By identifying coordinated switching events and conflicts of adjustable resources in the photovoltaic-storage-load system and adjusting the operation plan, the problem of sudden power changes at the grid connection point caused by the centralized switching of multiple types of resources was solved, ensuring the stable operation of the photovoltaic-storage-load system and that the scheduling sequence meets the requirements of power and virtual power plants, thus achieving more efficient resource scheduling.
Patent Information
- Application Number
- CN202611258899.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-19
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2046-08-19
AI Technical Summary
Existing photovoltaic-storage-load coordinated scheduling methods are unable to effectively identify power surges or limit exceedances at grid connection points caused by centralized switching of various adjustable resources, and lack clear handling of scheduling requirements at different levels, resulting in deviations from the expected absorption, economic and low-carbon goals during implementation.
By acquiring supply and demand forecast data and scheduling constraint data, the adjustable range of each adjustable resource is determined, an initial coordinated scheduling plan is generated, coordinated switching events within adjacent scheduling periods are identified, and coordinated switching conflicts are determined based on power changes at the grid connection point. The operation plan of the resources is adjusted to reduce the risk of power surges and exceeding limits, ensuring that the scheduling sequence meets the requirements of the power grid, virtual power plants, and local photovoltaic storage and load systems.
It achieves the reduction of power surges and over-limit risks at grid connection points caused by synchronous switching of multiple types of resources while meeting equipment operation boundaries and grid connection safety constraints. It also maintains the execution order of the upper-level power dispatch and the local photovoltaic-storage-load coordinated dispatch, and avoids the economic or low-carbon optimization results from deviating from the upper-level dispatch task.
Smart Images

Figure CN122844326B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of power system technology, and more specifically to a method, system, and storage medium for coordinated scheduling of photovoltaic, energy storage, and load. Background Technology
[0002] With the continuous integration of distributed photovoltaic (PV) systems into industrial parks, commercial buildings, and industrial energy consumption scenarios, PV power output exhibits significant volatility and intermittency due to weather conditions. To improve the local absorption capacity of PV, existing PV-storage-load systems typically involve coordinated scheduling with energy storage devices, flexible loads, and air conditioning loads. These systems combine time-of-use pricing, grid carbon emission factors, and grid-connected power limits to generate resource operation plans for different scheduling periods, thereby reducing electricity purchase costs and carbon emissions from electricity consumption.
[0003] In scenarios where virtual power plants participate in grid peak shaving, demand response, or active power regulation, the power dispatching platform issues power dispatching plans to the virtual power plants. The virtual power plants then generate their own dispatching plans based on these plans and the adjustable capabilities of each local resource unit, allocating the corresponding target grid connection point power, target regulation power, execution time period, and allowable deviation range to the local photovoltaic-storage-load system. While executing the virtual power plant dispatching plan, the local photovoltaic-storage-load system also needs to coordinate its dispatching based on local photovoltaic output, load demand, and energy storage status.
[0004] Existing coordinated scheduling methods typically divide scheduling cycles into fixed time intervals and determine the operating status and power of each adjustable resource based on the predicted supply and demand relationship within each scheduling period. While these methods can satisfy power balance and equipment operating constraints at the scheduling period level, different adjustable resources exhibit different response characteristics. The charging and discharging power of energy storage devices can change rapidly, flexible loads are usually limited by the start time and duration of tasks, and air conditioning loads experience indoor temperature recovery and a rebound in cooling demand after pre-cooling. When multiple adjustable resources are driven by the same changes in photovoltaic output, electricity price switching, or carbon emission changes, they are prone to concentrated startup, shutdown, or power changes at the same or adjacent scheduling period boundaries.
[0005] Existing methods primarily focus on average power and energy distribution within each scheduling period, failing to adequately reflect the cumulative impact of concentrated switching of multiple adjustable resources on grid-connected power changes within boundary periods. This can lead to abrupt changes in grid-connected power exchange, local power exceeding limits, or the shift of peak loads to adjacent periods after adjustment, causing the scheduling plan generated based on predictions to deviate from the expected absorption, economic, and low-carbon goals during actual execution. Therefore, identifying the power impact of concentrated switching of multiple adjustable resources and reducing its interference with the stable operation of photovoltaic-storage-load systems has become an urgent problem to be solved. Furthermore, when local photovoltaic-storage-load systems participate in power dispatch as resource units of virtual power plants, it is also necessary to maintain the execution order of different levels of scheduling requirements during the generation and adjustment of local operation plans. That is, under the premise of meeting equipment operation constraints and grid connection safety constraints, priority should be given to meeting the power dispatch plan, followed by the virtual power plant dispatch plan, and then optimizing local photovoltaic-storage-load supply and demand balance, operating costs, and carbon emissions. Existing methods lack explicit handling of the above-mentioned hierarchical scheduling order, which can easily cause local optimization results to deviate from the requirements of higher-level dispatch. Summary of the Invention
[0006] The purpose of this invention is to provide a method, system, and storage medium for coordinated scheduling of optical storage and load, so as to at least solve the problem of sudden power changes or exceeding limits at the grid connection point caused by centralized switching of multiple types of adjustable resources.
[0007] To achieve the above objectives, a first aspect of the present invention provides a method for coordinated scheduling of photovoltaic-storage-load systems. The method includes: acquiring supply and demand forecast data and scheduling constraint data within a target scheduling period, and determining the adjustable range of each adjustable resource in the photovoltaic-storage-load system; generating an initial coordinated scheduling plan within the adjustable range of each adjustable resource based on the supply and demand forecast data and the scheduling constraint data; determining coordinated switching events based on changes in the operating status of each adjustable resource within adjacent scheduling periods in the initial coordinated scheduling plan, and determining coordinated switching conflicts based on changes in grid connection point power corresponding to the coordinated switching events; and adjusting the operating plans of the corresponding adjustable resources based on the coordinated switching conflicts to obtain a target coordinated scheduling plan.
[0008] Optionally, the supply and demand forecast data includes: photovoltaic forecast power, base load forecast power, flexible load forecast power, air conditioning load forecast power, and available energy storage power; the dispatch constraint data includes: power dispatch plan, virtual power plant dispatch plan generated by the virtual power plant according to the power dispatch plan and issued to the photovoltaic-storage-load system, grid connection point power constraints, adjustable resource operation constraints, load task constraints, environmental comfort constraints, time-of-use electricity price, and grid carbon emission factor.
[0009] Optionally, determining the adjustable range of each adjustable resource in the photovoltaic-storage-load system includes: determining the adjustable power range of each adjustable resource based on the predicted power corresponding to each adjustable resource and the operational constraints of the adjustable resource; wherein, the adjustable resources include any one or more of energy storage devices, flexible loads, air conditioning loads, electric vehicle charging loads, and cold storage devices; determining the adjustable time period range of the corresponding adjustable resource based on the load task constraints and the environmental comfort constraints; and verifying the adjustable power range and adjustable time period range of each adjustable resource based on the grid connection point power constraints to obtain the adjustable range of each adjustable resource.
[0010] Optionally, based on the supply and demand forecast data and the scheduling constraint data, an initial coordinated scheduling plan is generated within the adjustable range of each of the adjustable resources, including: determining the predicted supply and demand difference for each scheduling period based on the supply and demand forecast data; determining the scheduling evaluation parameters for each scheduling period based on the time-of-use electricity price and the grid carbon emission factor; taking the reduction of the predicted supply and demand difference, operating costs, and carbon emissions as the scheduling objective, and within the power constraint of the grid connection point and the adjustable range of each of the adjustable resources, determining the initial operating state and initial operating power of each of the adjustable resources in each scheduling period; and generating the initial coordinated scheduling plan based on the initial operating state and the initial operating power.
[0011] Optionally, the process of determining the initial operating state and initial operating power of each adjustable resource in each scheduling period includes: generating candidate operating combinations corresponding to each scheduling period based on the adjustable power range and adjustable time range of each adjustable resource; determining the predicted grid connection point power corresponding to each candidate operating combination based on the predicted supply-demand difference and the resource adjustment power corresponding to each candidate operating combination; determining the operating cost and carbon emissions corresponding to each candidate operating combination based on the predicted grid connection point power and the scheduling evaluation parameters of the corresponding scheduling period; selecting a first candidate operating combination whose adjustment direction and response time satisfy the power dispatch plan from the candidate operating combinations that satisfy the grid connection point power constraint, the adjustable resource operating constraint, the load task constraint and the environmental comfort constraint; selecting a second candidate operating combination that satisfies the virtual power plant dispatch plan from the first candidate operating combination; and selecting a target operating combination from the second candidate operating combination whose comprehensive dispatch result corresponding to the predicted supply-demand difference, the operating cost and the carbon emissions satisfies the preset dispatch conditions; and determining the operating state and operating power of each adjustable resource in the target operating combination as the initial operating state and the initial operating power, respectively.
[0012] Optionally, determining the coordinated switching event based on the changes in the operating status of each adjustable resource within adjacent scheduling periods in the initial coordinated scheduling plan includes: comparing the initial operating status and initial operating power of each adjustable resource in adjacent scheduling periods to determine the target adjustable resource where the operating status switching or operating power change occurs; determining the resource switching time based on the scheduling period boundary corresponding to the target adjustable resource; determining the switching influence interval of the target adjustable resource based on the resource switching time, the change in operating power, and the corresponding adjustable resource operating constraints; and determining multiple target adjustable resources whose switching influence intervals overlap and their operating status changes as the coordinated switching event.
[0013] Optionally, determining the coordinated handover conflict based on the power change of the grid connection point corresponding to the coordinated handover event includes: determining the resource composite power change within the corresponding handover influence interval based on the change in operating power of each target adjustable resource in the coordinated handover event; determining the predicted grid connection point power within the handover influence interval based on the baseline grid connection point power before the coordinated handover event and the change in resource composite power; comparing the predicted grid connection point power with the grid connection point power constraint to determine the corresponding power limit violation result and power mutation result; when the power limit violation result indicates that the predicted grid connection point power exceeds the grid connection point power constraint, or the power mutation result indicates that the change in predicted grid connection point power at adjacent detection times exceeds a preset change threshold, the corresponding coordinated handover event is determined as a coordinated handover conflict.
[0014] Optionally, adjusting the operation plan of the corresponding adjustable resources according to the coordinated handover conflict to obtain a target coordinated scheduling plan includes: determining the adjustable power and adjustable time period of each target adjustable resource according to the target adjustable resources corresponding to the coordinated handover conflict and their handover impact interval; adjusting the operation status, operation power or resource handover time of each target adjustable resource within the adjustable power and the adjustable time period to obtain a candidate coordinated scheduling plan; redetermining the predicted grid connection point power within the handover impact interval according to the candidate coordinated scheduling plan, and performing power limit over-limit verification and power mutation verification on the predicted grid connection point power; and determining the candidate coordinated scheduling plan that passes the power limit over-limit verification and the power mutation verification and satisfies the scheduling constraint data as the target coordinated scheduling plan.
[0015] A second aspect of the present invention provides a photovoltaic-storage-load coordinated scheduling system, the system comprising: a data acquisition unit, configured to acquire supply and demand forecast data and scheduling constraint data within a target scheduling period, and determine the adjustable range of each adjustable resource in the photovoltaic-storage-load system; a plan generation unit, configured to generate an initial coordinated scheduling plan within the adjustable range of each adjustable resource based on the supply and demand forecast data and the scheduling constraint data; a conflict identification unit, configured to determine coordinated switching events based on changes in the operating status of each adjustable resource within adjacent scheduling periods in the initial coordinated scheduling plan, and determine coordinated switching conflicts based on changes in grid connection point power corresponding to the coordinated switching events; and a plan output unit, configured to adjust the operating plan of the corresponding adjustable resource based on the coordinated switching conflicts to obtain a target coordinated scheduling plan.
[0016] On the other hand, the present invention provides a computer-readable storage medium storing instructions that, when executed on a computer, cause the computer to perform the above-described optical-storage-load coordinated scheduling method.
[0017] Through the above technical solution, the present invention determines the adjustable range of each adjustable resource by combining supply and demand forecast data with scheduling constraint data, and can generate an initial coordinated scheduling plan under the premise of meeting equipment operating boundaries, load task requirements, and grid-connected power limits. Based on this, it further analyzes the changes in the operating status of each adjustable resource within adjacent scheduling periods, identifies coordinated switching events formed by the concentrated start-up, shutdown, or power change of multiple types of resources, and determines coordinated switching conflicts based on the corresponding grid-connected power changes. By adjusting the operating time, operating status, or operating power of conflicting resources, it can reduce the risk of sudden power changes and exceeding limits at the grid-connected point caused by the synchronous switching of multiple types of adjustable resources, and avoid the transfer of peak load to adjacent periods after adjustment. Simultaneously, by incorporating the power dispatch plan and virtual power plant dispatch plan into the scheduling constraint data, and selecting candidate operating combinations that meet equipment operating constraints and grid-connected safety constraints in sequence according to the power dispatch plan, virtual power plant dispatch plan, and local supply and demand, cost, and carbon emission targets, it can maintain the execution order among the superior power dispatch, virtual power plant dispatch, and local photovoltaic-storage-load coordinated scheduling, and avoid the local economic or low-carbon optimization results weakening the completion of the superior dispatch task.
[0018] Other features and advantages of the embodiments of the present invention will be described in detail in the following detailed description section. Attached Figure Description
[0019] The accompanying drawings are provided to further illustrate embodiments of the present invention and form part of the specification. They are used together with the following detailed description to explain the embodiments of the present invention, but do not constitute a limitation thereof. In the drawings: Figure 1This is a flowchart of the steps of a photoelectric storage-load coordinated scheduling method provided in one embodiment of the present invention; Figure 2 This is a detailed flowchart of step S20 of the optical-storage-load coordinated scheduling method provided in one embodiment of the present invention; Figure 3 This is a schematic diagram of multiple types of adjustable resource collaborative switching events provided in one embodiment of the present invention; Figure 4 This is a schematic diagram of the power change at the grid connection point before and after the cooperative switching conflict adjustment provided by one embodiment of the present invention; Figure 5 This is a system structure diagram of a photoelectric storage-load coordinated scheduling system provided in one embodiment of the present invention. Detailed Implementation
[0020] The specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are for illustration and explanation only and are not intended to limit the present invention.
[0021] like Figure 1 As shown, embodiments of the present invention provide a method for coordinated scheduling of optical storage and payload, the method comprising: Step S10: Obtain supply and demand forecast data and scheduling constraint data within the target scheduling period, and determine the adjustable range of each adjustable resource in the optical storage and load system.
[0022] Specifically, the supply and demand forecast data includes: photovoltaic forecast power, base load forecast power, flexible load forecast power, air conditioning load forecast power, and available energy storage power; the dispatch constraint data includes: power dispatch plan, virtual power plant dispatch plan generated by the virtual power plant according to the power dispatch plan and issued to the photovoltaic-storage-load system, grid connection point power constraints, adjustable resource operation constraints, load task constraints, environmental comfort constraints, time-of-use electricity price, and grid carbon emission factor.
[0023] Furthermore, determining the adjustable range of each adjustable resource in the photovoltaic-storage-load system includes: determining the adjustable power range of each adjustable resource based on the predicted power corresponding to each adjustable resource and the operational constraints of the adjustable resource; wherein, the adjustable resources include any one or more of energy storage devices, flexible loads, air conditioning loads, electric vehicle charging loads, and cold storage devices; determining the adjustable time period range of the corresponding adjustable resource based on the load task constraints and the environmental comfort constraints; and verifying the adjustable power range and adjustable time period range of each adjustable resource based on the grid connection point power constraints to obtain the adjustable range of each adjustable resource.
[0024] In this embodiment of the invention, the target scheduling period is divided into multiple scheduling time periods according to a preset scheduling granularity, and the supply and demand forecast data and scheduling constraint data corresponding to each scheduling time period are obtained. The preset scheduling granularity is determined based on the rate of change of photovoltaic output and the response cycle of adjustable resources. In this embodiment, the target scheduling period is from 00:00 to 24:00 of the next day, the scheduling granularity is 15 minutes, and a total of 96 scheduling time periods are formed; in the intraday rolling scheduling scenario, the scheduling granularity is set to 5 minutes.
[0025] Supply and demand forecast data includes photovoltaic (PV) power forecast, base load forecast, flexible load forecast, air conditioning load forecast, and available energy storage power. Base load forecast refers to rigid load forecasts that do not participate in coordinated dispatch, avoiding duplication with flexible load forecasts and air conditioning load forecasts. PV power forecast is obtained based on historical output, irradiance forecasts, and ambient temperature forecasts; flexible load forecast is used to characterize the baseline electricity demand of production equipment, charging equipment, or other transferable power tasks; available energy storage power is determined based on the current state of charge, rated charge / discharge power, and charge / discharge efficiency.
[0026] Dispatch constraint data includes power dispatch plans, virtual power plant dispatch plans, grid connection point power constraints, adjustable resource operation constraints, load task constraints, environmental comfort constraints, time-of-use pricing, and grid carbon emission factors. The power dispatch plan, issued by the power dispatch platform to the virtual power plant, characterizes the adjustment direction, response time, and aggregated adjustment power requirements that the virtual power plant needs to meet within the target dispatch cycle. The virtual power plant allocates corresponding adjustment tasks to each local resource unit based on the aggregated adjustment power requirements and the adjustable capabilities of each local resource unit. The virtual power plant dispatch plan, generated by the virtual power plant based on the power dispatch plan and the adjustable capabilities of the local photovoltaic-storage-load system, characterizes the target grid connection point power or target adjustment power allocated to the local photovoltaic-storage-load system, the execution time period, and the allowable deviation range. The local photovoltaic-storage-load system, under the premise of meeting grid connection power constraints, adjustable resource operation constraints, load task constraints, and environmental comfort constraints, first selects operation combinations whose adjustment direction and response time meet the power dispatch plan, and then selects operation combinations that meet the local response targets allocated by the virtual power plant dispatch plan. Local supply and demand balance, operating costs, and carbon emissions are optimized within the selected operation combinations. Grid connection power constraints include the upper limit of allowed power purchase, the upper limit of allowed reverse power transmission, and power change limits between adjacent time periods. Adjustable resource operation constraints include upper and lower limits of energy storage state of charge, upper limits of charging and discharging power, minimum equipment operating time, and power regulation rate. Load task constraints include the earliest start time, the latest completion time, task duration, and whether interruption is allowed. Environmental comfort constraints include the allowable range of indoor temperature and the target usage period; for example, the indoor temperature in office areas is limited to 24℃ to 26℃ from 08:00 to 18:00.
[0027] For each adjustable resource, the adjustable power range is determined based on the corresponding predicted power and operational constraints. For example, when energy storage is currently at 60% state of charge, with a permissible state of charge range of 20% to 90%, and a rated power of 500kW, the actual charge and discharge power boundaries for each time period are determined based on the remaining chargeable and dischargeable quantities. The adjustable time period range is determined based on load task constraints and environmental comfort constraints. For example, for a flexible load that runs continuously for 2 hours and needs to be completed before 17:00, its start-up time is limited to the time interval that satisfies the requirement for complete task execution. Finally, combined with grid connection point power constraints, the adjustable power range and adjustable time period range of each resource are checked, and adjustment combinations that would cause grid connection power to exceed limits are deleted, resulting in an adjustable range for subsequent initial coordinated scheduling. In other embodiments, adjustable resources also include electric vehicle charging loads, cold storage equipment, and production loads with power adjustment capabilities, and are not limited to the types listed above.
[0028] Step S20: Based on the supply and demand forecast data and the scheduling constraint data, generate an initial collaborative scheduling plan within the adjustable range of each of the adjustable resources.
[0029] Specifically, based on the supply and demand forecast data corresponding to each scheduling period, the predicted supply and demand difference of the photovoltaic-storage-load system is determined. Combined with the power dispatch plan, virtual power plant dispatch plan, time-of-use pricing, grid carbon emission factor, and grid connection point power constraints, the regulating power and operating periods are allocated within the adjustable range of each adjustable resource obtained in step S10. During the dispatching process, resource operation constraints, load task constraints, and environmental comfort constraints are simultaneously satisfied to determine the initial operating state and initial operating power of each adjustable resource in each scheduling period, forming an initial coordinated dispatch plan for subsequent coordinated switching analysis. Specifically, such as... Figure 2 Step S20 includes the following steps: Step S201: Determine the predicted supply and demand difference for each scheduling period based on the supply and demand forecast data.
[0030] Specifically, the target scheduling cycle is divided into multiple scheduling periods according to a preset scheduling granularity, and the predicted power of photovoltaics, the predicted power of base load, the predicted power of flexible load, and the predicted power of air conditioning load for each scheduling period are time-aligned. The predicted power of base load, the predicted power of flexible load, and the predicted power of air conditioning load are summarized to obtain the predicted power consumption for the corresponding scheduling period. Then, the predicted power consumption is compared with the predicted power of photovoltaics to obtain the predicted supply-demand gap.
[0031] In this embodiment, the predicted supply-demand difference is characterized by the direction of power consumption minus photovoltaic power generation. A predicted supply-demand difference greater than zero indicates that there is uncompensated electricity demand during the corresponding scheduling period. A predicted supply-demand difference less than zero indicates that there is unabsorbed photovoltaic power during the corresponding scheduling period. A predicted supply-demand difference equal to zero indicates that the predicted supply and demand are balanced. For example, if the predicted power consumption during a certain scheduling period is 900kW and the predicted photovoltaic power is 1100kW, then there is 200kW of unabsorbed photovoltaic power during that period. In other embodiments, the positive and negative directions of the predicted supply-demand difference are defined in opposite directions, but should remain consistent within the target scheduling cycle.
[0032] Step S202: Determine the scheduling evaluation parameters corresponding to each scheduling period based on the time-of-use electricity price and the power grid carbon emission factor.
[0033] Specifically, the time-of-use electricity price and the grid carbon emission factor are aligned according to each scheduling period to obtain the electricity purchase price parameter and electricity consumption carbon emission parameter corresponding to each scheduling period. The electricity purchase price parameter characterizes the cost of purchasing electricity from the grid per unit of electricity, while the electricity consumption carbon emission parameter characterizes the carbon emissions corresponding to purchasing electricity from the grid per unit of electricity. For scheduling scenarios that allow backfeeding of electricity to the grid, the on-grid electricity price for the corresponding scheduling period is also obtained, and this on-grid electricity price is used as the basis for evaluating the revenue from backfeeding.
[0034] Because time-of-use electricity prices and grid carbon emission factors have different dimensions and numerical ranges, they are normalized according to the value range of the corresponding parameters within the target scheduling cycle to obtain cost evaluation coefficients and carbon emission evaluation coefficients. The electricity purchase price parameter, the electricity consumption carbon emission parameter, the cost evaluation coefficient, and the carbon emission evaluation coefficient are collectively determined as the scheduling evaluation parameters. For example, if the electricity purchase price for a certain scheduling period is 1.20 yuan / kWh and the grid carbon emission factor is 0.62 kgCO2 / kWh, then this period has a higher priority for electricity consumption transfer compared to periods with lower electricity prices and lower carbon emissions. Subsequently, the operating costs and carbon emissions corresponding to each candidate operating combination are calculated based on the scheduling evaluation parameters, thereby ensuring that the parameters have a clear data source and usage destination. In other embodiments, the grid carbon emission factor uses a regional average value or an hourly published value, but a unified data caliber is used within the same target scheduling cycle.
[0035] Step S203: With the scheduling objective of reducing the predicted supply-demand gap, operating costs and carbon emissions, determine the initial operating state and initial operating power of each of the adjustable resources in each scheduling period within the power constraints of the grid connection point and the adjustable range of each of the adjustable resources.
[0036] Specifically, based on the adjustable power range and adjustable time period range of each adjustable resource, candidate operation combinations corresponding to each scheduling time period are generated; based on the predicted supply-demand difference and the resource adjustment power corresponding to each candidate operation combination, the predicted grid connection point power corresponding to each candidate operation combination is determined; based on the predicted grid connection point power and the scheduling evaluation parameters of the corresponding scheduling time period, the operating cost and carbon emissions corresponding to each candidate operation combination are determined; from the candidate operation combinations that satisfy the grid connection point power constraint, the adjustable resource operation constraint, the load task constraint and the environmental comfort constraint, a first candidate operation combination whose adjustment direction and response time period satisfy the power dispatch plan is selected; from the first candidate operation combination, a second candidate operation combination that satisfies the virtual power plant dispatch plan is selected; and from the second candidate operation combination, a target operation combination whose comprehensive dispatch result corresponding to the predicted supply-demand difference, the operating cost and the carbon emissions satisfy the preset dispatch conditions is selected; the operating state and operating power of each adjustable resource in the target operation combination are respectively determined as the initial operating state and the initial operating power.
[0037] In this embodiment of the invention, candidate operating combinations are formed by combining the operating states and operating power of resources in each scheduling period within the target scheduling cycle, according to the adjustable power range and adjustable time period range of each adjustable resource. For energy storage devices, candidate operating states include charging, discharging, and standby; for flexible loads, candidate operating states include running, stopping, and task shifting; for air conditioning loads, candidate operating states include normal cooling, pre-cooling, and reduced cooling power. Other adjustable resources generate corresponding candidate options according to their actual controllable states. Each candidate operating combination satisfies the upper and lower power limits, start / stop time periods, and continuous operation requirements of the corresponding resource.
[0038] Based on the power increase or decrease of each adjustable resource relative to the predicted electricity consumption baseline in each candidate operating combination, the corresponding resource adjustment power is determined. The predicted supply-demand difference is then superimposed with the resource adjustment power to obtain the predicted grid connection point power for the corresponding scheduling period. A positive predicted grid connection point power indicates electricity purchase from the grid, while a negative predicted power indicates power feedback to the grid. The operating cost within the target scheduling cycle is cumulatively determined based on the predicted grid connection point power and the time-of-use electricity price for the corresponding period. Electricity consumption carbon emissions are cumulatively determined based on the predicted grid connection point power and the grid carbon emission factor for the corresponding period. When the predicted grid connection point power is positive, the electricity purchase cost and electricity consumption carbon emissions are determined based on the purchased power, the time-of-use electricity price for the corresponding scheduling period, and the grid carbon emission factor. When the predicted grid connection point power is negative, the feedback revenue is determined based on the feedback power and the on-grid electricity price for the corresponding scheduling period, and this feedback revenue is deducted from the operating cost. Feedback power is not counted as negative carbon emissions according to the grid carbon emission factor, thus avoiding distortion of carbon emission calculation results due to changes in the direction of grid connection power. When surplus photovoltaic power is charged by energy storage or absorbed by adjustable loads, the power to be consumed is reduced accordingly. During periods of high electricity prices or high carbon emissions, when the power purchased is reduced by discharging from energy storage or load shifting, operating costs and carbon emissions are reduced accordingly.
[0039] For each candidate operation combination, the grid connection power constraint, adjustable resource operation constraint, load task constraint, and environmental comfort constraint are checked sequentially. Candidate operation combinations with grid connection power exceeding limits, energy storage charge state exceeding limits, load tasks not completed on schedule, or indoor temperatures exceeding the allowable range are deleted. Based on the adjustment direction and response period specified in the power dispatch plan, the remaining candidate operation combinations undergo a first-level screening, deleting those with response directions inconsistent with the adjustment direction or operating periods mismatched with the response period, resulting in the first candidate operation combination. Based on the target grid connection power or target adjustment power allocated to the local photovoltaic-storage-load system in the virtual power plant dispatch plan, the execution period, and the allowable deviation range, the first candidate operation combination undergoes a second-level screening, deleting the first candidate operation combination whose deviation between the predicted grid connection power or resource adjustment power and the corresponding target value exceeds the allowable deviation range, resulting in the second candidate operation combination. The preset dispatch condition is set as follows: under the premise that the photovoltaic power to be consumed is not higher than 5% of the predicted photovoltaic power generation, the candidate operation combination with the lowest comprehensive evaluation value of operating cost and carbon emissions is selected. In this embodiment, when the difference in the comprehensive evaluation value of multiple candidate operation combinations does not exceed 1%, the candidate operation combination with fewer resource state switching times is selected first. The operation status and operation power of each adjustable resource in the finally selected target operation combination in each scheduling period are determined as the initial operation status and initial operation power, respectively.
[0040] When there is no second candidate operating combination that satisfies the virtual power plant scheduling plan, local adjustable capacity insufficiency information is generated based on the current adjustable power range and adjustable time range of each adjustable resource, and the local adjustable capacity insufficiency information is fed back to the virtual power plant so that the virtual power plant can reallocate adjustment tasks or update the virtual power plant scheduling plan issued to the local photovoltaic-storage-load system.
[0041] Step S204: Generate the initial cooperative scheduling plan based on the initial operating state and the initial operating power.
[0042] Specifically, according to the chronological order of the scheduling periods within the target scheduling cycle, the initial operating state and initial operating power determined in step S203 are associated with the corresponding adjustable resources and scheduling periods to form an initial collaborative scheduling plan. The initial collaborative scheduling plan records at least the resource identifier, scheduling period, initial operating state, and initial operating power; for adjustable resources with cross-period operating constraints, it also records the corresponding continuous operating intervals and time period connections.
[0043] For example, the initial coordinated scheduling content for energy storage devices includes the charging, discharging, or standby status and corresponding power for each scheduling period; the initial coordinated scheduling content for flexible loads includes the task start time, stop time, and operating power; and the initial coordinated scheduling content for air conditioning loads includes the pre-cooling period, normal cooling period, and corresponding power. This yields a planned sequence for each adjustable resource as it changes with the scheduling period, and based on this, determines the changes in operating status and operating power between adjacent scheduling periods, providing a unified data foundation for subsequently identifying resource switching times and coordinated switching events. In other embodiments, the initial coordinated scheduling plan also records the target state of charge of energy storage, the target temperature of air conditioning, or the completion status of the load task, and is not limited to the above-mentioned recorded content.
[0044] Step S30: Determine the coordinated switching event based on the changes in the operating status of each adjustable resource in adjacent scheduling periods in the initial coordinated scheduling plan, and determine the coordinated switching conflict based on the power change of the grid connection point corresponding to the coordinated switching event.
[0045] Specifically, determining the coordinated switching event based on the changes in the operating status of each adjustable resource within adjacent scheduling periods in the initial coordinated scheduling plan includes: comparing the initial operating status and initial operating power of each adjustable resource in adjacent scheduling periods to determine the target adjustable resource where the operating status switching or operating power change occurs; determining the resource switching time based on the scheduling period boundary corresponding to the target adjustable resource; determining the switching influence range of the target adjustable resource based on the resource switching time, the change in operating power, and the corresponding adjustable resource operating constraints; and identifying multiple target adjustable resources whose switching influence ranges overlap and their operating status changes as the coordinated switching event.
[0046] Furthermore, determining the coordinated handover conflict based on the power change of the grid connection point corresponding to the coordinated handover event includes: determining the resource composite power change within the corresponding handover influence interval based on the change in operating power of each target adjustable resource in the coordinated handover event; determining the predicted grid connection point power within the handover influence interval based on the baseline grid connection point power before the coordinated handover event and the change in resource composite power; comparing the predicted grid connection point power with the grid connection point power constraint to determine the corresponding power limit violation result and power mutation result; when the power limit violation result indicates that the predicted grid connection point power exceeds the grid connection point power constraint, or the power mutation result indicates that the change in predicted grid connection point power at adjacent detection times exceeds a preset change threshold, the corresponding coordinated handover event is determined as a coordinated handover conflict.
[0047] In this embodiment of the invention, the initial operating state and initial operating power of each adjustable resource in adjacent scheduling periods are compared item by item according to the scheduling period sequence adopted in the initial coordinated scheduling plan. If the initial operating state of the previous scheduling period is different from that of the next scheduling period, or if the difference in initial operating power is not zero, the corresponding adjustable resource is determined as the target adjustable resource. Operating state switching includes switching energy storage devices from charging state to standby state, from standby state to discharging state, flexible loads from stopped state to operating state, air conditioning loads from pre-cooling state to normal cooling state, and other situations that change the direction of resource power output or power consumption state. When the operating state remains unchanged but the operating power is adjusted, it is also included in the subsequent switching impact analysis.
[0048] The resource switching moment is defined as the boundary of the scheduling period when the initial operating state or initial operating power of the target adjustable resource begins to change. For example, with a scheduling granularity of 15 minutes, if an energy storage device's initial operating state is charging (300kW) from 13:45 to 14:00, and discharging (200kW) from 14:00 to 14:15, then 14:00 is the corresponding resource switching moment. The change in operating power is determined by the algebraic difference between the corresponding power values of the two periods. In embodiments where charging or power consumption is positive and discharging or power supply is negative, the change in the energy storage device's operating power from 300kW to -200kW corresponds to a power change of -500kW. A unified power direction definition is used within the same target scheduling cycle to avoid duplicate or reverse calculations of changes between different resources.
[0049] Based on the resource switching time, the change in operating power, and the corresponding operational constraints of the adjustable resources, the switching impact range of the target adjustable resource is determined. The switching impact range characterizes the duration of the direct or delayed impact on the grid-connected power after the resource state change begins. For energy storage devices, the switching impact range is determined based on the charge / discharge power ramp-up rate, the charge / discharge direction switching time, and the shortest state hold time. For flexible loads, the switching impact range is determined based on the start-up process, the shutdown process, and the shortest continuous operating time. For air conditioning loads, the switching impact range is determined based on the indoor temperature recovery time after pre-cooling exit, the cooling power recovery process, and the start-stop interval of the air conditioning unit. For example, if the power transition time required for an energy storage device to switch from charging to discharging is 2 minutes, then its switching impact range lasts for 2 minutes from the resource switching time; if the cooling power recovery after the air conditioning pre-cooling ends lasts for 10 minutes, then the corresponding switching impact range lasts for 10 minutes from the pre-cooling exit time. In other embodiments, the switching impact range also includes an advance load reduction or power pre-adjustment phase before the resource switching time.
[0050] The switching impact intervals of each target adjustable resource are compared. When the switching impact intervals of two or more target adjustable resources overlap in time, the corresponding target adjustable resources and their operational status changes are identified as a coordinated switching event. The overlap of switching impact intervals includes complete overlap, partial overlap, and intervals less than a preset adjacent time range. In this embodiment, the preset adjacent time range is set to 2 minutes. When the interval between the end time of one switching impact interval and the start time of another switching impact interval does not exceed 2 minutes, both are grouped into the same coordinated switching event. This setting is used to avoid splitting multiple consecutive resource switching events for processing.
[0051] For each coordinated switching event, the operating power change process of each target adjustable resource within the corresponding switching impact interval is determined according to a unified detection time granularity. In this embodiment, the initial scheduling granularity is 15 minutes, and the detection time granularity is 1 minute. The combined power change of the resources is obtained by algebraically superimposing the operating power changes of each target adjustable resource at each detection time. For air conditioning loads with delayed response characteristics, the operating power change at each detection time is determined according to the power recovery curve after pre-cooling exit, and not all power changes are included in the resource switching time.
[0052] Based on the predicted photovoltaic power, predicted base load power, and the original operating power of each adjustable resource before the coordinated switching event, the baseline grid-connected power before the resource switching time is determined. The baseline grid-connected power is then superimposed with the change in the combined power of the resources at the corresponding detection time to obtain the predicted grid-connected power within the switching impact interval. Here, the predicted base load power is the predicted power of the electricity load not participating in coordinated dispatch, and the original operating power of each adjustable resource is the operating power corresponding to the resource switching time before the initial coordinated dispatch plan. A positive predicted grid-connected power indicates electricity purchase from the grid, while a negative predicted grid-connected power indicates power being fed back to the grid.
[0053] The predicted grid-connected power at each detection time is compared with the grid-connected power constraint to obtain the power limit violation result; the difference in predicted grid-connected power between adjacent detection times is compared with a preset change threshold to obtain the power mutation result. In this embodiment, the upper limit of the allowed power purchase at the grid-connected point is 2000kW, the upper limit of the allowed reverse power transmission is 500kW, and the preset change threshold is 300kW within one minute of each other. When the predicted grid-connected power exceeds any grid-connected power boundary, or the power change between adjacent detection times exceeds 300kW, the corresponding coordinated switching event is determined as a coordinated switching conflict. In other embodiments, the preset change threshold is set according to the grid-connected capacity, protection setting requirements, and historical safe operation data, and is not limited to the above values.
[0054] Preferably, the power change process of each target adjustable resource within the switching influence interval is expanded according to a unified detection time granularity, and the power change direction, change amplitude, and response start time corresponding to each detection moment are determined. When the power change direction of multiple target adjustable resources is the same at the same detection moment, and the interval between the response start times is less than a preset synchronization time range, the corresponding time period is determined as a co-directional superposition segment. When the power change directions are opposite, the corresponding time period is determined as a power cancellation segment.
[0055] Further comparison of the duration and combined power change corresponding to the co-current superposition segment and the power cancellation segment reveals that events with a co-current superposition duration exceeding 5 minutes and whose combined power change accounts for at least 70% of the total power change of the coordinated handover event are marked as high-aggregation coordinated handover events. Subsequently, conflict verification is prioritized for these high-aggregation coordinated handover events to avoid misclassifying resource handovers with mutually canceling power as high-risk conflicts, thereby improving the accuracy of coordinated handover conflict identification.
[0056] Step S40: Adjust the operation plan of the corresponding adjustable resources according to the cooperative switching conflict to obtain the target cooperative scheduling plan.
[0057] Specifically, based on the target adjustable resources corresponding to the coordinated switching conflict and their switching impact range, the adjustable power and adjustable time period of each target adjustable resource are determined; within the adjustable power and the adjustable time period, the operating status, operating power, or resource switching time of each target adjustable resource are adjusted to obtain a candidate coordinated scheduling plan; based on the candidate coordinated scheduling plan, the predicted grid connection point power within the switching impact range is re-determined, and the predicted grid connection point power is subjected to power limit exceedance verification and power mutation verification; the candidate coordinated scheduling plan that passes the power limit exceedance verification and the power mutation verification and satisfies the scheduling constraint data is determined as the target coordinated scheduling plan.
[0058] In this embodiment of the invention, for each cooperative switching conflict, the adjustable power range, adjustable time period range, and switching impact interval of the corresponding target adjustable resource are extracted to determine its adjustable power and adjustable time period. The adjustable power is the range of power that the target adjustable resource is allowed to increase or decrease relative to its initial operating power while maintaining operational constraints; the adjustable time period is the range of time periods that do not disrupt the requirements for completing the load task, environmental comfort requirements, and the minimum operating time of the equipment.
[0059] Without exceeding the constraints of grid connection power, adjustable resource operation, load tasks, and environmental comfort, multiple adjustable schemes are generated by adjusting the corresponding operating status, operating power, or resource switching time within the adjustable power and adjustable time period of each target adjustable resource. Priority is given to adjusting flexible loads and air conditioning loads with time-shifting capabilities, followed by using energy storage devices to compensate for remaining power changes. For flexible loads, the start or stop time is adjusted between the earliest start time and the latest finish time. For air conditioning loads, the pre-cooling exit time or phased restoration of cooling power is adjusted, provided the indoor temperature does not exceed the preset allowable range. For energy storage devices, the charging and discharging power or charging and discharging switching time is adjusted, provided the state of charge and charging / discharging power meet the corresponding operating constraints. The adjustable schemes are screened in the order of power dispatch plan, virtual power plant dispatch plan and local collaborative dispatch results. First, adjustable schemes whose adjustment direction or response time does not meet the power dispatch plan are deleted. Then, adjustable schemes whose deviation between the predicted grid connection point power or resource regulation power and the corresponding target value in the virtual power plant dispatch plan exceeds the allowable deviation range are deleted. The remaining adjustable schemes are determined as candidate collaborative dispatch plans.
[0060] In this embodiment, flexible loads and air conditioning loads with time-shifting capabilities are prioritized for adjustment, and then energy storage devices are used to compensate for changes in remaining power. For flexible loads, the start or stop time is adjusted between the earliest start time and the latest finish time. For air conditioning loads, the pre-cooling exit time or the cooling power is restored in stages, provided that the indoor temperature does not exceed 24°C to 26°C. For energy storage devices, the charging and discharging power or the charging and discharging switching time is adjusted, provided that the state of charge is maintained between 20% and 90% and the charging and discharging power does not exceed the rated power. Candidate collaborative scheduling plans are obtained through these adjustments.
[0061] Based on the candidate coordinated dispatch plan, the predicted grid-connected power within the switching impact interval is recalculated according to the detection time granularity adopted in step S30, and power limit exceedance verification and power mutation verification are performed respectively. For example, when the upper limit of the grid-connected power purchase is 2000kW and the allowable power change in adjacent minutes is 300kW, the candidate coordinated dispatch plan must simultaneously meet the requirement that the predicted grid-connected power does not exceed 2000kW and the power change in adjacent detection times does not exceed 300kW. Further verification is performed to ensure that the candidate coordinated dispatch plan meets the constraints of the power dispatch plan, virtual power plant dispatch plan, energy storage operation constraints, load task constraints, and environmental comfort constraints. Specifically, the power dispatch plan verification result is determined based on the adjustment direction and response time period corresponding to the candidate coordinated dispatch plan, and the virtual power plant dispatch plan verification result is determined based on the deviation between the predicted grid-connected power or resource adjustment power and the corresponding target value in the virtual power plant dispatch plan. The candidate coordinated dispatch plan that passes the power limit exceedance verification, power mutation verification, power dispatch plan verification, virtual power plant dispatch plan verification, and other constraint verifications is determined as the target coordinated dispatch plan. If conflicts still exist, continue to make corrections within the remaining adjustable range. If there are no candidate coordinated scheduling plans that have passed all verifications within the remaining adjustable range, mark the corresponding coordinated switching conflict as a conflict that cannot be eliminated internally, and generate scheduling prompts such as limiting photovoltaic output, reducing non-critical loads, requesting external power support, or reporting insufficient local adjustable capacity to the virtual power plant.
[0062] Preferably, based on the photovoltaic prediction error, the base load prediction error, and the response deviation of each target adjustable resource, corresponding power disturbance intervals are generated, and these power disturbance intervals are superimposed on the predicted grid-connected power corresponding to the target collaborative scheduling plan. The upper and lower bounds of the grid-connected power at each detection time are redefined according to a preset detection time granularity. When the upper bound of the grid-connected power does not exceed the upper limit of the grid-connected power, and the maximum power change at adjacent detection times does not exceed a preset change threshold, the target collaborative scheduling plan is determined as a robust scheduling plan.
[0063] When any verification result fails to meet the requirements, the switching time interval between the target adjustable resources is increased first, and then the initial charging and discharging power of the energy storage device is limited. After each adjustment, the upper and lower bounds of the grid connection point power at each detection time are redefined, and the power limit overrun verification, power mutation verification, power dispatch plan verification, and virtual power plant dispatch plan verification are re-executed until all disturbance scenarios pass the verification. In this embodiment, the photovoltaic prediction error is taken as ±8% of the predicted power, the base load prediction error is taken as ±5%, and the resource response deviation is taken as ±3% of the planned power. By introducing disturbance interval verification, it is possible to avoid the target collaborative dispatch plan only satisfying the constraints under a single prediction value, thereby improving the execution stability when facing short-term prediction deviations and equipment response errors.
[0064] In a specific embodiment, such as Figure 3 As shown, the target scheduling cycle is divided into multiple scheduling periods according to a preset scheduling granularity, and the initial operating states and initial operating power of energy storage devices, flexible loads, and air conditioning loads are compared sequentially in adjacent scheduling periods. In this embodiment, the energy storage device switches from charging to discharging at time t2, the flexible load switches from stopping to starting at time t2, and the air conditioning load exits the pre-cooling state at time t2 and enters normal cooling at a later time. Based on the switching time of energy storage charging and discharging direction, the starting process of the flexible load, and the cooling power recovery process after the air conditioning pre-cooling exits, the switching impact intervals corresponding to each resource are determined. Since the three switching impact intervals overlap between t2 and t3, the corresponding resources and their changes in operating states are determined as the same coordinated switching event.
[0065] Further, the power change at the grid connection point is determined by algebraically superimposing the changes in the operating power of each target adjustable resource within the switching impact range, combined with the photovoltaic predicted power and base load predicted power at the corresponding detection time. For example... Figure 4 As shown, the grid connection point power before adjustment rises rapidly after t2 and exceeds the upper limit of the grid connection point power near t3, indicating that the coordinated switching event caused a coordinated switching conflict. To address this conflict, the start-up time of the flexible load is shifted backward by one scheduling period, the pre-cooling exit process of the air conditioning load is adjusted to a phased resumption of normal cooling, and the power change amplitude of the energy storage device during the initial discharge phase from charging is reduced. The grid connection point power is recalculated according to the adjusted operating status, operating power, and resource switching time, resulting in... Figure 4 The adjusted curve shows that it did not exceed the grid connection point's power limit throughout the entire switching impact range, and the power change process was smoother. While maintaining the energy storage state of charge, flexible load task completion time limits, and indoor temperature allowable range all meeting the corresponding constraints, this adjustment result was determined as a candidate coordinated scheduling plan.
[0066] Before determining the target coordinated dispatch plan, the power dispatch plan is checked based on the adjustment direction and response time period corresponding to the candidate coordinated dispatch plans, and the virtual power plant dispatch plan is checked based on the deviation between the predicted grid connection point power or resource regulation power corresponding to the candidate coordinated dispatch plan and the corresponding target value in the virtual power plant dispatch plan. When the response direction and response time period meet the power dispatch plan, and the deviation is within the allowable deviation range specified in the virtual power plant dispatch plan, the candidate coordinated dispatch plan is determined as the target coordinated dispatch plan, and it is determined that the target coordinated dispatch plan maintains the execution order among power dispatch, virtual power plant dispatch, and local photovoltaic-storage-load coordinated dispatch.
[0067] like Figure 5 As shown, this invention provides a photovoltaic-storage-load coordinated scheduling system. The system includes: a data acquisition unit, used to acquire supply and demand forecast data and scheduling constraint data within a target scheduling period, and determine the adjustable range of each adjustable resource in the photovoltaic-storage-load system; a plan generation unit, used to generate an initial coordinated scheduling plan within the adjustable range of each adjustable resource based on the supply and demand forecast data and the scheduling constraint data; a conflict identification unit, used to determine coordinated switching events based on changes in the operating status of each adjustable resource within adjacent scheduling periods in the initial coordinated scheduling plan, and to determine coordinated switching conflicts based on changes in grid connection point power corresponding to the coordinated switching events; and a plan output unit, used to adjust the operating plan of the corresponding adjustable resource based on the coordinated switching conflicts to obtain a target coordinated scheduling plan.
[0068] The present invention also provides a computer-readable storage medium storing instructions that, when executed on a computer, cause the computer to perform the above-described optical-storage-load coordinated scheduling method.
[0069] Those skilled in the art will understand that all or part of the steps in the methods of the above embodiments can be implemented by a program instructing related hardware. This program is stored in a storage medium and includes several instructions to cause a microcontroller, chip, or processor to execute all or part of the steps of the methods described in the various embodiments of the present invention. The aforementioned storage medium includes various media capable of storing program code, such as a USB flash drive, a portable hard drive, a read-only memory (ROM), a random access memory (RAM), a magnetic disk, or an optical disk.
[0070] The optional embodiments of the present invention have been described in detail above with reference to the accompanying drawings. However, the embodiments of the present invention are not limited to the specific details described above. Within the scope of the technical concept of the embodiments of the present invention, various simple modifications can be made to the technical solutions of the embodiments of the present invention, and these simple modifications all fall within the protection scope of the embodiments of the present invention. It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. To avoid unnecessary repetition, the embodiments of the present invention will not further describe the various possible combinations.
[0071] Furthermore, various different embodiments of the present invention can be combined in any way, as long as they do not violate the spirit of the embodiments of the present invention, they should also be regarded as the content disclosed by the embodiments of the present invention.
Claims
1. A method for coordinated scheduling of optical storage and load, characterized in that, The method includes: Obtain supply and demand forecast data and scheduling constraint data within the target scheduling period to determine the adjustable range of each adjustable resource in the optical storage and load system; Based on the supply and demand forecast data and the scheduling constraint data, an initial collaborative scheduling plan is generated within the adjustable range of each of the adjustable resources; Cooperative switching events are determined based on the changes in the operating status of each adjustable resource within adjacent scheduling periods in the initial cooperative scheduling plan, and cooperative switching conflicts are determined based on the changes in grid connection point power corresponding to the cooperative switching events; wherein, Determining a coordinated switching event based on the changes in the operating status of each adjustable resource within adjacent scheduling periods in the initial coordinated scheduling plan includes: comparing the initial operating status and initial operating power of each adjustable resource in adjacent scheduling periods to determine the target adjustable resource where the operating status switching or operating power change occurs; determining the resource switching time based on the scheduling period boundary corresponding to the target adjustable resource; determining the switching impact range of the target adjustable resource based on the resource switching time, the change in operating power, and the corresponding adjustable resource operating constraints; and identifying multiple target adjustable resources whose switching impact ranges overlap and their changes in operating status as the coordinated switching event. The target collaborative scheduling plan is obtained by adjusting the operation plan of the corresponding adjustable resources according to the collaborative switching conflict.
2. The optical-storage-load coordinated scheduling method according to claim 1, characterized in that, Supply and demand forecast data include: Photovoltaic forecast power, base load forecast power, flexible load forecast power, air conditioning load forecast power, and available energy storage power; Scheduling constraint data includes: The power dispatch plan, the virtual power plant dispatch plan generated according to the power dispatch plan and issued to the photovoltaic-storage-load system, grid connection point power constraints, adjustable resource operation constraints, load task constraints, environmental comfort constraints, time-of-use electricity price and grid carbon emission factor.
3. The optical-storage-load coordinated scheduling method according to claim 2, characterized in that, Determine the adjustable range of each adjustable resource in the photovoltaic storage and load system, including: Based on the predicted power corresponding to each adjustable resource and the operating constraints of the adjustable resource, the adjustable power range of each adjustable resource is determined; wherein, The adjustable resources include any one or more of energy storage devices, flexible loads, air conditioning loads, electric vehicle charging loads, and cold storage devices; Based on the load task constraints and the environmental comfort constraints, determine the adjustable time period range of the corresponding adjustable resources; Based on the grid connection point power constraints, the adjustable power range and adjustable time period range of each adjustable resource are checked to obtain the adjustable range of each adjustable resource.
4. The optical-storage-load coordinated scheduling method according to claim 2, characterized in that, Based on the supply and demand forecast data and the scheduling constraint data, an initial collaborative scheduling plan is generated within the adjustable range of each of the adjustable resources, including: The predicted supply and demand difference for each scheduling period is determined based on the supply and demand forecast data. Based on the time-of-use electricity price and the power grid carbon emission factor, determine the scheduling evaluation parameters corresponding to each scheduling period; With the goal of reducing the predicted supply-demand gap, operating costs, and carbon emissions, the initial operating state and initial operating power of each adjustable resource are determined within the power constraints of the grid connection point and the adjustable range of each adjustable resource in each scheduling period. The initial collaborative scheduling plan is generated based on the initial operating state and the initial operating power.
5. The optical-storage-load coordinated scheduling method according to claim 4, characterized in that, The process of determining the initial operating state and initial operating power of each adjustable resource in each scheduling period includes: Based on the adjustable power range and adjustable time period range of each adjustable resource, candidate operation combinations corresponding to each scheduling time period are generated; Based on the predicted supply-demand gap and the resource adjustment power corresponding to each candidate operation combination, the predicted grid connection point power corresponding to each candidate operation combination is determined; Based on the predicted grid connection point power and the scheduling evaluation parameters for the corresponding scheduling period, the operating cost and carbon emissions corresponding to each candidate operation combination are determined. From the candidate operating combinations that satisfy the grid connection point power constraint, the adjustable resource operation constraint, the load task constraint and the environmental comfort constraint, select the first candidate operating combination whose adjustment direction and response time period satisfy the power dispatch plan; Select a second candidate operation combination from the first candidate operation combination that satisfies the virtual power plant scheduling plan; Select a target operation combination from the second candidate operation combinations that satisfies the preset scheduling conditions by the comprehensive scheduling results corresponding to the predicted supply and demand difference, the operating cost, and the carbon emissions. The operating state and operating power of each adjustable resource in the target operating combination are respectively determined as the initial operating state and the initial operating power.
6. The optical-storage-load coordinated scheduling method according to claim 1, characterized in that, Determining coordinated handover conflicts based on the power changes at the grid connection point corresponding to the coordinated handover event includes: Based on the change in the operating power of each target adjustable resource in the coordinated switching event, determine the change in the combined power of the resources within the corresponding switching impact interval; Based on the baseline grid connection point power before the occurrence of the coordinated handover event and the change in the combined resource power, the predicted grid connection point power within the handover impact range is determined; The predicted grid connection point power is compared with the grid connection point power constraint to determine the corresponding power limit exceedance result and power mutation result. When the power limit exceedance result indicates that the predicted grid connection point power exceeds the grid connection point power constraint, or the power mutation result indicates that the change in the predicted grid connection point power at adjacent detection times exceeds a preset change threshold, the corresponding cooperative handover event is determined as a cooperative handover conflict.
7. The optical-storage-load coordinated scheduling method according to claim 6, characterized in that, Based on the aforementioned cooperative switching conflict, the operation plan of the corresponding adjustable resources is adjusted to obtain the target cooperative scheduling plan, including: Based on the target adjustable resources corresponding to the cooperative handover conflict and their handover impact range, determine the adjustable power and adjustable time period of each target adjustable resource; Within the adjustable power and the adjustable time period, the operating status, operating power, or resource switching time of each of the target adjustable resources are adjusted to obtain a candidate cooperative scheduling plan; The predicted grid connection point power within the switching impact interval is re-determined based on the candidate coordinated scheduling plan, and the predicted grid connection point power is checked for power limit exceedance and power mutation. The candidate collaborative scheduling plan that passes the power limit check and the power mutation check and satisfies the scheduling constraint data is determined as the target collaborative scheduling plan.
8. A photovoltaic-storage-load collaborative scheduling system, characterized in that, The system is used to execute the optical-storage-load coordinated scheduling method according to any one of claims 1-7, and the system comprises: The acquisition unit is used to obtain supply and demand forecast data and scheduling constraint data within the target scheduling period, and to determine the adjustable range of each adjustable resource in the optical storage and load system. The planning generation unit is used to generate an initial collaborative scheduling plan within the adjustable range of each of the adjustable resources based on the supply and demand forecast data and the scheduling constraint data. The conflict identification unit is used to determine the coordinated switching event based on the changes in the operating status of each adjustable resource in adjacent scheduling periods in the initial coordinated scheduling plan, and to determine the coordinated switching conflict based on the power change of the grid connection point corresponding to the coordinated switching event. The planning output unit is used to adjust the operation plan of the corresponding adjustable resources according to the cooperative switching conflict to obtain the target cooperative scheduling plan.
9. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores instructions that, when executed on a computer, cause the computer to perform the optical-storage-load coordinated scheduling method as described in any one of claims 1-7.
Citation Information
Patent Citations
Method and system for distributed photovoltaic to participate in source-network load-storage coordination control
CN114142532A
Electrochemical energy storage low-voltage distribution network voltage treatment method based on heuristic algorithm
CN119543178A