BIM-based steel box girder pushing monitoring method and system

By optimizing the layout of monitoring points using a BIM-based monitoring benchmark model and genetic algorithm, and combining multi-source data registration and mechanical model inversion, the problem of restoring the continuous stress and deformation distribution of the entire beam in the monitoring of steel box girder launching was solved, thus ensuring construction safety and quality.

CN122674440BActive Publication Date: 2026-11-24CCCC THIRD HARBOR ENGINEERING CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611150097.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2026-07-31
Publication Date
2026-11-24
Estimated Expiration
2046-07-31

AI Technical Summary

Technical Problem

Existing methods for monitoring the launching of steel box girders cannot restore the continuous stress and deformation distribution of the entire girder, and the monitoring data is easily distorted by interference, leading to deviations in the judgment of structural condition and failing to guarantee construction safety and the quality of the completed bridge.

Method used

A monitoring benchmark model is established based on BIM. The layout of measuring points is optimized through genetic algorithms. Combined with multi-source data registration and mechanical model inversion, the accurate mapping and verification of deformation and stress field in the whole field are realized, and the launching construction posture is dynamically adjusted.

Benefits of technology

It enables the visualization of continuous stress and deformation distribution across the entire beam, accurately identifies risk areas, ensures construction safety and bridge quality, and avoids construction deviations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122674440B_ABST
    Figure CN122674440B_ABST
Patent Text Reader

Abstract

This invention provides a BIM-based method and system for monitoring the jacking of steel box girders, belonging to the field of jacking monitoring technology. This invention establishes a BIM model of the steel box girder jacking and unifies the engineering coordinate system. Based on the structural influence line, it screens candidate monitoring points sensitive to stress and deformation, performing dual-objective optimization with the goal of optimizing monitoring accuracy and the number of monitoring points, determining the monitoring point layout to form a BIM monitoring benchmark model. It collects multi-source monitoring data and completes spatiotemporal registration, obtaining a standardized monitoring dataset mapped to the engineering coordinate system, which is then written into the model. It retrieves data to invert the full-field deformation and stress field, calculates the theoretical mechanical response by combining the beam element stiffness matrix, and updates the model state after correcting abnormal data through relative residual verification. It constructs a Coulomb-viscous composite friction model to predict subsequent jacking attitude and stress, solves for the optimal jacking parameters, and dynamically adjusts the construction attitude after BIM verification. This invention achieves precise control of steel box girder jacking through a BIM fusion algorithm.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of jacking monitoring technology, specifically to a BIM-based method and system for monitoring the jacking of steel box girders. Background Technology

[0002] The steel box girder launching method has become the mainstream technology for the construction of long-span steel box girder bridges due to its advantages such as not requiring large hoisting equipment, not interfering with traffic under the bridge, and strong construction continuity. However, since the structural support position and stress state change dynamically with the progress of launching, the beam's shape, internal forces, and sliding friction characteristics are highly time-varying. Once the stress deviation or shape offset exceeds the allowable range, it is very easy to cause safety risks such as stress concentration in the beam, sliding instability, or even structural overturning. Therefore, full-process, high-precision construction monitoring and control is the core prerequisite for ensuring the safety of launching construction and the quality of the completed bridge.

[0003] Existing monitoring methods mostly adopt discrete single-point modes, relying on only a small number of measurement points to characterize the overall structural state. This cannot restore the continuous stress and deformation distribution of the entire beam, and it is easy to miss risk areas. Furthermore, there is a lack of data self-verification mechanisms based on the laws of structural mechanics, and the monitoring data is easily interfered with and distorted, leading to deviations in the judgment of structural state. This makes it impossible to provide reliable data support for the control of the jacking construction, and it is difficult to ensure construction safety and the quality of the completed bridge.

[0004] Therefore, it is necessary to provide a BIM-based method and system for monitoring the jacking of steel box girders to solve the problems mentioned above.

[0005] The information disclosed in the background section is only intended to enhance the understanding of the background of this disclosure, and therefore may include information that does not constitute prior art known to those skilled in the art. Summary of the Invention

[0006] The purpose of this invention is to provide a BIM-based method and system for monitoring the jacking of steel box girders, so as to solve the problems mentioned in the background art.

[0007] To achieve the above objectives, the present invention provides the following technical solution: A BIM-based monitoring method for the jacking of steel box girders includes the following steps: Step 1: Establish a BIM model of the steel box girder jacking and unify the engineering coordinate system. Based on the structural influence line, screen candidate measuring points that are sensitive to stress and deformation. Use a genetic algorithm to perform dual-objective optimization with the goal of optimizing the monitoring accuracy and the number of measuring points. Determine the layout of measuring points and bind the measuring point attributes to the BIM component ID to form a BIM monitoring benchmark model. Step 2: Collect multi-source monitoring data, perform time and spatial registration on the multi-source monitoring data to obtain a standardized monitoring dataset mapped to the engineering coordinate system, and write it into the BIM monitoring benchmark model; Step 3: Retrieve the standardized monitoring data written into BIM, invert the full-field deformation and stress field of the steel box girder and map it into the BIM monitoring benchmark model, extract the stiffness matrix of the beam element corresponding to the current launching position, calculate the theoretical mechanical response in combination with the boundary conditions, and update the verified full-field structural state to the BIM monitoring benchmark model after correcting abnormal data through relative residual judgment. Step 4: Based on the updated structural state data, establish a Coulomb-viscous composite friction coupling mechanical model to predict the attitude and stress of subsequent jacking cycles. Solve for the optimal jacking parameters with the optimization objectives of axial deviation and optimal stress distribution at key sections. Map the optimal jacking parameters to the BIM monitoring benchmark model and dynamically adjust the jacking construction attitude after verification.

[0008] Furthermore, a BIM model of the steel box girder launching was established and a unified engineering coordinate system was implemented. Based on the structural influence line, candidate measuring points sensitive to stress and deformation were screened. The method used was as follows: Construct a geometric model of the steel box girder, including the main body, temporary piers, sliding beams, and jacking jacks. Assign geometric dimensions, material elastic modulus, and unit weight to each component, and incorporate all components into a unified engineering world coordinate system. Based on the structural influence line theory, the influence lines of bending moment, shear force, and deflection of each section within the entire stroke of the jacking are calculated segment by segment. The sections where the extreme value of bending moment occurs, the section with the peak negative bending moment at the pier top, the section connecting the guide beam and the main beam, the section where the box girder segments are spliced, and the section with the largest amplitude of the sliding track support reaction are extracted as stress-sensitive candidate measuring points. The sections with the peak deflection and the section at the linear inflection point within the entire stroke are extracted as deformation-sensitive candidate measuring points.

[0009] Furthermore, the layout of the measuring points was determined and their attributes were bound to the BIM component IDs to form a BIM monitoring benchmark model for the steel box girder. The method used was as follows: For the selected stress-sensitive and deformation-sensitive candidate measuring points, a genetic algorithm is used for dual-objective optimization. The two optimization objectives are to improve the monitoring and reconstruction accuracy of stress and deformation across the entire field and to control the total number of measuring points, balancing monitoring accuracy and economy. The fitness evaluation criteria for the genetic algorithm are the maximum uniformity of the coverage of the structural response of the measuring points and the minimum level of reconstruction error. In combination with the layout of key stress sections, the feasibility of sensor installation space, and the monitoring sensitivity requirements, multi-dimensional constraints are set, and the optimal measuring points are obtained through iterative solution. Each optimal measuring point is assigned a unique identifier code, and the spatial coordinates, monitoring type, and preset sampling frequency of the measuring point are mapped one-to-one with the identity identifier of the corresponding component in the geometric model of the steel box girder. Measuring point markers with the above attributes are generated in the geometric model of the steel box girder, and the relationship between measuring points and components in the model is improved in a synchronous manner, forming a steel box girder jacking BIM monitoring benchmark model with linkage between components and measuring points.

[0010] Furthermore, multi-source monitoring data is collected, and time and spatial registration is performed on the multi-source monitoring data. The standardized monitoring dataset is then written into the BIM monitoring benchmark model. The method used is as follows: Simultaneously collect multi-source raw monitoring data on the stress, linear displacement, jack thrust, and slide support reaction of key sections of the steel box girder; Identify the sampling frequency of various monitoring data, select the sampling time corresponding to the lowest sampling frequency as a unified time node, use cubic spline interpolation algorithm to fit the time-varying continuous curve of high-frequency monitoring data, extract the monitoring values ​​corresponding to each unified time node, realize the one-to-one correspondence of timestamps of all monitoring data, and complete time domain registration. Using the engineering world coordinate system established in step 1 as a reference, a seven-parameter coordinate transformation model is used to solve the transformation parameters between the local measurement coordinate system of each sensor and the BIM coordinate system. The monitoring data after time domain registration is uniformly mapped to the BIM coordinate system to complete the spatial domain registration. After the time domain and spatial domain registration are completed, a standardized time-series monitoring dataset with spatiotemporal uniformity is finally obtained. This dataset is then written into the constructed BIM monitoring benchmark model in batches according to the association relationship between the unique identifier code of the measurement point and the BIM component ID.

[0011] Furthermore, the full-field deformation and stress field of the steel box girder were inverted and mapped into the BIM monitoring benchmark model. The method used was as follows: Standardized time-series monitoring data written into the BIM monitoring benchmark model is retrieved, and the three-dimensional spatial coordinates and corresponding stress and displacement values ​​of each measuring point are extracted. These are used as discrete measuring points for the interpolation calculation of the whole field deformation and stress field. With each discrete measuring point as the center, multiple quadratic radial basis functions are constructed based on the spatial distance between the measuring point and the point to be calculated. The radial basis functions of all discrete measuring points are combined to form the interpolation function. The weight coefficients corresponding to each basis function in the interpolation function are obtained by combining the measured monitoring values ​​of each measuring point. The entire space of the steel box girder is divided into several points to be calculated along the longitudinal and transverse directions. The points are substituted into the interpolation function after the weight coefficients are determined, and the deformation and stress values ​​of each point to be calculated are obtained respectively. The continuous deflection deformation field and normal stress distribution field of the whole field are reconstructed by data fitting. Based on the established unified engineering world coordinate system, the reconstructed full-field deformation cloud map and stress cloud map are accurately mounted onto the surface of the corresponding beam segment unit of the BIM monitoring benchmark model according to the spatial coordinate correspondence, so as to realize the BIM visualization mapping of full-field deformation and stress field.

[0012] Furthermore, the stiffness matrix of the beam element corresponding to the current jacking position is extracted, and the theoretical mechanical response is calculated in combination with the boundary conditions. The verified overall structural state is then updated to the BIM monitoring benchmark model. The method used is as follows: Based on the full-field stress distribution field and deflection deformation field that have been reconstructed and mounted to the BIM monitoring benchmark model, and combined with the current jacking construction progress, the effective stressed beam segments and key control sections under the current jacking process are identified, and the corresponding BIM beam unit range is determined. From the component attribute library of the beam unit corresponding to the BIM monitoring benchmark model, the pre-embedded beam unit stiffness matrix is ​​retrieved. This stiffness matrix is ​​pre-calculated and generated by the beam unit section characteristics and material mechanical parameters. Combined with the sliding support constraint boundary and jack thrust load boundary under the current jacking construction scenario, the theoretical mechanical response of each section of the steel box girder is obtained by using the structural mechanics finite element method. Based on the measured inversion values ​​of the measurement points obtained by inversion, the measured inversion values ​​of each measurement point location are compared with the theoretical calculation values ​​mentioned above, and the relative residuals between the two are calculated. If the relative residual exceeds the preset residual threshold, the measurement point data is determined to be abnormal data, and the abnormal data is replaced and corrected by the interpolation results of the surrounding adjacent measurement points. The structural state data of the entire field, after mechanical verification and correction of abnormal data, including the corrected stress field and deformation field data, will be synchronously updated to the component attributes of the corresponding beam element in the BIM monitoring benchmark model.

[0013] Furthermore, a Coulomb-viscous combined frictional coupling mechanical model was established to predict the attitude and stress of subsequent jacking cycles. The method used was as follows: Based on the updated overall structural state data and the frictional characteristics of the steel box girder jacking construction, a Coulomb-viscous composite frictional coupling mechanical model is established. This model comprehensively considers the static and dynamic frictional characteristics of Coulomb friction and the velocity correlation of viscous friction, adapting to the frictional stress scenario between the steel box girder and the slide. The current jacking position, beam element stiffness, boundary constraints, and the corrected structural state data are used as model input parameters and substituted into the composite frictional coupling mechanical model to solve for the attitude change law and stress distribution of the steel box girder in the jacking cycle, thus completing the accurate prediction of the attitude and stress of subsequent jacking cycles.

[0014] Furthermore, the jacking parameters are solved with the optimization objectives of axial deviation and optimal stress distribution at key sections. These parameters are then mapped to the BIM monitoring benchmark model for verification, and the jacking construction posture is dynamically adjusted. The method used is as follows: With the dual optimization objectives of minimizing the deviation of the jacking axis of the steel box girder and ensuring uniform stress distribution at key sections without exceeding the allowable stress, the jacking speed, jacking force, and synchronization of each jack are used as the jacking parameters to be optimized. Combining the predicted jacking posture and stress distribution, an objective function for optimizing the jacking parameters is constructed. The constraint range of the jacking parameters to be optimized is defined, and the particle swarm optimization algorithm is used to solve the objective function to obtain the optimal combination of jacking parameters. The optimal jacking parameters obtained by the solution are mapped to the BIM monitoring benchmark model to simulate the jacking construction process under these parameters and verify whether the jacking posture and stress distribution meet the construction safety requirements. If the verification is successful, the optimal jacking parameters are sent to the jacking construction control system to dynamically adjust the jacking construction posture. If the verification fails, the optimization objectives and constraints are readjusted and iteratively solved until the optimal jacking parameters that meet the requirements are obtained.

[0015] The present invention also provides a BIM-based steel box girder jacking monitoring system, the system being used to execute the BIM-based steel box girder jacking monitoring method described in any one of the above-mentioned methods, comprising: The benchmark construction module is used to establish a BIM model of the steel box girder launching and unify the engineering coordinate system. Based on the structural influence line, it screens candidate measuring points that are sensitive to stress and deformation. It uses a genetic algorithm to perform dual-objective optimization with the goal of optimizing the monitoring accuracy and the number of measuring points, determines the layout of measuring points, and binds the measuring point attributes to the BIM component ID to form a BIM monitoring benchmark model. The spatiotemporal registration module is used to collect multi-source monitoring data, perform time and spatial registration on the multi-source monitoring data, obtain a standardized monitoring dataset mapped to the engineering coordinate system, and write it into the BIM monitoring benchmark model. The field inversion module is used to retrieve standardized monitoring data written into BIM, invert the full-field deformation and stress field of the steel box girder and map it into the BIM monitoring benchmark model, extract the stiffness matrix of the beam element corresponding to the current launching position, calculate the theoretical mechanical response in combination with boundary conditions, and update the verified full-field structural state to the BIM monitoring benchmark model after correcting abnormal data through relative residual judgment. The prediction and control module is used to establish a Coulomb-viscous composite friction coupling mechanical model based on the updated structural state data, predict the attitude and stress of subsequent jacking cycles, and solve for the optimal jacking parameters with the optimization objectives of axial deviation and optimal stress distribution of key sections. After mapping the optimal jacking parameters to the BIM monitoring benchmark model for verification, the jacking construction attitude is dynamically adjusted.

[0016] Compared with the prior art, the beneficial effects of the present invention are: Sensitive measuring points are selected based on structural influence lines. The layout of measuring points is determined by a genetic algorithm with dual objectives and bound to BIM component IDs, solving the problems of arbitrary and unreasonable measurement point layout in the existing system. Based on scientific measuring points, this invention completes the standardized registration of multi-source monitoring data. The theoretical mechanical response is calculated by combining the stiffness matrix of beam elements and boundary conditions. Abnormal data is corrected by relative residuals, effectively eliminating interference and solving the problems of easy distortion of existing monitoring data and deviation in structural state judgment. By inverting the full-field deformation and stress field and mapping it to the BIM model, the limitations of discrete single-point monitoring are broken. The continuous stress and deformation distribution of the entire beam can be presented intuitively, risk areas can be accurately identified, and the structural status can be fully and accurately perceived. Based on the updated structural status, a coupled mechanical model is established to predict the subsequent jacking attitude and stress, solve the optimal jacking parameters, and dynamically adjust the construction attitude. This changes the current situation of manual experience-based control, avoids construction deviations, and ensures construction safety and bridge completion quality. Attached Figure Description

[0017] Figure 1 This is a schematic diagram of the overall method flow of the present invention; Figure 2 This is a schematic diagram of the system module flow of the present invention. Detailed Implementation

[0018] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to specific embodiments.

[0019] It should be noted that, unless otherwise defined, the technical or scientific terms used in this invention should have the ordinary meaning understood by one of ordinary skill in the art to which this invention pertains. The terms "first," "second," and similar terms used in this invention do not indicate any order, quantity, or importance, but are merely used to distinguish different components. Terms such as "comprising" or "including" mean that the element or object preceding the word encompasses the elements or objects listed following the word and their equivalents, without excluding other elements or objects. Terms such as "connected" or "linked" are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. Terms such as "upper," "lower," "left," and "right" are used only to indicate relative positional relationships; when the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0020] Example: Please see Figure 1 A BIM-based method for monitoring the jacking of steel box girders, comprising the following steps: Step 1: Establish a BIM model of the steel box girder launching and unify the engineering coordinate system. Based on the structural influence line, screen candidate measuring points sensitive to stress and deformation. Use a genetic algorithm to perform dual-objective optimization with the goal of optimizing the monitoring accuracy and the number of measuring points. Determine the layout of measuring points and bind the measuring point attributes to the BIM component ID to form a BIM monitoring benchmark model.

[0021] In a specific embodiment of the present invention, the detailed implementation method for establishing a BIM model of the steel box girder jacking and unifying the engineering coordinate system, screening candidate measuring points based on structural influence lines and optimizing their layout, and finally forming a BIM monitoring benchmark model is as follows: A complete geometric model of the steel box girder launching construction system was constructed using bridge BIM parametric modeling software. The model covers five core components: the main body of the steel box girder, temporary piers, sliding beams, launching jacks, and guide beams. The steel box girder was modeled segment by segment according to the segment division rules in the construction drawings, and the cross-sectional parameters of each segment, such as top plate thickness, bottom plate thickness, web spacing, and diaphragm spacing, were completely consistent with the design documents. Corresponding physical and mechanical properties were assigned to all components: the main body of the steel box girder, guide beams, and sliding beams were made of Q345qD bridge steel, with an elastic modulus set to 2.06 × 10⁻⁶. 5 MPa, unit weight 78.5 kN / m³, Poisson's ratio 0.3; temporary piers are made of C40 concrete with an elastic modulus of 3.25 × 10⁻⁶. 4 MPa, density of 25kN / m³; the project construction control network independent engineering coordinate system is adopted uniformly, with the bridge abutment position at the starting point of the bridge axis as the coordinate origin, the longitudinal direction of the bridge as the positive X-axis, the transverse direction of the bridge as the positive Y-axis, and the vertical upward direction as the positive Z-axis. All components are included in this unified coordinate system to complete spatial positioning, ensuring that the model coordinate reference is completely consistent with the actual measured coordinate reference on the construction site, and eliminating systematic deviations in subsequent spatial registration.

[0022] It should be noted that the method for screening sensitive candidate measurement points based on stress and deformation of structural influence lines is as follows: The entire jacking stroke of the steel box girder is divided into several continuous calculation cases along the longitudinal direction of the bridge at a step distance of 0.5m. The sliding support position is simulated to move forward segment by segment as the jacking stroke progresses. The influence line static method of structural mechanics is used to calculate the bending moment influence line, shear force influence line and deflection influence line of each section of the entire beam for each case. For screening stress-sensitive candidate measuring points: The absolute values ​​of bending moment extremes and shear force extremes and the amplitude of slide support reaction force of each section throughout the entire stroke are statistically analyzed. The sections with the top 15% of the absolute values ​​of bending moment extremes, the sections with the peak negative bending moment at the top of each temporary pier, the sections of the guide beam and main beam splicing, the sections of the steel box girder segments spliced ​​on site, and the sections of the slide corresponding to the top 10% of the amplitude of support reaction force are extracted and together form a set of stress-sensitive candidate measuring points. For screening candidate measurement points sensitive to deformation: the absolute values ​​of the deflection extreme values ​​of each section throughout the entire stroke are statistically analyzed, and the sections with the top 10% of the deflection extreme values, the cantilever end section of the leading beam, and the inflection point section of the vertical curve of the bridge are extracted to form a set of candidate measurement points sensitive to deformation; after merging and deduplicating the two types of candidate measurement points, the final set of candidate measurement points is obtained.

[0023] Furthermore, a genetic algorithm is used to optimize the layout of measuring points in a dual-objective manner, and the attributes of the measuring points are bound to BIM components to generate a monitoring benchmark model. The specific method is as follows: A non-dominated sorting genetic algorithm is used to solve the dual-objective optimization problem for the candidate measurement point set. The two optimization objectives are: to achieve the highest accuracy of monitoring and reconstruction of full-field stress and deformation, i.e., to minimize the root mean square error between the full-field reconstruction value based on measurement point inversion and the theoretical true value; and to minimize the total number of measurement points deployed, thereby controlling the on-site deployment cost and maintenance workload. The specific implementation process of the algorithm is as follows: Binary encoding is used, with each candidate transducer point corresponding to a gene bit. A gene bit of 1 indicates that the transducer point is selected for the layout scheme, while a gene bit of 0 indicates that it is not selected. For each set of measuring points, the radial basis interpolation method is used to calculate the root mean square error of the reconstruction of stress and deformation in the whole field. The fitness evaluation system is constructed in combination with the number of measuring points. The uniformity of measuring point coverage is characterized by the coefficient of variation of the measuring point spacing. The smaller the coefficient of variation, the higher the uniformity. The reconstruction error and uniformity together constitute the basis for fitness evaluation. The pier top section and the connection section between the guide beam and the main beam are designated as mandatory measurement points as rigid constraints; the installation positions of the measuring points must avoid the stiffening ribs of the box girder and the welded joints of the transverse diaphragms, while meeting the space requirements for sensor pasting / installation; the sensitivity of the stress measuring points should not be less than 1. The sensitivity of the displacement measuring point shall not be less than 0.1 mm, as a performance constraint; The entropy weight method is used to assign weights to two indicators in the Pareto optimal solution set: reconstruction accuracy and number of measurement points. The scheme with the highest comprehensive score is selected as the final optimal measurement point layout scheme. Each selected optimal measuring point is assigned a unique measuring point code, with the coding rule being "monitoring type-section location-serial number", for example, "Y-LD-01" represents the stress measuring point of the No. 1 guide beam section; In the BIM model, a shared parameter attribute set is created for each measuring point, which includes five core attributes: measuring point code, spatial three-dimensional coordinates, monitoring type, preset sampling frequency, and the ID of the component to which it belongs. Through the component association function of the BIM software, the attribute set of each measuring point is mapped and bound one by one with the unique identity (ID) of the beam segment and pier component to ensure that subsequent monitoring data can be directly located to the corresponding component. In the model, different types of measuring points are distinguished by different markers: stress measuring points are marked with red circles and displacement measuring points are marked with blue squares. The visualization of all measuring points is completed simultaneously. Finally, the component geometric information, material mechanical properties, and measuring point association attributes are integrated to form a steel box girder launching BIM monitoring benchmark model that links components and measuring points. The model is then exported as an IFC format file with complete attributes for subsequent full-process data interaction.

[0024] In this embodiment, step 1 serves as the core link in building the benchmark for the entire monitoring method. On one hand, it uses the structural influence line theory to accurately screen stress and deformation-sensitive sections to form a set of candidate measuring points. Then, it combines a genetic algorithm to perform dual-objective optimization with the goal of optimizing both monitoring accuracy and the number of measuring points. Under the premise of reasonably controlling the cost of measuring point layout, it significantly improves the mechanical relevance and global coverage uniformity of the measuring point layout, overcoming the shortcomings of traditional experience-based point layout with weak relevance and low utilization rate. This provides a reliable discrete data foundation for the subsequent high-precision inversion of the full-field deformation and stress field. On the other hand, by unifying the engineering coordinate system and binding the measuring point attributes with BIM component IDs one by one, a BIM monitoring benchmark model with both spatial benchmark and attribute information is formed. This provides a unified information carrier and spatial benchmark for the subsequent spatiotemporal registration of multi-source data, visualization mapping of field results, dynamic updating of structural state, and stress verification of control parameters.

[0025] Step 2: Collect multi-source monitoring data, perform time and spatial registration on the multi-source monitoring data to obtain a standardized monitoring dataset mapped to the engineering coordinate system, and write it into the BIM monitoring benchmark model.

[0026] In a specific embodiment of the present invention, the specific implementation methods for multi-source monitoring data acquisition, spatiotemporal registration, and writing standardized datasets into the BIM model are as follows: Based on the optimal measurement point layout determined in step 1, monitoring sensors are deployed according to categories, and a synchronous acquisition system is established: vibrating wire surface strain sensors with a nominal sensitivity of 1 are deployed at the stress measurement point locations. The default sampling frequency is 1Hz; wire-type displacement sensors are deployed at the linear displacement measuring points in conjunction with a fully automatic total station to collect data on the vertical deflection and lateral deviation of the beam, with a sampling frequency of 0.2Hz; high-precision piezoelectric pressure sensors are deployed at the oil circuit ends of each jacking jack to collect the real-time output jacking force, with a sampling frequency of 2Hz; and magnetic force sensors are deployed below the slide rail supports of each temporary pier to collect the normal support reaction force of the slide rail, with a sampling frequency of 0.5Hz. All sensors are connected to a unified distributed data acquisition terminal. The terminal has a built-in GPS and Beidou dual-mode clock synchronization module with a time synchronization accuracy of better than 1ms. All sensors are activated to collect data synchronously through a unified trigger signal. Each piece of raw monitoring data is accompanied by a millisecond-level timestamp and a unique identifier code for the corresponding measurement point. The raw data is transmitted in real time and temporarily stored in the local time series database of the on-site industrial control computer.

[0027] It should be noted that the specific method for time-domain registration based on cubic spline interpolation is as follows: First, the raw monitoring data is preprocessed to remove outliers exceeding 30% of the physical range, and retain the valid time series data. The actual sampling frequency of each type of monitoring data is automatically identified, and the time series corresponding to the lowest sampling frequency is selected as the unified reference time axis. In this embodiment, the displacement monitoring sampling frequency is the lowest, which is 0.2Hz, corresponding to a 5s sampling interval. This time node sequence is used as the unified time reference for all data.

[0028] For monitoring data with sampling frequencies higher than the reference frequency, a cubic spline interpolation algorithm is used to complete time-series resampling: using the original time-series points of each high-frequency data as sample nodes, a piecewise cubic polynomial interpolation function is constructed to ensure the continuity of function values, first derivatives, and second derivatives at adjacent segment nodes. The interpolation boundary adopts the natural spline boundary condition, that is, the second derivative of the first and last nodes is 0. Substituting all time points of the reference time axis into the fitted interpolation function, the monitoring values ​​at the corresponding time are calculated one by one, so that the monitoring data of all measuring points correspond one-to-one with the timestamps of the reference time axis, eliminating the time-series misalignment caused by the difference in sampling frequencies of different sensors, and completing the time domain registration.

[0029] The registered data is organized into a standardized time series matrix with a uniform time step. Each row corresponds to a reference time and each column corresponds to the monitoring value of a measurement point, ensuring strict alignment in the time dimension.

[0030] It should be noted that the specific method for spatial domain registration based on the seven-parameter model is as follows: Using the engineering world coordinate system established in step 1 as the target reference coordinate system, the Bursa seven-parameter coordinate transformation model is adopted to achieve the spatial reference unification from the local measurement coordinate system of each sensor to the BIM engineering coordinate system. In practice, four control points of the same name are evenly distributed along the longitudinal direction on the top surface of the steel box girder. These control points simultaneously possess the theoretical coordinates from the BIM model and the coordinates measured by the total station on site. Based on the coordinate pairs of the four control points, the three translation parameters (ΔX, ΔY, ΔZ) and three rotation parameters of the coordinate transformation are iteratively solved using the least squares method. With a scale parameter k, the coordinate transformation residual of the control points is controlled within ±2mm after the solution is completed, ensuring that the transformation accuracy meets the construction monitoring requirements. in: The translation parameters (ΔX, ΔY, ΔZ) represent the coordinate translation amounts of the construction coordinate system along the X, Y, and Z axes of the BIM engineering coordinate system, respectively. Rotation parameters ( ), representing the rotation angles of the construction coordinate system around the X, Y, and Z axes of the BIM engineering coordinate system, respectively; The scale parameter k represents the coordinate scaling factor between the two coordinate systems; Based on the seven parameters obtained from the solution, the on-site measured spatial coordinates of all stress measuring points, displacement measuring points, and support reaction force measuring points are uniformly transformed to the BIM engineering coordinate system, so that the spatial reference of all monitoring data is completely consistent with the BIM model, eliminating the systematic deviation of different sensor measurement coordinate systems, and completing the spatial domain registration.

[0031] Furthermore, the standardized monitoring dataset is written into the BIM model, specifically as follows: The data after dual registration in the time and spatial domains is a standardized time-series monitoring dataset with unified time and space. Each data entry contains four core types of information: unique identifier code of the measurement point, spatial coordinates in the BIM coordinate system, corresponding timestamp, and monitoring value. By using the secondary development API interface of BIM modeling software, a data mapping channel between the on-site industrial control computer database and the BIM monitoring benchmark model is established; based on the association relationship between the measurement point code and BIM component ID pre-bound in step 1, standardized monitoring data is written in batches into the shared attribute fields of the corresponding measurement points, including two types of dynamic parameters: "current monitoring value" and "latest update time". The data writing adopts an incremental update mechanism. After each jacking cycle is completed, the data writing and update is automatically performed once to ensure that the data in the BIM monitoring benchmark model is synchronized with the on-site construction status in real time, providing a unified data entry point for subsequent full-site deformation stress inversion and theoretical mechanics verification.

[0032] In this embodiment, step 2 serves as the core step in the standardized preprocessing of multi-source monitoring data. It takes the various heterogeneous raw monitoring data collected under the measurement point layout in step 1, eliminates the temporal misalignment caused by the difference in sampling frequency of different sensors through time registration, and achieves the benchmark alignment of the local measurement coordinates of each sensor with the unified engineering coordinate system through spatial registration. Finally, a standardized monitoring dataset with consistent spatiotemporal dimensions is obtained and written into the BIM monitoring benchmark model. This not only solves the problem of asynchronous temporal and spatial benchmarks of multi-source monitoring data, which prevents direct fusion and calculation, but also effectively reduces the calculation error caused by data heterogeneity. It provides an accurate and consistent input basis for subsequent full-field deformation and stress field inversion and theoretical mechanical response verification. At the same time, it realizes the association and mounting of monitoring data with BIM model components, further consolidating the role of the BIM model as a unified information carrier for the entire process, and ensuring the smooth connection of subsequent field reconstruction, mechanical verification and visualization display.

[0033] Step 3: Retrieve the standardized monitoring data written into BIM, invert the full-field deformation and stress field of the steel box girder and map it into the BIM monitoring benchmark model, extract the stiffness matrix of the beam element corresponding to the current launching position, calculate the theoretical mechanical response in combination with the boundary conditions, and update the verified full-field structural state to the BIM monitoring benchmark model after correcting abnormal data through relative residual judgment.

[0034] In a specific embodiment of the present invention, the specific implementation methods for full-field deformation and stress field inversion, BIM visualization mapping, theoretical mechanical response verification, and abnormal data correction are as follows: The standardized time-series monitoring data written into the BIM monitoring benchmark model in step 2 is retrieved through the BIM software secondary development interface, and the three-dimensional coordinates of all valid measuring points in the BIM coordinate system are extracted. and the corresponding measured stress values Measured deflection value This is used as a discrete sample point for the full-field interpolation calculation, where , The total number of valid measurement points. An index for valid measurement points; A full-field interpolation system is constructed using multiple quadratic radial basis functions. The basis function form for a single measurement point is as follows: In the formula: Let be the spatial Euclidean distance between the point to be determined and the measuring point. The radial basis function shape parameter is used to adjust the smoothness of the interpolation surface and the local fitting accuracy of the measurement points; in this embodiment, it is taken as 0.8 times the average spacing of all measurement points to balance the interpolation smoothness and the local fitting accuracy. The global interpolation function is a linear combination of radial basis functions at all measurement points. Taking the stress field as an example, the interpolation function has the following form: in, For the first The weight coefficients corresponding to each measurement point For the first Multiple quadratic radial basis functions corresponding to each measurement point For the point to be found and the first Spatial Euclidean distance between measurement points; Substituting the spatial coordinates and measured stress values ​​of each measuring point into the above interpolation function, a system of linear equations is constructed and solved to obtain the weighting coefficients corresponding to all measuring points. After determining the weighting coefficients, inputting any coordinate (x, y, z) within the structural space will allow the calculation of the interpolated stress value corresponding to that location, thus enabling the derivation of a continuously distributed full-field stress field from discrete measurement point data. Following the same interpolation process, interpolation calculations are performed using the measured deflection values ​​at each measurement point to obtain the full-field deflection distribution.

[0035] After obtaining the full-field stress field and full-field deflection field, the coordinate information of the spatial grid nodes is passed into the interpolation function to solve for the stress and deflection values ​​of each node. The values ​​are then matched one by one with the spatial positions of the components in the BIM model, completing the visualization mapping of the full-field deformation and stress field data with the BIM model. This allows for an intuitive display of the internal deformation and continuous stress distribution of the structure in the BIM scene.

[0036] It should be noted that, based on the constraint that the interpolation function must take values ​​at the measurement points that are strictly equal to the measured values, an nth-order linear equation system is constructed, and the LU decomposition method is used to solve it to obtain all the weight coefficients. The method for solving the weighting coefficients of the deformation field is the same as that for the stress field, except that the input is replaced with the measured deflection value. The entire steel box girder is divided into a calculation grid along the longitudinal direction at 1m intervals and in the transverse direction according to the web spacing. This grid includes the longitudinal direction... Cross section, transverse bridge direction The system calculates the stress and deflection values ​​of each point by substituting the coordinates of all points into the interpolation function. The results are then fitted and reconstructed to form a continuous normal stress distribution field and vertical deflection deformation field. The output format is a structured numerical matrix with spatial coordinates.

[0037] Furthermore, based on a unified engineering world coordinate system, a spatial mapping relationship between the computational grid and BIM beam elements is established. The specific method is as follows: Each point to be calculated is matched to the surface node of the BIM beam element with the closest spatial distance, and the reconstructed stress and deformation values ​​are written in batches into the surface node attributes of the corresponding beam element.

[0038] The post-processing visualization module of BIM software uses a continuous rainbow color scale to render numerical values: the stress cloud map uses a color scale from blue to red to correspond to stress from 0 to the allowable stress value of steel, and the deformation cloud map uses a color scale from blue to red to correspond to deflection from 0 to the maximum deflection value under the current working condition; the rendered stress cloud map and deformation cloud map are accurately mounted to the unit surface of the corresponding beam segment, preserving the original geometric shape of the component, realizing the BIM visualization of discrete monitoring data to continuous field state, and can intuitively identify stress concentration areas and deformation distortion locations.

[0039] Furthermore, the theoretical mechanical response is calculated based on the stiffness matrix of the beam element. The specific calculation method is as follows: Based on the current jacking construction mileage, the effective load-bearing beam segment range under the current working conditions is determined: taking the beam segment that has been jacked to the slide support as the main body, including the front cantilever guide beam segment, excluding the subsequent beam segments that have not yet been erected, and filtering out all BIM beam units within the corresponding range through the start and end mileage attributes of the beam unit as the object of mechanical calculation; Retrieve the pre-embedded element stiffness matrix of the corresponding beam element from the component attribute library of the BIM monitoring benchmark model; this stiffness matrix is ​​pre-generated based on Euler-Bernoulli beam theory, according to the element cross-sectional area. Moment of inertia of cross section Material elastic modulus , unit length Construct the stiffness matrix of a 6-DOF beam element and bind it to the beam element ID for storage; Apply the following boundary and load conditions for the current working condition: apply vertical hinged supports at the beam element nodes corresponding to each slide support, and apply lateral constraints at the lateral limiting positions of the temporary piers; apply horizontal jacking thrust loads at each jack action node, and simultaneously apply a uniformly distributed load of the beam's self-weight. Assemble the overall stiffness matrix using the direct stiffness method, solve for the nodal displacement vectors after introducing boundary condition corrections, and then inversely calculate the theoretical values ​​of bending moment, shear force, and normal stress at each beam element section using the element stiffness matrix, i.e., the theoretical mechanical response of the current working condition.

[0040] Furthermore, the relative residuals are calculated, and outliers are corrected using the following method: Extract the inverted measured values ​​and the corresponding theoretical calculated values ​​for each measuring point, and calculate the relative residuals using the following formula: in, The relative residual of stress at the measuring point, The measured inversion value is the stress at the measuring point location. The stress is calculated theoretically at the measurement point location; the deformation residual is calculated in the same way as the stress. It should be noted that, The normal stress value of the steel box girder section at the measuring point was obtained by interpolating and inverting the discrete monitoring data using multiple quadratic radial basis functions; Based on the stiffness matrix of the beam element, and combined with the boundary and load conditions of the current jacking operation, the theoretical value of the normal stress of the section is obtained by structural mechanics method. In this embodiment, the preset relative residual threshold is 15%. If the residual of a measuring point exceeds this threshold, the measuring point data is determined to be abnormal data. The abnormal data is corrected by the nearest neighbor interpolation method: the three valid normal measuring points with the closest spatial distance to the abnormal measuring point are selected, and the correction value of the measuring point position is calculated by the above-mentioned multiple quadratic radial basis interpolation method, replacing the original abnormal data. If two or more consecutive measuring points on the same cross section are abnormal, the interpolation correction is performed simultaneously by combining the measuring point data of the same position on the upstream and downstream adjacent cross sections to ensure that the correction result conforms to the structural stress law. After all abnormal data is corrected, full-field interpolation reconstruction is performed again to obtain the final full-field stress field and deformation field after verification and correction.

[0041] Furthermore, the BIM benchmark monitoring model is updated based on the verified structural status data. The specific method is as follows: The structural state data of the entire field after mechanical verification and anomaly correction, including the final stress field value, deformation field value, and data verification status mark, are synchronously updated to the component attribute library of the corresponding beam element in the BIM monitoring benchmark model according to the spatial mapping relationship, and the cloud map rendering results are updated synchronously. At the same time, the verification logs such as the abnormal measurement point number, residual value, and correction method are recorded and stored in the traceability field of the model attribute, so as to realize the traceable dynamic update of the structural state data, and provide real and reliable input data for subsequent jacking attitude prediction and parameter optimization.

[0042] In this embodiment, step 3, as the core link of full-field structural state reconstruction and data reliability verification, follows the standardized monitoring data written into the BIM model in step 2. It obtains the continuous deformation field and stress field of the steel box girder throughout the field through inversion and maps them to the BIM monitoring benchmark model. This breaks through the physical limitations of traditional discrete single-point monitoring and can completely cover risk areas such as stress concentration and deformation distortion outside the measuring point, effectively reducing the probability of missed structural risks. At the same time, it extracts the stiffness matrix of the beam element corresponding to the current jacking position, calculates the theoretical mechanical response in combination with boundary conditions, and establishes a data self-verification mechanism based on structural mechanics laws by judging and correcting abnormal monitoring data through relative residuals. This can effectively suppress data distortion caused by factors such as sensor drift and on-site environmental disturbances, and significantly improve the accuracy and reliability of structural state perception.

[0043] Step 4: Based on the updated structural state data, establish a Coulomb-viscous composite friction coupling mechanical model to predict the attitude and stress of subsequent jacking cycles. Solve for the optimal jacking parameters with the optimization objectives of axial deviation and optimal stress distribution at key sections. Map the optimal jacking parameters to the BIM monitoring benchmark model and dynamically adjust the jacking construction attitude after verification.

[0044] In a specific embodiment of the present invention, the specific implementation methods for constructing the composite frictional coupling mechanical model, predicting the jacking attitude and stress in advance, intelligently optimizing the jacking parameters, and verifying and controlling BIM are as follows: Furthermore, retrieve the verified full-site structural state data updated to the BIM monitoring benchmark model in step 3, and extract the normal reaction force of each slide support under the current working condition. , For the slide index, and , The total number of slides and the pushing speed of the beam. Based on the measured values ​​of stress at key sections, a Coulomb-viscous composite frictional coupling mechanical model is constructed to accurately characterize the time-varying characteristics of frictional resistance between the bottom plate of the steel box girder and the sliding track interface. The total frictional resistance at a single track is composed of the superposition of the Coulomb friction component and the viscous damping component, and the calculation formula is as follows: in, For the first The frictional resistance of the slide. Let be the equivalent kinetic friction coefficient of the slide interface. For the first The normal support reaction force of the slide, This is the equivalent viscous damping coefficient of the sliding interface, used to characterize the viscous effect that causes frictional resistance to change linearly with sliding speed. The pushing speed of the steel box girder; The model parameters were dynamically calibrated using the least squares method: monitoring data from three consecutive uniform and stable jacking cycles were selected, and the measured total jacking force (jacking force and total frictional resistance are balanced in the uniform phase), total normal reaction force, and jacking speed of each cycle were used as the sample set to construct an overdetermined system of equations for solution. and The optimal fitting value is obtained; the parameters are recalibrated every 10 jacking cycles to automatically adapt to the frictional characteristic drift caused by contact surface wear and lubrication degradation during construction, ensuring that the prediction accuracy always meets the engineering requirements.

[0045] Furthermore, based on the calibrated composite friction model, the structural response of the subsequent eight jacking cycles is deduced according to the predetermined single-step jacking step distance, achieving advanced prediction of attitude and stress. The specific deduction process is as follows: Starting from the current jacking progress, the forward movement position of the beam after each jacking cycle is simulated in sequence. The range of the supporting beam segments and the normal reaction force of each slide are redistributed, and the friction resistance distribution and total jacking force requirement of each slide are calculated by substituting them into the composite friction model. The stiffness matrix of the beam element pre-embedded in the BIM monitoring benchmark model is called, and the sliding constraint boundary, jack thrust load and friction resistance load corresponding to each cycle are updated synchronously. The nodal displacement vector and element internal force of the beam under the cycle are solved by the direct stiffness method, and the lateral deviation value (attitude index) and normal stress value (stress index) of each control section are extracted. The calculation is performed iteratively cycle by cycle based on the jacking step distance. Finally, the axis deviation change curve and the stress change curve of the key section are output for the subsequent 8 jacking cycles. This completes the advance prediction of jacking attitude and stress. The prediction results are simultaneously and temporarily stored in the prediction attribute field of the BIM model.

[0046] Furthermore, using the particle swarm optimization algorithm and the advanced prediction results as the basis for calculation, a jacking parameter optimization model is constructed to solve for the optimal combination of construction parameters that takes into account both the alignment and the stress. The specific method is as follows: Assume the site is equipped with a total of The platform pushes the jacks, and the optimization variables include the output thrust of each jack. Single-cycle jacking step distance Average speed of pushing ,common A real variable is used to achieve synchronous control of the jacking force by differentiating and matching the jacking force of each jack; A dual-objective collaborative optimization approach is adopted. Objective 1 is to minimize the lateral deviation of the beam axis, i.e., to minimize the maximum absolute value of the lateral deviation of each control section in subsequent iterations; Objective 2 is to optimize the stress uniformity of key sections, i.e., to minimize the coefficient of variation of stress in key sections. A linear weighted method is used to construct the comprehensive objective function: in, To find the minimum value of the comprehensive objective function, For the axis deviation control term, the weighting coefficient is... The absolute value of the maximum lateral deviation of the axis of each control section of the steel box girder during subsequent jacking cycles is a core indicator reflecting the degree of lateral alignment deviation of the girder. This refers to the allowable limit for lateral deviation of the bridge axis during construction, i.e., the maximum permissible deviation of the bridge axis as specified in the bridge construction specifications or project design documents. It is used to normalize the deviation index and eliminate dimensional differences. The weighting coefficient for the stress uniformity control term. The coefficient of variation (COP) is the normal stress at the critical section, used to characterize the uniformity of stress distribution at the critical section. A smaller COP indicates more balanced stress distribution at each critical section and a lower risk of stress concentration. The COP is the ratio of the standard deviation to the arithmetic mean of the stress samples. In this embodiment... , All values ​​are 0.5; It should be noted that constraints are set based on the comprehensive objective function: Jack load constraints: ,in For the first The rated jacking force of the jack; Stress safety constraints: Maximum stress at critical sections in subsequent cycles ,in The allowable bending stress of bridge steel; Construction process constraints: , The parameter range matches the rated working range of the jacking equipment; among which, This represents the minimum push step distance for a single cycle. This represents the maximum push step distance in a single cycle. To minimize the jacking speed, To achieve the maximum jacking speed; Linear compliance constraint: Maximum deviation of the axis within subsequent cycles It meets the alignment requirements of the construction specifications; The above optimization model was solved using the standard particle swarm optimization algorithm. The specific implementation parameters were as follows: real-number encoding was used, with each particle corresponding to a set of push parameters; the population size was set to 60, and the maximum number of iterations was 120 generations; the inertia weight decreased linearly from 0.9 to 0.4, and the individual learning factor... Global learning factor The fitness evaluation criterion is the comprehensive objective function value; the smaller the fitness, the better the particle. When the number of iterations reaches the upper limit, or the change in the global optimal fitness is less than [value missing] for 25 consecutive generations... The iteration terminates when the time is right, and the optimal push parameter combination corresponding to the globally optimal particle is output.

[0047] Furthermore, the optimal launching parameters obtained from the solution are mapped to the component attributes of the launching system in the BIM monitoring benchmark model to conduct a pre-verification of stress safety. The specific method is as follows: Call the beam element stiffness matrix and current boundary conditions in the BIM model, apply the jacking force and friction resistance load corresponding to the optimal parameters, recalculate the structural mechanical response of the subsequent jacking cycle, and verify two core indicators: whether the maximum stress of the key section is less than the allowable stress of the steel and whether the maximum lateral deviation of the axis is less than the construction allowable limit.

[0048] If both indicators meet the requirements, the verification is deemed successful. The optimal jacking parameters are then sent to the on-site jacking hydraulic control system via the industrial communication interface. Subsequent jacking cycles are executed according to the optimized jacking force distribution, step distance, and speed, dynamically adjusting the construction posture of the beam. If the verification fails to meet the safety requirements, the corresponding stress or deviation constraint thresholds are tightened, and the particle swarm algorithm is restarted for iterative solution until the optimal parameter combination that meets the safety requirements is output, ensuring that the force is controllable and the alignment is compliant throughout the construction adjustment process.

[0049] In this embodiment, step 4 constructs a Coulomb-viscous composite friction coupling mechanical model, taking into account both the Coulomb static friction characteristics of the slide friction and the velocity-related viscous damping characteristics. This allows for a more realistic dynamic deduction of the slide resistance, structural internal forces, and axis offset changes in subsequent jacking cycles, enabling advanced prediction of jacking attitude and stress trends. This upgrades the traditional passive monitoring mode, which only provides real-time feedback, to an active control mode that predicts in advance, moving the risk control window forward and effectively improving the shortcomings of existing technologies in terms of lagging control. Simultaneously, the optimal jacking parameters are solved with the goal of minimizing axis offset and optimizing stress distribution at key sections, replacing the traditional parameter adjustment method that relies on manual experience, thus improving the accuracy and objectivity of jacking attitude control. Furthermore, the optimal parameters are mapped to the BIM monitoring benchmark model to complete the stress safety verification before guiding construction adjustments. This avoids new structural stress risks caused by parameter adjustments, ensuring the safety and rationality of construction adjustments, and ultimately achieving dynamic closed-loop control of construction attitude.

[0050] Please see Figure 2The present invention also provides a BIM-based steel box girder jacking monitoring system, the system being used to execute any of the above-mentioned BIM-based steel box girder jacking monitoring methods, including: The benchmark construction module is used to establish a BIM model of the steel box girder launching and unify the engineering coordinate system. Based on the structural influence line, it screens candidate measuring points that are sensitive to stress and deformation. It uses a genetic algorithm to perform dual-objective optimization with the goal of optimizing the monitoring accuracy and the number of measuring points, determines the layout of measuring points, and binds the measuring point attributes to the BIM component ID to form a BIM monitoring benchmark model. The spatiotemporal registration module is used to collect multi-source monitoring data, perform time and spatial registration on the multi-source monitoring data, obtain a standardized monitoring dataset mapped to the engineering coordinate system, and write it into the BIM monitoring benchmark model. The field inversion module is used to retrieve standardized monitoring data written into BIM, invert the full-field deformation and stress field of the steel box girder and map it into the BIM monitoring benchmark model, extract the stiffness matrix of the beam element corresponding to the current launching position, calculate the theoretical mechanical response in combination with boundary conditions, and update the verified full-field structural state to the BIM monitoring benchmark model after correcting abnormal data through relative residual judgment. The prediction and control module is used to establish a Coulomb-viscous composite friction coupling mechanical model based on the updated structural state data, predict the attitude and stress of subsequent jacking cycles, and solve for the optimal jacking parameters with the optimization objectives of axial deviation and optimal stress distribution of key sections. After mapping the optimal jacking parameters to the BIM monitoring benchmark model for verification, the jacking construction attitude is dynamically adjusted.

[0051] The above formulas are all dimensionless calculations. The formulas are derived from software simulations based on a large amount of collected data to obtain the most recent real-world results. The preset parameters in the formulas are set by those skilled in the art according to the actual situation.

[0052] The above embodiments can be implemented, in whole or in part, by software, hardware, firmware, or any other combination thereof. When implemented in software, the above embodiments can be implemented, in whole or in part, as a computer program product. Those skilled in the art will recognize that the units and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented by electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution.

[0053] The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment, depending on actual needs.

[0054] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any changes or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application.

Claims

1. A BIM-based monitoring method for the jacking of steel box girders, characterized in that, The specific steps include: Step 1: Establish a BIM model of the steel box girder jacking and unify the engineering coordinate system. Based on the structural influence line, screen candidate measuring points that are sensitive to stress and deformation. Use a genetic algorithm to perform dual-objective optimization with the goal of optimizing the monitoring accuracy and the number of measuring points. Determine the layout of measuring points and bind the measuring point attributes to the BIM component ID to form a BIM monitoring benchmark model. Step 2: Collect multi-source monitoring data, perform time and spatial registration on the multi-source monitoring data to obtain a standardized monitoring dataset mapped to the engineering coordinate system, and write it into the BIM monitoring benchmark model; Step 3: Retrieve the standardized monitoring data written into BIM, invert the full-field deformation and stress field of the steel box girder and map it into the BIM monitoring benchmark model, extract the stiffness matrix of the beam element corresponding to the current launching position, calculate the theoretical mechanical response in combination with the boundary conditions, and update the verified full-field structural state to the BIM monitoring benchmark model after correcting abnormal data through relative residual judgment. Step 4: Based on the updated structural state data, establish a Coulomb-viscous composite friction coupling mechanical model to predict the attitude and stress of subsequent jacking cycles. Solve for the optimal jacking parameters with the optimization objectives of axial deviation and optimal stress distribution at key sections. Map the optimal jacking parameters to the BIM monitoring benchmark model and dynamically adjust the jacking construction attitude after verification.

2. The BIM-based method for monitoring the jacking of steel box girders according to claim 1, characterized in that, A BIM model of the steel box girder launching was established and a unified engineering coordinate system was implemented. Candidate measuring points sensitive to stress and deformation were screened based on structural influence lines. The method used was as follows: Construct a geometric model of the steel box girder, including the main body, temporary piers, sliding beams, and jacking jacks. Assign geometric dimensions, material elastic modulus, and unit weight to each component, and incorporate all components into a unified engineering world coordinate system. Based on the structural influence line theory, the influence lines of bending moment, shear force, and deflection of each section within the entire stroke of the jacking are calculated segment by segment. The sections where the extreme value of bending moment occurs, the section with the peak negative bending moment at the pier top, the section connecting the guide beam and the main beam, the section where the box girder segments are spliced, and the section with the largest amplitude of the sliding track support reaction are extracted as stress-sensitive candidate measuring points. The sections with the peak deflection and the section at the linear inflection point within the entire stroke are extracted as deformation-sensitive candidate measuring points.

3. The BIM-based method for monitoring the jacking of steel box girders according to claim 2, characterized in that, The layout of the measuring points was determined and their attributes were bound to the BIM component IDs to form a BIM monitoring baseline model for the steel box girder. The method used was as follows: For the selected stress-sensitive and deformation-sensitive candidate measuring points, a genetic algorithm is used for dual-objective optimization. The two optimization objectives are to improve the monitoring and reconstruction accuracy of stress and deformation across the entire field and to control the total number of measuring points, balancing monitoring accuracy and economy. The fitness evaluation criteria for the genetic algorithm are the maximum uniformity of the coverage of the structural response of the measuring points and the minimum level of reconstruction error. In combination with the layout of key stress sections, the feasibility of sensor installation space, and the monitoring sensitivity requirements, multi-dimensional constraints are set, and the optimal measuring points are obtained through iterative solution. Each optimal measuring point is assigned a unique identifier code, and the spatial coordinates, monitoring type, and preset sampling frequency of the measuring point are mapped one-to-one with the identity identifier of the corresponding component in the geometric model of the steel box girder. Measuring point markers with the above attributes are generated in the geometric model of the steel box girder, and the relationship between measuring points and components in the model is improved in a synchronous manner, forming a steel box girder jacking BIM monitoring benchmark model with linkage between components and measuring points.

4. The BIM-based method for monitoring the jacking of steel box girders according to claim 1, characterized in that, Multi-source monitoring data was collected, and time and spatial registration was performed on the multi-source monitoring data. The standardized monitoring dataset was then written into the BIM monitoring benchmark model. The method used was as follows: Simultaneously collect multi-source raw monitoring data on the stress, linear displacement, jack thrust, and slide support reaction of key sections of the steel box girder; Identify the sampling frequency of various monitoring data, select the sampling time corresponding to the lowest sampling frequency as a unified time node, use cubic spline interpolation algorithm to fit the time-varying continuous curve of high-frequency monitoring data, extract the monitoring values ​​corresponding to each unified time node, realize the one-to-one correspondence of timestamps of all monitoring data, and complete time domain registration. Using the engineering world coordinate system established in step 1 as a reference, a seven-parameter coordinate transformation model is used to solve the transformation parameters between the local measurement coordinate system of each sensor and the BIM coordinate system. The monitoring data after time domain registration is uniformly mapped to the BIM coordinate system to complete the spatial domain registration. After the time domain and spatial domain registration are completed, a standardized time-series monitoring dataset with spatiotemporal uniformity is finally obtained. This dataset is then written into the constructed BIM monitoring benchmark model in batches according to the association relationship between the unique identifier code of the measurement point and the BIM component ID.

5. The BIM-based method for monitoring the jacking of steel box girders according to claim 1, characterized in that, The method used to invert the full-field deformation and stress field of the steel box girder and map it into the BIM monitoring baseline model is as follows: Standardized time-series monitoring data written into the BIM monitoring benchmark model is retrieved, and the three-dimensional spatial coordinates and corresponding stress and displacement values ​​of each measuring point are extracted. These are used as discrete measuring points for the interpolation calculation of the whole field deformation and stress field. With each discrete measuring point as the center, multiple quadratic radial basis functions are constructed based on the spatial distance between the measuring point and the point to be calculated. The radial basis functions of all discrete measuring points are combined to form the interpolation function. The weight coefficients corresponding to each basis function in the interpolation function are obtained by combining the measured monitoring values ​​of each measuring point. The entire space of the steel box girder is divided into several points to be calculated along the longitudinal and transverse directions. The points are substituted into the interpolation function after the weight coefficients are determined, and the deformation and stress values ​​of each point to be calculated are obtained respectively. The continuous deflection deformation field and normal stress distribution field of the whole field are reconstructed by data fitting. Based on the established unified engineering world coordinate system, the reconstructed full-field deformation cloud map and stress cloud map are accurately mounted onto the surface of the corresponding beam segment unit of the BIM monitoring benchmark model according to the spatial coordinate correspondence, so as to realize the BIM visualization mapping of full-field deformation and stress field.

6. The BIM-based method for monitoring the jacking of steel box girders according to claim 5, characterized in that, Extract the stiffness matrix of the beam element corresponding to the current jacking position, calculate the theoretical mechanical response based on the boundary conditions, and update the verified overall structural state to the BIM monitoring benchmark model. The method used is as follows: Based on the full-field stress distribution field and deflection deformation field that have been reconstructed and mounted to the BIM monitoring benchmark model, and combined with the current jacking construction progress, the effective stressed beam segments and key control sections under the current jacking process are identified, and the corresponding BIM beam unit range is determined. From the component attribute library of the beam unit corresponding to the BIM monitoring benchmark model, the pre-embedded beam unit stiffness matrix is ​​retrieved. This stiffness matrix is ​​pre-calculated and generated by the beam unit section characteristics and material mechanical parameters. Combined with the sliding support constraint boundary and jack thrust load boundary under the current jacking construction scenario, the theoretical mechanical response of each section of the steel box girder is obtained by using the structural mechanics finite element method. Based on the measured inversion values ​​of the measurement points obtained by inversion, the measured inversion values ​​of each measurement point location are compared with the theoretical calculation values ​​mentioned above, and the relative residuals between the two are calculated. If the relative residual exceeds the preset residual threshold, the measurement point data is determined to be abnormal data, and the abnormal data is replaced and corrected by the interpolation results of the surrounding adjacent measurement points. The structural state data of the entire field, after mechanical verification and correction of abnormal data, including the corrected stress field and deformation field data, will be synchronously updated to the component attributes of the corresponding beam element in the BIM monitoring benchmark model.

7. The BIM-based method for monitoring the jacking of steel box girders according to claim 1, characterized in that, A Coulomb-viscous combined frictional coupling mechanical model was established to predict the attitude and stress of subsequent jacking cycles. The method used was as follows: Based on the updated overall structural state data and the frictional characteristics of the steel box girder jacking construction, a Coulomb-viscous composite frictional coupling mechanical model is established. This model comprehensively considers the static and dynamic frictional characteristics of Coulomb friction and the velocity correlation of viscous friction, adapting to the frictional stress scenario between the steel box girder and the slide. The current jacking position, beam element stiffness, boundary constraints, and the corrected structural state data are used as model input parameters and substituted into the composite frictional coupling mechanical model to solve for the attitude change law and stress distribution of the steel box girder in the jacking cycle, thus completing the accurate prediction of the attitude and stress of subsequent jacking cycles.

8. A BIM-based method for monitoring the jacking of steel box girders according to claim 7, characterized in that, The jacking parameters were solved with the optimization objectives of axial deviation and optimal stress distribution at key sections. After mapping the parameters to the BIM monitoring benchmark model for verification, the jacking construction posture was dynamically adjusted. The method used was as follows: With the dual optimization objectives of minimizing the deviation of the jacking axis of the steel box girder and ensuring uniform stress distribution at key sections without exceeding the allowable stress, the jacking speed, jacking force, and synchronization of each jack are used as the jacking parameters to be optimized. Combining the predicted jacking posture and stress distribution, an objective function for optimizing the jacking parameters is constructed. The constraint range of the jacking parameters to be optimized is defined, and the particle swarm optimization algorithm is used to solve the objective function to obtain the optimal combination of jacking parameters. The optimal jacking parameters obtained by the solution are mapped to the BIM monitoring benchmark model to simulate the jacking construction process under these parameters and verify whether the jacking posture and stress distribution meet the construction safety requirements. If the verification is successful, the optimal jacking parameters are sent to the jacking construction control system to dynamically adjust the jacking construction posture. If the verification fails, the optimization objectives and constraints are readjusted and iteratively solved until the optimal jacking parameters that meet the requirements are obtained.

9. A BIM-based monitoring system for the jacking of steel box girders, characterized in that, The system is used to execute the BIM-based steel box girder jacking monitoring method according to any one of claims 1-8, including: The benchmark construction module is used to establish a BIM model of the steel box girder launching and unify the engineering coordinate system. Based on the structural influence line, it screens candidate measuring points that are sensitive to stress and deformation. It uses a genetic algorithm to perform dual-objective optimization with the goal of optimizing the monitoring accuracy and the number of measuring points, determines the layout of measuring points, and binds the measuring point attributes to the BIM component ID to form a BIM monitoring benchmark model. The spatiotemporal registration module is used to collect multi-source monitoring data, perform time and spatial registration on the multi-source monitoring data, obtain a standardized monitoring dataset mapped to the engineering coordinate system, and write it into the BIM monitoring benchmark model. The field inversion module is used to retrieve standardized monitoring data written into BIM, invert the full-field deformation and stress field of the steel box girder and map it into the BIM monitoring benchmark model, extract the stiffness matrix of the beam element corresponding to the current launching position, calculate the theoretical mechanical response in combination with boundary conditions, and update the verified full-field structural state to the BIM monitoring benchmark model after correcting abnormal data through relative residual judgment. The prediction and control module is used to establish a Coulomb-viscous composite friction coupling mechanical model based on the updated structural state data, predict the attitude and stress of subsequent jacking cycles, and solve for the optimal jacking parameters with the optimization objectives of axial deviation and optimal stress distribution of key sections. After mapping the optimal jacking parameters to the BIM monitoring benchmark model for verification, the jacking construction attitude is dynamically adjusted.

Citation Information

Patent Citations

  • Bridge jacking automatic monitoring method based on lofting robot

    CN109826108A

  • Movable formwork construction monitoring method and system based on finite element simulation

    CN121503176A