A pump and trench cleaning rig and method of construction

CN122589201APending Publication Date: 2026-08-18MCC TIANGONG GROUP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610741147.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-05-27
Publication Date
2026-08-18

AI Technical Summary

Technical Problem

存在施工人员吊装进入泵池内进行人工清理时,不仅面临高处坠落等安全风险,且清理过程中垃圾不便取放等技术问题

Benefits of technology

[0015]本发明具有的优点和积极效果是:由于采用上述技术方案,通过将支撑架体安装于泵池顶部,在支撑架体上安装作业平台和垃圾收集部,能减少垃圾转运频次,提高作业连续性和安全性;具有结构简单,加工成本低等优点。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122589201A_ABST
    Figure CN122589201A_ABST
Patent Text Reader

Abstract

The application provides a pump pool cleaning work frame and a construction method. The pump pool cleaning work frame comprises a support frame body used for being mounted on the top of a pump pool, a work platform connected with the support frame body, and a garbage collecting part movably connected with the support frame body. The construction method of the pump pool cleaning work frame comprises the following steps: erecting the support frame body on the top of the pump pool; adjusting the garbage collecting part to an appropriate position; and standing a construction worker on the work platform to clean the inner wall of the pump pool. The application has the advantages of reducing the garbage transfer frequency, improving the operation continuity and safety, simple structure and low processing cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of pump pool construction technology, and in particular relates to a pump pool cleaning operation frame and construction method. Background Technology

[0002] In existing technologies, sludge tends to accumulate on the upper inner wall of the pump pool during long-term operation, requiring regular cleaning. When construction workers are hoisted into the pump pool for manual cleaning, they not only face safety risks such as falls from heights, but also encounter technical challenges such as the difficulty of removing and placing debris during the cleaning process. Summary of the Invention

[0003] To solve the above-mentioned technical problems, the present invention provides a pump pool cleaning operation frame and construction method, which is particularly suitable for pump pool inner wall cleaning and garbage collection operations.

[0004] The technical solution adopted in this invention is: a pump pool cleaning operation frame, including a support frame for installation on the top of the pump pool; an operation platform connected to the support frame; and a waste collection unit movably connected to the support frame.

[0005] Preferably, the support frame includes multiple U-shaped main frames and overlapping components. Each U-shaped main frame includes two opposing vertical support components and a horizontal support component for connecting the two vertical support components. Each vertical support component is connected to a corresponding overlapping component. The overlapping component is used to be erected on the top of the pump pool. The working platform is connected to multiple horizontal support components. The waste collection unit is movably connected between two corresponding vertical support components.

[0006] Preferably, the work platform includes multiple scaffold boards, each of which is vertically connected to multiple horizontal support components.

[0007] Preferably, the support frame further includes an adjusting rod, which is slidably connected between two vertical support members, and the waste collection part includes a collection container and a sliding connector connected to each other, with the sliding connector slidably connected to the adjusting rod.

[0008] Preferably, an elastic clip is provided on the outside of the collection container, which is used to hold the collection bag fitted onto the collection container.

[0009] Preferably, a hook is provided on the outside of the collection container.

[0010] Preferably, it also includes an auxiliary fixing part, which includes at least two flexible connecting members. One end of the flexible connecting member is connected to the support frame, and the other end extends to the outside of the pump pool and is connected to an external fixing point.

[0011] Preferably, the present invention also provides a construction method for a pump pool cleaning work frame, comprising the following steps:

[0012] The support frame is erected on top of the pump pool;

[0013] Adjust the waste collection unit to the appropriate position;

[0014] Construction workers stand on the work platform and clean the inner wall of the pump pool.

[0015] The advantages and positive effects of this invention are as follows: by adopting the above technical solution, by installing the support frame on the top of the pump pool and installing the working platform and waste collection unit on the support frame, the frequency of waste transfer can be reduced, and the continuity and safety of operation can be improved; it also has the advantages of simple structure and low processing cost. Attached Figure Description

[0016] Figure 1 This is a schematic diagram of the structure of one embodiment of the present invention;

[0017] Figure 2 This is a top view of the support frame structure in one embodiment of the present invention;

[0018] Figure 3 This is a schematic diagram showing the connection relationship between the waste collection unit and the support frame in one embodiment of the present invention;

[0019] In the picture:

[0020] 1. Vertical support components; 2. Horizontal support components; 3. Overlapping components; 4. Scaffold boards; 5. Adjusting rods; 6. Sliding sleeves; 7. Locking bolts; 8. Sliding connectors; 9. Connecting rods; 10. Collection containers; 11. Elastic clamps; 12. Hooks; 13. Connecting plates; 14. Flexible connecting components; 15. External fixing points; 16. Safety ropes; 17. Pump pool. Detailed Implementation

[0021] The embodiments of the present invention will now be described with reference to the accompanying drawings. The described embodiments are only some embodiments of the present invention, and not all embodiments.

[0022] The embodiments of the present invention are described in detail below. Examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar units or units having the same or similar functions throughout.

[0023] The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention. In the description of the present invention, it should be understood that terms such as "installation," "connection," and "fixing" should be interpreted broadly, and can refer to direct connection, installation, or fixing, or indirect connection, installation, or fixing. The present invention does not impose any limitations in this regard.

[0024] like Figure 1-3As shown in the schematic diagram, an embodiment of the present invention for a pump pool cleaning operation frame includes a support frame for mounting on the top of the pump pool 17; an operation platform connected to the support frame; and a waste collection unit movably connected to the support frame.

[0025] The support frame and working platform work together to provide a support base for construction workers to stand in the pump pool 17. The garbage collection section can be adapted and adjusted to improve the safety and continuity of the cleaning operation in the pump pool 17.

[0026] Preferably, the support frame includes multiple U-shaped main frames and overlapping members 3. Each U-shaped main frame includes two opposing vertical support members 1 and a horizontal support member 2 for connecting the two vertical support members 1. Each vertical support member 1 is connected to a corresponding overlapping member 3. The overlapping member 3 is used to erect the support frame on top of the pump pool 17. The working platform is connected to multiple horizontal support members 2. The waste collection unit is movably connected between two corresponding vertical support members 1. The support frame is erected on top of the pump pool 17 through the overlapping members 3. The support frame can be made of channel steel, which has low processing cost and can be processed and prepared on-site according to the pump pool 17.

[0027] Preferably, the working platform includes multiple scaffold planks 4, each scaffold plank 4 being vertically connected to multiple horizontal support members 2. By laying and combining multiple scaffold planks 4 and horizontal support members 2 into a grid structure, each scaffold plank 4 can be vertically connected to each horizontal support member 2, which helps to distribute the load and improve the uniformity of load bearing.

[0028] Preferably, the support frame further includes an adjusting rod 5, which is slidably connected between two vertical support members 1. The waste collection unit includes a collection container 10 and a sliding connector 8 connected to the collection container 10 via a connecting rod 9. The sliding connector 8 is slidably connected to the adjusting rod 5. The waste collection unit can be adapted and adjusted in both horizontal and vertical directions, improving the working comfort of construction personnel and thus helping to improve the convenience and continuity of cleaning operations.

[0029] Preferably, an elastic clip 11 is provided on the outside of the collection container 10. The elastic clip 11 is used to clamp the collection bag fitted on the collection container 10. By clamping and fixing the opening of the collection bag to the collection container 10 with the elastic clip 11, the risk of the bag opening slipping or falling off during the garbage disposal process can be reduced, and the risk of garbage scattering and contaminating the pump pool 17 can be reduced. After the operation is completed, the collection bag can be directly packed and taken out, which can reduce the amount of cleaning work required for the collection container 10.

[0030] Preferably, a hook 12 is provided on the outside of the collection container 10. The hook 12 can be used to hang small cleaning tools or gloves, allowing construction workers to retrieve spare materials without returning to the ground during the operation, which can reduce the consumption of non-operation time and help improve the continuity and efficiency of a single pool operation.

[0031] Preferably, the system also includes an auxiliary fixing part, which comprises at least two flexible connecting members 14. One end of each flexible connecting member 14 is connected to the support frame, and the other end extends to the outside of the pump pool 17 and is connected to an external fixing point 15. The two flexible connecting members 14 are arranged in opposite directions, which can apply counter-tension to the support frame from both sides of the pump pool 17 when necessary. The auxiliary fixing part, together with the overlapping member 3, provides multiple reinforcements, which helps to improve the overall stability of the work platform and the safety of construction personnel.

[0032] Preferably, the present invention also provides a construction method for a pump pool cleaning work frame, comprising the following steps:

[0033] The support frame is erected on top of the pump pool 17;

[0034] Adjust the waste collection unit to the appropriate position;

[0035] Construction workers stand on the work platform and clean the inner wall of pump pool 17.

[0036] Example 1:

[0037] In this embodiment, the pump pool cleaning frame includes a support frame, a working platform, a waste collection section, and an auxiliary fixing section.

[0038] The support frame includes multiple U-shaped main frames and overlapping components 3. Each U-shaped main frame consists of two opposing vertical support components 1 (made of channel steel in this embodiment) and a horizontal support component 2 (made of channel steel in this embodiment) connecting the two vertical support components 1. The vertical support components 1 and the horizontal support components 2 are connected by high-strength bolts, forming an upward-opening U-shaped structure. To make the connection more reliable, in addition to the main load-bearing system of the bolt connection, the channel steel connection is fully welded on both sides for auxiliary reinforcement.

[0039] Multiple U-shaped main frames are spaced apart along the first direction. Each vertical support member 1 is vertically connected to an overlapping member 3, which extends horizontally so that the overlapping member 3 can be erected on the upper surface of the top of the pump pool 17.

[0040] The work platform comprises multiple scaffold planks 4. The scaffold planks 4 are laid on the top surface of multiple horizontal support members 2 of the U-shaped main frame, and the length direction of the scaffold planks 4 is parallel to the first direction. Each scaffold plank 4 is simultaneously perpendicularly connected to at least two horizontal support members 2. The scaffold planks 4 are fixed to the horizontal support members 2 by multiple clamping bolt assemblies, facilitating disassembly and transportation.

[0041] The support frame also includes an adjusting rod 5, with its two ends slidably connected to two opposing vertical support members 1. Specifically, a sliding sleeve 6 is fixed to each end of the adjusting rod 5. The sliding sleeve 6 is slidably fitted onto the corresponding vertical support member 1 and can be fixed by a locking bolt 7, so that the adjusting rod 5 can slide up and down along the vertical support member 1 and be fixed at the required height by the locking bolt 7.

[0042] The waste collection unit includes a sliding connector 8, a connecting rod 9, a collection container 10, an elastic clip 11, and a hook 12. The sliding connector 8 is sleeved on and slidably connected to the adjusting rod 5. It is understood that in different embodiments, the sliding connector 8 can be fixed to the desired position of the adjusting rod 5 by a locking bolt; this is prior art and will not be elaborated upon here. One end of the connecting rod 9 is fixedly connected to the sliding connector 8, and the other end is connected to the side wall of the collection container 10. The collection container 10 is a barrel-shaped structure with an open top, used to hold the collected waste. The collection container 10 is made of stainless steel or high-density polyethylene.

[0043] An elastic clip 11 is disposed on the outer wall of the collection container 10. The elastic clip 11 is a thin metal or plastic clip with elasticity, which can clamp the opening of the collection bag fitted onto the collection container 10. In use, the opening of the collection bag is folded back and fitted onto the outside of the top opening of the collection container 10, and clamped and fixed by the elastic clip 11. The connection method between the elastic clip 11 and the collection container 10 is prior art.

[0044] Hook 12 is attached to the outer wall of collection container 10 for hanging equipment collection bags or small cleaning tools.

[0045] The auxiliary fixing part includes at least two flexible connecting members 14. In this embodiment, the flexible connecting members 14 are steel wire ropes. One end of each flexible connecting member 14 is connected to the connecting plate 13 fixedly connected to the horizontal support member 2 via a connecting ring, and the other end extends outward from the pump pool 17 and is connected to an external fixing point 15. The external fixing point 15 can be a fixed foundation structure such as a ground anchor, and its connection method with the flexible connecting member 14 is existing technology. The two flexible connecting members 14 are arranged in opposite directions, which can apply counter-tension to the support frame from both sides of the pump pool 17 when necessary, to assist in reinforcement and improve safety.

[0046] In a specific construction process:

[0047] According to the size of the pump pool 17, select the corresponding number and size of U-shaped main frames, and place the overlapping components 3 of each U-shaped main frame on the upper surface of the top of the pump pool 17 so that the U-shaped main frame is installed inside the pump pool 17, and the horizontal support component 2 is suspended above the bottom of the pump pool 17.

[0048] Multiple scaffold boards 4 are laid on the top surface of multiple horizontal support members 2. The length direction of each scaffold board 4 is parallel to the arrangement direction of the U-shaped main frame, and each scaffold board 4 is perpendicularly connected to at least two horizontal support members 2.

[0049] After sliding both ends of the adjusting rod 5 to the desired height, fix it with the locking bolt 7.

[0050] The sliding connector 8 of the waste collection unit is fitted onto the adjusting rod 5 and adjusted to the appropriate position.

[0051] The opening of the collection bag is folded back and placed over the outside of the top opening of the collection container 10, and the opening is clamped and fixed by the elastic clip 11.

[0052] At least two flexible connecting members 14 have one end connected to the connecting plate 13 under the support frame, and the other end extends to the outside of the pump pool 17 and is connected to the external fixing point 15, adjusting the preload of the flexible connecting members 14.

[0053] During construction, fixed blocks are set on the side of the pump pool 17 as anchor points for the safety rope 16. Construction workers wear five-point safety belts and are reliably connected to the safety rope 16, thereby constructing a fall protection system for high-altitude operations and providing effective safety assurance for the cleaning operation.

[0054] Construction workers stand on scaffold boards 4 to clean the inside of the pump pool 17, and put the cleaned-up garbage into the collection bags in the collection container 10. The equipment bags are then hung on hooks 12 for replacement when the pump pool is full.

[0055] By mounting the support frame on top of the pump pool 17 and installing a working platform on the support frame, stable support is provided for construction workers to stand and work. The support frame is equipped with an adjustable garbage collection part, which allows construction workers to easily put garbage into the collection container 10 during the cleaning process, reducing the frequency of garbage transfer and improving the continuity of work. The collection container 10 is equipped with elastic clips 11 and hooks 12 on the outside, which can not only reliably fix the collection bag and reduce the risk of slippage, but also hang equipment and tools, improving the convenience of on-site work. The auxiliary fixing part applies counter-pulling force from both sides outside the pool, which helps to enhance the overall stability and safety. The working frame can be reused multiple times, reducing construction costs.

[0056] The embodiments of the present invention have been described in detail above, but the content described is only a preferred embodiment of the present invention and should not be considered as limiting the scope of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the patent coverage of the present invention.

Claims

1. A cleaning frame for pump tanks, characterized in that, include: A support frame for mounting on top of the pump sump; The work platform is connected to the support frame. The waste collection unit is movably connected to the support frame.

2. The pump pool cleaning work frame according to claim 1, characterized in that, The support frame includes multiple U-shaped main frames and overlapping components. Each U-shaped main frame includes two opposing vertical support components and a horizontal support component for connecting the two vertical support components. Each vertical support component is connected to a corresponding overlapping component. The overlapping component is used to be erected on the top of the pump pool. The working platform is connected to multiple horizontal support components. The waste collection unit is movably connected between two corresponding vertical support components.

3. The pump pool cleaning work frame according to claim 2, characterized in that, The work platform includes multiple scaffold boards, each of which is vertically connected to multiple horizontal support components.

4. The pump pool cleaning work frame according to claim 2 or 3, characterized in that, The support frame also includes an adjusting rod, which is slidably connected between the two vertical support members. The waste collection part includes a collection container and a sliding connector connected to each other, and the sliding connector is slidably connected to the adjusting rod.

5. The pump pool cleaning work frame according to claim 4, characterized in that, The collection container is provided with an elastic clip on the outside, which is used to hold the collection bag sleeved on the collection container.

6. The pump pool cleaning work frame according to claim 4, characterized in that, The collection container is equipped with hooks on the outside.

7. The pump pool cleaning work frame according to any one of claims 1-3, 5 and 6, characterized in that, It also includes an auxiliary fixing part, which includes at least two flexible connecting members. One end of the flexible connecting member is connected to the support frame, and the other end extends to the outside of the pump pool and is connected to an external fixing point.

8. A construction method for a pump pool cleaning work frame, utilizing the pump pool cleaning work frame according to any one of claims 1-7, characterized in that, Includes the following steps: The support frame is erected on top of the pump tank; Adjust the waste collection unit to the appropriate position; Construction workers stand on the work platform to clean the inner wall of the pump tank.