curtain wall unit and its supporting steel frame lying flat, awaiting hoisting. Figure 7 This is a schematic diagram showing the lifting state of the curtain wall unit and auxiliary installation frame; Figure 8 This is a schematic diagram showing the vertical state of the curtain wall unit and auxiliary mounting bracket; Figure 9 This is a schematic diagram showing the curtain wall unit and auxiliary mounting bracket separated. Figure 10 This is the lifting state of the curtain wall unit after the auxiliary mounting bracket is detached; Figure 11 This is a side view of the extended auxiliary frame structure; Figure 12 This is a top view of the extended auxiliary frame structure; Figure 13 This is a side view of the frame-type auxiliary structure.

[0015] Reference numerals in the attached drawings: 1-Main structure, 2-Connecting bracket, 3-Column assembly, 31-Main column, 311-First main column, 312-Second main column, 32-Reinforcing plate, 321-First reinforcing plate, 322-Second reinforcing plate, 4-Connecting assembly, 41-First connecting piece, 42-First connecting piece, 5-Horizontal beam, 6-Glass curtain wall, 7-Sealing component, 8-Auxiliary mounting frame, 81-Auxiliary frame body, 811-Frame main pole, 812-Frame secondary pole, 813-Frame extension pole, 82-Bottom stop, 83-Side stop, 84-Frame column, 85-Frame bottom frame, 9-First hook, 10-Second hook. Detailed Implementation

[0016] The technical solutions of the present invention will be described in detail below through embodiments. The following embodiments are merely exemplary and can only be used to explain and illustrate the technical solutions of the present invention, and should not be construed as limiting the technical solutions of the present invention.

[0017] Taking the construction of a certain science and technology innovation center as an example, it has glass curtain wall units that span multiple floors. The width of the unit panel is W=1.500 m and the length is H=10.775 m.

[0018] like Figures 1 to 13 As shown, a construction method for an ultra-long glass curtain wall unit installation structure is further illustrated, with the specific steps as follows: Step 1: The curtain wall unit to be installed includes a glass curtain wall 6 and a main frame set on the glass curtain wall 6. The main frame is composed of a column assembly 3, a docking assembly 4 connected to the column assembly 3, and a beam 5. The column assembly 3 includes a mother column 31 and a reinforcing plate 32 set inside the mother column 31.

[0019] Among them, a first vertical column 311 and a corresponding second vertical column 312 are respectively provided at the splicing point of adjacent curtain wall units; a reinforcing plate 32 is inserted into both the first vertical column 311 and the second vertical column 312.

[0020] In this embodiment, the mother column 31 is an aluminum alloy column. Both the first mother column 311 and the second mother column 312 are provided with cavities. The first mother column 311 is provided with an insert plate on one side, and the second mother column 312 is provided with a notch corresponding to the insert plate. A reinforcing plate 32 is inserted into the cavity.

[0021] In this embodiment, the reinforcing plate 32 is a rigid plate with strength adapted to resist the bending strength of the glass curtain wall 6. The reinforcing plate 32 is typically installed within the height range of the glass curtain wall 6. The reinforcing plate 32 is connected to the corresponding vertical column 31 by screws and bolts. The reinforcing plate 32 includes a first reinforcing plate 321 and a second reinforcing plate 322. The first reinforcing plate 321 is inserted into the cavity of the first vertical column 311, and the second reinforcing plate 322 is inserted into the cavity of the second vertical column 312. The first reinforcing plate 321 and the second reinforcing plate 322 are both connected to the corresponding column and the docking assembly 4 by bolts on the side of the first reinforcing plate 321 and the second reinforcing plate 322 adjacent to the main structure 1. One end of the first reinforcing plate 321 and the second reinforcing plate 322 is also connected to the corresponding vertical column 31 by screws.

[0022] Step 2: Fabricate auxiliary mounting bracket 8 according to the dimensions of the curtain wall unit, wherein the length and width of the auxiliary mounting bracket 8 shall not be less than the length and width of the glass curtain wall 6.

[0023] In this embodiment, the auxiliary mounting bracket 8 includes an auxiliary bracket body 81, a bottom stop 82 disposed in the width direction of the auxiliary bracket body 81, and a side stop 83 disposed in the length direction of the auxiliary bracket body 81. The bottom stop 82 is usually disposed in the width direction of the auxiliary bracket body 81, and the bottom stop 82 is an L-shaped part, with its horizontal part detachably connected to the auxiliary bracket body 81.

[0024] In this embodiment, the side baffles 83 are spaced apart along the length of the auxiliary frame 81, and the side baffles 83 are detachably connected to the auxiliary frame 81; the height of the side baffles 83 and the bottom baffles 82 is not less than the thickness of the curtain wall unit, and the side baffles 83 and the bottom baffles 82 are also provided with a buffer pad or shock absorber on the side adjacent to the curtain wall unit.

[0025] In this embodiment, the auxiliary frame 81 includes parallel main frame rods 811 and secondary frame rods 812 connected between the two main frame rods 811 and spaced apart. The secondary frame rods 812 are connected to both ends of the main frame rods 811, and a bottom stop 82 is connected to one end of the secondary frame rod 812. The width of the secondary frame rod 812 is not less than the width of the curtain wall unit. A frame extension rod 813 is also detachably installed on the side of the main frame rod 811 away from the bottom stop 82. The sum of the lengths of the main frame rod 811 and the frame extension rod 813 is greater than the length of the curtain wall unit.

[0026] In this embodiment, the auxiliary frame 81 is also a frame component. The frame body is formed by setting the frame columns 84 and the frame bottom frame 85 below the two main frames 811, wherein the bottom frame is set corresponding to the main frame 811 and the secondary frame 812. The frame component is used to ensure that the rigidity and strength of the frame body meet the design requirements when the curtain wall is too long during construction.

[0027] Step 3: When making the auxiliary installation frame 8, a bottom stop 82 shall be provided at least at one end along the longitudinal direction, and side stops 83 shall be provided at intervals along the longitudinal direction; the bottom stop 82 and side stops 83 shall be provided to ensure that the curtain wall unit does not slip during hoisting.

[0028] Step 4: After the auxiliary mounting bracket 8 is made, place the curtain wall unit after the main frame is installed on it; set the first suspension point on the auxiliary mounting bracket 8, which is located at the opposite end of the bottom stop 82; set the second suspension point on the glass curtain wall 6, which is also located at the opposite end of the bottom stop 82.

[0029] Step 5: During hoisting, the first hook 9 first hoists the auxiliary installation frame 8, slowly lifting and moving the curtain wall unit to a near-vertical position. Then, the second hook 10 begins to lift and bear the force, making the curtain wall unit stand upright and stable in the air. After stabilization, the first hook 9 begins to slowly lower, and the auxiliary installation frame 8 slowly falls to the ground. The first hook 9 is then removed, and the curtain wall unit is continued to be lifted to the installation position via the second hook 10.

[0030] Step 6: The column assembly 3 of the curtain wall unit is connected to the main structure 1 by the docking assembly 4. The main structure 1 is pre-embedded with the connector bracket 2, which is adjustable to the docking assembly 4. The first male column 311 and the second male column 312 of the adjacent curtain wall units are connected by plugging. The joint between the adjacent curtain wall units is filled with the sealant 7, thus completing the construction of the ultra-long glass curtain wall unit installation structure.

[0031] Among them, the connecting bracket 2 is an L-shaped steel piece with a long hole on the horizontal part, which is connected to the main structure 1 by bolts; the vertical part of the connecting bracket 2 is connected to the docking assembly 4.

[0032] In this embodiment, the docking component 4 is a steel part and at least two sets are provided. Each set of docking components 4 includes a first docking part 41 and a second docking part 42. The first docking part 41 is an L-shaped part, and the second docking part 42 is a U-shaped part with a vertical connecting plate. The U-shaped opening is connected to the horizontal part of the first docking part 41, and the vertical connecting plate is connected to the vertical mother column 31.

[0033] The above description is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any changes or substitutions that can be conceived by those skilled in the art within the scope of the technology disclosed in the present invention should be included within the scope of protection of the present invention.

Claims

1. A construction method for an ultra-long glass curtain wall unit installation structure, characterized in that, The glass curtain wall is an extra-long glass curtain wall, with a length of no less than 10m. The specific steps are as follows: Step 1: The curtain wall unit to be installed includes a glass curtain wall and a main frame set on the glass curtain wall. The main frame is composed of column assemblies, connecting assemblies and beams connected to the column assemblies. The column assembly includes a main column and a reinforcing plate set inside the main column. Among them, a first vertical column and a corresponding second vertical column are respectively set at the splicing point of adjacent curtain wall units; a reinforcing plate is inserted into both the first vertical column and the second vertical column; Step 2: Fabricate auxiliary mounting brackets according to the dimensions of the curtain wall units, wherein the length and width of the auxiliary mounting brackets shall not be less than the length and width of the glass curtain wall; Step 3: When making the auxiliary installation frame, a bottom stop should be installed at least at one end along the longitudinal direction, and side stops should be installed at intervals along the longitudinal direction; the installation of the bottom stop and side stops will ensure that the curtain wall unit does not slip during hoisting. Step 4: After the auxiliary mounting bracket is fabricated, place the curtain wall unit with the main frame installed on top of it; set the first suspension point on the auxiliary mounting bracket, with the first suspension point located at the opposite end of the bottom support; set the second suspension point on the glass curtain wall, with the second suspension point also located at the opposite end of the bottom support. Step 5: During hoisting, the first hook first lifts the auxiliary installation frame, slowly lifting and moving the curtain wall unit to a near-vertical position. Then, the second hook begins to lift and bear the force, making the curtain wall unit stand upright and stable in the air. After stabilization, the first hook begins to slowly lower, and the auxiliary installation frame slowly falls to the ground. The first hook is removed, and the curtain wall unit is lifted to the installation position using the second hook. Step Six: The column components of the curtain wall unit are connected to the main structure by a docking component. Connecting brackets are pre-embedded on the main structure, and the connecting brackets are adjustable to the docking components. The first and second parent columns of adjacent curtain wall units are connected by plugging in. The joints between adjacent curtain wall units are filled with sealant, thus completing the construction of the ultra-long glass curtain wall unit installation structure.

2. The construction method for an ultra-long glass curtain wall unit installation structure as described in claim 1, characterized in that, The connecting bracket is an L-shaped piece with a long hole on the horizontal part, through which bolts are used to connect it to the main structure; the vertical part of the connecting bracket is connected to the docking assembly. The docking components are provided in at least two sets. Each set of docking components includes a first docking piece and a second docking piece. The first docking piece is an L-shaped piece, and the second docking piece is a U-shaped piece with a vertical connecting plate. The U-shaped opening is connected to the horizontal part of the first docking piece, and the vertical connecting plate is connected to the vertical column.

3. The construction method for an ultra-long glass curtain wall unit installation structure as described in claim 1, characterized in that, Both the first and second male columns are provided with cavities. The first male column is provided with an insert plate on one side, and the second male column is provided with a notch corresponding to the insert plate. A reinforcing plate is inserted into the cavity.

4. The construction method for an ultra-long glass curtain wall unit installation structure as described in claim 1, characterized in that, The reinforcing plate is a rigid plate with strength adapted to resist the bending strength of the glass curtain wall. The reinforcing plate is usually installed within the height range of the glass curtain wall. The reinforcing plate is connected to the corresponding vertical column by screws and bolts.

5. The construction method for an ultra-long glass curtain wall unit installation structure as described in claim 4, characterized in that, The reinforcing plate includes a first reinforcing plate and a second reinforcing plate. The first reinforcing plate is inserted into the cavity of the first vertical column, and the second reinforcing plate is inserted into the cavity of the second vertical column. The first and second reinforcing plates are connected to the corresponding columns and docking components by bolts on the side of the first and second reinforcing plates adjacent to the main structure. One end of the first and second reinforcing plates is also connected to the corresponding vertical column by screws.

6. The construction method for an ultra-long glass curtain wall unit installation structure as described in claim 1, characterized in that, The auxiliary mounting bracket includes an auxiliary frame body, a bottom stop in the width direction of the auxiliary frame body, and a side stop in the length direction of the auxiliary frame body; the bottom stop is usually provided in the width direction of the auxiliary frame body, and the bottom stop is an L-shaped part, with its horizontal part detachably connected to the auxiliary frame body.

7. The construction method for an ultra-long glass curtain wall unit installation structure as described in claim 6, characterized in that, Side blocks are spaced apart along the length of the auxiliary frame, and the side blocks are detachably connected to the auxiliary frame; the height of the side blocks and bottom blocks is not less than the thickness of the curtain wall unit, and the side blocks and bottom blocks are also provided with a buffer pad or shock-absorbing pad on the side adjacent to the curtain wall unit.

8. The construction method for an ultra-long glass curtain wall unit installation structure as described in claim 1, characterized in that, The auxiliary frame includes parallel main frames and secondary frames that connect the two main frames and are spaced apart; the secondary frames are connected to both ends of the main frames, and a bottom stop is connected to one end of the secondary frame; the width of the secondary frame is not less than the width of the curtain wall unit. A frame extension rod is also installed on the side of the main frame away from the bottom support. The sum of the lengths of the main frame and the frame extension rod is greater than the length of the curtain wall unit.

9. The construction method for an ultra-long glass curtain wall unit installation structure as described in claim 8, characterized in that, The auxiliary frame is also a frame component, which is formed by setting up support columns and a bottom frame under the two main poles. The bottom frame is set corresponding to the main poles and secondary poles. The application of the frame component is to ensure that the rigidity and strength of the frame meet the design requirements when the curtain wall is too long during construction.