Mobile paint spray booth multi-site remote networking operation and maintenance data scheduling management method
By acquiring data such as spraying operation load, filtration pressure differential increase, and abnormal exhaust duration, the maintenance load level and risk level of the spray booth are assessed, and the priority of cross-site maintenance tasks is set. This solves the problem of inaccurate sorting of spray booth maintenance tasks in existing technologies, and realizes efficient continuous operation of the spray booth and effective execution of maintenance tasks.
Patent Information
- Application Number
- CN202611082500.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-21
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2046-07-21
AI Technical Summary
Existing technologies cannot accurately determine the site maintenance load level of the paint booth, cannot form a cross-site maintenance task sequence, lack dispatch constraints involving the availability of spare parts, and cannot generate a cross-site maintenance task sorting result that is disconnected from the actual recovery effect.
By acquiring the painting operation load, filter pressure differential increase, duration of abnormal exhaust, and number of available spare parts at each site, a cross-site maintenance task ranking and feedback update is formed, including assessing the site maintenance load level, painting continuity risk level, and cross-site executable assignment priority.
It improves the continuity of multi-site painting and the accuracy of cross-site maintenance task sequencing, ensuring continuous operation of the paint booth and the effective execution of maintenance tasks.
Smart Images

Figure CN122596599B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of remote operation and maintenance technology, and more specifically, to a method for scheduling and managing data for remote network operation and maintenance of multiple sites in mobile paint booths. Background Technology
[0002] Mobile paint booths are commonly used for temporary painting operations on vehicles, equipment shells, and large components. After multiple sites are connected to a unified operation and maintenance center via a remote networking platform, exhaust filtration, spare parts replenishment, and maintenance dispatch need to be managed collaboratively under different workloads. Existing remote operation and maintenance platforms can typically receive site operation data and alarm information, and arrange maintenance tasks according to manual inspection plans or single-site fault prompts. The relevant data provides basic information for continuous operation of the paint booth, maintenance of the filtration system, and spare parts allocation.
[0003] The existing technology has the following shortcomings: Currently, existing technologies cannot form site maintenance load levels, accurately form paint spraying continuity risk levels and cross-site maintenance task sequences, lack dispatch constraints involving the number of available spare parts, cannot form cross-site executable dispatch priorities, and lack feedback correction of the sorting results based on the exhaust recovery value after maintenance. This leads to a disconnect between the sorting results of subsequent cross-site maintenance tasks and the actual recovery effect. Therefore, a multi-site remote networking operation and maintenance data scheduling and management method for mobile paint booths is proposed.
[0004] The information disclosed in the background section is only intended to enhance the understanding of the background of this disclosure, and therefore may include information that does not constitute prior art known to those skilled in the art. Summary of the Invention
[0005] To overcome the above-mentioned deficiencies of the prior art, embodiments of the present invention provide a method for remote networked operation and maintenance data scheduling and management of mobile spray booths at multiple sites. By continuously transmitting the site spraying operation load, the increase in filter pressure difference, the duration of abnormal exhaust, the number of available spare parts, and the exhaust recovery value after maintenance, a cross-site maintenance task sorting and feedback update is formed.
[0006] To achieve the above objectives, the present invention provides the following technical solution: a method for remote networking operation and maintenance data scheduling and management of multiple sites in a mobile spray booth, comprising the following steps: Step S1: Obtain the spraying operation load of each mobile spray booth, collect the increase in filtration pressure difference, and assess the maintenance load level of the site by combining the spraying operation load and the increase in filtration pressure difference. Step S2: Read the duration of abnormal ventilation, analyze the risk level of paint spraying continuity in combination with the site maintenance load level, and determine whether the corresponding site has entered the cross-site maintenance task sequence. Mark the risk of the site that has entered the cross-site maintenance task sequence. Step S3: Read the available quantity of spare parts, set the cross-site executable dispatch priority based on the paint continuity risk level and the available quantity of spare parts, and sort the cross-site maintenance tasks of the marked sites using the cross-site executable dispatch priority. Step S4: After maintenance is completed, collect the exhaust recovery value after maintenance, generate a priority feedback correction benchmark by combining the cross-site executable dispatch priority, and update the sorting results of subsequent cross-site maintenance tasks based on the priority feedback correction benchmark.
[0007] In a preferred embodiment, in step S1, the site spraying operation load refers to the degree of occupancy of spraying operations formed by the mobile spray booths of each site within the same statistical period. The increase in filtration pressure differential is the increase in pressure differential of the filter components of the mobile paint booths at each site within the same statistical period. The station spraying load and filtration pressure difference growth of each mobile spray booth were standardized for each station.
[0008] In a preferred embodiment, in step S1, the calculated value corresponding to the mobile spray booth at the site is calculated using the geometric mean method based on the results of the standardized load of the integrated spraying operation at the site and the standardized increase in the filtration pressure difference. The calculated values corresponding to the mobile spray booths at each site within the same scheduling batch are arranged in descending order. Based on the total number of sites within the same scheduling batch, the arrangement results are divided into three consecutive sequence intervals. The first one-third of the sequence interval is the first sequence interval, the middle one-third of the sequence interval is the second sequence interval, and the last one-third of the sequence interval is the third sequence interval. When the arrangement order of the mobile spray booth at the site falls into the first order range, the site maintenance load level is assessed as high. When the site's mobile paint booth is ranked in the second position, the site's maintenance load level is assessed as medium. When the site's mobile paint booth is ranked in the third position, the site maintenance load level is assessed as low.
[0009] In a preferred embodiment, in step S2, the duration of abnormal exhaust is the length of time that the exhaust state of each mobile paint booth deviates from the normal exhaust state. Convert the site maintenance load level into an ordered value, where high corresponds to 3, medium corresponds to 2, and low corresponds to 1. The duration of abnormal exhaust ventilation at mobile paint booths at various sites within the same scheduling batch is standardized by interval processing to obtain the standardized result of the duration of abnormal exhaust ventilation. The calculated value of the painting continuity risk level corresponding to the mobile spray booth at the site is obtained by taking the ordered values corresponding to the maintenance load level of the comprehensive site and the standardized results of the duration of abnormal ventilation.
[0010] In a preferred embodiment, in step S2, the calculated values of the continuous risk level of painting within the same scheduling batch are arranged in descending order, and the front, middle and back segments of the arrangement order are determined according to the preset upper limit of the number of high-risk sites and the preset upper limit of the number of low-risk sites. When the mobile spray booth is at the beginning of the sequence, the spray painting continuity risk level is analyzed as high. When the mobile spray booth is in the middle of the sequence, the spray painting continuity risk level is analyzed as medium. When the mobile spray booth is located at the end of the sequence, the spray painting continuity risk level is analyzed as low. Determine if the corresponding site has entered the cross-site maintenance task sequence: When the continuity risk level of painting is high or medium, the corresponding site will be added to the cross-site maintenance task sequence, and the corresponding site will be marked with risk. When the risk level of paint continuity is low, the corresponding site will not be included in the cross-site maintenance task sequence.
[0011] In a preferred embodiment, in step S3, the number of spare parts available is the number of spare parts that can be locked by the remote operation and maintenance platform and used for maintenance of the corresponding site when the maintenance task is dispatched. The risk level of continuous painting is converted into an ordered value, where high corresponds to 3, medium to 2, and low to 1; the cross-site dispatch priority is set according to the ordered value: ,in, For the cross-site executable dispatch priority of the j-th marked site, Let be the ordered value of the paint continuity risk level after conversion for the j-th marked site. Let j be the number of spare parts available at the j-th marked site. It is the natural logarithm function; The cross-site maintenance tasks of the marked sites are sorted in descending order of cross-site executable dispatch priority to obtain the sorting result of the cross-site maintenance tasks.
[0012] In a preferred embodiment, in step S4, the post-maintenance exhaust recovery value is the degree to which the exhaust status of the mobile paint booth at the corresponding site returns to normal operation after the cross-site maintenance task is completed. After standardizing the exhaust ventilation recovery values corresponding to completed cross-site maintenance tasks, a priority feedback correction benchmark is generated: ,in, This serves as the priority feedback correction benchmark for the j-th completed cross-site maintenance task. The cross-site executable dispatch priority used when dispatching the j-th completed cross-site maintenance task. To maintain the standardized results of the rear exhaust recovery value.
[0013] In a preferred embodiment, in step S4, the priority feedback correction benchmarks of completed cross-site maintenance tasks are classified into two risk categories, high and medium, according to the corresponding paint continuity risk level. The median of the priority feedback correction benchmarks in each category is taken as the priority feedback correction benchmark for subsequent cross-site maintenance tasks under the same paint continuity risk level. When updating the sorting results of subsequent cross-site maintenance tasks, the cross-site executable assignment priority of the subsequent cross-site maintenance tasks is added to the priority feedback correction benchmark under the corresponding paint continuity risk level, and then rearranged in descending order according to the added value.
[0014] The technical effects and advantages of this invention are as follows: This invention improves the continuity of multi-site painting and the accuracy of cross-site maintenance task sequencing by acquiring the painting operation load of each mobile spray booth, collecting the increase in filter pressure difference, assessing the maintenance load level of each site based on the painting operation load, reading the duration of abnormal exhaust ventilation, analyzing the painting continuity risk level based on the site maintenance load level, determining whether the corresponding site has entered the cross-site maintenance task sequence, marking the risk of sites entering the cross-site maintenance task sequence, reading the available spare parts quantity, setting the cross-site executable dispatch priority based on the painting continuity risk level and the available spare parts quantity, sorting the cross-site maintenance tasks of marked sites using the cross-site executable dispatch priority, collecting the exhaust ventilation recovery value after maintenance, generating a priority feedback correction benchmark based on the cross-site executable dispatch priority, and updating the sorting results of subsequent cross-site maintenance tasks based on the priority feedback correction benchmark. Attached Figure Description
[0015] Figure 1 This is a flowchart illustrating the implementation of the mobile spray booth multi-site remote networking operation and maintenance data scheduling and management method of the present invention.
[0016] Figure 2 This is a schematic diagram illustrating the steps of the mobile spray booth multi-site remote networking operation and maintenance data scheduling and management method of the present invention. Detailed Implementation
[0017] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0018] This invention generates maintenance tasks for multi-site mobile paint booths in the order of site maintenance load level, paint continuity risk level, cross-site executable dispatch priority, and priority feedback correction benchmark, so that the maintenance tasks can be scheduled according to the workload, ventilation anomalies, spare parts constraints, and maintenance recovery effects.
[0019] Example 1, as Figures 1 to 2 As shown, the method for remote network operation and maintenance data scheduling and management of mobile spray booths at multiple sites includes the following steps: Step S1: Obtain the spraying operation load of each mobile spray booth, collect the increase in filtration pressure difference, and assess the maintenance load level of the site by combining the spraying operation load and the increase in filtration pressure difference. Step S2: Read the duration of abnormal ventilation, analyze the risk level of paint spraying continuity in combination with the site maintenance load level, and determine whether the corresponding site has entered the cross-site maintenance task sequence. Mark the risk of the site that has entered the cross-site maintenance task sequence. Step S3: Read the available quantity of spare parts, set the cross-site executable dispatch priority based on the paint continuity risk level and the available quantity of spare parts, and sort the cross-site maintenance tasks of the marked sites using the cross-site executable dispatch priority. Step S4: After maintenance is completed, collect the exhaust recovery value after maintenance, generate a priority feedback correction benchmark by combining the cross-site executable dispatch priority, and update the sorting results of subsequent cross-site maintenance tasks based on the priority feedback correction benchmark.
[0020] The specific implementation is as follows: In step S1, the site spraying operation load refers to the degree of spraying operation occupancy formed by each site's mobile spray booth within the same statistical period. It is obtained by reading the operation records uploaded by the site operation management system or spraying controller connected to each site's mobile spray booth, reflecting the spraying usage intensity of the corresponding site within the statistical period. The increase in filtration pressure difference is the increase in pressure difference of the filter components of each mobile paint booth within the same statistical period. It is collected by pressure difference detection devices installed on the air inlet and outlet sides of the filter components and reflects the increase in the degree of clogging of the filter components.
[0021] A mobile spray booth is a spray painting facility that can be moved and arranged between different work sites and is equipped with a spray painting work space, exhaust filtration components, and operation and maintenance data acquisition components.
[0022] For mobile paint booths within the same scheduling batch, the site spraying operation load is standardized by area: ,in, Let the station spraying load of the mobile spray booth at station j be , This represents the minimum value of the spraying operation load at each site within the same scheduling batch. This represents the maximum value of the spraying operation load at each site within the same scheduling batch. This is the result after standardizing the site spraying workload; the higher the site spraying workload, The larger the value, the higher the degree to which the mobile spray booth at that site is occupied by spraying operations.
[0023] It should be added that when performing interval standardization, if the maximum and minimum values are the same, the standardized result should be set to 1.
[0024] The increase in filtration differential pressure at each mobile paint booth within the same scheduling batch is standardized by interval processing to obtain the standardized result of the increase in filtration differential pressure. The larger the increase in filtration differential pressure, the more obvious the blockage of the filter components of the mobile paint booth at that site.
[0025] The geometric mean method is used to assess the site maintenance load level. ,in, Let be the calculated value for the maintenance load level corresponding to the j-th mobile paint booth. This is the result of standardizing the spraying workload at the site. This is the result after standardizing the increase in filtration pressure difference.
[0026] If either the standardized result of the site spraying operation load or the standardized result of the filtration pressure difference increase is too low, All parameters will be suppressed, which can prevent the site maintenance load level from being excessively increased due to a single parameter being too high.
[0027] Mobile paint booths at various stations within the same dispatch batch Sort in descending order and classify site maintenance load levels according to the sort order: Based on the total number of stations within the same scheduling batch, the sorting results are divided into three consecutive sequence intervals. The first one-third of the sequence interval is the first sequence interval, the middle one-third of the sequence interval is the second sequence interval, and the last one-third of the sequence interval is the third sequence interval. When the arrangement order of the mobile paint booth at the site falls into the first order range, the maintenance load level of the site is assessed as high. When the mobile paint booth at a site falls into the second position range in the arrangement sequence, the maintenance load level of the site is assessed as medium. When the mobile paint booth at a site falls into the third position in the arrangement sequence, the maintenance load level of that site is assessed as low.
[0028] The site maintenance load level refers to the maintenance pressure classification result characterized by the site painting operation load and the increase in filtration pressure difference, which is used to input the analysis of the continuity risk level of painting in subsequent steps.
[0029] In step S2, the duration of abnormal exhaust is read, the risk level of paint continuity is analyzed in combination with the site maintenance load level, and it is determined whether the corresponding site has entered the cross-site maintenance task sequence. The sites that have entered the cross-site maintenance task sequence are marked with risks. The duration of abnormal ventilation is the length of time that the ventilation status of each mobile paint booth deviates from the normal ventilation status. It is obtained by reading the abnormal ventilation records in the ventilation control cabinet, ventilation monitoring device or remote operation and maintenance platform of each mobile paint booth, and reflects the duration of the impact of abnormal ventilation on the continuity of painting operations.
[0030] The paint spraying continuity risk level refers to the risk classification result of the mobile paint booth at the corresponding site affecting the continuous operation of paint spraying operations due to increased maintenance load and continued abnormal ventilation.
[0031] Convert the site maintenance load level into an ordered value, where high corresponds to 3, medium corresponds to 2, and low corresponds to 1. The duration of abnormal exhaust ventilation at mobile paint booths at each site within the same scheduling batch is standardized by interval processing to obtain the standardized duration of abnormal exhaust ventilation. The standardized duration of abnormal exhaust ventilation is then used to analyze the risk level of paint spraying continuity. The longer the abnormal ventilation lasts, the more significant the impact of the mobile paint booth on the continuity of painting. The following formula is used to rank the risk levels of painting continuity: ,in, Let be the ordered values of the site maintenance load level for the j-th mobile paint booth after conversion. The result is the standardized duration of the abnormal ventilation. This is the calculated value for the paint spraying continuity risk level corresponding to the j-th mobile paint booth. Higher site maintenance load levels and longer periods of abnormal ventilation are associated with higher risk levels. The larger the value, the higher the likelihood that the painting operation will be forced to be interrupted or reduced in load.
[0032] Mobile paint booths at various stations within the same dispatch batch Arranged in descending order, and the risk level of continuous painting is classified according to the order of arrangement: When the mobile spray booth is at the beginning of the sequence, the spray painting continuity risk level is analyzed as high. When the mobile spray booth is in the middle of the sequence, the spray painting continuity risk level is analyzed as medium. When the mobile spray booth is located at the end of the sequence, the spray painting continuity risk level is analyzed as low.
[0033] The front, middle, and rear segments are continuous sequence intervals determined based on the total number of stations within the same scheduling batch and the preset upper limits for the number of high-risk and low-risk stations, respectively. After the descending order is completed, the stations with the highest sequence number and the number not exceeding the preset upper limit for the number of high-risk stations are determined as the front segment, the stations with the lowest sequence number and the number not exceeding the preset upper limit for the number of low-risk stations are determined as the rear segment, and the remaining stations between the front and rear segments are determined as the middle segment.
[0034] The preset upper limit for the number of high-risk sites is set as follows: based on the total number of sites in the same scheduling batch, the number of maintenance personnel available for that scheduling batch, the number of available filter component spare parts, and the scheduling cycle length; when the number of maintenance personnel and the number of available filter component spare parts are small, or the scheduling cycle length is short, the preset upper limit for the number of high-risk sites is reduced; when the number of maintenance personnel and the number of available filter component spare parts are large, or the scheduling cycle length is long, the preset upper limit for the number of high-risk sites is increased.
[0035] The preset upper limit for the number of low-risk sites is set as follows: First, the basic number of low-risk sites is determined based on the total number of sites within the same scheduling batch. Then, the basic number of low-risk sites is adjusted based on the number of maintenance personnel available for that scheduling batch, the number of available filter component spares, and the scheduling cycle length. Specifically, when the number of maintenance personnel, the number of available filter component spares, or the scheduling cycle length is lower than the corresponding preset benchmark value, the basic number of low-risk sites is adjusted upwards. When the number of maintenance personnel, the number of available filter component spares, or the scheduling cycle length is higher than the corresponding preset benchmark value, the basic number of low-risk sites is adjusted downwards. The adjusted number is used as the preset upper limit for the number of low-risk sites.
[0036] Determine if the corresponding site has entered the cross-site maintenance task sequence: When the continuity risk level of painting is high or medium, the corresponding site will be added to the cross-site maintenance task sequence, and the corresponding site will be marked with risk. When the risk level of paint continuity is low, the corresponding site will not be included in the cross-site maintenance task sequence.
[0037] The cross-site maintenance task sequence is a set of maintenance tasks to be dispatched by the remote operation and maintenance platform for multiple mobile paint booths. It is used to sort and dispatch subsequent cross-site maintenance resources.
[0038] Among them, the remote operation and maintenance platform refers to the management system used to remotely receive and summarize the operating data of site equipment, and generate, manage and dispatch maintenance tasks.
[0039] In step S3, the available spare parts quantity is read. The available spare parts quantity is the number of spare parts that can be locked and used for maintenance at the corresponding site when the remote operation and maintenance platform dispatches maintenance tasks. It is obtained by the spare parts inventory management system and reflects whether the cross-site maintenance task has the conditions for immediate execution.
[0040] Cross-site executable dispatch priority is a dispatch ranking criterion that simultaneously reflects the risk level of paint continuity and the quantity of spare parts available. The continuous risk level of the painting process is converted into an ordered value, where high corresponds to 3, medium to 2, and low to 1; then, the cross-site dispatch priority is set according to the following formula: ,in, For the j-th marked site, the cross-site executable dispatch priority, Let be the ordered value of the paint continuity risk level after conversion for the j-th marked site. Let j be the number of spare parts available at the j-th marked site. It is the natural logarithm function.
[0041] The higher the risk level of continuous painting, The larger the size, the greater the number of spare parts available. The larger the number of available spare parts, the more the natural logarithm function will compress the increment caused by an excessive number of spare parts, making the sorting more biased towards the common satisfaction of risk urgency and execution conditions.
[0042] The reason for choosing the natural logarithm function is that it can preserve the difference between the number of available spare parts and the number of available spare parts, while suppressing the excessive amplification of the cross-site executable dispatch priority when the number of available spare parts is large. It is suitable for scheduling scenarios where cross-site maintenance resources are limited and the risk level needs to be reflected first.
[0043] The cross-site maintenance tasks of the marked sites are sorted in descending order of cross-site executable dispatch priority; when the cross-site executable dispatch priorities of two marked sites are the same, the order in which they enter the cross-site maintenance task sequence is maintained to obtain the sorting result of the cross-site maintenance tasks.
[0044] In step S4, after maintenance is completed, the post-maintenance exhaust recovery value is collected. The post-maintenance exhaust recovery value is the degree to which the exhaust status of the mobile paint booth at the corresponding site has returned to normal operation after the cross-site maintenance task is completed. It is collected by the exhaust monitoring device after maintenance is completed and the mobile paint booth at the corresponding site resumes exhaust and forms a stable record, reflecting the restoration effect of this maintenance on the exhaust abnormality.
[0045] The priority feedback correction benchmark is a correction basis formed by the cross-site executable assignment priority of cross-site maintenance tasks that have been executed and the exhaust ventilation recovery value after maintenance. It is used to adjust the sorting results of subsequent cross-site maintenance tasks.
[0046] After standardizing the exhaust ventilation recovery values corresponding to completed cross-site maintenance tasks, a priority feedback correction benchmark is generated: ,in, This serves as the priority feedback correction benchmark for the j-th completed cross-site maintenance task. The cross-site executable dispatch priority used when dispatching the j-th completed cross-site maintenance task. To maintain the standardized results of the rear exhaust recovery value.
[0047] Cross-site execution dispatch priority is higher and the exhaust recovery value after maintenance is lower. The larger the value, the higher the correction margin needed for subsequent cross-site maintenance tasks of the same type when sorting; the higher the exhaust ventilation recovery value after maintenance. The smaller the value, the better the original sorting is for distributing this type of task.
[0048] The priority feedback correction benchmarks for completed cross-site maintenance tasks are classified into two risk categories, high and medium, according to the corresponding paint continuity risk level. The median of the priority feedback correction benchmarks within each category is then used as the priority feedback correction benchmark for subsequent cross-site maintenance tasks under the same paint continuity risk level.
[0049] When updating the sorting results of subsequent cross-site maintenance tasks, the cross-site executable assignment priority of the subsequent cross-site maintenance tasks is added to the priority feedback correction benchmark under the corresponding paint continuity risk level, and then rearranged in descending order according to the added value; if no priority feedback correction benchmark has been formed under the corresponding paint continuity risk level, the sorting result formed in step S3 is retained.
[0050] Through the above processing, the station painting operation load, filter pressure difference increase, station maintenance load level, duration of abnormal exhaust, painting continuity risk level, cross-site maintenance task sequence, spare parts availability, cross-site executable assignment priority, exhaust recovery value after maintenance, and priority feedback correction benchmark all have clear sources, calculation relationships, and subsequent uses. The subsequent ranking results of cross-site maintenance tasks can be updated with maintenance execution feedback.
[0051] Finally, it should be noted that in this paper, relational terms such as first and second are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations.
[0052] Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.
[0053] In this document, the singular forms “a,” “an,” and “the” may also include the plural forms unless the context clearly indicates otherwise. It should also be understood that terms such as “comprising / including” or “having” specify the presence of the stated features, integrals, steps, operations, components, parts, or combinations thereof, but do not preclude the possibility of the presence or addition of one or more other features, integrals, steps, operations, components, parts, or combinations thereof. Meanwhile, the term “and / or” as used in this specification includes any and all combinations of the associated listed items.
[0054] The various embodiments in this specification are described in a progressive manner. Each embodiment focuses on the differences from other embodiments. The various embodiments can be combined as needed, and the same or similar parts can be referred to each other.
[0055] The above description of the disclosed embodiments will enable those skilled in the art to make or use various modifications to these embodiments. It will be readily apparent to those skilled in the art that the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of this application. Therefore, this application is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A method for remote network operation and maintenance data scheduling and management of mobile spray booths at multiple sites, characterized in that: Includes the following steps: Step S1: Obtain the spraying operation load of each mobile spray booth, collect the increase in filtration pressure difference, and assess the maintenance load level of the site by combining the spraying operation load and the increase in filtration pressure difference. Step S2: Read the duration of abnormal ventilation, analyze the risk level of paint spraying continuity in combination with the site maintenance load level, and determine whether the corresponding site has entered the cross-site maintenance task sequence. Mark the risk of the site that has entered the cross-site maintenance task sequence. Step S3: Read the available quantity of spare parts, set the cross-site executable dispatch priority based on the paint continuity risk level and the available quantity of spare parts, and sort the cross-site maintenance tasks of the marked sites using the cross-site executable dispatch priority. Step S4: After maintenance is completed, collect the exhaust ventilation recovery value after maintenance, generate a priority feedback correction benchmark by combining the cross-site executable dispatch priority, and update the sorting results of subsequent cross-site maintenance tasks based on the priority feedback correction benchmark; In step S1, the site spraying operation load refers to the degree of occupancy of spraying operations formed by the mobile spray booths at each site within the same statistical period; The increase in filtration pressure differential is the increase in pressure differential of the filter components of the mobile paint booths at each site within the same statistical period. The station spraying load and filtration pressure difference increase of each mobile spray booth were standardized for each station. In step S3, the number of spare parts available is the number of spare parts that can be locked by the remote operation and maintenance platform and used for maintenance of the corresponding site when the maintenance task is dispatched. The risk level of continuous painting is converted into an ordered value, where high corresponds to 3, medium to 2, and low to 1; the cross-site dispatch priority is set according to the ordered value: ,in, For the j-th marked site, the cross-site executable dispatch priority, Let be the ordered value of the paint continuity risk level conversion for the j-th marked site. Let j be the number of spare parts available at the j-th marked site. It is the natural logarithm function; The cross-site maintenance tasks of the marked sites are sorted in descending order of cross-site executable dispatch priority to obtain the sorting result of the cross-site maintenance tasks.
2. The method for remote networking operation and maintenance data scheduling and management of mobile spray booths at multiple sites according to claim 1, characterized in that: In step S1, the calculated value corresponding to the mobile spray booth at the site is calculated using the geometric mean method, based on the standardized results of the combined site spraying operation load and the standardized results of the filter pressure difference increase. The calculated values corresponding to the mobile spray booths at each site within the same scheduling batch are arranged in descending order. Based on the total number of sites within the same scheduling batch, the arrangement results are divided into three consecutive sequence intervals. The first one-third of the sequence interval is the first sequence interval, the middle one-third of the sequence interval is the second sequence interval, and the last one-third of the sequence interval is the third sequence interval. When the arrangement order of the mobile spray booth at the site falls into the first order range, the site maintenance load level is assessed as high. When the site's mobile paint booth is ranked in the second position, the site's maintenance load level is assessed as medium. When the site's mobile paint booth is ranked in the third position, the site maintenance load level is assessed as low.
3. The method for remote networking operation and maintenance data scheduling and management of mobile spray booths at multiple sites according to claim 2, characterized in that: In step S2, the duration of abnormal exhaust is the length of time that the exhaust status of each mobile paint booth deviates from the normal exhaust status. Convert the site maintenance load level into an ordered value, where high corresponds to 3, medium corresponds to 2, and low corresponds to 1. The duration of abnormal exhaust ventilation at mobile paint booths at various sites within the same scheduling batch is standardized by interval processing to obtain the standardized result of the duration of abnormal exhaust ventilation. The calculated value of the painting continuity risk level corresponding to the mobile spray booth at the site is obtained by taking the ordered values corresponding to the maintenance load level of the comprehensive site and the standardized results of the duration of abnormal ventilation.
4. The method for remote networking operation and maintenance data scheduling and management of mobile spray booths at multiple sites according to claim 3, characterized in that: In step S2, the calculated values of the continuous risk level of painting within the same scheduling batch are arranged in descending order, and the front, middle and back segments of the arrangement are determined according to the preset upper limit of the number of high-risk sites and the preset upper limit of the number of low-risk sites. When the mobile spray booth is at the beginning of the sequence, the spray painting continuity risk level is analyzed as high. When the mobile spray booth is in the middle of the sequence, the spray painting continuity risk level is analyzed as medium. When the mobile spray booth is located at the end of the sequence, the spray painting continuity risk level is analyzed as low. Determine if the corresponding site has entered the cross-site maintenance task sequence: When the risk level of paint continuity is high or medium, the corresponding site will be added to the cross-site maintenance task sequence, and the corresponding site will be marked with a risk label.
5. The method for remote networking operation and maintenance data scheduling and management of mobile spray booths at multiple sites according to claim 1, characterized in that: In step S4, the post-maintenance exhaust recovery value refers to the degree to which the exhaust status of the mobile paint booth at the corresponding site returns to normal operation after the cross-site maintenance task is completed. After standardizing the exhaust ventilation recovery values corresponding to completed cross-site maintenance tasks, a priority feedback correction benchmark is generated: ,in, This serves as the priority feedback correction benchmark for the j-th completed cross-site maintenance task. The cross-site executable dispatch priority used when dispatching the j-th completed cross-site maintenance task. To maintain the standardized results of the rear exhaust recovery value.
6. The method for remote networking operation and maintenance data scheduling and management of mobile spray booths at multiple sites according to claim 5, characterized in that: In step S4, the priority feedback correction benchmarks of completed cross-site maintenance tasks are classified into two risk categories, high and medium, according to the corresponding paint continuity risk level. The median of the priority feedback correction benchmarks in each category is taken as the priority feedback correction benchmark for subsequent cross-site maintenance tasks under the same paint continuity risk level. When updating the sorting results of subsequent cross-site maintenance tasks, the cross-site executable assignment priority of the subsequent cross-site maintenance tasks is added to the priority feedback correction benchmark under the corresponding paint continuity risk level, and then rearranged in descending order according to the added value.
Citation Information
Patent Citations
Hydropower station operation and maintenance priority ranking method based on equipment health degree
CN121146143A
Operation maintenance scheduling method and system based on AI Agent
CN121526553A