10kv disconnecting switch intelligent monitoring system
By using an intelligent monitoring system that combines contact temperature and load current data to eliminate the influence of ambient temperature and calculate the duration of temperature difference deviation, accurate status assessment and alarm of 10KV disconnect switches are achieved, solving the problem of false alarms due to ambient temperature rise and improving the accuracy of fault identification.
Patent Information
- Application Number
- CN202611176980.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-05
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2046-08-05
AI Technical Summary
Existing technologies cannot effectively distinguish between ambient temperature rise and abnormal temperature rise of 10kV disconnect switches, resulting in a high false alarm rate. Furthermore, they lack comprehensive consideration of the duration of abnormal temperature, making it difficult to accurately identify the truly faulty 10kV disconnect switches.
A 10KV disconnector intelligent monitoring system is adopted. The data acquisition module acquires contact temperature and load current data, the ambient temperature difference calculation module eliminates the synchronous influence of ambient temperature, the load temperature rise calculation module correlates temperature difference with load current, the abnormality duration calculation module calculates the duration of temperature difference offset, and the comprehensive scoring calculation module integrates multi-dimensional information to score and alarm.
It reduces large-scale false alarms caused by high ambient temperatures, improves the accuracy of identifying anomalies in 10KV disconnect switches, can more accurately assess the true heating state of contacts when load current fluctuates, filters instantaneous temperature rise, and improves the accuracy of fault identification.
Smart Images

Figure CN122697673B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of power equipment monitoring technology, specifically to a 10KV disconnector intelligent monitoring system. Background Technology
[0002] 10kV disconnectors are widely used switching equipment in power distribution networks, and their contact temperature is a crucial indicator reflecting their operating status. When abnormalities occur in the contacts of a 10kV disconnector due to poor contact, oxidation, or loosening, the contact resistance increases, leading to an abnormal temperature rise under load current. If not detected in time, this can cause contact burnout or even power outages. Current temperature monitoring methods typically involve installing temperature sensors at the contacts of each 10kV disconnector and setting a fixed temperature alarm threshold. An alarm is triggered when the contact temperature exceeds the threshold.
[0003] However, multiple 10kV disconnect switches within a substation operate under the same environmental conditions, and changes in ambient temperature can cause the contact temperatures of all 10kV disconnect switches to rise or fall synchronously. During periods of high summer temperatures, even if the 10kV disconnect switches themselves are functioning normally, their contact temperatures may approach or exceed fixed alarm thresholds due to rising ambient temperatures, resulting in widespread false alarms. Existing methods lack effective means to distinguish between ambient temperature rises and temperature rises caused by 10kV disconnect switch anomalies, and also lack comprehensive consideration of the duration of temperature anomalies, making it difficult to accurately identify the 10kV disconnect switches that truly require attention. Summary of the Invention
[0004] This invention provides a 10kV disconnector intelligent monitoring system to solve the technical problem that existing technologies cannot distinguish between ambient temperature rise and abnormal temperature rise of the 10kV disconnector, resulting in a high false alarm rate.
[0005] This invention provides a 10kV disconnector intelligent monitoring system, the system comprising: The data acquisition module is used to acquire the contact temperature data sequence and load current data sequence of all 10KV disconnect switches in the same substation; An ambient temperature difference calculation module is used to calculate the ambient temperature difference offset of each 10KV disconnector based on the difference sequence between the contact temperature value sequence of each 10KV disconnector and the average contact temperature of all 10KV disconnectors. The load temperature rise calculation module is used to calculate the load temperature rise ratio of each 10KV disconnector based on the ambient temperature difference offset and the load current value of each 10KV disconnector. The abnormal duration calculation module is used to count the number of consecutive cycles in which the ambient temperature difference offset of each of the 10KV disconnect switches exceeds the attention threshold in multiple consecutive monitoring cycles, and to calculate and obtain the temperature abnormal duration. The comprehensive scoring calculation module is used to calculate the single comprehensive anomaly score of each of the 10KV disconnect switches based on the load temperature rise ratio and the temperature anomaly duration. The status classification and alarm module is used to classify the status and issue alarms for each of the 10KV disconnect switches based on the single unit comprehensive anomaly score.
[0006] One or more technical solutions provided in this invention have at least the following technical effects or advantages: First, this invention calculates the difference between the contact temperature of each 10KV disconnector and the average temperature of all 10KV disconnector contacts in the same substation as the ambient temperature difference offset. Using the average temperature as a dynamic benchmark, it eliminates the influence of synchronous fluctuations in ambient temperature. Compared with existing methods that use a fixed temperature threshold, it can distinguish between ambient temperature rise and abnormal temperature rise of 10KV disconnectors, reducing large-scale false alarms caused by high ambient temperature.
[0007] Secondly, the present invention correlates the temperature difference offset with the square of the load current by the load temperature rise ratio, reflecting the degree of temperature rise caused by a unit load current. Compared with the existing methods that only rely on the absolute value of the contact temperature, it can more accurately assess the true heating state of the contact when the load current fluctuates.
[0008] Third, this invention uses the duration of temperature anomaly to count the number of consecutive cycles in which the temperature difference deviation exceeds the attention threshold. Compared with existing methods that only trigger alarms based on single-point temperature over-limit, this invention integrates information from two dimensions: temperature rise amplitude and duration. This can filter out instantaneous temperature rises caused by short-term current surges and improve the accuracy of identifying truly abnormal 10KV disconnect switches. Attached Figure Description
[0009] To more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0010] Figure 1 This is a structural diagram of a 10KV disconnector intelligent monitoring system provided in an embodiment of the present invention; Figure 2 This is a logic diagram of a 10KV disconnector intelligent monitoring system provided in an embodiment of the present invention; Figure 3 This is an example table and diagram of monitoring data from a 10KV disconnector intelligent monitoring system provided in an embodiment of the present invention; The diagram shows the following modules: Data Acquisition Module 11, Ambient Temperature Difference Calculation Module 12, Load Temperature Rise Calculation Module 13, Anomaly Duration Calculation Module 14, Comprehensive Scoring Calculation Module 15, and Status Classification and Alarm Module 16. Detailed Implementation
[0011] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
[0012] Example 1, as Figure 1 and Figure 2 As shown, the present invention provides a 10kV disconnector switch intelligent monitoring system, the system comprising the following modules: Data acquisition module 11 is used to acquire the contact temperature data sequence and load current data sequence of all 10KV disconnect switches in the same substation; Existing monitoring methods typically set fixed temperature alarm thresholds for each 10kV disconnector. However, when multiple 10kV disconnectors in a substation operate under the same environmental conditions, high summer temperatures or low winter temperatures can cause synchronous fluctuations in the contact temperatures of all 10kV disconnectors. Relying solely on the absolute value of the contact temperature of a single 10kV disconnector cannot distinguish whether the temperature rise is due to ambient temperature increases or an abnormality within the 10kV disconnector itself. To eliminate the collective impact of ambient temperature, it is necessary to simultaneously acquire the contact temperature data of all 10kV disconnectors within the same substation, using the group average as a dynamic benchmark.
[0013] The data acquisition module 11 provided in this embodiment of the invention is also used to acquire the contact temperature values of each 10KV disconnector switch within a preset monitoring window through a temperature sensor, and arrange them in the order of acquisition time to form a contact temperature data sequence of each 10KV disconnector switch. The load current values of each 10KV disconnector switch within the preset monitoring window are obtained and arranged in chronological order of acquisition time to form a load current data sequence for each 10KV disconnector switch.
[0014] Specifically, temperature sensors are used to acquire the contact temperatures of each 10kV disconnector switch within a preset monitoring window. The temperature sensors are contact or non-contact temperature measuring devices installed at the contacts of each 10kV disconnector switch, continuously acquiring contact temperature values at a preset acquisition frequency. The preset acquisition frequency is determined based on the required time resolution of temperature changes, and is taken as the reciprocal of the time required for the 10kV disconnector switch contact temperature to reach a thermally stable state under a step change in load current. The thermally stable state refers to the state where the contact temperature no longer changes significantly after a change in load current. The time required for thermal stability is determined by the thermal time constant of the 10kV disconnector switch, which is the time required for the contact temperature to change from its initial value to 63.2% of its steady-state value. The thermal time constant of the 10kV disconnector switch contacts is typically in the range of 5 to 15 minutes, with the specific value influenced by contact structure, materials, contact conditions, and heat dissipation conditions. In engineering practice, 10 minutes is generally used as a typical estimated value. For example, the thermal time constant of the 10KV disconnector contact is about 10 minutes, and the preset sampling frequency is 1 ÷ 10 = 0.1 times per minute, that is, once every 10 minutes.
[0015] The preset monitoring window is a fixed time interval that traces back from the current moment. The length of the preset monitoring window is determined based on the need for early detection of abnormal contact temperatures in the 10kV disconnector, and is chosen to cover multiple complete temperature change cycles of the 10kV disconnector under normal load fluctuations. The method for determining the preset monitoring window is as follows: obtain historical load current data of the substation, statistically analyze the daily peak-valley variation cycle of the load current, and take a preset multiple of the daily peak-valley variation cycle as the preset monitoring window length. The preset multiple is set to 3, ensuring that the window contains at least three complete daily load change cycles, thus ensuring the representativeness of the statistical characteristics of the temperature data. For example, if the daily peak-valley variation cycle is 24 hours, the preset monitoring window length = 24 × 3 = 72 hours.
[0016] The contact temperature values of each 10kV disconnector within the preset monitoring window are arranged in chronological order of acquisition time to form a contact temperature data sequence for each 10kV disconnector. Each 10kV disconnector corresponds to one contact temperature data sequence, and the sequence length is the number of acquisition times within the preset monitoring window.
[0017] Simultaneously, the load current values of each 10kV disconnector within the preset monitoring window are acquired. These load current values are obtained from the secondary side of the current transformer in the substation. The acquisition method involves synchronously recording the load current value flowing through each 10kV disconnector at each acquisition time. The load current values of each 10kV disconnector are arranged in chronological order of acquisition time to form a load current data sequence for each 10kV disconnector. The sequence length is the same as the contact temperature data sequence length, and each acquisition time corresponds one-to-one.
[0018] For example, a substation has six 10kV disconnect switches, numbered G1 to G6. The preset monitoring window length is 72 hours, and the data acquisition frequency is once every 10 minutes, with a total of 432 acquisition moments within the window. Temperature sensors simultaneously acquire the contact temperature values of the six 10kV disconnect switches at each acquisition moment, and also record the load current value of each 10kV disconnect switch. The contact temperature data sequence of 10kV disconnect switch G1 contains 432 temperature values, and the load current data sequence contains 432 current values; the two sequences correspond one-to-one in time.
[0019] The following technical effects have been achieved through this module: Using a preset monitoring window as the unified time range, the contact temperature and load current values of all 10KV disconnect switches in the same substation are collected synchronously. This provides the necessary group temperature data for subsequent calculation of environmental temperature difference offset, and also provides current data support for the calculation of load temperature rise ratio.
[0020] The ambient temperature difference calculation module 12 is used to calculate the ambient temperature difference offset of each 10KV disconnector based on the difference sequence between the contact temperature value sequence of each 10KV disconnector and the average contact temperature of all 10KV disconnectors. In the actual operating environment of a substation, all 10kV disconnect switches operate under the same ambient temperature conditions. When the ambient temperature changes, the contact temperatures of each 10kV disconnect switch will rise or fall synchronously. If the absolute value of the contact temperature of each 10kV disconnect switch is directly used as the basis for anomaly judgment, a large number of false alarms are likely to occur during the high-temperature season, while truly abnormal 10kV disconnect switches may be missed during the low-temperature season. To eliminate the synchronous influence of ambient temperature on the contact temperatures of each 10kV disconnect switch, it is necessary to use the group average of the contact temperatures of all 10kV disconnect switches in the same substation as a dynamic benchmark to calculate the degree to which the contact temperature of each 10kV disconnect switch deviates from the group average.
[0021] The ambient temperature difference calculation module 12 provided in this embodiment of the invention is also used to obtain the contact temperature values of all 10KV disconnect switches in the same substation at each acquisition time, and calculate the arithmetic mean of all the contact temperature values as the group temperature mean. The instantaneous temperature difference offset of the 10KV disconnector is obtained by subtracting the average temperature of the group from the contact temperature of the 10KV disconnector at the time of data acquisition. The instantaneous temperature difference offset values of each of the 10KV disconnect switches at each acquisition time within the most recent preset monitoring window are arranged in chronological order of acquisition time to form an environmental temperature difference offset sequence for each of the 10KV disconnect switches.
[0022] Specifically, the system acquires the contact temperature values of all 10kV disconnectors within the same substation at each acquisition time. The contact temperature values are collected and recorded by temperature sensors at each acquisition time within a preset monitoring window, with each 10kV disconnector corresponding to one contact temperature value at each acquisition time. For each acquisition time, the system acquires the contact temperature values of all 10kV disconnectors within the substation at that time, forming the group temperature data for that acquisition time.
[0023] Calculate the arithmetic mean of all contact temperature values as the group temperature mean. Assume there are N 10kV disconnectors in the substation. For the j-th data acquisition time, the contact temperature value of the i-th 10kV disconnector is Tij. The group temperature mean at that acquisition time is Tavgj = (T1j + T2j + ... + TNj) ÷ N. The group temperature mean reflects the overall level of the contact temperatures of all 10kV disconnectors at that acquisition time, including the common influence of ambient temperature on all 10kV disconnectors.
[0024] For example, a substation has six 10kV disconnect switches, numbered G1 to G6. At a certain data collection time, the contact temperatures of the six 10kV disconnect switches are as follows: G1 86.2℃, G2 72.5℃, G3 70.8℃, G4 73.1℃, G5 71.6℃, and G6 74.8℃. The average temperature of the group is calculated as (86.2 + 72.5 + 70.8 + 73.1 + 71.6 + 74.8) ÷ 6 = 449.0 ÷ 6 ≈ 74.8℃.
[0025] Calculate the contact temperature of each 10kV disconnector at the time of data acquisition, subtract the average temperature of the group, and obtain the instantaneous temperature difference offset value of each 10kV disconnector at that time of data acquisition. The instantaneous temperature difference offset value of the i-th 10kV disconnector at the j-th data acquisition time is ΔTij = Tij - Tavgj. A positive instantaneous temperature difference offset value indicates that the contact temperature of the 10kV disconnector is higher than the group average, with a relatively additional temperature rise; a negative value indicates that the contact temperature is lower than the group average; and zero indicates that it is the same as the group average.
[0026] The calculation is repeated for each acquisition time within the preset monitoring window to obtain the instantaneous temperature difference offset value of each 10kV disconnector at each acquisition time. The instantaneous temperature difference offset values of each 10kV disconnector at each acquisition time within the most recent preset monitoring window are arranged in chronological order of acquisition time to form a sequence of environmental temperature difference offsets for each 10kV disconnector. The sequence length is the number of acquisition times within the preset monitoring window.
[0027] For example, the preset monitoring window length is 72 hours, and the data collection frequency is once every 10 minutes, for a total of 432 data collection moments. The environmental temperature difference offset sequence of the 10kV disconnector switch G1 contains 432 instantaneous temperature difference offset values, arranged in chronological order. During the midday period, the ambient temperature is higher, and the average temperature of the population increases accordingly. The instantaneous temperature difference offset value of G1 may remain at a relatively stable level due to the synchronous increase of the environmental baseline. During the nighttime period, the average temperature of the population decreases, and the instantaneous temperature difference offset value of G1 may be more prominent under the low environmental baseline due to the abnormal temperature rise characteristics.
[0028] The following technical effects have been achieved through this module: Using the group average temperature of all 10kV disconnector contact points within the same substation as a dynamic benchmark, the instantaneous temperature difference offset of each 10kV disconnector from the group average was calculated, eliminating the common impact of synchronous fluctuations in ambient temperature on all 10kV disconnectors. The ambient temperature difference offset sequence retains the temporal distribution information of temperature anomalies at each acquisition time, providing continuous temporal data for subsequent statistical analysis of the duration of temperature anomalies.
[0029] The load temperature rise calculation module 13 is used to calculate the load temperature rise ratio of each 10KV disconnector based on the ambient temperature difference offset and the load current value of each 10KV disconnector. The temperature rise of the contacts depends not only on whether the contact resistance is normal, but also on the magnitude of the load current flowing through the contacts. When the load current is large, even if the contact resistance is normal, the contact temperature will rise accordingly, resulting in a larger instantaneous temperature difference deviation. When the load current is small, even if the contact resistance is high, the heat generated may be limited, and the instantaneous temperature difference deviation will be smaller. If the absolute value of the instantaneous temperature difference deviation is used to judge whether there is an abnormality in the 10kV disconnector, misjudgment may occur due to fluctuations in the load current.
[0030] The load temperature rise calculation module 13 provided in this embodiment of the invention is also used to obtain the instantaneous temperature difference offset value and load current value of the 10KV disconnecting switch at each acquisition time. The ratio of the instantaneous temperature difference offset value to the square of the load current value is calculated as the single-point load temperature rise ratio at the acquisition time. The load temperature rise ratio of each 10kV disconnector is obtained by calculating the arithmetic mean of the single-point load temperature rise ratio at each acquisition time within the most recent preset monitoring window.
[0031] When the load current value is zero, it also includes: Obtain the load current value at the current acquisition time. When the load current value is zero, determine that the 10KV disconnect switch is in the open state, set the single-point load temperature rise ratio at the acquisition time to zero, and mark the acquisition time as an invalid temperature rise sampling point. The number of sampling times marked as invalid temperature rise sampling points within the preset monitoring window is counted. If the proportion of invalid temperature rise sampling points to the total number of sampling times within the preset monitoring window is greater than the preset invalid proportion threshold, the load temperature rise ratio is taken as the load temperature rise ratio of the previous valid monitoring window. If there is no load temperature rise ratio of the previous valid monitoring window, the load temperature rise ratio is taken as 0.
[0032] Specifically, for each acquisition moment, the instantaneous temperature difference offset value of each 10kV disconnector is obtained from the output of the ambient temperature difference calculation module, and the load current value of each 10kV disconnector is obtained from the output of the data acquisition module. The instantaneous temperature difference offset value is denoted as ΔTij, representing the instantaneous temperature difference offset value of the i-th 10kV disconnector at the j-th acquisition moment, and the load current value is denoted as Iij.
[0033] The ratio of the instantaneous temperature difference offset to the square of the load current is calculated and used as the single-point load temperature rise ratio at that acquisition moment. Single-point load temperature rise ratio Rij = ΔTij ÷ (Iij) 2 The single-point load temperature rise ratio reflects the temperature difference deviation caused by a unit square load current at the time of data acquisition. When the contact resistance is normal, the temperature rise caused by a unit square current should be at a low level; when the contact resistance increases due to poor contact, the heat generated under the same load current is greater, the temperature difference deviation is more significant, and the single-point load temperature rise ratio increases accordingly.
[0034] Obtain the load current value at the current sampling moment. When the load current value is zero, the 10kV disconnector is determined to be in the open state. In the open state, no current flows through the contacts, and no Joule heat is generated. Therefore, the calculated single-point load temperature rise ratio is physically meaningless. Set the single-point load temperature rise ratio at this sampling moment to zero and mark this sampling moment as an invalid temperature rise sampling point.
[0035] The load temperature rise ratio of the 10kV disconnector is obtained by iterating through all the acquisition times within the preset monitoring window and calculating the arithmetic mean of the single-point load temperature rise ratio for each valid acquisition time (i.e., acquisition times not marked as invalid temperature rise sampling points). Load temperature rise ratio = (ΣRij) ÷ M, where M is the number of valid acquisition times within the preset monitoring window, and the summation is performed only on valid acquisition times.
[0036] For example, the 10kV disconnector G1 has 432 data acquisition moments within a preset monitoring window. Of these, the load current is greater than zero at 380 acquisition moments and zero at 52 acquisition moments. In these 380 valid acquisition moments, the instantaneous temperature difference offset ΔT1j and the load current I1j at each moment are used to calculate the corresponding single-point load temperature rise ratio R1j. The arithmetic mean of the single-point load temperature rise ratios for the 380 valid acquisition moments is 0.0285. Therefore, the load temperature rise ratio of the 10kV disconnector G1 within this preset monitoring window is 0.0285.
[0037] The number of sampling times marked as invalid temperature rise sampling points within the preset monitoring window is counted. If the proportion of invalid temperature rise sampling points to the total number of sampling times within the preset monitoring window is greater than the preset invalid proportion threshold, the load temperature rise ratio is taken as the load temperature rise ratio of the previous valid monitoring window. If there is no load temperature rise ratio of the previous valid monitoring window, the load temperature rise ratio is taken as 0.
[0038] The method for determining the preset invalidity threshold is as follows: Obtain the percentage of invalid temperature rise sampling points for all 10kV disconnectors in the substation across all historical monitoring windows, and take the 95th percentile of this percentage as the preset invalidity threshold. The 95th percentile indicates that approximately 95% of the invalid temperature rise sampling points in the historical monitoring windows do not exceed this value; cases exceeding this value are considered low-probability anomalies. For example, after statistical analysis, the 95th percentile of the percentage of invalid temperature rise sampling points in all historical monitoring windows of the substation is 0.65, and the preset invalidity threshold = 0.65.
[0039] For example, the 10kV disconnector G2 has 432 data collection points within the same preset monitoring window. Of these, the load current is greater than zero in 120 collection points and zero in 312. The proportion of the 312 invalid temperature rise sampling points to the total number of collection points within the preset monitoring window is approximately 0.722 (312 ÷ 432). Since 0.722 is greater than the preset invalid proportion threshold of 0.65, the proportion of invalid temperature rise sampling points exceeds the threshold, and the load temperature rise ratio of the current monitoring window is unreliable. The load temperature rise ratio of this 10kV disconnector is then taken as the load temperature rise ratio of the previous valid monitoring window. If the load temperature rise ratio of the previous valid monitoring window is 0.0182, then the load temperature rise ratio of the current monitoring window is taken as 0.0182; otherwise, if there is no load temperature rise ratio of the previous valid monitoring window, then the load temperature rise ratio is taken as 0.
[0040] For example, Figure 3This is an example table of monitoring data from a 10kV disconnector intelligent monitoring system provided in an embodiment of the present invention. It shows the original collected values of contact temperature and load current of six 10kV disconnectors in the same substation at a certain acquisition time, as well as the calculated average group temperature and the instantaneous temperature difference offset of each 10kV disconnector.
[0041] The following technical effects have been achieved through this module: The ratio of instantaneous temperature difference offset to the square of the load current is used as the single-point load temperature rise ratio. This normalizes the temperature rise difference to an equivalent temperature rise coefficient caused by a unit load current, eliminating the influence of the load current magnitude on the temperature difference offset. During the 10kV disconnecting switch's open period, the corresponding sampling points are marked as invalid and excluded. When there are too many invalid sampling points, the calculation results of the historical valid window are used, avoiding distortion of the load temperature rise ratio caused by frequent switching.
[0042] The abnormal duration calculation module 14 is used to count the number of consecutive cycles in which the ambient temperature difference offset of each of the 10KV disconnect switches exceeds the attention threshold in multiple consecutive monitoring cycles, and to calculate and obtain the temperature abnormal duration. In actual operation, 10kV disconnecting switches may experience occasional temperature abnormalities due to short-term current surges or instantaneous load fluctuations. These transient anomalies are usually short-lived and recover on their own, without triggering an alarm. However, 10kV disconnecting switch anomalies truly caused by poor contact or contact aging exhibit persistent temperature deviations, deviating from normal levels for multiple consecutive monitoring cycles. Judging anomalies solely based on single-point temperature deviation values or statistical values from a single cycle cannot distinguish between transient fluctuations and continuous degradation, easily leading to false alarms due to short-term surges.
[0043] The abnormal duration calculation module 14 provided in this embodiment of the invention is also used to divide the preset monitoring window into multiple monitoring periods. For each monitoring period, the arithmetic mean of the instantaneous temperature difference offset values at each acquisition time is obtained as the periodic temperature difference offset value of the monitoring period. The number of consecutive monitoring cycles in which the periodic temperature difference offset value continuously exceeds the preset attention threshold within the preset monitoring window is counted as the number of consecutive over-limit cycles. The duration of temperature anomalies is calculated based on the number of consecutive out-of-limit cycles and the total number of monitoring cycles within the preset monitoring window.
[0044] Specifically, the preset monitoring window is divided into multiple monitoring cycles. The length of the monitoring cycle is determined based on the shortest observable timescale of the abnormal development of the 10kV disconnector switch contact temperature. The method for determining the monitoring cycle length is as follows: obtain the shortest duration for the contact temperature of the 10kV disconnector switch contact to rise from the normal level to the alarm level when the contact resistance deteriorates from the normal value to the abnormal value, and take this shortest duration as the monitoring cycle length. For example, based on the thermal time constant and contact resistance deterioration rate of the 10kV disconnector switch contact, the shortest duration for the contact temperature to rise from the normal level to the alarm level is approximately 4 hours, and the monitoring cycle length is set to 4 hours. The preset monitoring window length is determined by the data acquisition module to be 72 hours, and the monitoring cycle length is set to 4 hours. A total of 18 monitoring cycles are divided within the preset monitoring window.
[0045] For each monitoring cycle, the instantaneous temperature difference offset value at each acquisition moment within that monitoring cycle is obtained. The instantaneous temperature difference offset value is output by the environmental temperature difference calculation module and recorded in the environmental temperature difference offset sequence for each 10kV disconnector. The arithmetic mean of all instantaneous temperature difference offset values within that monitoring cycle is calculated as the periodic temperature difference offset value for that monitoring cycle. The periodic temperature difference offset value reflects the overall level of deviation of the contact temperature of the 10kV disconnector from the group average within that monitoring cycle.
[0046] For example, the 10kV disconnector G1 is divided into 18 monitoring cycles within a preset monitoring window, with each cycle containing 24 data acquisition moments (4 hours ÷ 10 minutes). In the 8th monitoring cycle, the arithmetic mean of the 24 instantaneous temperature difference offset values is 9.8℃, and the cycle temperature difference offset value for this cycle is 9.8℃. In the 9th monitoring cycle, the cycle temperature difference offset value is 10.5℃; and in the 10th monitoring cycle, the cycle temperature difference offset value is 11.2℃.
[0047] The number of consecutive monitoring cycles in which the periodic temperature difference deviation value continuously exceeds a preset attention threshold within the preset monitoring window is counted as the number of consecutive exceedance cycles. The method for counting consecutive exceedance cycles is as follows: starting from the current monitoring cycle, backtracking is performed to check if the periodic temperature difference deviation value exceeds the preset attention threshold. If the periodic temperature difference deviation value of the current cycle exceeds the threshold, the check continues backward until the first cycle that does not exceed the threshold is encountered. The number of consecutive cycles from the next cycle to the current cycle is the number of consecutive exceedance cycles. If the periodic temperature difference deviation value of the current cycle does not exceed the threshold, the number of consecutive exceedance cycles is zero.
[0048] The method for determining the preset attention threshold is as follows: obtain the periodic temperature difference offset values of all 10kV disconnect switches in the substation for each monitoring cycle within the historical normal monitoring window, and take the 95th percentile of all normal periodic temperature difference offset values as the preset attention threshold. The 95th percentile indicates that approximately 95% of the normal periodic temperature difference offset values do not exceed this value, and temperature difference offsets exceeding this value are considered low-probability abnormal situations.
[0049] For example, the total number of periodic temperature difference deviations of all 10kV disconnectors in the substation within the historical normal monitoring window is 2160 (6 units × 18 cycles × 20 historical windows), with the 95th percentile being 5.2℃. The preset attention threshold is set to 5.2℃. The periodic temperature difference deviation of 10kV disconnector G1 exceeded 5.2℃ for 11 monitoring cycles from the 8th to the 18th, with a consecutive number of exceeding the limit cycles of 11.
[0050] The duration of temperature anomalies is obtained by dividing the number of consecutive over-limit cycles by the total number of monitoring cycles within the preset monitoring window. Duration of temperature anomalies = Number of consecutive over-limit cycles ÷ Total number of monitoring cycles. The value of the duration of temperature anomalies ranges from 0 to 1. The closer to 1, the longer the duration of the temperature difference deviation, and the greater the possibility of a persistent anomaly in the 10kV disconnector; the closer to 0, the shorter the duration of the temperature difference deviation, which may only be a momentary fluctuation.
[0051] For example, the number of consecutive over-limit cycles for 10kV disconnector G1 is 11, and the total number of monitoring cycles is 18. The temperature anomaly duration is approximately 0.611 (11 ÷ 18). This value indicates that within the preset monitoring window, G1 is in a state where the temperature difference deviation exceeds the attention threshold for approximately 61.1% of the time, indicating a relatively sustained temperature anomaly in the 10kV disconnector. For 10kV disconnector G2, within the same preset monitoring window, only the 3rd and 4th cycles exceed 5.2℃ in terms of temperature difference deviation, resulting in 2 consecutive over-limit cycles. The temperature anomaly duration is approximately 0.111 (2 ÷ 18). This value indicates that the temperature difference deviation of G2 is short-lived and may only be caused by instantaneous load fluctuations, suggesting a low probability of a sustained anomaly in the 10kV disconnector.
[0052] The following technical effects have been achieved through this module: By dividing the monitoring window into multiple monitoring cycles and counting the number of consecutive cycles in which the temperature difference deviation value exceeds the limit, the duration of the temperature anomaly is obtained. This quantifies the duration of the temperature difference deviation from the time dimension, which can filter out occasional temperature anomalies caused by short-term current surges or load fluctuations. This expands the anomaly judgment of 10KV disconnect switches from instantaneous amplitude to a comprehensive evaluation of amplitude and duration, improving the accuracy of identifying truly abnormal 10KV disconnect switches.
[0053] The comprehensive scoring calculation module 15 is used to calculate the single comprehensive anomaly score of each of the 10KV disconnect switches based on the load temperature rise ratio and the temperature anomaly duration. The load temperature rise ratio and the duration of temperature anomalies characterize the operating status of 10kV disconnectors from different dimensions: a higher load temperature rise ratio increases the likelihood of abnormal contact resistance; a higher duration of temperature anomalies indicates a more persistent temperature difference deviation, which is more likely to be a sign of 10kV disconnector degradation rather than a momentary fluctuation. These two indicators need to be integrated into a unified comprehensive anomaly score for each 10kV disconnector to facilitate ranking and classification.
[0054] The comprehensive scoring calculation module 15 provided in this embodiment of the invention is also used to multiply the load temperature rise ratio of each of the 10KV disconnect switches by the first scoring weight coefficient to obtain the temperature rise score component; Multiply the duration of temperature anomaly of each of the 10KV disconnect switches by the second scoring weight coefficient to obtain the duration score component; The temperature rise score component is added to the continuous score component to obtain the single comprehensive anomaly score of each 10KV disconnector switch. The sum of the first score weight coefficient and the second score weight coefficient is 1. The first score weight coefficient and the second score weight coefficient are obtained based on the fluctuation characteristics of the environmental temperature difference offset sequence.
[0055] The first and second scoring weight coefficients are obtained based on the fluctuation characteristics of the environmental temperature difference offset sequence, including: Calculate the standard deviation of the instantaneous temperature difference offset at each acquisition time within the preset monitoring window; Divide the standard deviation by the preset upper limit of the temperature difference standard deviation reference to obtain the temperature difference fluctuation. The temperature fluctuation is used as the first scoring weight coefficient, and 1 is subtracted from the temperature fluctuation to obtain the second scoring weight coefficient.
[0056] Specifically, the load temperature rise ratio of each 10kV disconnector is multiplied by the first scoring weight coefficient to obtain the temperature rise score component. Temperature rise score component = first scoring weight coefficient × load temperature rise ratio. The load temperature rise ratio is output by the load temperature rise calculation module, and the first scoring weight coefficient is determined based on the fluctuation characteristics of the ambient temperature difference offset sequence, which will be detailed in the following steps.
[0057] The duration of temperature anomalies of each 10kV disconnector is multiplied by the second scoring weight coefficient to obtain the duration score component. Duration score component = second scoring weight coefficient × duration of temperature anomalies. The duration of temperature anomalies is output by the anomaly duration calculation module. The second scoring weight coefficient is equal to 1 minus the first scoring weight coefficient, so that the sum of the two weight coefficients is 1.
[0058] The temperature rise score component and the duration score component are added together to obtain the single-unit comprehensive anomaly score of the 10kV disconnector. Single-unit comprehensive anomaly score = temperature rise score component + duration score component. The single-unit comprehensive anomaly score combines the temperature rise magnitude information reflected by the load temperature rise ratio and the time duration information reflected by the temperature anomaly duration. The higher the value, the higher the probability and severity of the 10kV disconnector anomaly.
[0059] The first and second scoring weighting coefficients are obtained based on the fluctuation characteristics of the environmental temperature difference offset sequence. The specific acquisition method is as follows: Calculate the standard deviation of the instantaneous temperature difference offset at each acquisition time within the preset monitoring window. The instantaneous temperature difference offset is ΔTij output by the environmental temperature difference calculation module. Each 10kV disconnector corresponds to an environmental temperature difference offset sequence within the preset monitoring window. Calculate the standard deviation of the instantaneous temperature difference offset at each acquisition time within this sequence. The standard deviation of the instantaneous temperature difference offset at each acquisition time within the preset monitoring window reflects the fluctuation range of the contact temperature of the 10kV disconnector deviating from the group mean within the preset monitoring window. The larger the standard deviation of the instantaneous temperature difference offset at each acquisition time within the preset monitoring window, the more drastic the temperature difference fluctuation of the 10kV disconnector, and the lower the reliability and stability of the instantaneous temperature difference anomaly. The smaller the standard deviation of the instantaneous temperature difference offset at each acquisition time within the preset monitoring window, the more stable the temperature difference state, and the higher the reliability of the instantaneous temperature difference anomaly.
[0060] The temperature fluctuation is obtained by dividing the standard deviation of the instantaneous temperature difference offset at each collection time within the preset monitoring window by the preset upper limit of the temperature difference standard deviation reference. Temperature fluctuation = Standard deviation of instantaneous temperature difference offset at each collection time within the preset monitoring window ÷ Preset upper limit of the temperature difference standard deviation reference. When the calculation result is greater than 1, the temperature fluctuation is set to 1, ensuring that the first scoring weight coefficient does not exceed 1 and the second scoring weight coefficient is not lower than 0, thus avoiding situations where the weight allocation exceeds a reasonable range.
[0061] The method for determining the upper limit of the preset temperature difference standard deviation is as follows: Obtain the standard deviation of the instantaneous temperature difference offset values at each acquisition time within the preset monitoring window for all 10kV disconnectors in the substation within the historical normal monitoring window. Take the 95th percentile of the standard deviation of the instantaneous temperature difference offset values at each acquisition time within all preset monitoring windows as the upper limit of the preset temperature difference standard deviation. The 95th percentile indicates that approximately 95% of the standard deviations of the instantaneous temperature difference offset values at each acquisition time within the preset monitoring window in the normal monitoring window do not exceed this value. Temperature fluctuations exceeding this value are considered abnormally severe and should be truncated by taking 1 to ensure that the first scoring weight coefficient reaches the upper limit.
[0062] Temperature fluctuation is assigned as the second weighting factor to the duration of temperature anomalies, while the first weighting factor, 1 minus temperature fluctuation, is assigned to the load temperature rise ratio. When temperature fluctuation is large (close to 1), it indicates that the ambient temperature deviation fluctuates drastically. The duration of temperature anomalies, as a statistical periodic indicator, is not sensitive to instantaneous fluctuations and has stronger stability, thus receiving a higher weight through the second weighting factor. The load temperature rise ratio, affected by short-term fluctuations, has a reduced weight. When temperature fluctuation is small (close to 0), it indicates that the ambient temperature deviation is stable. The load temperature rise ratio can stably reflect the true heating state of the contacts, receiving a higher weight through the first weighting factor, making the comprehensive score more sensitive to the magnitude of contact temperature rise.
[0063] For example, the standard deviation of the instantaneous temperature difference offset of the 10kV disconnector G1 at each acquisition time within the preset monitoring window is 0.52. The 95th percentile of the standard deviation of the instantaneous temperature difference offset of all 10kV disconnectors in the substation at each acquisition time within the preset monitoring window during historical normal monitoring is 1.2, and the upper limit of the preset temperature difference standard deviation is taken as 1.2. The temperature difference fluctuation = 0.52 ÷ 1.2 ≈ 0.433, which does not exceed 1, so the second scoring weight coefficient is taken as 0.433, and the first scoring weight coefficient = 1 - 0.433 = 0.567.
[0064] The load temperature rise calculation module outputs a load temperature rise ratio of 0.0285 for the 10kV disconnector G1, and the anomaly duration calculation module outputs a temperature anomaly duration of 0.611 for G1. The temperature rise score component = 0.567 × 0.0285 ≈ 0.0162, and the duration score component = 0.433 × 0.611 ≈ 0.265. The overall anomaly score for a single unit = 0.0162 + 0.265 ≈ 0.281.
[0065] The standard deviation of the instantaneous temperature difference offset of the 10kV disconnector G2 at each acquisition time within the preset monitoring window is 0.18, and the temperature fluctuation is 0.18 ÷ 1.2 = 0.150. The second scoring weight coefficient is 0.150, and the first scoring weight coefficient is 0.850. The load temperature rise ratio of G2 is 0.0082, and the temperature anomaly duration is 0.111. The temperature rise score component is 0.850 × 0.0082 ≈ 0.0070, and the duration score component is 0.150 × 0.111 ≈ 0.017. The comprehensive anomaly score for a single unit is 0.0070 + 0.017 ≈ 0.024.
[0066] It is important to note that when the load temperature rise ratio of a 10kV disconnector is set to 0 due to the proportion of invalid sampling points exceeding a threshold, the temperature rise score component of that 10kV disconnector is 0, and its overall anomaly score consists only of the duration score component. In this case, the anomaly judgment of the 10kV disconnector relies entirely on the duration of the temperature anomaly; that is, it only assesses the persistence of its temperature difference deviation from a time perspective, and cannot assess the degree of temperature rise caused by unit current from an amplitude perspective. When a 10kV disconnector that has been disconnected for a long time is put back into operation, at least one complete preset monitoring window of data accumulation is required before the effective calculation of the load temperature rise ratio can be restored.
[0067] The following technical effects have been achieved through this module: The load temperature rise ratio and the duration of temperature anomalies are weighted and summed to form a comprehensive anomaly score for a single unit, integrating information from both the temperature rise amplitude and the duration of the anomaly. The temperature fluctuation, determined by the standard deviation of the instantaneous temperature difference offset at each acquisition time within a preset monitoring window, is used as the basis for weight allocation. When temperature fluctuations are severe, the weight of the load temperature rise ratio is reduced, and the weight of the duration of temperature anomalies is increased; conversely, when the temperature difference is stable, the weighting is reversed. This allows for adaptive adjustment of the confidence level of each indicator based on the data fluctuation characteristics of the current monitoring window, improving the reliability and adaptability of the comprehensive score.
[0068] The status classification and alarm module 16 is used to classify the status and issue alarms for each of the 10KV disconnect switches based on the single unit comprehensive anomaly score.
[0069] The individual anomaly scores of multiple 10kV disconnect switches within the same substation constitute a group distribution. Alarm thresholds need to be dynamically determined based on the statistical characteristics of this group distribution, rather than using fixed thresholds. During high-temperature seasons, the contact temperatures of all 10kV disconnect switches generally increase, causing the average group score to shift upwards, potentially leading to widespread false alarms with fixed thresholds. Conversely, during low-temperature seasons or light-load periods, the overall group score is lower, and fixed thresholds may miss truly abnormal devices.
[0070] The status classification and alarm module 16 provided in this embodiment of the invention is also used to obtain a warning threshold and a monitoring threshold, wherein the warning threshold is greater than the monitoring threshold; When the single unit comprehensive abnormal score is greater than or equal to the warning threshold, the 10KV disconnect switch is determined to be in a serious abnormal state, and a maintenance work order is generated. When the comprehensive anomaly score of a single unit is greater than or equal to the monitoring threshold and less than the warning threshold, the 10KV disconnector is determined to be in a general abnormal state, the 10KV disconnector is added to the watch list, and the monitoring cycle of the 10KV disconnector is corrected based on the comprehensive anomaly score. When the comprehensive anomaly score of a single unit is less than the monitoring threshold, the 10KV disconnector is determined to be in normal condition, and the regular monitoring cycle is maintained.
[0071] The acquisition of the warning threshold and monitoring threshold includes: Obtain the comprehensive anomaly score of each 10KV disconnector in the same substation within the current preset monitoring window, and calculate the arithmetic mean of the comprehensive anomaly scores of each 10KV disconnector as the group score mean. Calculate the standard deviation of the individual comprehensive anomaly score for all the 10kV disconnect switches, and use it as the group score standard deviation; The sum of the mean and standard deviation of the group ratings is calculated and used as the warning threshold. The monitoring threshold is obtained by subtracting the smaller of the standard deviation of the group scores and the mean of the group scores from the mean of the group scores.
[0072] Specifically, the system obtains the comprehensive anomaly score for each 10kV disconnector within the same substation within the current preset monitoring window. This comprehensive anomaly score is output by the comprehensive score calculation module, with each 10kV disconnector corresponding to a single score value.
[0073] Calculate the arithmetic mean of the individual comprehensive anomaly scores for all 10kV disconnect switches, and use this as the group average score. The group average score reflects the overall anomaly level of all 10kV disconnect switches in the substation within the current preset monitoring window, and is a comprehensive reflection of the group's ambient temperature and load level.
[0074] Calculate the standard deviation of the individual comprehensive anomaly scores for all 10kV disconnectors, and use this as the group score standard deviation. The group score standard deviation reflects the dispersion of anomaly levels among the 10kV disconnectors. The standard deviation is larger when only one or a few 10kV disconnectors have significantly higher scores than other 10kV disconnectors; the standard deviation is smaller when the scores of all 10kV disconnectors are similar.
[0075] The warning threshold is calculated by adding the group score mean to the group score standard deviation. The warning threshold = group score mean + group score standard deviation. The warning threshold changes dynamically with the group score mean and standard deviation. When multiple 10kV disconnect switches simultaneously experience temperature increases under the same environmental conditions, the group score mean rises, and the warning threshold automatically adjusts to the overall environmental change, preventing widespread false alarms due to high temperatures. Conversely, when only a single or a few 10kV disconnect switches show significantly higher scores, the group score standard deviation increases, and the warning threshold rises accordingly to identify genuine outliers.
[0076] The monitoring threshold is calculated by subtracting the smaller of the group score standard deviation and the group score mean from the group score mean. When the group score standard deviation is less than the group score mean, it indicates that the dispersion of the scores of each 10kV disconnector is low; when the group score standard deviation is greater than or equal to the group score mean, it indicates that the score fluctuates drastically. To avoid the monitoring threshold being excessively suppressed, the monitoring threshold is set to zero.
[0077] For example, a substation has six 10kV disconnect switches, numbered G1 to G6. Within the current preset monitoring window, the individual comprehensive anomaly scores for the six 10kV disconnect switches are as follows: G1 0.281, G2 0.024, G3 0.018, G4 0.015, G5 0.036, and G6 0.022. The group score mean = (0.281 + 0.024 + 0.018 + 0.015 + 0.036 + 0.022) ÷ 6 = 0.396 ÷ 6 = 0.066. The calculated group score standard deviation is 0.095. Since the group score standard deviation of 0.095 is greater than the group score mean of 0.066, the group score mean of 0.066 is taken as the smaller value, and the monitoring threshold = 0.066 - 0.066 = 0. Warning threshold = 0.066 + 0.095 = 0.161.
[0078] The individual comprehensive abnormality score of each 10kV disconnector is compared with the warning threshold and monitoring threshold, and a three-level status classification is implemented.
[0079] When the overall anomaly score of a single 10kV disconnector is greater than or equal to the warning threshold, the 10kV disconnector is determined to be in a serious abnormal state. A serious abnormal state indicates that the contacts of the 10kV disconnector have obvious contact problems or aging issues, and the temperature rise and duration have reached a level requiring immediate attention. A maintenance work order is generated, which includes the 10kV disconnector number, the overall anomaly score of the single unit, the load temperature rise ratio, the duration of the temperature anomaly, and recommended maintenance measures.
[0080] When the comprehensive anomaly score of a single 10kV disconnector is greater than or equal to the monitoring threshold but less than the warning threshold, the 10kV disconnector is determined to be in a general anomaly state. A general anomaly state indicates that the 10kV disconnector has shown initial signs of anomaly, but has not yet reached the urgency level requiring immediate repair; however, it requires enhanced monitoring and continuous attention. The 10kV disconnector is added to the attention list, and its monitoring cycle is adjusted based on the comprehensive anomaly score. For example, the comprehensive anomaly score of 10kV disconnector G1 is 0.281, which is greater than or equal to the warning threshold of 0.161, thus it is determined to be in a severe anomaly state, and a repair work order is generated. The comprehensive anomaly scores of 10kV disconnectors G2 are 0.024, G3 is 0.018, G4 is 0.015, G5 is 0.036, and G6 is 0.022, all greater than or equal to the monitoring threshold of 0 and less than the warning threshold of 0.161, thus they are determined to be in a general anomaly state, added to the attention list, and their monitoring cycles are adjusted according to their respective scores.
[0081] The monitoring cycle is corrected by multiplying the regular monitoring cycle by the ratio of the comprehensive anomaly score to the warning threshold, i.e., the corrected monitoring cycle = regular monitoring cycle × (warning threshold ÷ comprehensive anomaly score). The closer the comprehensive anomaly score is to the warning threshold, the shorter the corrected monitoring cycle and the higher the monitoring frequency, so as to promptly capture the trend of anomaly deterioration. For example, the regular monitoring cycle of 10kV disconnector G1 is 4 hours, the comprehensive anomaly score of a single unit is 0.281, the warning threshold is 0.161, and the corrected monitoring cycle = 4 × (0.161 ÷ 0.281) = 4 × 0.573 ≈ 2.29 hours, rounded up to 2.3 hours.
[0082] When the overall anomaly score of a single unit is less than the monitoring threshold, the 10kV disconnector is determined to be in a normal state. A normal state indicates that the 10kV disconnector is operating well, and both the temperature rise and the duration of the anomaly are within normal ranges. Maintain the regular monitoring cycle and continue monitoring at the original sampling frequency.
[0083] The following technical effects have been achieved through this module: Warning and monitoring thresholds are dynamically determined by the group mean and standard deviation of the comprehensive anomaly scores of all 10kV disconnect switches in the same substation. The warning threshold is adaptively adjusted according to the distribution of the group scores. When the temperature of multiple 10kV disconnect switches rises simultaneously under the same environmental conditions, the warning threshold is automatically raised to avoid large-scale false alarms.
[0084] When only a single or a few 10kV disconnect switches have significantly outstanding scores, the warning threshold increases accordingly based on the expansion of the standard deviation, enabling accurate identification of outliers. For 10kV disconnect switches in severely abnormal states, maintenance work orders are generated for immediate processing; for 10kV disconnect switches in general abnormal states, the monitoring cycle is shortened with increased attention; and for 10kV disconnect switches in normal states, routine monitoring is maintained, achieving differentiated operation and maintenance management based on hierarchical decision-making.
[0085] The above-described embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this application.
Claims
1. A 10kV disconnector intelligent monitoring system, characterized in that, include: The data acquisition module is used to acquire the contact temperature data sequence and load current data sequence of all 10KV disconnect switches in the same substation; An ambient temperature difference calculation module is used to calculate the ambient temperature difference offset of each 10KV disconnector based on the difference sequence between the contact temperature value sequence of each 10KV disconnector and the average contact temperature of all 10KV disconnectors. The load temperature rise calculation module is used to calculate the load temperature rise ratio of each 10KV disconnector based on the ambient temperature difference offset and the load current value of each 10KV disconnector. The load temperature rise ratio reflects the temperature difference offset caused by the unit square load current at the time of acquisition. The abnormal duration calculation module is used to count the number of consecutive cycles in which the ambient temperature difference offset of each of the 10KV disconnect switches exceeds the attention threshold in multiple consecutive monitoring cycles, and to calculate and obtain the temperature abnormal duration. The comprehensive scoring calculation module is used to calculate the single comprehensive anomaly score of each of the 10KV disconnect switches based on the load temperature rise ratio and the duration of temperature anomaly. The status classification and alarm module is used to classify the status and issue alarms for each of the 10KV disconnect switches based on the single unit comprehensive anomaly score. The calculation of the ambient temperature difference offset of each 10kV disconnector is based on the difference sequence between the contact temperature value sequence of each 10kV disconnector and the average contact temperature of all 10kV disconnectors, including: Obtain the contact temperature values of all 10kV disconnect switches in the same substation at each acquisition time, and calculate the arithmetic mean of all the contact temperature values as the group temperature mean. The instantaneous temperature difference offset of the 10KV disconnector is obtained by subtracting the average temperature of the group from the contact temperature of the 10KV disconnector at the time of data acquisition. The instantaneous temperature difference offset values of each of the 10KV disconnect switches at each acquisition time within the most recent preset monitoring window are arranged in chronological order of acquisition time to form an environmental temperature difference offset sequence of each of the 10KV disconnect switches. The method involves calculating the duration of temperature anomalies by counting the number of consecutive monitoring cycles in which the ambient temperature difference deviation of each of the 10kV disconnecting switches exceeds the attention threshold, including: The preset monitoring window is divided into multiple monitoring periods. For each monitoring period, the arithmetic mean of the instantaneous temperature difference offset values at each acquisition time is obtained as the periodic temperature difference offset value of the monitoring period. The number of consecutive monitoring cycles in which the periodic temperature difference offset value continuously exceeds the preset attention threshold within the preset monitoring window is counted as the number of consecutive over-limit cycles. The duration of temperature anomaly is calculated based on the number of consecutive out-of-limit cycles and the total number of monitoring cycles within the preset monitoring window. The calculation of a single-unit comprehensive anomaly score for each 10kV disconnector switch based on the load temperature rise ratio and the duration of temperature anomaly includes: Multiply the load temperature rise ratio of each of the 10KV disconnect switches by the first scoring weight coefficient to obtain the temperature rise score component; Multiply the duration of temperature anomaly of each of the 10KV disconnect switches by the second scoring weight coefficient to obtain the duration score component; The temperature rise score component is added to the continuous score component to obtain the single comprehensive anomaly score of each 10KV disconnector switch. The sum of the first score weight coefficient and the second score weight coefficient is 1. The first score weight coefficient and the second score weight coefficient are obtained based on the fluctuation characteristics of the environmental temperature difference offset sequence.
2. The intelligent monitoring system for a 10kV disconnector switch according to claim 1, characterized in that, The acquisition of contact temperature data sequences and load current data sequences of all 10kV disconnectors within the same substation includes: The temperature sensor acquires the contact temperature values of each 10kV disconnector switch within the preset monitoring window, and arranges them in the order of acquisition time to form a contact temperature data sequence for each 10kV disconnector switch. The load current values of each 10KV disconnector switch within the preset monitoring window are obtained and arranged in chronological order of acquisition time to form a load current data sequence for each 10KV disconnector switch.
3. The intelligent monitoring system for a 10kV disconnector switch according to claim 1, characterized in that, The calculation of the load temperature rise ratio of each 10kV disconnector based on the ambient temperature difference offset and the load current value of each 10kV disconnector includes: For each acquisition moment, the instantaneous temperature difference offset value and load current value of the 10KV disconnecting switch at that acquisition moment are obtained; The ratio of the instantaneous temperature difference offset value to the square of the load current value is calculated as the single-point load temperature rise ratio at the acquisition time. The load temperature rise ratio of each 10kV disconnector is obtained by calculating the arithmetic mean of the single-point load temperature rise ratio at each acquisition time within the most recent preset monitoring window.
4. The intelligent monitoring system for a 10kV disconnector switch according to claim 3, characterized in that, When the load current value is zero, it also includes: Obtain the load current value at the current acquisition time. When the load current value is zero, determine that the 10KV disconnect switch is in the open state, set the single-point load temperature rise ratio at the acquisition time to zero, and mark the acquisition time as an invalid temperature rise sampling point. The number of sampling times marked as invalid temperature rise sampling points within the preset monitoring window is counted. If the proportion of invalid temperature rise sampling points to the total number of sampling times within the preset monitoring window is greater than the preset invalid proportion threshold, the load temperature rise ratio is taken as the load temperature rise ratio of the previous valid monitoring window. If there is no load temperature rise ratio of the previous valid monitoring window, the load temperature rise ratio is taken as 0.
5. The intelligent monitoring system for a 10kV disconnector switch according to claim 1, characterized in that, The first and second scoring weight coefficients are obtained based on the fluctuation characteristics of the environmental temperature difference offset sequence, including: Calculate the standard deviation of the instantaneous temperature difference offset at each acquisition time within the preset monitoring window; Divide the standard deviation by the preset upper limit of the temperature difference standard deviation reference to obtain the temperature difference fluctuation. The temperature fluctuation is used as the first scoring weight coefficient, and 1 is subtracted from the temperature fluctuation to obtain the second scoring weight coefficient.
6. The intelligent monitoring system for a 10kV disconnector switch according to claim 1, characterized in that, The process of classifying the status and issuing alarms for each 10kV disconnector based on the individual comprehensive anomaly score includes: Obtain a warning threshold and a monitoring threshold, wherein the warning threshold is greater than the monitoring threshold; When the single unit comprehensive abnormal score is greater than or equal to the warning threshold, the 10KV disconnect switch is determined to be in a serious abnormal state, and a maintenance work order is generated. When the comprehensive anomaly score of a single unit is greater than or equal to the monitoring threshold and less than the warning threshold, the 10KV disconnector is determined to be in a general abnormal state, the 10KV disconnector is added to the watch list, and the monitoring cycle of the 10KV disconnector is corrected based on the comprehensive anomaly score. When the comprehensive anomaly score of a single unit is less than the monitoring threshold, the 10KV disconnector is determined to be in normal condition, and the regular monitoring cycle is maintained.
7. The intelligent monitoring system for a 10kV disconnector switch according to claim 6, characterized in that, The acquisition of the warning threshold and monitoring threshold includes: Obtain the comprehensive anomaly score of each 10kV disconnector in the same substation within the current preset monitoring window, and calculate the arithmetic mean of the comprehensive anomaly scores of each 10kV disconnector as the group score mean. Calculate the standard deviation of the individual comprehensive anomaly score for all the 10kV disconnect switches, and use it as the group score standard deviation; The sum of the mean and standard deviation of the group ratings is calculated and used as the warning threshold. The monitoring threshold is obtained by subtracting the smaller of the standard deviation of the group scores and the mean of the group scores from the mean of the group scores.
Citation Information
Patent Citations
System and method for monitoring thermal defect of high-tension switch cabinet on line
CN103529351A
Power equipment temperature data remote monitoring system and method based on Internet of Things
CN112729610A