Finite element correction method for improving the calculation accuracy of bearing capacity of long-short pile composite foundation
Patent Information
- Application Number
- CN202611104189.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-24
- Publication Date
- 2026-10-16
- Estimated Expiration
- 2046-07-24
AI Technical Summary
[0003]然而,现有的长短桩复合地基承载力计算方法,大多基于理想化的桩土完全接触和同步受力假定,没有结合施工实测数据(如桩顶标高)来反映各桩在加载初期存在的起承时序差异
[0007] Based on the embodiments provided in this application, by receiving construction records, measured data of pile top elevation, and measured data of cushion layer thickness, the actual thickness distribution and initial contact gap of the cushion layer at each pile location can be reconstructed. This allows for the quantitative acquisition of pile top contact timing determination data, thereby incorporating construction discrete characteristics into the calculation model. On this basis, a dual-model comparison calculation is performed using a synchronous load-bearing benchmark finite element model and a non-synchronous bearing correction finite element model. Based on the comparison data of the bearing response output by both models, sections that deviate from the ideal synchronous load-bearing assumption during the actual bearing evolution process, as well as sections where feature points may be misjudged, can be accurately identified, thus generating targeted bearing capacity correction results. This method effectively compensates for the prediction bias caused by neglecting non-synchronous pile top bearing in existing calculation methods, improves the accuracy of bearing capacity calculation for composite foundations with long and short piles, and better meets the bearing capacity analysis needs under actual engineering conditions such as fluctuating pile top elevation and uneven cushion layer thickness.