A single-sided hardening layout for greenhouse construction
Patent Information
- Application Number
- CN202611171736.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-04
- Publication Date
- 2026-09-25
AI Technical Summary
[0003]本发明要解决的技术问题是温室建设过程中,硬化土地分布不合理,容易导致恢复不达标的问题
[0009]综上所述,本发明通过单边硬化,集中硬化土地资源,减少土地浪费,在单边硬化处设置土壤压力监测器,在地布土壤覆盖处设置土壤监测器,将多监测器的数据进行汇总集和,监测设备的稳定性、桁架的稳定性以及硬化土地的承压情况,以减少后续恢复时候的时间和难度。
Smart Images

Figure CN122812482A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of greenhouse construction technology, and specifically to a single-sided hardening layout for greenhouse construction. Background Technology
[0002] The country is now strictly controlling land monitoring, and the standards and requirements for land hardening and restoration are becoming increasingly stringent. During the construction of existing greenhouses, some land may be hardened due to the equipment used and the trucks entering and leaving. However, since the hardened land is interspersed with the original land, subsequent restoration may result in some areas not meeting the standards or the land conditions being inconsistent with those of the unhardened land, which may lead to a decline in the utilization rate of some land. Summary of the Invention
[0003] The technical problem this invention aims to solve is that, during greenhouse construction, the unreasonable distribution of hardened land can easily lead to substandard restoration.
[0004] To solve the above-mentioned technical problems, the technical solution of the present invention is to provide a single-sided hardened layout for greenhouse construction, including a work area and a road. The work area includes a greenhouse area and a hardened area. The hardened area is adjacent to the road. Construction work equipment is provided on the hardened area. The greenhouse area is located on the other side of the hardened area. A production and processing area is provided at one end of the greenhouse area.
[0005] Optionally, the greenhouse area is covered with a ground cover.
[0006] Optionally, the ground of the greenhouse area is non-hardened soil, and a soil monitor is installed in the soil.
[0007] Optionally, the hardened area is made of hardened soil, and a soil pressure sensor is installed in the ground.
[0008] Optionally, the thickness of the hardened soil in the hardened zone shall not be less than 20 cm.
[0009] In summary, this invention concentrates hardened land resources through unilateral hardening, reducing land waste. Soil pressure monitors are installed at the unilateral hardening points, and soil monitors are installed at the soil covering points. Data from multiple monitors are aggregated and combined to monitor the stability of the equipment, the stability of the truss, and the pressure bearing capacity of the hardened land, thereby reducing the time and difficulty of subsequent restoration. Attached Figure Description
[0010] Figure 1 This is a top view schematic diagram of the single-sided hardening layout of the greenhouse construction according to the present invention;
[0011] Figure 2 This is a cross-sectional schematic diagram of the single-sided hardening layout of the greenhouse construction according to the present invention; In the diagram: 1. Work area; 2. Road; 3. Greenhouse area; 4. Hardened area; 5. Production and processing area; 6. Soil monitor; 7. Soil pressure sensor. Detailed Implementation
[0012] The following combination Figure 1-2 The present invention will be described in further detail below.
[0013] This invention discloses a single-sided hardening layout for greenhouse construction, with reference to... Figure 1 and Figure 2 It includes work area 1 and road 2. Work area 1 includes greenhouse area 3 and hardened area 4. Hardened area 4 is adjacent to road 2. Construction equipment is installed on hardened area 4. Greenhouse area 3 is located on the other side of hardened area 4. Production and processing area 5 is located at one end of greenhouse area 3. Production and processing area 5 is equipped with a production line for harvesting, transporting and sorting crops in the greenhouse.
[0014] In a further embodiment, greenhouse area 3 is covered with ground cover, and the ground of greenhouse area 3 is non-hardened soil. Soil monitors 6 are installed in the soil. Due to the influence of soil moisture and seasons, the soil will change. Therefore, sensors are arranged in the pure soil part to detect the soil temperature, humidity, salinity and other conditions. Based on the changes in the soil index and the data collection of the hardened part, the overall pressure of the greenhouse, as well as the pressure on the equipment and the land recovery are monitored, so as to realize the combination of land environment protection and production operation. Greenhouse area 3 is used for the subsequent construction of greenhouse, and the construction materials can be stacked or manufactured in hardened area 4.
[0015] In a further embodiment, the ground of hardened area 4 is hardened soil, and a soil pressure sensor 7 is installed in the ground. The thickness of the hardened soil in hardened area 4 is not less than 20cm. Specifically, due to the unilateral pressure, the stability of the monitoring equipment, the stability of the truss, and the bearing capacity of the hardened soil are monitored. In order to ensure that the hardened soil can be restored smoothly in the future, referring to the general hardening of building construction, except that the hardening thickness at the warehouse entrance will exceed 20cm, the hardening in other places will still be around 20cm. The thickness can reach 30cm at the site of heavy truck operation. The load-bearing columns and mechanical equipment are placed in the hardened area without special thickening of the hardening, so as to reduce the time and difficulty of subsequent restoration and reduce compaction.
[0016] This invention concentrates hardened land on the side of the road, which facilitates construction and is conducive to subsequent land restoration, thus achieving uniformity of land indicators.
[0017] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit it. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention, and all such modifications or substitutions should be covered within the scope of the claims of the present invention.
Claims
1. A single-sided hardened layout for greenhouse construction, characterized in that, It includes a work area (1) and a road (2). The work area (1) includes a greenhouse area (3) and a hardened area (4). The hardened area (4) is adjacent to the road (2). Construction equipment is provided on the hardened area (4). The greenhouse area (3) is located on the other side of the hardened area (4). A production and processing area (5) is provided at one end of the greenhouse area (3).
2. The greenhouse construction with a single-sided hardened layout according to claim 1, characterized in that, The greenhouse area (3) is covered with ground cover.
3. The greenhouse construction with a single-sided hardened layout according to claim 2, characterized in that, The ground of the greenhouse area (3) is non-hardened soil, and a soil monitor (6) is installed in the soil.
4. The greenhouse construction with a single-sided hardened layout according to claim 1, characterized in that, The hardened area (4) has hardened soil on its surface, and a soil pressure sensor (7) is installed in the ground.
5. The greenhouse construction with a single-sided hardened layout according to claim 4, characterized in that, The thickness of the hardened soil in the hardened zone (4) shall not be less than 20 cm.