Power system ancillary service capacity configuration method and system based on multi-source disturbance analysis
Patent Information
- Application Number
- CN202611044903.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-14
- Publication Date
- 2026-09-15
AI Technical Summary
[0005]为了克服现有技术的上述缺陷,本发明的实施例提供基于多源扰动分析的电力系统辅助服务容量配置方法及系统,通过基于多源扰动分析与运行状态分类的自适应容量配置方法,解决了现有固定比例法中未充分考虑新能源出力随机波动及负荷扰动协同影响,导致辅助服务容量需求适应性不足和配置不合理的问题
上述基于多源扰动分析的电力系统辅助服务容量配置方法,相比于传统仅依据历史最大负荷波动或单一新能源出力预测偏差进行辅助服务容量配置的方法,具有以下优点:该方案首先通过挖掘电力系统历史运行数据,提取新能源出力变化特征和负荷扰动特征,能够充分反映新能源随机波动和负荷变化的实际运行规律;进一步根据新能源不同运行状态对历史扰动过程进行分类,形成与不同运行状态相对应的新能源扰动特征集合,提高了扰动特征提取的针对性和准确性;同时,将新能源扰动与负荷扰动进行融合分析,构建多源扰动运行场景,并计算各场景对应的系统功率扰动量,使辅助服务容量需求能够同时考虑新能源波动、负荷变化以及二者共同作用产生的系统功率失衡影响;最后结合预设安全约束条件对容量需求进行筛选,使配置结果不仅满足不同扰动场景下的功率调节需求,还能够满足系统安全运行要求。因此,该技术方案能够提高辅助服务容量配置结果与实际电网运行状态的匹配程度,减少因扰动场景考虑不足导致的容量配置不足或过度配置问题,提高新能源高比例接入条件下电力系统运行的安全性、可靠性和经济性。
Smart Images

Figure CN122759720A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of power system ancillary service capacity configuration technology, and more specifically, to a power system ancillary service capacity configuration method and system based on multi-source disturbance analysis. Background Technology
[0002] As the scale of new energy power generation continues to expand, the proportion of renewable energy sources such as wind power and photovoltaics integrated into the power system is gradually increasing. Because the output of new energy sources is random and fluctuating, its power variations can affect the active power balance and frequency stability of the power system. Therefore, it is necessary to configure reasonable frequency regulation ancillary service capacity to ensure the safe and stable operation of the power grid.
[0003] Currently, the main method for calculating frequency regulation capacity demand in power systems is the fixed-proportion method, which determines the frequency regulation capacity demand by setting a fixed proportional coefficient based on the system load size or operational experience. For example, some power grids determine the frequency regulation capacity demand based on a certain proportion of the forecasted load, and allocate ancillary service resources through the proportional relationship between frequency regulation capacity and system load.
[0004] However, existing fixed-ratio methods primarily determine frequency regulation capacity requirements based on load size or historical experience, failing to fully consider the uncertainties and fluctuations in the output of renewable energy sources such as wind and solar power under the backdrop of rapid renewable energy development. This makes it difficult for fixed ratio values to adapt to the system's operational needs after a high proportion of renewable energy is integrated. Setting the frequency regulation capacity requirement too high leads to redundancy in frequency regulation resource allocation, increasing operating costs; setting it too low may fail to meet system frequency control requirements, affecting the safe and stable operation of the power grid. Therefore, existing frequency regulation capacity allocation methods suffer from insufficient consideration of the randomness of renewable energy and poor adaptability to capacity demands. Summary of the Invention
[0005] To overcome the aforementioned deficiencies of the prior art, embodiments of the present invention provide a power system ancillary service capacity configuration method and system based on multi-source disturbance analysis. By using an adaptive capacity configuration method based on multi-source disturbance analysis and operating status classification, the present invention solves the problem that the existing fixed-ratio method does not fully consider the random fluctuations in new energy output and the synergistic effects of load disturbances, resulting in insufficient adaptability to ancillary service capacity demand and unreasonable configuration.
[0006] To achieve the above objectives, the present invention provides the following technical solution: Firstly, this application provides a method for configuring ancillary service capacity in a power system based on multi-source disturbance analysis. This method includes: acquiring historical operating data of the power system and extracting characteristics of renewable energy output changes and load disturbances; classifying historical renewable energy operating states according to the renewable energy output change characteristics to obtain a set of renewable energy disturbance characteristics corresponding to different operating states; using the renewable energy disturbance characteristic set and load disturbance characteristics to generate multi-source disturbance operating scenarios covering both renewable energy disturbances and load disturbances, and calculating the system power disturbance in each scenario; determining the corresponding ancillary service capacity requirements based on the system power disturbance in each scenario, filtering the capacity requirements using preset security constraints, and outputting the final target ancillary service capacity configuration result.
[0007] In one embodiment, acquiring historical operating data of the power system and extracting the characteristics of new energy output changes and load disturbances includes: acquiring historical operating data of the power system within a preset historical time period; aligning the operating data according to a preset time interval and dividing the aligned data into multiple historical operating state samples by a continuous time window; extracting the operating state feature parameters of each sample and constructing a historical operating state feature vector, with multiple feature vectors forming a historical operating state feature library.
[0008] In one embodiment, extracting the characteristics of new energy output change and load disturbance further includes: acquiring target operating state data and constructing a target operating state feature vector; calculating the similarity between the target operating state feature vector and each historical feature vector in the historical operating state feature library to obtain a feature distance value; selecting a preset number of historical operating state samples with the highest ranking based on the ranking result of the feature distance value as a target similar operating state set; and extracting the characteristics of new energy output change and load disturbance based on the target similar operating state set.
[0009] In one embodiment, extracting renewable energy output variation features and load disturbance features based on a set of similar target operating states includes: acquiring continuous time-series operating data of each historical operating state sample in the set of similar target operating states; dividing the renewable energy output variation process and load power variation process in each sample into time windows to obtain multiple output variation sequences and load power variation sequences; extracting renewable energy output fluctuation feature parameters for each output variation sequence and performing statistical analysis to obtain renewable energy output random variation features under different similar operating states; extracting load disturbance features for each load power variation sequence; associating and matching renewable energy output random variation features and load disturbance features at the same time scale to form multi-source disturbance feature samples; and performing statistical analysis on multiple multi-source disturbance feature samples to obtain a set of renewable energy output variation features and a set of load disturbance features.
[0010] In one embodiment, obtaining the new energy disturbance feature set corresponding to different operating states includes: matching the new energy disturbance feature vector corresponding to the target operating state with the central feature vector of each category to determine the new energy operating state category to which the target operating state belongs; and calling the corresponding new energy disturbance feature set according to the determined category.
[0011] In one embodiment, generating a multi-source disturbance operation scenario encompassing both renewable energy disturbances and load disturbances includes: determining a renewable energy disturbance parameter range based on a renewable energy disturbance feature set; randomly sampling disturbance parameters within the parameter range to generate multiple renewable energy disturbance process sequences; determining a load disturbance parameter range based on load disturbance features; randomly sampling disturbance parameters within the parameter range to generate multiple load disturbance process sequences; performing time-scale matching on the renewable energy disturbance process sequences and the load disturbance process sequences; and combining the two according to time correspondence to generate multiple multi-source disturbance operation scenarios.
[0012] In one embodiment, calculating the system power disturbance in each scenario includes: acquiring the power sequence of new energy disturbance and the power sequence of load disturbance in each multi-source disturbance operation scenario, performing time-series correlation analysis on the two to determine the time-series coupling coefficient between new energy disturbance and load disturbance; performing coupling correction on the new energy disturbance and load disturbance in each scenario based on the time-series coupling coefficient to obtain the initial disturbance power in the region; dividing the region according to the power grid topology, and determining the regional disturbance propagation coefficient by combining the electrical connection relationship between regions, line transmission capacity and historical disturbance transmission data; calculating the equivalent power disturbance in the system based on the regional disturbance propagation coefficient and the initial disturbance power in the region, and determining the system power disturbance corresponding to each multi-source disturbance operation scenario accordingly.
[0013] In one embodiment, determining the corresponding ancillary service capacity requirements based on the system power disturbance in each scenario includes: determining the maximum power deficit in each scenario based on the system power disturbance curve corresponding to each multi-source disturbance operation scenario; determining the rapid response ancillary service capacity requirements based on the maximum power deficit and the system power disturbance change rate; determining the continuous adjustment ancillary service capacity requirements based on the duration of the system power disturbance; combining the rapid response ancillary service capacity requirements and the continuous adjustment ancillary service capacity requirements to obtain the comprehensive ancillary service capacity requirements corresponding to each scenario; and correcting the comprehensive ancillary service capacity requirements based on the disturbance severity evaluation index for each scenario to obtain the corrected ancillary service capacity requirements.
[0014] In one embodiment, the capacity requirements are filtered based on preset security constraints to output the final target auxiliary service capacity configuration result. This includes: obtaining a set of auxiliary service capacity requirements corresponding to each multi-source disturbance operation scenario, and obtaining the available capacity of candidate auxiliary service resources; matching the auxiliary service capacity requirements of each scenario according to the available capacity to generate candidate configuration schemes that meet the capacity requirements; filtering the candidate configuration schemes according to preset security constraints, including capacity sufficiency constraints, response time constraints, and continuous adjustment capability constraints, eliminating schemes that do not meet any of the constraints, and obtaining feasible auxiliary service capacity configuration schemes; and comprehensively ranking the feasible auxiliary service capacity configuration schemes based on their resource configuration costs and capacity margins, and selecting the optimal scheme as the target auxiliary service capacity configuration result.
[0015] Secondly, this application provides a power system ancillary service capacity configuration system based on multi-source disturbance analysis. This system includes: a historical operation feature extraction module, used to acquire historical power system operation data and extract renewable energy output change characteristics and load disturbance characteristics; a renewable energy disturbance state classification module, used to classify historical renewable energy operation states according to renewable energy output change characteristics, obtaining a set of renewable energy disturbance features corresponding to different operation states; a multi-source disturbance scenario construction and power disturbance calculation module, used to generate multi-source disturbance operation scenarios covering renewable energy disturbances and load disturbances using the renewable energy disturbance feature set and load disturbance characteristics, and calculate the system power disturbance amount under each scenario; and an ancillary service capacity optimization configuration module, used to determine the corresponding ancillary service capacity requirements based on the system power disturbance amount under each scenario, and to filter the capacity requirements using preset safety constraints, outputting the final target ancillary service capacity configuration result.
[0016] As can be seen from the above technical solutions, the embodiments of this application have the following advantages: The aforementioned power system ancillary service capacity configuration method based on multi-source disturbance analysis has the following advantages compared to traditional methods that only rely on historical maximum load fluctuations or single renewable energy output prediction deviations for ancillary service capacity configuration: Firstly, this scheme extracts renewable energy output variation characteristics and load disturbance characteristics by mining historical power system operating data, fully reflecting the actual operating patterns of renewable energy random fluctuations and load changes. Secondly, it classifies historical disturbance processes according to different renewable energy operating states, forming a set of renewable energy disturbance characteristics corresponding to different operating states, improving the targeting and accuracy of disturbance characteristic extraction. Simultaneously, it integrates renewable energy disturbances and load disturbances for analysis, constructing multi-source disturbance operating scenarios and calculating the corresponding system power disturbance for each scenario, enabling ancillary service capacity requirements to simultaneously consider renewable energy fluctuations, load changes, and the system power imbalance caused by their combined effects. Finally, it filters capacity requirements based on preset safety constraints, ensuring that the configuration results not only meet the power regulation requirements under different disturbance scenarios but also satisfy the system's safe operation requirements. Therefore, this technical solution can improve the matching degree between the ancillary service capacity configuration results and the actual grid operation status, reduce the problem of insufficient or excessive capacity configuration caused by insufficient consideration of disturbance scenarios, and improve the safety, reliability and economy of power system operation under the condition of high proportion of new energy access. Attached Figure Description
[0017] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0018] Figure 1 This is a schematic flowchart of a power system ancillary service capacity configuration method based on multi-source disturbance analysis, provided in an embodiment of this application.
[0019] Figure 2 This is a schematic diagram of the power system ancillary service capacity configuration system based on multi-source disturbance analysis, provided as an embodiment of this application.
[0020] Figure 3 This is a clustering distribution map of new energy disturbance characteristics provided in the embodiments of this application.
[0021] Figure 4 This is a schematic diagram of the system power deviation recovery curve provided in the embodiments of this application. Detailed Implementation
[0022] To enable those skilled in the art to better understand the technical solutions in this application, the technical solutions in the embodiments of this application will be clearly and completely described below. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of the embodiments. Based on the embodiments in this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.
[0023] Reference Figure 1 As shown in the schematic diagram, the power system ancillary service capacity configuration method based on multi-source disturbance analysis provided by the present invention includes the following steps: S1. Obtain historical operating data of the power system, and extract the characteristics of new energy output change and load disturbance based on the historical operating data.
[0024] In this embodiment, historical operating data of the power system is acquired, and the characteristics of new energy output changes and load disturbances are extracted based on the historical operating data. This includes constructing a historical operating status feature database, specifically including: Acquire historical operating data of the power system within a preset historical time period. The historical operating data includes actual output data of new energy sources, predicted output data of new energy sources, load power data, meteorological environment data, installed capacity data of new energy sources, and corresponding time information. The running data is time-aligned according to a preset time interval, and the time-aligned running data is divided according to a continuous time window to obtain multiple historical running state samples. For each historical operating status sample, the corresponding operating status feature parameters are extracted, including new energy operating status feature parameters and load operating status feature parameters. The new energy operation status characteristic parameters include new energy power output, new energy power output ratio, new energy installed capacity and corresponding meteorological condition parameters, and the load operation status characteristic parameters include load power, load change trend, load change rate and time period characteristics.
[0025] Based on the operational status feature parameters corresponding to each historical operational status sample, a historical operational status feature vector is constructed, and multiple historical operational status feature vectors form a historical operational status feature library.
[0026] Specifically, to verify the effectiveness of the historical operating status feature extraction process, statistical analysis was conducted on the actual output change process and load power change process of new energy sources within typical time periods. The specific operating data is shown in Table 1: Table 1 Examples of some characteristic parameters of historical operating status samples
[0027] Furthermore, based on historical operating data, the characteristics of new energy output changes and load disturbances are extracted, including: Obtain the target operating status data for the ancillary service capacity configuration to be performed. The target operating status data includes the predicted output of new energy sources, the installed capacity of new energy sources, meteorological environmental parameters, and the predicted load power at the target time scale. A target operating state feature vector is constructed based on the target operating state data, and the similarity between the target operating state feature vector and each historical operating state feature vector in the historical operating state feature library is calculated. The similarity calculation specifically involves: calculating the difference between the target operating state feature vector and the corresponding feature parameter in each historical operating state feature vector, and normalizing the difference to obtain the deviation value corresponding to each feature parameter; summing the squares of the deviation values corresponding to each feature parameter and taking the square root to obtain the feature distance value between the target operating state and the historical operating state; determining the state similarity based on the feature distance value, where a smaller feature distance value indicates a higher degree of similarity between the target operating state and the corresponding historical operating state.
[0028] Based on the similarity calculation results, historical operating state samples that match the target operating state feature vector are selected from the historical operating state feature library to obtain a target similar operating state set; Specifically, the matching process involves selecting a preset number of historical running state samples from the top of the sorted state distance values, based on the sorting results from smallest to largest, to form a target similar running state set.
[0029] Extract the characteristics of new energy output change and load disturbance based on the set of similar operating states of the target.
[0030] Furthermore, based on the set of similar target operating states, the characteristics of new energy output changes and load disturbances are extracted, including: Obtain continuous time series operation data corresponding to each historical operation state sample in the target similar operation state set. The continuous time series operation data includes the actual output data of new energy, the predicted output data of new energy, the load power data and the corresponding time information for each time node. Based on the continuous time series operation data, time windows are divided into the actual output change process and load power change process of new energy sources in the sample of similar operation states of each target to obtain multiple new energy output change sequences and load power change sequences. Extract the characteristic parameters of renewable energy output fluctuation from the power output change sequences of each renewable energy source; The new energy output fluctuation characteristic parameters include the new energy output change amplitude, the new energy output change rate, the maximum fluctuation amplitude of new energy output, the new energy output ramp-up rate, and the new energy output fluctuation duration. Specifically, the change in new energy output is obtained based on the difference in actual output data between adjacent time points; the rate of change in new energy output is obtained based on the ratio of the change in new energy output to the corresponding time interval; the duration of new energy output fluctuation is determined based on the cumulative result of the change in new energy output within multiple consecutive time points; and the maximum fluctuation amplitude of new energy output is determined based on the maximum and minimum values of the change in new energy output within each time window.
[0031] Statistical analysis is performed on the new energy output fluctuation characteristic parameters corresponding to the samples of similar operating states of each target to obtain the random variation characteristics of new energy output under different similar operating states. Load disturbance characteristic parameters are extracted from each of the aforementioned load power change sequences; The load disturbance characteristic parameters include load change amplitude, load change rate, maximum load disturbance amount, load disturbance duration, and load change trend characteristics. Specifically, the load power change is obtained based on the load power difference between adjacent time nodes; the load change rate is obtained based on the ratio between the load power change and the time interval; the maximum load disturbance is determined based on the extreme value of the load power change within a continuous time window; and the load change trend characteristics are determined based on the direction and duration of continuous load power change.
[0032] Based on the random variation characteristics of the new energy output and the load disturbance characteristic parameters, the new energy output variation characteristics and load disturbance process corresponding to each target similar operating state sample are correlated and matched to obtain the new energy output variation characteristics and load disturbance characteristics under the target operating state. Specifically, the association matching includes: combining the characteristics of new energy output change and load disturbance characteristics at the same time scale according to the time correspondence of samples of similar operating states of each target, to form a multi-source disturbance characteristic sample corresponding to the target operating state.
[0033] Statistical analysis is performed on multiple multi-source disturbance feature samples to obtain the set of new energy output change features and load disturbance feature set corresponding to the target operating state.
[0034] It should be noted that by constructing a historical operating status feature library, multi-dimensional operating information such as actual output of new energy, predicted output of new energy, installed capacity, meteorological environment, and load operating characteristics are integrated and represented. By using a similarity matching mechanism between the target operating status feature vector and the historical operating status feature vector, similar operating status samples that are highly related to the current ancillary service capacity configuration requirements are screened from a large amount of historical operating data. On this basis, continuous time series analysis methods are further combined to dynamically extract features of the new energy output fluctuation process and the load power disturbance process, realizing the transformation from "fixed disturbance parameter setting" to "adaptive extraction of disturbance features based on operating status".
[0035] S2, based on the characteristics of the new energy output change, classify the historical new energy operating states to obtain the new energy disturbance feature set corresponding to different operating states. The new energy disturbance feature set is used to characterize the fluctuation amplitude, change rate and duration of the new energy output during random changes.
[0036] In this embodiment, based on the characteristics of the new energy output change, the historical operating states of new energy sources are classified to obtain a set of new energy disturbance characteristics corresponding to different operating states, including: Based on the set of new energy output change characteristics, the new energy disturbance characteristic parameters corresponding to each historical operating state sample are normalized to convert new energy disturbance characteristic parameters of different dimensions into standardized characteristic parameters under a unified scale. Specifically, the normalization process includes: obtaining standardized values corresponding to each new energy disturbance characteristic parameter based on the maximum and minimum values of each parameter in all historical operating state samples, so as to eliminate classification bias caused by differences in dimensions between different characteristic parameters.
[0037] Based on the normalized new energy disturbance characteristic parameters, construct the new energy disturbance characteristic vector corresponding to each historical new energy operating state; The new energy disturbance feature vector includes the new energy output fluctuation amplitude feature, the rate of change feature, and the duration feature, which are used to characterize the disturbance intensity and change pattern during the random change process of new energy output.
[0038] Based on the new energy disturbance feature vectors corresponding to each historical new energy operating status, cluster analysis is performed on the historical new energy operating status to obtain multiple new energy operating status categories. Specifically, the clustering analysis includes: obtaining the feature distance between the new energy disturbance feature vectors corresponding to any two historical new energy operating states; determining the degree of similarity of disturbance features between each historical new energy operating state based on the feature distance; and classifying historical new energy operating states with a disturbance feature similarity less than a preset classification threshold into the same category.
[0039] Specifically, the preset classification threshold is determined by statistically analyzing the feature distance distribution between the new energy disturbance feature vectors corresponding to all historical new energy operation status samples, and based on a preset quantile (e.g., taking the median or mean of all feature distance values).
[0040] Based on the historical operating status samples included in each new energy operating status category, statistical analysis is performed on the new energy disturbance characteristics corresponding to each category to obtain the new energy disturbance characteristic set corresponding to different operating status categories; The set of new energy disturbance characteristics includes the statistical distribution characteristics of the amplitude of new energy output change, the statistical distribution characteristics of the rate of change of new energy output, and the statistical distribution characteristics of the duration of new energy output fluctuation under the corresponding operating state category. Specifically, based on the changes in renewable energy output corresponding to each historical operating state sample within the same renewable energy operating state category, the range of renewable energy fluctuation amplitude corresponding to that operating state category is obtained by statistical analysis; based on the rate of change in renewable energy output corresponding to each historical operating state sample, the range of renewable energy change rate corresponding to that operating state category is obtained by statistical analysis; based on the duration of renewable energy output fluctuation corresponding to each historical operating state sample, the range of renewable energy disturbance duration corresponding to that operating state category is obtained by statistical analysis.
[0041] Based on the set of new energy disturbance characteristics corresponding to each new energy operation status category, a mapping relationship is established between the classification results of new energy operation status and the set of new energy disturbance characteristics. The mapping relationship is used to quickly determine the random disturbance characteristics of new energy sources that may occur under the target operating state based on the new energy operating state category corresponding to that operating state.
[0042] Furthermore, based on the power output change characteristics of the new energy sources corresponding to the target operating state, the target operating state is matched with the disturbance characteristics corresponding to each new energy operating state category to determine the new energy operating state category corresponding to the target operating state. The matching process includes: obtaining the Euclidean distance between the new energy disturbance feature vector corresponding to the target operating state and the central feature vector of each new energy operating state category, and determining the target new energy operating state category according to the principle of minimum distance value.
[0043] Based on the determined target new energy operating state category, the corresponding new energy disturbance feature set is invoked to obtain the new energy disturbance feature set under the target operating state.
[0044] Specifically, to verify the effectiveness of the classification of new energy operating states, cluster analysis was performed based on the fluctuation amplitude, rate of change, and duration in the new energy disturbance feature vector to obtain the distribution of different new energy operating state categories, such as... Figure 3 As shown, the historical operating status of renewable energy sources is divided into multiple categories based on differences in disturbance characteristics. Category I corresponds to a state of gradual change in renewable energy output, Category II corresponds to a state of normal fluctuation, and Category III corresponds to a state of rapid fluctuation. This demonstrates that the classification based on disturbance characteristics can effectively distinguish the operating status of different renewable energy sources, providing a basis for subsequent retrieval of the corresponding disturbance characteristic set.
[0045] It should be noted that, compared to conventional techniques that determine renewable energy disturbance characteristics based on fixed empirical values, typical operating scenarios, or single statistical indicators, this technical solution proposes a disturbance feature extraction method based on adaptive classification of historical renewable energy operating state characteristics. By normalizing multi-dimensional disturbance features such as the amplitude, rate of change, and duration of renewable energy output fluctuations corresponding to historical operating state samples, a renewable energy disturbance feature vector at a unified scale is constructed. Then, a feature similarity clustering method is used to classify historical renewable energy operating states, realizing a shift from "pre-setting typical disturbance parameters" to "automatically identifying disturbance patterns based on historical operating patterns." Simultaneously, by statistically analyzing renewable energy disturbance features within the same operating state category, a disturbance feature set that can characterize the random fluctuation patterns of renewable energy under different operating states is formed. A mapping relationship between operating state categories and disturbance feature sets is established, enabling rapid matching of corresponding renewable energy disturbance patterns when facing new target operating states, thus improving the efficiency of disturbance feature acquisition. This technical solution fully considers the randomness and volatility of new energy output, as well as the differences in disturbance patterns between different operating states. It can more accurately describe the fluctuation amplitude, rate of change, and duration characteristics of new energy output changes, providing input basis that is more in line with actual operating conditions for subsequent multi-source disturbance operation scenario generation and ancillary service capacity demand calculation. This improves the accuracy, reliability, and economy of ancillary service capacity configuration, and reduces the problems of insufficient capacity configuration or resource waste caused by traditional methods that use fixed safety margins or single disturbance models.
[0046] S3. Based on the set of new energy disturbance characteristics and the load disturbance characteristics, generate a multi-source disturbance operation scenario that combines new energy disturbance and load disturbance, and determine the system power disturbance amount corresponding to each of the multi-source disturbance operation scenarios.
[0047] In this embodiment, based on the set of new energy disturbance characteristics and the load disturbance characteristics, a multi-source disturbance operation scenario combining new energy disturbance and load disturbance is generated, including: Obtain the set of new energy disturbance features and load disturbance features corresponding to the target operating state. The set of new energy disturbance features includes the statistical distribution features of the fluctuation amplitude, rate of change and duration of new energy output corresponding to different new energy operating state categories. The load disturbance features include the load power change amplitude, rate of change, disturbance direction and duration features. Based on the set of new energy disturbance characteristics, statistical analysis is performed on the new energy disturbance parameters corresponding to the target operating state to obtain the range of new energy disturbance parameters; The range of new energy disturbance parameters includes the range of new energy output change amplitude, the range of new energy output change rate, and the range of new energy disturbance duration. Specifically, based on the historical statistical data of each new energy disturbance characteristic parameter in the new energy disturbance characteristic set, the mean and standard deviation of the corresponding characteristic parameter are extracted, and the upper and lower limits of the corresponding characteristic parameter are determined according to the preset confidence level, and the upper and lower limits are used as the range of new energy disturbance parameters. The preset information level is set according to the coverage of historical operating data. The preset information level is used to ensure that the determined range of new energy disturbance parameters can cover a preset proportion of historical new energy disturbance processes.
[0048] Based on the range of the new energy disturbance parameters and the corresponding statistical distribution characteristics, the new energy disturbance parameters are randomly sampled to obtain multiple combinations of new energy disturbance parameters; The new energy disturbance parameter combination includes the new energy disturbance amplitude, the new energy disturbance change rate, and the new energy disturbance duration.
[0049] Based on the various combinations of new energy disturbance parameters, a new energy disturbance process sequence is generated according to the corresponding disturbance time order; Specifically, the new energy disturbance process sequence includes: taking the predicted output of new energy under the target operating state as the initial value, determining the change in new energy output based on the amplitude of new energy disturbance, determining the change relationship between adjacent time nodes based on the rate of change of new energy disturbance, and determining the range of disturbance effect based on the duration of new energy disturbance, thereby obtaining the new energy disturbance power change sequence on a continuous time scale.
[0050] Based on the load disturbance characteristics, statistical analysis is performed on the load disturbance parameters corresponding to the target operating state to obtain the range of load disturbance parameters; The load disturbance parameter range includes the range of load power change amplitude, the range of load power change rate, the load disturbance direction, and the range of load disturbance duration.
[0051] Specifically, based on the statistical results of the corresponding characteristic parameters in the historical load disturbance samples, the mean, standard deviation and variation range of each load disturbance characteristic parameter are extracted, and the range of load disturbance parameters is determined based on the variation range. Based on the range of load disturbance parameters and their corresponding statistical distribution characteristics, the load disturbance parameters are randomly sampled to obtain multiple combinations of load disturbance parameters; The load disturbance parameter combination includes load disturbance amplitude, load disturbance rate of change, load disturbance direction, and load disturbance duration.
[0052] Based on the various combinations of load disturbance parameters, a load disturbance process sequence is generated in the corresponding time order; Specifically, the load disturbance process sequence includes: taking the predicted load power under the target operating state as the initial value, determining the load power change direction according to the load disturbance direction, determining the load power change amount according to the load disturbance amplitude, and determining the load disturbance change process at continuous time nodes according to the load change rate and duration.
[0053] Time-scale matching processing is performed on the new energy disturbance process sequence and the load disturbance process sequence to obtain a new energy disturbance sequence and a load disturbance sequence with consistent time nodes; Specifically, the time scale matching process includes: interpolating or resampling the new energy disturbance sequence and the load disturbance sequence according to a preset sampling time interval, so that the new energy disturbance sequence and the load disturbance sequence have the same number of time sampling points.
[0054] Based on the time correspondence between the new energy disturbance sequence and the load disturbance sequence after time scale matching, the new energy disturbance process and the load disturbance process are combined to generate multiple multi-source disturbance operation scenarios that combine new energy disturbance and load disturbance. The multi-source disturbance operation scenario includes a new energy disturbance power change curve and a load disturbance power change curve. The new energy disturbance power change curve is used to describe the random power output change process on the new energy side, and the load disturbance power change curve is used to describe the power change process on the load side.
[0055] Further, the system power disturbance amount corresponding to each of the multi-source disturbance operation scenarios is determined, including: Obtain the new energy disturbance power sequence, load disturbance power sequence, and corresponding regional operation information for each of the multi-source disturbance operation scenarios; The renewable energy disturbance power sequence includes the renewable energy output change of each renewable energy access node on a continuous time scale, the load disturbance power sequence includes the load power change of each load node on a corresponding time scale, and the regional operation information includes the renewable energy access area, the load area, the grid node connection relationship, and the transmission line parameters.
[0056] Based on the new energy disturbance power sequence and the load disturbance power sequence, a time correlation analysis is performed on the new energy disturbance process and the load disturbance process in the historical operating state sample to obtain the time-series coupling parameters between new energy disturbance and load disturbance. The timing coupling parameters include the disturbance correlation coefficient and the disturbance time delay. Specifically, the system acquires the renewable energy disturbance sequence and load disturbance sequence corresponding to the same operating area from historical operating status samples; sets a preset time delay range, and acquires the Pearson correlation coefficient between the renewable energy disturbance sequence and the load disturbance sequence under different time delay values; determines the time delay value corresponding to the maximum Pearson correlation coefficient based on the Pearson correlation coefficients corresponding to each time delay value; and uses the maximum correlation coefficient as the dynamic correlation strength between renewable energy disturbance and load disturbance. The specific formula for calculating the time delay is as follows:
[0057] In the formula, This is the amount of time delay. This is the Pearson correlation coefficient.
[0058] The new energy-load disturbance coupling coefficient is determined based on the maximum correlation coefficient and the time delay. The specific calculation formula for the new energy-load disturbance coupling coefficient is as follows:
[0059] In the formula, The dynamic coupling coefficient between renewable energy sources and load disturbances represents the degree of coupling influence in correcting system power disturbances when there is a time-series correlation between renewable energy disturbances and load disturbances. A preset coupling adjustment coefficient is used to adjust the degree of impact of new energy disturbances on load disturbances. The maximum correlation coefficient is 1.
[0060] Based on the new energy-load disturbance coupling coefficient, the new energy disturbance and load disturbance in each multi-source disturbance operation scenario are dynamically coupled and corrected to obtain the initial disturbance power in the region considering the time correlation. The initial disturbance power in the region is calculated using the following formula:
[0061] In the formula, This represents the initial disturbance power in the region. Let be the load disturbance power in region i. Let be the power disturbance of new energy sources in region i. To account for the time lag in the power disturbance caused by new energy sources.
[0062] Based on the regional operation information, the power grid is divided into regions to obtain multiple disturbance propagation areas; The regional division is based on the location of new energy access, the location of load nodes, and the topological connection of the power grid, so that new energy disturbances and load disturbances in the same region have the same power exchange relationship.
[0063] The regional disturbance propagation coefficient is calculated based on the electrical connection relationship between each disturbance propagation area, the line transmission capacity, and historical disturbance transmission data. The regional disturbance propagation coefficient includes the basic propagation coefficient, the line capacity correction coefficient, and the historical disturbance correction coefficient, specifically including: The basic propagation coefficient is determined based on the electrical distance between regional nodes:
[0064] In the formula, Basic propagation coefficient, Let be the electrical distance between region i and region j.
[0065] Determine the line capacity correction factor based on the remaining transmission capacity of inter-regional transmission lines:
[0066] In the formula, This is the line capacity correction factor. This represents the remaining transmission capacity of the line between region i and region j. This represents the maximum transmission capacity of the line.
[0067] The historical disturbance correction coefficient is determined based on the regional disturbance propagation results in historical operational data:
[0068] In the formula, This is the historical disturbance correction factor. The number of historical disturbance events included in the statistics. Let be the power disturbance of source region i in the k-th historical disturbance event. Let be the change in power response of target region j during the k-th historical disturbance event.
[0069] Based on the aforementioned basic propagation coefficient, line capacity correction coefficient, and historical correction coefficient, the final regional disturbance propagation coefficient is obtained. :
[0070] The propagation coefficients for each region were then normalized to ensure that:
[0071] Based on the final regional disturbance propagation coefficient and the regional equivalent disturbance power after considering time coupling, calculate the system equivalent power disturbance for each multi-source disturbance operation scenario; The equivalent power disturbance of the system is calculated using the following formula:
[0072] In the formula, This represents the system's equivalent power disturbance.
[0073] Based on the equivalent power disturbance of the system at consecutive time points, generate system power disturbance curves for the corresponding multi-source disturbance operation scenarios; Based on the system power disturbance curve, extract the corresponding system disturbance characteristic parameters; The system disturbance characteristic parameters include: maximum power disturbance amplitude, maximum power change rate, disturbance duration, and disturbance cumulative energy. Based on the system disturbance characteristic parameters, the system power disturbance degree corresponding to each multi-source disturbance operation scenario is sorted to obtain the system power disturbance amount corresponding to each disturbance operation scenario.
[0074] It should be noted that the innovation of this scheme compared to conventional technical solutions lies in the following: This scheme breaks through the traditional method of simply calculating the system power disturbance by subtracting the disturbance power from the power of renewable energy sources and the power of the load disturbance. Instead, it introduces the temporal coupling relationship between renewable energy disturbances and load disturbances, as well as a regional disturbance propagation constraint mechanism. First, by analyzing the time correlation between renewable energy output changes and load changes through historical operating data, the disturbance time delay and dynamic coupling coefficient are determined, enabling dynamic correction of the synergistic effect of renewable energy disturbances and load disturbances. This allows the calculation results to reflect the lag effect of renewable energy random fluctuations on load response. Furthermore, by combining the grid regional division results and comprehensively considering regional electrical connection relationships, line transmission capacity, and historical actual disturbance transmission patterns, a regional disturbance propagation coefficient is constructed to correct the power disturbance impact between different regions, realizing spatial propagation modeling from local disturbances to overall system disturbances. Through the above joint analysis of the time and spatial dimensions, the system power imbalance process under the combined effects of renewable energy fluctuations, load changes, and grid structure constraints can be more accurately depicted. Compared with conventional methods, this scheme can avoid the calculation deviation of system power disturbance caused by ignoring the correlation between new energy sources and load disturbances and regional propagation effects, improve the accuracy and reliability of system power disturbance prediction in multi-source disturbance scenarios, provide a calculation basis that is more in line with actual operating characteristics for subsequent determination of ancillary service capacity requirements, and enhance the adaptability of ancillary service capacity configuration results to different new energy penetration levels, different regional operating states, and complex disturbance scenarios.
[0075] S4. Based on the system power disturbance amount corresponding to each of the multi-source disturbance operation scenarios, determine the auxiliary service capacity requirements under each disturbance scenario, and filter the auxiliary service capacity requirements based on preset security constraints to obtain the target auxiliary service capacity configuration result.
[0076] In this embodiment, the auxiliary service capacity requirements under each disturbance scenario are determined based on the system power disturbance amount corresponding to each of the multi-source disturbance operation scenarios, including: Obtain the system power disturbance curves and system disturbance characteristic parameters corresponding to each multi-source disturbance operation scenario; The system power disturbance curve represents the power deviation change process of the system at each time node caused by the combined effect of changes in new energy output and load changes; the system disturbance characteristic parameters include the maximum power disturbance amplitude, the maximum power change rate, the disturbance duration, and the disturbance cumulative energy, which are used to characterize the degree of system power imbalance under different disturbance operation scenarios.
[0077] Based on the system power disturbance curve, determine the maximum power deficit corresponding to each multi-source disturbance operation scenario; The maximum power deficit is used to represent the maximum power demand required to maintain system power balance under the corresponding disturbance scenario. Specifically, the extreme values of the system power disturbance are obtained by comparing the system power disturbance values corresponding to consecutive time nodes; when the system power disturbance value indicates that the system power generation is less than the load demand, the maximum value of the power deficit is determined as the maximum power deficit value under the corresponding disturbance scenario.
[0078] The specific formula for calculating the maximum power deficit is as follows:
[0079] In the formula, Let be the maximum power deficit corresponding to the i-th multi-source disturbance operation scenario. Let be the system equivalent power disturbance at time node t for the i-th disturbance scenario.
[0080] Based on the maximum power deficit and the system power disturbance change rate, determine the rapid response auxiliary service capacity requirements under the corresponding disturbance scenario; The rapid response ancillary service capacity requirement is used to meet the instantaneous power balance requirements under conditions of rapid fluctuations in new energy sources or sudden load changes.
[0081] Specifically, the system power change rate is calculated based on the power change between adjacent time points in the system power disturbance curve, and the adjustment capacity required by the fast response resources is determined based on the maximum power change rate. The specific formula for calculating the maximum power change rate is as follows:
[0082] In the formula, Let be the maximum power change rate corresponding to the i-th disturbance scenario. The time interval between adjacent time nodes. Let be the system equivalent power disturbance at time node t-1 corresponding to the i-th disturbance scenario.
[0083] Based on the maximum power deficit and the maximum power change rate, determine the rapid response ancillary service capacity requirement:
[0084] In the formula, For the rapid response auxiliary service capacity requirement corresponding to the i-th disturbance scenario, This is a response time correction factor used to adjust capacity requirements based on the response speed of auxiliary service resources.
[0085] The continuous adjustment of ancillary service capacity requirements is determined based on the duration of the system power disturbance. The continuously adjusted ancillary service capacity requirement is used to meet the power balance requirements under conditions of long-term new energy output deviation or continuous load changes.
[0086] Specifically, the duration of the disturbance is determined based on the length of time during which the system power disturbance curve continuously exceeds a preset disturbance threshold. The longer the duration of the disturbance, the longer the system needs to provide auxiliary adjustment capabilities. The preset disturbance threshold is determined based on the statistical range of system power disturbance under historical normal operating conditions. Specifically, it can be calculated using the average value and standard deviation of historical power disturbance data, and the power disturbance exceeding the preset range is used as the disturbance identification threshold.
[0087] Based on the duration of the disturbance and the maximum power deficit, determine the continuous adjustment of ancillary service capacity requirements:
[0088] In the formula, For the continuous adjustment auxiliary service capacity requirement corresponding to the i-th disturbance scenario, This corresponds to the duration of the disturbance.
[0089] Based on the rapid response auxiliary service capacity requirements and the continuous adjustment auxiliary service capacity requirements, determine the comprehensive auxiliary service capacity requirements corresponding to each multi-source disturbance operation scenario. The integrated auxiliary service capacity requirement is used to simultaneously meet the rapid power compensation requirement in the initial stage of the disturbance and the stable adjustment requirement in the continuous stage of the disturbance.
[0090] Specifically, the calculation is performed by combining the capacity requirements for rapid response ancillary services and the capacity requirements for continuous adjustment of ancillary services:
[0091] In the formula, This represents the comprehensive auxiliary service capacity requirement corresponding to the i-th multi-source disturbance operation scenario.
[0092] Furthermore, based on the system disturbance characteristic parameters corresponding to each multi-source disturbance operation scenario, the comprehensive auxiliary service capacity requirement is modified to obtain an auxiliary service capacity requirement that takes into account the severity of the disturbance. The correction process includes: Establish an evaluation index for the severity of disturbance based on the maximum power disturbance amplitude, maximum power change rate, and disturbance duration corresponding to different disturbance scenarios; The specific calculation formula for the evaluation index of the severity of the disturbance is as follows:
[0093] In the formula, This represents the severity index of the disturbance corresponding to the i-th disturbance scenario. The rated power of the system, To preset the reference power change rate, The preset reference disturbance duration, , , These represent the weight coefficients corresponding to different perturbation characteristics.
[0094] The weighting coefficients are determined based on the normalized range of each disturbance characteristic parameter. Specifically, the number of characteristic parameters corresponding to the maximum power disturbance amplitude, the maximum power change rate, and the disturbance duration are set with equal weights and then distributed on an average basis according to the number of disturbance characteristic parameters participating in the evaluation.
[0095] Based on the aforementioned disturbance severity index, the comprehensive ancillary service capacity requirement is adjusted:
[0096] In the formula, This is the revised ancillary service capacity requirement.
[0097] It should be noted that the technical solution for determining ancillary service capacity requirements based on the system power disturbance magnitude corresponding to each of the aforementioned multi-source disturbance operation scenarios has the following advantages compared to the conventional method of determining ancillary service capacity solely based on maximum power deficit or empirical margin: This solution fully utilizes the system power disturbance curves corresponding to the multi-source disturbance operation scenarios, comprehensively considering the impact of random fluctuations in renewable energy, load changes, and their coupling effect on system power balance. By extracting multi-dimensional disturbance characteristics such as maximum power disturbance amplitude, power change rate, and disturbance duration, it achieves refined analysis of ancillary service requirements under different disturbance scenarios. Simultaneously, it distinguishes between rapid response ancillary service capacity requirements and continuous adjustment ancillary service capacity requirements, ensuring that the configuration results can meet both short-term power imbalance requirements such as rapid ramp-up of renewable energy and sudden load changes, as well as long-term power deviation adjustment requirements. Furthermore, it dynamically corrects the initial capacity requirements through disturbance severity evaluation indicators, enabling the ancillary service capacity to adaptively adjust according to the risk level of different disturbance scenarios. Compared with the traditional fixed capacity configuration method, this scheme can avoid the problem of insufficient or excessive capacity configuration caused by only considering a single maximum disturbance, improve the matching degree between the ancillary service capacity calculation results and the actual system operating status, and improve the efficiency and economy of ancillary service resource utilization while ensuring the safe and stable operation of the power system.
[0098] Furthermore, the auxiliary service capacity requirements are filtered based on preset security constraints to obtain the target auxiliary service capacity configuration result, including: Based on the auxiliary service capacity requirements corresponding to each multi-source disturbance operation scenario, obtain the set of auxiliary service capacity requirements under the corresponding disturbance scenario; The ancillary service capacity requirement set includes the rapid response ancillary service capacity requirement, the continuous adjustment ancillary service capacity requirement, and the comprehensive ancillary service capacity requirement corresponding to each disturbance scenario. It is used to characterize the scale of ancillary adjustment resources required for the system to maintain power balance under different disturbance conditions.
[0099] Based on the set of auxiliary service capacity requirements, obtain candidate auxiliary service resource information for participating in auxiliary service capacity configuration; The candidate auxiliary service resource information includes the adjustable capacity, maximum response power, response time, continuous adjustment time, and current availability of each auxiliary service resource. The ancillary service resources include energy storage devices, adjustable power supplies, controllable loads, and other resources that can provide power regulation capabilities.
[0100] Based on the candidate auxiliary service resource information and the auxiliary service capacity requirement set, calculate the available auxiliary service capacity corresponding to each candidate auxiliary service resource; The capacity to provide ancillary services refers to the actual adjustment capability that each ancillary service resource can provide under the current operating state.
[0101] Specifically, the available ancillary service capacity is determined based on the rated adjustment capacity of the ancillary service resources, their current operating status, and response capability limitations:
[0102] In the formula, Let m be the available auxiliary service capacity of the m-th auxiliary service resource. The maximum adjustment capacity of the m-th auxiliary service resource. The availability status coefficient of the m-th ancillary service resource is used to represent the proportion of the device that can currently participate in ancillary services.
[0103] Based on the available auxiliary service capacity, the auxiliary service capacity requirements corresponding to each multi-source disturbance operation scenario are initially matched to obtain candidate configuration schemes that meet the capacity requirements. The candidate configuration schemes include the resource types, resource quantities, and corresponding auxiliary service capacity involved in the auxiliary services.
[0104] Specifically, the available auxiliary service capacity of each auxiliary service resource is summed and compared with the auxiliary service capacity requirement under the corresponding disturbance scenario:
[0105] In the formula, The number of auxiliary service resources involved in the configuration. This represents the corrected auxiliary service capacity requirement corresponding to the i-th disturbance scenario.
[0106] When the cumulative available ancillary service capacity is greater than or equal to the ancillary service capacity requirement, the corresponding resource combination will be determined as a candidate configuration scheme.
[0107] Furthermore, the candidate configuration schemes are screened according to preset security constraints to obtain effective configuration schemes that meet the system's security operation requirements; The preset safety constraints include sufficient capacity constraints, response time constraints, and continuous adjustment capability constraints.
[0108] Specifically, it includes: Based on the aforementioned capacity sufficiency constraint, the total capacity of auxiliary services in the candidate configuration schemes is determined; Wherein, the capacity sufficiency constraint means:
[0109] In the formula, This represents the total capacity of auxiliary services corresponding to the candidate configuration schemes.
[0110] When the total capacity of auxiliary services is less than the corresponding required capacity, the candidate configuration scheme is eliminated.
[0111] The response speed of the candidate configuration schemes is judged based on the aforementioned response time constraint. Wherein, the response time constraint means:
[0112] In the formula, This refers to the actual response time of auxiliary service resources in the candidate configuration scheme. This represents the maximum allowable response time for the system.
[0113] If the response time of a candidate configuration exceeds the preset response time requirement, the candidate configuration will be eliminated.
[0114] Based on the continuous adjustment capability constraint, the continuous adjustment time of the candidate configuration scheme is determined; Wherein, the continuous adjustment capability constraint represents:
[0115] In the formula, The duration for which candidate configuration options can continuously provide auxiliary services. This represents the duration of the disturbance in the corresponding disturbance scenario.
[0116] If a candidate configuration scheme cannot meet the continuous adjustment time requirement, the candidate configuration scheme shall be eliminated.
[0117] Based on the above safety constraint screening results, a feasible auxiliary service capacity configuration scheme that meets the system operation safety requirements is obtained; The feasible auxiliary service capacity configuration scheme is a candidate scheme that simultaneously satisfies the constraints of sufficient capacity, response time, and continuous adjustment capability.
[0118] Based on the resource configuration cost and capacity margin corresponding to the feasible auxiliary service capacity configuration schemes, the multiple feasible auxiliary service capacity configuration schemes are sorted to determine the target auxiliary service capacity configuration result. The capacity margin refers to the backup capacity configured to exceed the auxiliary service capacity requirements, which is used to improve the system's adaptability to disturbance uncertainties.
[0119] Specifically, the feasible configuration schemes are ranked according to the comprehensive evaluation indicators corresponding to each scheme:
[0120] In the formula, Let be the comprehensive evaluation value of the a-th feasible configuration scheme. The cost of configuring auxiliary service resources for the corresponding configuration scheme. For the capacity margin of the corresponding configuration scheme, To ensure the resource response performance of the corresponding configuration scheme, , , This indicates the preset evaluation weights.
[0121] The preset evaluation weights are determined based on the data dispersion of each evaluation indicator in the historical auxiliary service configuration scheme. Specifically, the standard deviation of the historical data corresponding to each evaluation indicator is calculated, and the corresponding weight is determined according to the proportion of the standard deviation of each indicator to the sum of the standard deviations of all indicators.
[0122] Based on the comprehensive evaluation value, the feasible configuration schemes are sorted, and the configuration scheme that meets the security constraints and has the best comprehensive evaluation value is selected as the target auxiliary service capacity configuration result.
[0123] like Figure 4As shown, after obtaining the ancillary service capacity configuration results using the method of the present invention, the system power deviation recovery speed is significantly improved and the power fluctuation range after disturbance is reduced. This indicates that the method of the present invention can reasonably configure the ancillary service capacity according to the actual disturbance characteristics, thereby improving the system's ability to cope with random fluctuations in new energy sources and load disturbances.
[0124] It should be noted that the technical solution of filtering ancillary service capacity requirements based on preset security constraints to obtain the target ancillary service capacity configuration result has the following advantages compared to the traditional method of determining ancillary service capacity solely based on the system's maximum power deficit: Firstly, this solution obtains the ancillary service capacity requirements under different disturbance conditions based on the system power disturbance characteristics corresponding to multi-source disturbance operation scenarios. Then, it quantitatively analyzes the available capacity of ancillary service resources by combining the actual adjustment capabilities of candidate ancillary service resources, avoiding the problem of mismatch between configured capacity and actual support capacity due to ignoring resource availability status. Furthermore, by setting capacity sufficiency constraints, response time constraints, and continuous adjustment capability constraints, the candidate configuration schemes are screened from multiple dimensions, ensuring that the final configuration result not only meets the disturbance power compensation requirements but also meets the system's rapid response and continuous adjustment requirements, improving the security and reliability of the ancillary service configuration scheme. Simultaneously, by comprehensively considering configuration costs, capacity margins, and response performance, multiple feasible configuration schemes are optimized and selected, enabling the ancillary service resources to be rationally configured while ensuring stable system operation, reducing redundant configuration of ancillary service resources, and improving resource utilization efficiency. Compared to conventional fixed capacity configuration methods, this scheme can dynamically match based on new energy fluctuations, load changes, and the actual capacity of ancillary service resources, thereby improving the adaptability of ancillary service capacity configuration results to complex multi-source disturbance scenarios.
[0125] Reference Figure 2 As shown in the diagram, the power system ancillary service capacity configuration system based on multi-source disturbance analysis provided by this invention includes a historical operation feature extraction module, a new energy disturbance status classification module, a multi-source disturbance scenario construction and power disturbance calculation module, and an ancillary service capacity optimization configuration module. The modules are interconnected. The historical operation feature extraction module is used to acquire historical operation data of the power system and extract the characteristics of new energy output changes and load disturbances. The new energy disturbance status classification module is used to classify the historical new energy operation status according to the characteristics of new energy output change, and obtain the new energy disturbance feature set corresponding to different operation statuses. The multi-source disturbance scenario construction and power disturbance calculation module is used to generate multi-source disturbance operation scenarios covering both new energy disturbances and load disturbances by utilizing the set of new energy disturbance characteristics and load disturbance characteristics, and to calculate the system power disturbance in each scenario; The auxiliary service capacity optimization configuration module is used to determine the corresponding auxiliary service capacity requirements based on the system power disturbance in each scenario, filter the capacity requirements with preset security constraints, and output the final target auxiliary service capacity configuration result.
[0126] The above embodiments can be implemented, in whole or in part, by software, hardware, firmware, or any other combination thereof. When implemented using software, the above embodiments can be implemented, in whole or in part, in the form of a computer program product.
[0127] Those skilled in the art will recognize that the modules and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.
[0128] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.
[0129] In conclusion, the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A method for configuring ancillary service capacity in a power system based on multi-source disturbance analysis, characterized in that, include: Acquire historical operating data of the power system and extract the characteristics of new energy output changes and load disturbances; Based on the characteristics of changes in renewable energy output, the historical operating states of renewable energy are classified to obtain a set of renewable energy disturbance characteristics corresponding to different operating states; By utilizing the set of disturbance characteristics of new energy sources and the characteristics of load disturbance, a multi-source disturbance operation scenario covering both new energy disturbance and load disturbance is generated, and the system power disturbance in each scenario is calculated. The corresponding ancillary service capacity requirements are determined based on the system power disturbance in each scenario, and the capacity requirements are filtered by preset security constraints to output the final target ancillary service capacity configuration result.
2. The method according to claim 1, characterized in that, The acquisition of historical power system operation data and the extraction of new energy output variation characteristics and load disturbance characteristics include: Obtain historical operating data of the power system within a preset historical time period; The running data is time-aligned according to a preset time interval, and the aligned data is divided into continuous time windows to obtain multiple historical running state samples. Extract the operating status feature parameters of each sample and construct a historical operating status feature vector. The historical operating status feature library is composed of multiple feature vectors.
3. The method according to claim 2, characterized in that, The extraction of new energy output variation characteristics and load disturbance characteristics also includes: Acquire target running status data and construct target running status feature vector; The similarity between the target operating state feature vector and each historical feature vector in the historical operating state feature library is calculated to obtain the feature distance value. Based on the sorting results of the feature distance values, a preset number of historical running state samples with the highest sorting are selected as the target similar running state set. Extract the characteristics of new energy output change and load disturbance based on the set of similar operating states of the target.
4. The method according to claim 3, characterized in that, The extraction of new energy output variation characteristics and load disturbance characteristics based on the target similar operating state set includes: Obtain continuous time series operation data of each historical operation state sample in the target similar operation state set; The time window was divided for the changes in new energy output and load power in each sample to obtain multiple output change sequences and load power change sequences. For each of the aforementioned power output change sequences, the characteristic parameters of the new energy power output fluctuation are extracted and statistically analyzed to obtain the random change characteristics of the new energy power output under different similar operating conditions; For each load power change sequence, extract the load disturbance characteristics; By correlating and matching the random variation characteristics of new energy output with load disturbance characteristics at the same time scale, a multi-source disturbance characteristic sample is formed. Statistical analysis was performed on multiple multi-source disturbance characteristic samples to obtain the set of new energy output change characteristics and the set of load disturbance characteristics.
5. The method according to claim 1, characterized in that, The obtained set of new energy disturbance characteristics under different operating states includes: The new energy disturbance feature vector corresponding to the target operating state is matched with the central feature vector of each category to determine the new energy operating state category to which the target operating state belongs; Based on the determined category, the corresponding set of new energy disturbance characteristics is invoked.
6. The method according to claim 1, characterized in that, The generated multi-source disturbance operation scenario, encompassing both new energy disturbances and load disturbances, includes: Based on the set of new energy disturbance characteristics, the range of new energy disturbance parameters is determined, and the disturbance parameters within the range are randomly sampled to generate multiple new energy disturbance process sequences. Based on the characteristics of load disturbance, the range of load disturbance parameters is determined, and the disturbance parameters within the range are randomly sampled to generate multiple load disturbance process sequences. The time scale of the new energy disturbance process sequence and the load disturbance process sequence are matched, and the two are combined according to the time correspondence to generate multiple multi-source disturbance operation scenarios.
7. The method according to claim 1, characterized in that, The calculation of system power disturbance in each scenario includes: Obtain the power sequences of new energy disturbances and load disturbances in various multi-source disturbance operation scenarios, perform time-series correlation analysis on the two, and determine the time-series coupling coefficient between new energy disturbances and load disturbances; Based on the aforementioned time-series coupling coefficient, the new energy disturbance and load disturbance in each scenario are coupled and corrected to obtain the initial disturbance power of the region. The regions are divided according to the power grid topology, and the regional disturbance propagation coefficient is determined by combining the electrical connection relationship between regions, the transmission capacity of the lines and historical disturbance propagation data. Based on the regional disturbance propagation coefficient and the initial disturbance power of the region, the equivalent power disturbance of the system is calculated, and the system power disturbance corresponding to each multi-source disturbance operation scenario is determined accordingly.
8. The method according to claim 1, characterized in that, The process of determining the corresponding ancillary service capacity requirements based on the system power disturbance in each scenario includes: Based on the system power disturbance curves corresponding to each multi-source disturbance operation scenario, determine the maximum power deficit in each scenario; Based on the maximum power deficit and the system power disturbance rate, determine the capacity requirements for rapid response ancillary services; Determine the continuous adjustment of ancillary service capacity requirements based on the duration of system power disturbances; By combining rapid response to ancillary service capacity requirements with continuous adjustment of ancillary service capacity requirements, the comprehensive ancillary service capacity requirements corresponding to each scenario can be obtained. Based on the evaluation index of the severity of disturbances in each scenario, the comprehensive auxiliary service capacity requirement is adjusted to obtain the adjusted auxiliary service capacity requirement.
9. The method according to claim 1, characterized in that, The step of filtering the capacity requirements based on preset security constraints and outputting the final target auxiliary service capacity configuration result includes: Obtain the set of auxiliary service capacity requirements corresponding to each multi-source disturbance operation scenario, and obtain the available capacity of candidate auxiliary service resources; Based on the available capacity, the auxiliary service capacity requirements of each scenario are matched to generate candidate configuration schemes that meet the capacity requirements; The candidate configuration schemes are screened according to preset security constraints, including capacity sufficiency constraints, response time constraints, and continuous adjustment capability constraints. Schemes that do not meet any of the constraints are eliminated to obtain feasible auxiliary service capacity configuration schemes. Based on a comprehensive ranking of the resource allocation costs and capacity margins of the feasible auxiliary service capacity configuration schemes, the optimal scheme is selected as the target auxiliary service capacity configuration result.
10. A system using the power system ancillary service capacity configuration method based on multi-source disturbance analysis as described in any one of claims 1-9, characterized in that, include: The historical operation feature extraction module is used to acquire historical operation data of the power system and extract the characteristics of new energy output changes and load disturbances. The new energy disturbance status classification module is used to classify the historical new energy operation status according to the characteristics of new energy output change, and obtain the new energy disturbance feature set corresponding to different operation statuses. The multi-source disturbance scenario construction and power disturbance calculation module is used to generate multi-source disturbance operation scenarios covering both new energy disturbances and load disturbances by utilizing the set of new energy disturbance characteristics and load disturbance characteristics, and to calculate the system power disturbance in each scenario; The auxiliary service capacity optimization configuration module is used to determine the corresponding auxiliary service capacity requirements based on the system power disturbance in each scenario, filter the capacity requirements with preset security constraints, and output the final target auxiliary service capacity configuration result.