Weak surrounding rock shallow-buried tunnel portal section excavation method

CN122707562APending Publication Date: 2026-09-08CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611193510.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-07
Publication Date
2026-09-08

AI Technical Summary

Technical Problem

[0003]现有的隧道工程中,针对小角度斜交、浅埋偏压洞口段的松散砂砾层及松散坡积物,通常采用明挖的施工方法进行开挖,即,先开挖并支护边坡,将浅埋段全部明挖后,再施工隧道衬砌结构物,然后再回填隧道成暗洞的施工方法,为大开挖技术,不利于环保

Benefits of technology

[0032] 1. The method for excavating the portal section of a shallow-buried tunnel under biased pressure in weak surrounding rock provided by this invention involves first excavating the natural slope above the arch crown outside the tunnel excavation outline, then sequentially constructing vertical steel pipe piles, arch caps, constructing the outer retaining wall of the tunnel, and backfilling with slag for counter-pressure, and finally carrying out tunnel excavation and support. This method can reduce the amount of excavation, lower the slope height, balance the biased pressure, maximize the protection of the upper road, reduce construction safety risks, avoid the construction risks of dangerous deep foundation pit projects, improve construction reliability, accelerate construction progress, and protect the ecological environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122707562A_ABST
    Figure CN122707562A_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of tunnel engineering, in particular to a kind of soft weak surrounding rock shallow-buried unsymmetrical pressure tunnel portal section excavation method, comprising the following steps: S10, slope excavation tunnel excavation contour line above the natural slope of arch top and support;S20, vertical steel pipe pile is built outside tunnel excavation contour line on the side of mountain;S30, set range in tunnel arch portion is built reinforced concrete arch cap;S40, the slope toe of the reinforced concrete arch cap on the side of mountain that has been excavated and supported is backfilled;S50, build tunnel outside retaining wall;S60, the upper part of the reinforced concrete arch cap is backfilled and counter-pressured;S70, tunnel subsurface excavation and support are carried out.The present application can reduce the disturbance of lower construction to slope, avoid the construction risk of dangerous deep foundation pit engineering, improve construction reliability, speed up construction progress and protect ecological environment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of tunnel engineering technology, specifically to a method for excavating the portal section of a shallow-buried tunnel under bias pressure in weak surrounding rock. Background Technology

[0002] In mountainous highways, mountain tunnels are key projects connecting routes. Due to unfavorable terrain and complex geological conditions, tunnel entrances often need to pass through long sections of shallowly buried, biased, and loosely covered layers. As a result, new highway tunnels pass under existing highways, tunnel entrances intersect with existing highways at small angles, shallowly buried and biased, and tunnel entrances are in soft surrounding rock of loose sand and gravel soil.

[0003] In existing tunnel engineering projects, for loose gravel layers and loose colluvial deposits in shallow buried sections with small-angle oblique intersections and bias pressure, the open-cut construction method is usually adopted. That is, the slope is first excavated and supported, the entire shallow buried section is excavated, the tunnel lining structure is constructed, and then the tunnel is backfilled to form a closed tunnel. This method is a large-scale excavation technology, which is not conducive to environmental protection. Meanwhile, the following drawbacks also exist: It requires slope excavation, resulting in a large excavation area, excessively high slopes, and a large excavation volume; slopes require support after excavation, leading to a large support volume; large excavation and support volumes inevitably result in high costs; slope construction must follow a layered excavation and support method from top to bottom, resulting in a long construction period; open excavation is a high-risk project for deep foundation pit construction, and loose sand layers and loose colluvial gravel soil have poor self-stabilizing capacity; if support is not timely or appropriate, landslides are easily induced, posing a very high safety risk; large-scale excavation damages the ecological environment and is detrimental to environmental protection and soil and water conservation; large-scale excavation does not comply with the tunnel specifications' requirement of "early entry and late exit."

[0004] However, the aforementioned shallow-buried tunnel portal sections in weak surrounding rock with biased pressure are mostly located in ecologically fragile areas. Due to environmental protection, water conservation, and the stability of the superstructure road, large-scale excavation of the lower sections is not permitted. Therefore, it is necessary to develop excavation methods for shallow-buried tunnel portal sections in weak surrounding rock with biased pressure, considering geological conditions such as small-angle oblique entry, tunneling under existing highways, severe shallow burial with biased pressure, and tunnel portal overburden consisting of loose sand layers and loose colluvial deposits. Summary of the Invention

[0005] For the construction conditions of shallow-buried tunnels with weak surrounding rock and bias pressure, such as small-angle oblique entry, underpass of existing highways, severe shallow burial and bias pressure, and loose sand and loose colluvial deposits as the overburden layer at the tunnel entrance, this invention provides a method for excavating the tunnel entrance section of shallow-buried tunnels with weak surrounding rock and bias pressure. This method can reduce the disturbance of the slope to the lower construction, avoid the construction risks of dangerous projects with deep foundation pits, improve construction reliability, accelerate construction progress, and protect the ecological environment.

[0006] This invention is achieved through the following technical solution:

[0007] This invention provides a method for excavating the portal section of a shallow-buried tunnel under bias pressure in weak surrounding rock, characterized by the following steps:

[0008] S10, The natural slope above the arch outside the tunnel outline is protected during the slope excavation.

[0009] S20. Construct vertical steel pipe piles outside the tunnel excavation outline on the mountainside.

[0010] S30. Construct a reinforced concrete arch cap within the designated area of ​​the tunnel arch;

[0011] S40. Backfill the slope toe of the reinforced concrete arch cap on the mountainside that has been excavated and supported;

[0012] S50, Construct a retaining wall on the outside of the tunnel;

[0013] S60. Backfill and counter-pressure the upper part of the reinforced concrete arch cap;

[0014] S70, carry out tunnel excavation and support.

[0015] Optionally, the specific steps of step S10 are as follows:

[0016] S11. Grouting support shall be provided for the natural slope outside the design range of the tunnel entrance.

[0017] S12. Excavation and support of the upper side slope of the tunnel arch;

[0018] S13. The slope is excavated to the tunnel excavation outline arch elevation by using a top-to-bottom layered excavation method.

[0019] Optionally, in step S20, the steel pipe pile is a concrete steel pipe pile.

[0020] Optionally, in step S30, the step of constructing the reinforced concrete arch cap is as follows:

[0021] S31. Use existing sand and soil to make the bottom mold of the tunnel large pipe shed arch to form an earth arch;

[0022] S32. Install steel frames on the earth arch, construct longitudinal connecting steel bars, and install tunnel advance large pipe shed guide pipes;

[0023] S33. Pouring concrete forms a reinforced concrete arch cap.

[0024] Optionally, in step S30, after constructing the reinforced concrete arch cap, advanced large pipe shed construction is carried out according to the design requirements and the location of the pre-embedded large pipe shed sleeve.

[0025] Optionally, in step S40, when backfilling the slope toe of the reinforced concrete arch cap on the mountainside that has been excavated and supported, crushed stone is used for backfilling.

[0026] Optionally, in step S50, before constructing the outer retaining wall of the tunnel, the slope is excavated along the outer sidewall of the tunnel according to the self-stabilizing capacity of the colluvium, and the steel frame of the sidewall is lowered and supported.

[0027] Optionally, in step S50, after constructing the retaining wall on the outside of the tunnel, advanced large pipe shed construction is carried out according to the design requirements and the location of the pre-embedded large pipe shed casing.

[0028] Optionally, in step S60, when backfilling and counter-pressing the upper part of the reinforced concrete arch cap, a layer of crushed stone and a layer of surface clay are backfilled sequentially on the upper part of the reinforced concrete arch cap.

[0029] Optionally, in step S70, the upper, middle and lower three-stage method is used for tunnel excavation.

[0030] Optionally, in step S70, if the bearing capacity of the invert arch foundation is less than 300 kPa, the foundation is reinforced by vertical grouting steel pipe grouting.

[0031] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0032] 1. The method for excavating the portal section of a shallow-buried tunnel under biased pressure in weak surrounding rock provided by this invention involves first excavating the natural slope above the arch crown outside the tunnel excavation outline, then sequentially constructing vertical steel pipe piles, arch caps, constructing the outer retaining wall of the tunnel, and backfilling with slag for counter-pressure, and finally carrying out tunnel excavation and support. This method can reduce the amount of excavation, lower the slope height, balance the biased pressure, maximize the protection of the upper road, reduce construction safety risks, avoid the construction risks of dangerous deep foundation pit projects, improve construction reliability, accelerate construction progress, and protect the ecological environment.

[0033] 2. The method for excavating the entrance section of a shallow buried tunnel under biased pressure in weak surrounding rock provided by the present invention first balances the biased pressure before entering the tunnel for excavation and cover construction, which improves the safety of tunnel construction and speeds up the construction progress.

[0034] 3. The method for excavating the portal section of a shallow buried tunnel with bias pressure in weak surrounding rock provided by this invention uses an earth arch as the bottom formwork to install a steel frame, and then pours concrete. There is no risk of working at height, which improves the operability of construction and speeds up the construction progress.

[0035] 4. The method for excavating the portal section of a shallow buried tunnel with bias pressure in weak surrounding rock provided by the present invention first excavates the natural slope above the arch on the outer edge of the tunnel excavation outline, then sequentially constructs vertical steel pipe piles, arch caps, and retaining walls on the outer side of the tunnel, and fills slag for counter-pressure, and finally carries out tunnel excavation and support. This method can utilize the self-stabilizing ability of the soil, reduce the amount of support, and reduce damage to the ecological environment. Attached Figure Description

[0036] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the embodiments will be briefly described below. It should be understood that the following drawings only show some embodiments of the present invention and should not be considered as a limitation of the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0037] In the attached diagram:

[0038] Figure 1 This is a flowchart illustrating the method for excavating the portal section of a shallow-buried, biased tunnel in weak surrounding rock, as provided in an embodiment of the present invention.

[0039] Figure 2 This is a schematic diagram of the structure of the shallow buried biased tunnel entrance section in weak surrounding rock, as described in an embodiment of the present invention. Detailed Implementation

[0040] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. The components of the embodiments of this application described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.

[0041] In the description of this specification, the references to terms such as "one embodiment / mode," "some embodiments / modes," "example," "specific example," or "some examples," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment / mode or example is included in at least one embodiment / mode or example of this application. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment / mode or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments / modes or examples.

[0042] Example

[0043] Combination Figure 1 and Figure 2 This embodiment provides a method for excavating the portal section of a shallow-buried, biased tunnel in weak surrounding rock, including the following steps:

[0044] S10, the natural slope above the arch on the outer contour line of the tunnel is excavated and supported.

[0045] Specifically, the steps for slope excavation and support of the natural slope above the arch on the outer edge of the tunnel excavation outline are as follows:

[0046] S11. Grouting support shall be provided for the natural slope outside the design range (e.g., within 5m to 10m) outside the excavation range of the tunnel entrance.

[0047] S12. Excavation and support of the upper side slope of the tunnel arch;

[0048] S13. The slope is excavated to the tunnel excavation outline arch elevation by using a top-to-bottom layered excavation method.

[0049] In this embodiment, a small amount of natural slope above the arch outside the tunnel excavation outline is first excavated, and the slope is anchored and sprayed for support.

[0050] Before construction, the natural slope within 5m to 10m of the tunnel entrance is grouted and supported using small grouting pipes (e.g., φ42×4, 400cm / pipe, with a spacing of 100cm between rows). Then, the slope above the tunnel arch is excavated and supported with a slope ratio of 1:0.75, using the same support parameters as the natural slope. Simultaneously, excavation is carried out layer by layer from top to bottom, with each layer supported at a height not exceeding 200cm, until the tunnel excavation outline reaches the arch elevation.

[0051] S20. Vertical steel pipe piles are constructed outside the tunnel excavation outline on the mountainside.

[0052] Generally, the steel pipe piles are concrete steel pipe piles. The specific construction steps are as follows: Step S10 utilizes the platform formed by excavation to construct two rows of vertical steel pipe piles outside the tunnel excavation outline on the mountainside to pre-support the slope and tunnel. In this embodiment, the vertical steel pipe piles are φ108×6 vertical steel pipes with holes in their circumferential walls. The upper part of the vertical steel pipe is at the same height as the top of the soil arch, and the depth of insertion into the lowest elevation of the tunnel invert is greater than or equal to 200cm. Simultaneously, according to project requirements, steel reinforcement bundles of corresponding specifications (such as 3φ28) are installed inside the steel pipes, and then the steel pipes are grouted until they are full. The longitudinal spacing of the steel pipes is 60cm, the row spacing is 50cm, and they are arranged in a quincunx pattern.

[0053] S30. Construct a reinforced concrete arch cap within the designated area of ​​the tunnel arch.

[0054] Specifically, the steps for constructing a reinforced concrete arch cap are as follows:

[0055] S31. Use existing sand and soil to make the bottom mold of the tunnel large pipe shed arch to form an earth arch. For example, within a 150° range of the tunnel arch, use existing sand and soil to excavate manually and make the bottom mold of the tunnel large pipe shed arch to form an earth arch.

[0056] S32. Install steel frames on the earth arch, construct longitudinal connecting steel bars, and install tunnel advance large pipe shed guide pipes. For example, first use I18 I-beams to install steel frames on the earth arch. The longitudinal spacing of the steel frames is 60cm. The steel frames are longitudinally connected using threaded steel bars of the corresponding specifications (such as φ22 threaded steel bars). The circumferential spacing of the steel frames is 100cm. Then, install large pipe shed guide pipes on the outside of the steel frames and weld them to the steel frames with short steel bars for fixation.

[0057] The dimensions of the cap base at the bottom of the tunnel arch are determined based on the actual conditions of the construction site. Generally, the cap base is set at the lower part of the tunnel arch on both sides parallel to the tunnel alignment. The cap base on the mountain side should be at least 100cm long and at least 50cm thick. A longitudinal reinforcing cage is placed inside the cap base, positioned outside the steel frame. The reinforcement of the cap base's reinforcing cage follows the relevant specifications, such as: four φ25 diameter threaded steel bars are longitudinally installed at the four corner points, one at each corner; circumferential threaded steel bars (stirrups) are φ16 diameter threaded steel bars, spaced 60cm apart longitudinally. The cap base's reinforcing cage is fixedly connected to the tunnel arch steel frame, for example, using short steel bars welded together for secure fixation.

[0058] S33. Concrete is poured to form a reinforced concrete arch cap. Specifically, the concrete for the cap bases on both sides is poured first, then the formwork is hung, and the arch cap concrete is poured symmetrically from bottom to top. In this embodiment, the concrete grade is C30. For the side facing the mountain, the over-excavated portion at the toe of the slope below the top elevation of the cap base is fully filled with concrete of the same grade.

[0059] It should be understood that after the reinforced concrete arch cap is constructed, the pre-construction of the large pipe shed will be carried out according to the design requirements and the location of the pre-embedded large pipe shed casing. The steel pipe piles of the reinforced concrete arch cap can be replaced by jet grouting piles or sleeve valve pipe grouting to reinforce the strata, so as to provide bearing capacity for the arch shell, pre-support the slope and tunnel.

[0060] S40. Backfill the slope toe of the already excavated and supported slope on the mountain side of the reinforced concrete arch cap, that is, use crushed stone soil to backfill the slope toe of the already excavated and supported slope on the mountain side of the upper part of the arch cap, so as to counter-pressure the slope, reduce the slope height, and stabilize the slope.

[0061] S50, Construct retaining walls on the outer side of the tunnel.

[0062] Specifically, before constructing the outer retaining wall of the tunnel, the slope of the section near the outer sidewall of the tunnel is excavated according to the self-stabilizing capacity of the colluvium, and the steel frame of the sidewall is laid down and supported.

[0063] In other words, based on the self-stabilizing capacity of the colluvium, the excavation slope ratio of the temporary slope on the outside of the tunnel and the mountain side inside the tunnel is selected, the slope is excavated on the outside sidewall of the tunnel, and the steel frame of the sidewall is lowered and the mesh is installed and shotcreted for support. Of course, vertical steel pipe piles can also be used for pre-support.

[0064] When the bearing capacity of the retaining wall foundation does not meet the requirements, the foundation is reinforced by expanding the foundation and grouting, and then the retaining wall is constructed. Under the premise of ensuring safety, the temporary excavation slope ratio of the foundation pit and the single-cycle construction length of the retaining wall are determined according to the actual site conditions. Generally, the outer retaining wall of the tunnel is a C25 concrete retaining wall, and its foundation grouting reinforcement uses vertical grouting small steel pipes (φ76). Each grouting pipe is 400cm long, with a spacing of 100cm between pipes, arranged in a staggered pattern. Alternatively, jet grouting piles or sleeve valve pipes can be used to reinforce the stratum.

[0065] S60. Backfill and counter-pressure the upper part of the reinforced concrete arch cap.

[0066] Specifically, when backfilling and counter-compacting the upper part of the reinforced concrete arch cap, a layer of crushed stone and a layer of surface clay are backfilled sequentially on the upper part of the reinforced concrete arch cap. That is, after the concrete strength of the retaining wall exceeds 5MPa, crushed stone and surface clay are backfilled above the arch cap according to the design requirements and compacted.

[0067] S70, carry out tunnel excavation and support.

[0068] In this embodiment, the tunnel excavation is carried out using the upper, middle, and lower three-step method, that is, the tunnel excavation and support work are completed according to the upper, middle, and lower three-step method. Specifically, the upper step is the part above the tunnel arch line, the middle step is the part below the tunnel arch line to the bottom of the tunnel sidewall, and the lower step is the tunnel invert section.

[0069] During construction, work proceeds layer by layer from top to bottom. The excavation advance is selected based on the self-stabilizing capacity of the surrounding rock revealed during excavation, and the excavation length of a single cycle is generally controlled to a spacing of no more than two steel frames. Initial support work, including steel frames, steel frame anchors, longitudinal connecting steel bars, steel mesh, and shotcrete, is completed according to the design support parameters.

[0070] When the bearing capacity of the invert arch foundation is less than 300 kPa, vertical grouting steel pipes are used to reinforce the foundation. Specifically, the grouting steel pipes are φ76, 400 cm long, and spaced 100 cm apart, arranged in a quincunx pattern. The longitudinal excavation length of the invert arch should not exceed 300 cm. After excavation, timely support and closure into a ring are required.

[0071] After the excavation is completed, the remaining work, such as waterproofing and drainage, reinforced concrete lining, and portal end walls, will be completed in accordance with the design requirements.

[0072] Therefore, the method for excavating the portal section of a shallow buried tunnel under biased pressure in weak surrounding rock provided in this embodiment first excavates the natural slope above the arch on the outer edge of the tunnel excavation outline, then sequentially constructs vertical steel pipe piles, arch caps, and retaining walls on the outer side of the tunnel, and fills slag for counter-pressure, and finally carries out tunnel excavation and support. This reduces the amount of excavation, lowers the slope height, balances the biased pressure, protects the upper road to the maximum extent, and reduces construction safety risks.

[0073] Meanwhile, this embodiment uses an earthen arch as the bottom formwork to install a steel frame and pour concrete to form an arch cap, eliminating the risk of working at heights, improving the operability of construction, and accelerating the construction progress; and balancing the bias pressure before entering the tunnel excavation and cover construction improves the safety of tunnel construction and accelerates the construction progress.

[0074] In addition, this embodiment first excavates the natural slope above the arch on the outer edge of the tunnel excavation outline, then sequentially constructs vertical steel pipe piles, arch caps, and outer retaining walls of the tunnel, and fills slag for counterweight. Finally, the tunnel is excavated and supported, which meets the design requirement of "early entry and late exit", minimizes the damage to the ecological environment caused by large-scale excavation, and can reduce the amount of support by utilizing the self-stabilizing ability of the soil, thus having the characteristics of environmental protection and energy saving.

[0075] In summary, this embodiment reduces the construction height of the slope, minimizes the disturbance to the slope caused by the lower construction, avoids the construction risks of deep foundation pit projects, and solves the problem of bias pressure at the tunnel entrance before construction, which greatly improves the reliability of the solution, speeds up the construction progress, protects the ecological environment to the greatest extent, and saves project investment in many ways. It has broad practical value and promotion value.

[0076] The specific embodiments described above further illustrate the purpose, technical solution, and beneficial effects of the present invention. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

Claims

1. A method for excavating the portal section of a shallow-buried tunnel under biased pressure in weak surrounding rock, characterized in that, Includes the following steps: S10, The natural slope above the arch outside the tunnel outline is protected during the slope excavation. S20. Construct vertical steel pipe piles outside the tunnel excavation outline on the mountainside. S30. Construct a reinforced concrete arch cap within the designated area of ​​the tunnel arch; S40. Backfill the slope toe of the reinforced concrete arch cap on the mountainside that has been excavated and supported; S50, Construct a retaining wall on the outside of the tunnel; S60. Backfill and counter-pressure the upper part of the reinforced concrete arch cap; S70, carry out tunnel excavation and support.

2. The method for excavating the portal section of a shallow-buried, biased-pressure tunnel in weak surrounding rock according to claim 1, characterized in that, The specific steps of step S10 are as follows: S11. Grouting support shall be provided for the natural slope outside the design range of the tunnel entrance. S12. Excavation and support of the upper side slope of the tunnel arch; S13. The slope is excavated to the tunnel excavation outline arch elevation by using a top-to-bottom layered excavation method.

3. The method for excavating the portal section of a shallow-buried, biased-pressure tunnel in weak surrounding rock according to claim 1, characterized in that, In step S20, the steel pipe pile is a concrete steel pipe pile.

4. The method for excavating the portal section of a shallow-buried, biased-pressure tunnel in weak surrounding rock according to claim 1, characterized in that, In step S30, the step of constructing the reinforced concrete arch cap is as follows: S31. Use existing sand and soil to make the bottom mold of the tunnel large pipe shed arch to form an earth arch; S32. Install steel frames on the earth arch, construct longitudinal connecting steel bars, and install tunnel advance large pipe shed guide pipes; S33. Pouring concrete forms a reinforced concrete arch cap.

5. The method for excavating the portal section of a shallow-buried, biased-pressure tunnel in weak surrounding rock according to claim 4, characterized in that, In step S30, after constructing the reinforced concrete arch cap, the advanced large pipe shed construction is carried out according to the design requirements and the location of the pre-embedded large pipe shed sleeve.

6. The method for excavating the portal section of a shallow-buried, biased-pressure tunnel in weak surrounding rock according to claim 1, characterized in that, In step S40, when backfilling the slope toe of the reinforced concrete arch cap on the mountainside that has been excavated and supported, crushed stone is used for backfilling.

7. The method for excavating the portal section of a shallow-buried, biased-pressure tunnel in weak surrounding rock according to claim 1, characterized in that, In step S50, before constructing the outer retaining wall of the tunnel, the slope is excavated along the outer sidewall of the tunnel according to the self-stabilizing capacity of the colluvium, and the steel frame of the sidewall is lowered and supported.

8. The method for excavating the portal section of a shallow-buried, biased-pressure tunnel in weak surrounding rock according to claim 7, characterized in that, In step S60, when backfilling and counter-pressing the upper part of the reinforced concrete arch cap, a layer of crushed stone and a layer of surface clay are backfilled sequentially on the upper part of the reinforced concrete arch cap.

9. The method for excavating the portal section of a shallow-buried, biased-pressure tunnel in weak surrounding rock according to any one of claims 1 to 8, characterized in that, In step S70, the tunnel excavation is carried out using the upper, middle, and lower three-stage method.

10. The method for excavating the portal section of a shallow-buried, biased-pressure tunnel in weak surrounding rock according to claim 9, characterized in that, In step S70, if the bearing capacity of the invert arch foundation is less than 300 kPa, the foundation shall be reinforced by vertical grouting steel pipe grouting.