Mountainous small watershed distributed storm flood simulation method
By determining the critical value of the anterior impact rainfall in small watersheds in mountainous areas based on the ratio of soil saturated hydraulic conductivity to rainfall intensity, switching runoff paths and constructing water storage capacity distribution curves, the problem of simulation result distortion in existing technologies has been solved, achieving higher simulation adaptability and accuracy.
Patent Information
- Application Number
- CN202611348283.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-02
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2046-09-02
AI Technical Summary
Existing technologies lack a method for simulating runoff generation in small mountain watersheds that uses the discriminant relationship between saturated hydraulic conductivity and rainfall intensity as a priori theoretical basis to drive the runoff generation module to classify and determine parameters according to the underlying surface conditions of the watershed, and can use this discriminant relationship to independently verify the consistency of simulation results. This results in distorted simulation results that are difficult to verify in areas without data.
By determining whether there is a critical value for pre-influence rainfall in the watershed based on the ratio of soil saturated hydraulic conductivity to the average rainfall intensity during the rainfall process, the runoff generation path is switched, and the infiltration runoff is calculated by combining the full-storage-over-infiltration mixed runoff generation path. The water storage capacity distribution curve is constructed using soil, topography and lithology information to reduce the dependence on measured flood calibration.
It improves the adaptability and accuracy of rainstorm and flash flood simulation in small watersheds in mountainous areas, is applicable to areas with scarce data, reduces reliance on measured data, and enhances the independent consistency verification capability of simulation results.
Smart Images

Figure CN122864265B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of hydrological simulation and flash flood disaster prevention technology, and relates to a distributed rainstorm flash flood simulation method for small watersheds in mountainous areas. Background Technology
[0002] The Xin'anjiang model, representing the saturated runoff model, is a widely used rainfall-runoff model. Its spatial distribution of water storage capacity is described by an exponential empirical curve (shape parameter B), and the runoff is calculated entirely based on the saturated mechanism. However, in mountainous watersheds with shallow soil layers and steep slopes, surface runoff exceeding infiltration levels under short-duration heavy rainfall conditions cannot be ignored. A purely saturated structure leads to a systematic underestimation of flood peaks in such events. Furthermore, shape parameter B is a purely empirical parameter, calibrated based on measured flood data, and cannot be determined a priori in areas with no or insufficient data.
[0003] Existing hybrid runoff generation models superimpose infiltration runoff calculations on areas that are not fully filled. However, their infiltration calculation modules typically participate in calculations consistently across all time periods and events, lacking the ability to make prior judgments about whether and at what intensity the infiltration mechanism needs to be activated under the current underlying surface conditions of the watershed. Infiltration-related parameters (maximum infiltration capacity, spatial distribution index, proportion of affected area, etc.) generally rely on measured flood calibration, which is difficult to determine in watersheds without data. Furthermore, the runoff generation mechanism characteristics obtained after model operation (such as the frequency and proportion of infiltration occurrence) lack independent theoretical verification. Once the parameter calibration results are distorted, it is difficult to identify the problem from the simulation results themselves.
[0004] Existing methods for spatializing water storage capacity curves, such as those based on topographic indices, mostly stop at curve fitting itself and are rarely combined with classification parameterization schemes for super-permeable flow generation modules. They have not formed a complete technical chain from discrimination theory, through flow generation structure design, parameter prior determination, to theoretical verification of simulation results.
[0005] In summary, existing technologies lack a method for simulating runoff generation in small mountain watersheds that uses the discriminant relationship between saturated hydraulic conductivity and rainfall intensity as a priori theoretical basis, drives the super-permeable runoff generation module to determine parameters according to the underlying surface conditions of the watershed, and can use this discriminant relationship to independently verify the consistency of simulation results. Summary of the Invention
[0006] To address the aforementioned technical problems in existing technologies, this invention proposes a distributed stormwater flash flood simulation method for small watersheds in mountainous areas. This method enables adaptive switching of runoff paths under different pre-wetting conditions, improving the adaptability and accuracy of stormwater flash flood simulation in small watersheds in mountainous areas. The specific technical solution is as follows:
[0007] A method for simulating distributed flash floods in small watersheds of mountainous areas includes:
[0008] Based on the ratio of soil saturated hydraulic conductivity to average rainfall intensity during the rainfall process in the target watershed, it is determined whether there is a critical value for pre-contributing rainfall in the target watershed.
[0009] When a critical value for the amount of rainfall affecting the preceding period is determined, the amount of rainfall affecting the preceding period is recursively calculated for each time period. Based on the comparison result between the amount of rainfall affecting the preceding period and the critical value for the amount of rainfall affecting the preceding period, the system switches between the full-storage runoff generation path and the full-storage-excessive-infiltration mixed runoff generation path. When there is no critical value for the amount of rainfall affecting the preceding period, the full-storage-excessive-infiltration mixed runoff generation path is used for runoff generation calculation.
[0010] A water storage capacity distribution curve is constructed based on the effective water storage capacity within the watershed, and the full-storage flow rate is calculated using the water storage capacity distribution curve.
[0011] Under the full-infiltration-over-permeability mixed flow path, for the unfilled area, the over-permeability flow rate is calculated based on the preset maximum infiltration capacity, the spatial distribution index of infiltration capacity, and the proportion of over-permeability area. The over-permeability flow rate is then superimposed with the full-infiltration flow rate to obtain the total flow rate.
[0012] Furthermore, based on the sand content of each DEM grid i in the target watershed... Clay content and soil bulk density The soil saturated hydraulic conductivity of each grid cell i is estimated using the soil transformation function. and including field holding capacity wilting moisture content and capillary rise height These are the soil hydraulic parameters required for calculating infiltration capacity and effective water storage capacity of the grid.
[0013] Furthermore, a first-order gamma autoregressive process GAR(1) is fitted to the rainfall intensity sequence of historical rainfall events to obtain the shape parameter μ and scale parameter β of the rainfall intensity marginal distribution, and the average rainfall intensity of the rainfall process is calculated according to E[I]=μβ.
[0014] Furthermore, determining whether the target watershed has a critical value for pre-existing rainfall impact includes: when the soil saturation hydraulic conductivity of the target watershed... The ratio of the average rainfall intensity E[I] of the rainfall process A value greater than 1 indicates a critical rainfall threshold for determining the existence of limited prior influence. ;when When the value is less than or equal to 1, it is determined that there is no critical value for finite antecedent rainfall, and the runoff generation is calculated using the mixed runoff generation path of full storage and excessive infiltration.
[0015] Furthermore, the aforementioned critical value for rainfall influencing the early stages... To ensure the proportion of over-permeability flow Reaching the preset critical percentage The preceding rainfall impact is determined by solving the following implicit functional equation using the Brent method: Definition ,in In order to accumulate and fully generate production flow, The maximum water storage capacity of the basin To account for the impact of earlier rainfall, Take representative rainfall data from the target watershed; This indicates that the rainfall duration is accumulated based on the conditional expectation semi-analytical calculation within the GAR(1) framework.
[0016] Furthermore, the current period affects rainfall. Reaching or exceeding the critical value of rainfall affecting previous periods At that time, a full runoff path is adopted; the current period affects rainfall. Below the critical value of rainfall that affected previous periods The process employs a mixed flow generation path of full storage and super-permeability.
[0017] Furthermore, based on the physical definition of the maximum water storage capacity of the basin... According to the DEM raster topographic index of the target watershed Map the groundwater depth as Let be the groundwater depth of the i-th grid cell. The average depth of groundwater in the basin. The average topographic index of the watershed. The conversion factor is the topographic index to the groundwater depth; combined with the actual soil moisture storage. Calculate the effective water storage capacity of each grid cell:
[0018] ; Effective water storage capacity of all DEM grids Arranged in ascending order, the water storage capacity distribution curve is obtained. And from this curve The average water storage capacity WM of the basin can be determined directly.
[0019] Furthermore, under the mixed runoff generation pathway of full-saturation and over-permeability, the proportion of full-saturation runoff area is first considered. Other In areas not yet fully filled, infiltration capacity is used as the maximum. Spatial distribution index of infiltration capacity The ratio of the area of excessive infiltration to the area that is not fully filled Calculate the intensity of excess flow :
[0020] hour: ;
[0021] hour:
[0022] Where I represents rainfall intensity;
[0023] Then, by calculating the intensity of the excess permeability flow... Calculation time range The flow rate of the super-permeable product within.
[0024] Furthermore, the maximum infiltration capacity Spatial distribution index of infiltration capacity and the proportion of areas where over-infiltration occurs The maximum infiltration capacity is assigned a value based on slope grouping and lithology type. The value range is set according to lithology type, and the soil saturated hydraulic conductivity Ks is used to constrain the relative size of the value range corresponding to different lithology types; the spatial distribution index of infiltration capacity γ increases with the increase of slope grouping; the proportion of area where infiltration exceeds the limit. Set according to lithology type.
[0025] The beneficial effects of this invention include:
[0026] 1. This invention can switch between a full-storage runoff path and a full-storage-over-infiltration mixed runoff path based on the critical value of rainfall in the early stage, thereby improving the adaptability of the simulation of flash floods in mountainous small watersheds to different underlying surface conditions and early-stage wet conditions.
[0027] 2. This invention utilizes soil, topography, and lithology information to construct water storage capacity distribution curves and sets the parameters of the super-permeability module in different zones, thereby reducing the dependence on measured flood calibration and making it suitable for small watersheds in mountainous areas with scarce data. Attached Figure Description
[0028] Figure 1 This is a flowchart of a distributed rainstorm and flash flood simulation method for small watersheds in mountainous areas based on the critical value of rainfall in the early stage, according to the present invention;
[0029] Figure 2 This is a schematic diagram of the runoff path selection based on the discriminant ratio and the critical value of the preceding rainfall influencing the present invention;
[0030] Figure 3 This is a flowchart illustrating the construction process of the spatialized water storage capacity distribution curve of the present invention. Detailed Implementation
[0031] To make the objectives, technical solutions, and technical effects of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments.
[0032] like Figure 1As shown, this embodiment of the invention provides a method for simulating distributed rainstorms and flash floods in small mountain watersheds based on critical values of rainfall in the early stages, including the following steps:
[0033] S1, Data Acquisition and Preprocessing: Acquire DEM data, soil texture data, lithological distribution data, and historical rainfall sequences for the target watershed; when conditions permit, historical flow sequences can be acquired for simulation result verification.
[0034] Extracting unit contour lines of catchment area from DEM data and slope The dimensionless topographic index is calculated according to the following formula:
[0035] ,
[0036] In the formula, For reference catchment area, i represents the i-th grid cell.
[0037] The sand content of each grid cell was obtained based on soil texture data. Clay content and soil bulk density Soil saturated hydraulic conductivity of the target watershed was estimated using soil transformation functions. and field water holding capacity wilting moisture content Capillary rise height .
[0038] The soil transformation function is as follows:
[0039] First, calculate the porosity based on the soil bulk density:
[0040] ,
[0041] In the formula, The density of soil particles is taken as the saturated volumetric water content.
[0042] .
[0043] The moisture content of wilted plants is calculated using the following formula:
[0044]
[0045] The calculation results are limited to:
[0046] .
[0047] Capillary rise height Calculate according to the following formula:
[0048]
[0049] Right now:
[0050] .
[0051] Saturated hydraulic conductivity Calculate according to the following formula:
[0052]
[0053] Right now:
[0054] .
[0055] The first step is determined based on the content of sand, silt, and clay particles. The USDA soil texture category is defined for each grid cell, and soil moisture characteristic curve parameters are determined based on a pre-defined soil texture parameter table. and ,in The scaling parameter for the van Genuchten curve. The parameters are the curve shape parameters. Field water holding capacity is determined according to the soil moisture characteristic curve at a water potential of 33 kPa and the corresponding pressure head. Calculation of moisture content at the location:
[0056] ,
[0057] in:
[0058] .
[0059] Therefore, the soil transformation function can be explicitly expressed as:
[0060] .
[0061] The soil moisture characteristic curve adopts the Brooks-Corey type, and its specific form is as follows:
[0062] ;
[0063] In the formula, This refers to the pressure head corresponding to soil water suction. For the first A grid at pressure head The volumetric moisture content below.
[0064] The piecewise function explicitly states:
[0065] ①When At that time, soil moisture content was taken as field capacity. ;
[0066] ②When At that time, soil moisture content was determined according to shape parameters. The pressure head decreases with increasing pressure head and gradually approaches the minimum. .
[0067] Flood events are classified according to historical rainfall sequences, and the rainfall intensity sequences of historical events are extracted.
[0068] S2, Calculation of rainfall characteristic parameters: Based on the historical rainfall intensity sequence, a first-order gamma autoregressive process GAR(1) is fitted to obtain the shape parameter μ and scale parameter β of the rainfall intensity marginal distribution, and the average rainfall intensity of the rainfall process is calculated according to E[I]=μβ; based on the soil saturated hydraulic conductivity The ratio of the average rainfall intensity of the rainfall process to the calculated value. .
[0069] S3, Determination of the critical value of rainfall affecting the early stage:
[0070] when At that time, it was determined that there might be a limited threshold of pre-emptive rainfall affecting the target watershed. And perform numerical solutions; when When it is determined that there is no finite Subsequently, a mixed flow generation path of full storage and super-permeability was adopted.
[0071] For any candidate anterior impact rainfall Based on the Green-Ampt infiltration model and the GAR(1) rainfall intensity parameters determined by S2, the expected excess infiltration yield of the entire rainfall event was calculated. :
[0072] ,
[0073] in For the first Rainfall intensity during certain periods To take into account the impact of previous rainfall Green–Ampt infiltration capacity.
[0074] Define the proportion of super-permeable flow:
[0075] ,
[0076] In the formula, To accumulate and fully utilize production capacity; This represents the maximum water storage capacity for each river basin; The rainfall amounts are representative of the events.
[0077] The preceding rainfall amount that satisfies the following formula is defined as the critical value. :
[0078] =0.10;
[0079] Construct the objective function:
[0080] .
[0081] The numerical solution uses the Brent method. Solve within range With a solution accuracy of 0.5 mm, the obtained convergence value is... .
[0082] If the whole is valid All within the range Then take This indicates that the assumption of full runoff is approximately true throughout the entire process; if the entire effective runoff... All within the range Then it is determined that there is no finite Subsequently, a mixed flow generation path of full storage and super-permeability was adopted.
[0083] S4, Production Path Switching:
[0084] For critical rainfall values with limited prior influence The target watershed was analyzed by iteratively calculating the rainfall amounts affecting previous periods during the simulation process. ;when Reaching or exceeding When the flow path is full, flow calculation is performed; when Below When the flow is full-overflow mixed flow path is used, the flow is calculated.
[0085] For rainfall thresholds where there is no limited preceding influence For the target watershed, a mixed runoff generation path of full storage and over-permeability is used for runoff generation calculation during the simulation operation.
[0086] like Figure 2 As shown, when Ks / E[I]>1, based on the previous rainfall... With critical value The corresponding flow path is selected based on the comparison results; when Ks / E[I]≤1, the full-saturation-over-permeability mixed flow path is adopted.
[0087] S5, such as Figure 3 As shown, the spatialized water storage capacity distribution curve is constructed by calculating the effective water storage capacity of each grid in the watershed based on soil hydraulic parameters and groundwater depth.
[0088] DEM raster topographic index of the target watershed Mapping the depth of groundwater as ,in, Let be the groundwater depth of the i-th grid cell. The average groundwater depth in the basin. Let i be the terrain index of the i-th grid. The average topographic index of the watershed. The conversion factor between topographic index and groundwater depth;
[0089] Combined with soil moisture characteristic curve Calculate the first Actual soil moisture storage per grid cell:
[0090] .
[0091] Therefore, the effective water storage capacity of the i-th grid is calculated:
[0092] .
[0093] Effective water storage capacity of all grid cells Arranged in ascending order.
[0094] For any given water storage capacity The cumulative area ratio is calculated using the following formula:
[0095] .
[0096] By different and its corresponding This forms the water storage capacity distribution curve of the basin.
[0097] The average water storage capacity of the basin is calculated according to the following formula:
[0098] ;
[0099] In the formula, For the first The area of each grid cell, The total number of grid cells in the target watershed.
[0100] S6, Calculation of mixed flow generation between full-saturation and over-permeability:
[0101] Under the full runoff path, the water storage capacity distribution curve obtained in step S5 is used. The full-capacity production flow is calculated grid by grid.
[0102] Under the mixed runoff generation pathway of full-storage and over-permeability, on the unstorage area (1−FR) outside the full-storage area FR, based on the maximum infiltration capacity... Spatial distribution index of infiltration capacity and the proportion of the area where over-infiltration occurs Calculate the intensity of excess flow :
[0103] hour: ;
[0104] hour:
[0105] Where I represents rainfall intensity;
[0106] The current excess permeability production rate is:
[0107] .
[0108] The total amount of excess permeability flow within the calculation time range is:
[0109] .
[0110] The total production flow rate is obtained by superimposing the super-permeable production flow rate with the full-storage production flow rate.
[0111] Grouped by slope and lithology, the maximum infiltration capacity was determined. Spatial distribution index of infiltration capacity and the proportion of areas where over-infiltration occurs Assign values to different zones: maximum infiltration capacity The value range is set according to lithology, and the soil saturated hydraulic conductivity Ks is used to constrain the relative size of the value range corresponding to different lithology types; the spatial distribution index of infiltration capacity... The percentage of areas experiencing excessive infiltration increases with increasing slope. Set according to lithology type.
[0112] The excess permeability runoff does not pass through the free water reservoir, but is directly incorporated into the surface runoff, and is superimposed with the full reservoir runoff to obtain the total runoff.
[0113] Example 1: A watershed where there is no critical value for rainfall with limited uptake.
[0114] In a target watershed with a catchment area of 64.1 km², 96% of the soil is weathered shale and slate. Based on soil texture data, the soil saturated hydraulic conductivity Ks = 0.04 mm / h was estimated. Following step S2, a GAR(1) process was fitted using the historical rainfall intensity sequence of the dominant rainstorm type in the watershed, yielding an average rainfall intensity E[I] = 2.80 mm / h, and calculating Ks / E[I] = 0.01. Since Ks / E[I] ≤ 1, step S3 determined that there is no finite antecedent rainfall threshold in the watershed. The simulated operation adopted a mixed flow generation path of full storage and super-permeability.
[0115] Following step S5, calculate the groundwater depth based on the topographic indices of each grid cell. ,Will Substitute the Brooks-Corey soil moisture characteristic curves to calculate the actual soil moisture storage of each grid cell. Then calculate the effective water storage capacity of each grid cell. ; to all grids Arranged in ascending order, the watershed water storage capacity distribution curve was obtained statistically. The average water storage capacity of the basin is calculated using an area-weighted average. In this embodiment, the average water storage capacity of the target watershed is calculated to be: .
[0116] Following step S6, set the excess permeability runoff parameters according to the lithology and slope of the target watershed. Maximum infiltration capacity. The value range is set to 3–15 mm / h, and in this embodiment, it is: .
[0117] The simulation was validated using 15 historical floods in the target watershed. The flood simulation pass rate was 93.3%, and the coefficient of determination was 0.79–0.92, indicating that the method of the present invention can be applied in the absence of finite floods. In this case, a flood process simulation was completed using a mixed runoff generation path of full storage and excessive infiltration.
[0118] Example 2: A watershed with a limited pre-rainfall impact threshold.
[0119] The target watershed in this embodiment is the granite watershed, and DEM data, soil texture data, lithological distribution data, and historical hourly rainfall and flow data of the watershed are obtained.
[0120] Based on soil texture data, the saturated hydraulic conductivity of this granite watershed was calculated using a soil transformation function:
[0121] .
[0122] Following step S2, the average rainfall intensity of the rainfall process is obtained by fitting the hourly rainfall intensity sequence of 15 historical floods in the granite watershed to a GAR(1) process: ;
[0123] thus:
[0124] ;
[0125] because:
[0126] ;
[0127] According to step S3, it was determined that there was a limited critical value for the early-stage impact rainfall in the granite watershed.
[0128] This embodiment uses the maximum water storage capacity of the basin: ;
[0129] The representative rainfall event was the median of the total rainfall from all historical flood events in the granite watershed. ;
[0130] The preset critical over-permeability flow rate is: .
[0131] Construct the objective function:
[0132] .
[0133] And using the Brent method in Solving within the specified range with a solution accuracy of 0.5 mm, we obtain:
[0134] .
[0135] During the simulation, the amount of rainfall affecting the previous period was extrapolated time by time. .when When, a mixed flow path of full storage and super-permeability is adopted; when At that time, a full flow path is adopted.
[0136] Following step S5, the effective water storage capacity of each grid cell in the granite watershed is calculated based on the topographic index, groundwater depth, and soil moisture characteristic curves. And statistically obtained the water storage capacity distribution curve. and average water storage capacity of the basin ; Calculate the full-storage flow rate and excess-infiltration flow rate for each time period according to step S6, and then superimpose the two to obtain the total flow rate and flood process.
[0137] Using the method of this invention, simulations were conducted on 90 historical floods in six representative small mountain watersheds. These watersheds cover various rock types, including granite, mixed lithology, and argillaceous slate, with watershed areas ranging from 64.1 to 806 km². The verification results demonstrate that the method of this invention can select appropriate runoff pathways based on watershed water flow conditions, rainfall characteristics, and antecedent rainfall, and can successfully simulate flash flood events.
[0138] Under the comparative conditions of this embodiment, compared with the comparative model without runoff path switching, the average relative error of flood peaks in some watersheds decreased. The above results are only used to illustrate the application effect of the method of the present invention in the selected watersheds and events, and do not constitute a limitation on the simulation accuracy for all watersheds or all rainfall scenarios.
[0139] In addition, the water storage capacity distribution curve can be constructed from soil, topography and other data, and the parameters of the super-infiltration module can be set in zones according to slope and lithology, thereby reducing the reliance on a large amount of measured flood calibration data.
[0140] The above description is merely a preferred embodiment of the present invention and is not intended to limit the invention in any way. Although the implementation process of the present invention has been described in detail above, those skilled in the art can still modify the technical solutions described in the foregoing examples or make equivalent substitutions for some of the technical features. All modifications and equivalent substitutions made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A method for simulating distributed flash floods and torrential rains in small watersheds of mountainous areas, characterized in that, include: Based on the ratio of soil saturated hydraulic conductivity to average rainfall intensity during the rainfall process in the target watershed, it is determined whether there is a critical value for pre-contributing rainfall in the target watershed. When it is determined that there is a critical value of the previous impact rainfall, the previous impact rainfall is recursively calculated for each time period, and the process is switched between the full storage runoff path and the full storage-excess infiltration mixed runoff path based on the comparison result between the previous impact rainfall and the previous impact rainfall critical value. When there is no critical value for rainfall that affects the early stage, the runoff generation path described above is used for runoff generation calculation. A water storage capacity distribution curve is constructed based on the effective water storage capacity within the watershed, and the full-storage flow rate is calculated using the water storage capacity distribution curve. Under the aforementioned full-infiltration-over-infiltration mixed flow path, for the unfulfilled area, the over-infiltration flow rate is calculated based on the preset maximum infiltration capacity, the spatial distribution index of infiltration capacity, and the proportion of over-infiltration area. The over-infiltration flow rate is then superimposed with the full-infiltration flow rate to obtain the total flow rate. The determination of whether the target watershed has a critical value for pre-existing rainfall impact includes: when the soil saturation hydraulic conductivity of the target watershed is... With the average rainfall intensity of the rainfall process ratio A value greater than 1 indicates a critical rainfall threshold for determining the existence of limited prior influence. ;when When the value is less than or equal to 1, it is determined that there is no critical value for finite antecedent rainfall, and the runoff is calculated using a mixed runoff generation path of full storage and excessive infiltration. The critical value of rainfall in the early stage To ensure the proportion of over-permeability flow Reaching the preset critical percentage The preceding rainfall impact is determined by solving the following implicit functional equation using the Brent method: Definition ,in In order to accumulate and fully generate production flow, The maximum water storage capacity of the basin To account for the impact of earlier rainfall, Take representative rainfall data from the target watershed. The rainfall data represents a representative event in the target watershed. The rainfall duration was accumulated based on the conditional expectation semi-analytical calculation within the framework of the first-order gamma autoregressive process GAR(1); When the initial impact on rainfall Reaching or exceeding the critical value of rainfall affecting previous periods At that time, a full runoff path is adopted; the current period affects rainfall. Below the critical value of rainfall that affected previous periods The process employs a mixed flow generation path of full storage and super-permeability.
2. The method as described in claim 1, characterized in that, Based on the sand content of each DEM grid i in the target watershed Clay content and soil bulk density The soil saturated hydraulic conductivity of each grid cell i is estimated using the soil transformation function. and including field holding capacity wilting moisture content and capillary rise height These are the soil hydraulic parameters required for calculating infiltration capacity and effective water storage capacity of the grid.
3. The method as described in claim 1, characterized in that, By fitting a first-order gamma autoregressive process GAR(1) to the rainfall intensity sequence of historical rainfall events, the shape parameter μ and scale parameter β of the rainfall intensity marginal distribution are obtained, and the average rainfall intensity of the rainfall process is calculated according to E[I]=μβ.
4. The method as described in claim 1, characterized in that, Based on the physical definition of the maximum water storage capacity of a watershed According to the DEM raster topographic index of the target watershed Map the groundwater depth as Let be the groundwater depth of the i-th grid cell. The average depth of groundwater in the basin. The average topographic index of the watershed. The conversion factor between topographic index and groundwater depth is... For field water holding capacity, This refers to the wilting moisture content; based on the actual soil moisture reserves. Calculate the effective water storage capacity of each grid cell: ; Effective water storage capacity of all DEM grids Arranged in ascending order, the water storage capacity distribution curve is obtained. And from this curve The average water storage capacity WM of the basin can be determined directly.
5. The method as described in claim 1, characterized in that, Under the mixed flow generation path of full-saturation and over-permeability, the proportion of full-saturation flow generation area should be considered first. Other In areas not yet fully filled, infiltration capacity is used as the maximum. Spatial distribution index of infiltration capacity The ratio of the area of excessive infiltration to the area that is not fully filled Calculate the intensity of excess flow : hour: ; hour: ; Where I represents rainfall intensity; Then, by calculating the intensity of the excess permeability flow... Calculation time range The flow rate of the super-permeable product within.
6. The method as described in claim 1, characterized in that, The maximum infiltration capacity, the spatial distribution index of infiltration capacity, and the proportion of over-infiltration area are assigned values according to slope grouping and lithology type. Among them, the maximum infiltration capacity is set with a value range according to lithology type, and the relative size of the value range corresponding to different lithology types is constrained by the soil saturated hydraulic conductivity. The spatial distribution index of infiltration capacity increases with the increase of slope grouping. The proportion of over-infiltration area is set according to lithology type.
Citation Information
Patent Citations
Flood forecasting model construction method based on space-time variable source mixed runoff production theory
CN118278562A
Method for Constructing a Flood Forecasting Model Based on Spatio-Temporal Variable Ssource Mixed Runoff Generation Theory
LU507092B1