Low-voltage area user access line t-connection group identification method, device and system

By constructing a high correlation matrix and a high matching matrix, and combining a sliding window adaptive cumulative sum mutation point detection algorithm, the T-connection group of users in low-voltage distribution areas is identified, solving the problem of difficult identification in existing technologies and achieving accurate automatic identification and improved robustness.

CN122869748BActive Publication Date: 2026-11-24STATE GRID JIANGSU ELECTRIC POWER CO LTD RESEARCH INSTITUTE +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611340944.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2026-09-01
Publication Date
2026-11-24
Estimated Expiration
2046-09-01

AI Technical Summary

Technical Problem

Existing technologies are insufficient to efficiently identify T-connection groups of users in low-voltage distribution areas, leading to difficulties in adjusting line losses, deterioration of power quality, and safety hazards, and there is a lack of effective identification methods.

Method used

By constructing a high correlation matrix and a high matching matrix, and combining a sliding window adaptive cumulative sum mutation point detection algorithm, voltage and current mutation points between users are identified, a confirmed connection relationship matrix is ​​generated, and electrical distance anomaly detection is used to identify users suspected of abnormal connection.

Benefits of technology

It enables accurate and automatic identification of T-connection relationships of user service lines in low-voltage distribution areas, improving identification accuracy and robustness, and can accurately classify T-connection groups and identify users suspected of abnormal connections.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122869748B_ABST
    Figure CN122869748B_ABST
Patent Text Reader

Abstract

This invention discloses a method, device, and system for identifying T-connection groups of user service lines in low-voltage distribution areas. The method includes: calculating an improved T-type grey relational degree matrix of voltage change in the same phase among users, generating a high-relationship matrix and high-relationship users; extracting the current and voltage mutation point sets of each high-relationship user, calculating the matching degree matrix of voltage mutation points in the same phase among users, and constructing a high-matching degree matrix; generating a confirmed connection relationship matrix and a relational graph based on the high-relationship matrix and the high-matching degree matrix, decomposing the connections according to the connected paths in the relational graph to generate a set of user service line T-connection groups; detecting abnormal electrical distances between user pairs within each user service line T-connection group to output users suspected of abnormal connections; identifying the user connection sequence for each user service line T-connection group and classifying users into active-influence and passive-response types. This invention enables accurate and automatic identification of the relationships within user service line T-connection groups.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of power distribution network technology, and specifically relates to a method, device and system for identifying T-connection groups of users in low-voltage distribution areas. Background Technology

[0002] Low-voltage distribution substations are a crucial link connecting the main grid and end users, and the accuracy of the topology directly affects maintenance work such as line loss management and fault location. In urban-rural fringe areas, due to dense housing and limited land, the phenomenon of T-connected service lines serving multiple households with a single branch line is common. During peak summer load periods, these lines, with their smaller diameters, are prone to overload, leading to power quality degradation, line overheating, and even fire hazards. This also severely hinders the accurate management of the "household-pole" topology. Currently, identifying T-connected users faces three major problems: First, manual verification is inefficient. The large scale of low-voltage equipment and the complex wiring on-site make manual topology checks for each household time-consuming and labor-intensive. Second, line loss adjustment is difficult. The conductors in T-connected service lines are generally smaller in diameter and have higher impedance. Due to the stress on the crossarms, it is difficult to replace them with larger diameter conductors, resulting in a significant drop in voltage quality at the end. Third, there is a lack of effective technical means for identifying groups of users connected to a single service line.

[0003] There are three main existing identification methods: manual on-site inspection, which is inefficient, costly, and difficult to scale; comparison of ledger and topology data, which relies on static data and suffers from low accuracy due to issues such as unauthorized user modifications and untimely ledger updates; and measurement data, which uses meter voltage sequences to calculate user correlations to determine T-connection relationships. However, these methods cannot distinguish between common disturbances in the upstream power grid and unique voltage fluctuations of individual users, making them prone to false positives; linear indices are not accurate enough for identifying non-stationary sequences; and the lack of electrical causality verification means that pairwise correlations alone are insufficient to effectively distinguish between genuine T-connections and false similarities between neighboring users in the same transformer area, leading to chain-like misjudgments due to abnormal users. Summary of the Invention

[0004] To address the aforementioned issues, this invention proposes a method, device, and system for identifying T-connection groups of low-voltage transformer substation users, which can achieve accurate and automatic identification of T-connection relationships and suspected abnormally connected users in low-voltage transformer substations.

[0005] To achieve the above-mentioned technical objectives and effects, the present invention is implemented through the following technical solution:

[0006] In a first aspect, the present invention provides a method for identifying groups of users connected to T-connections in low-voltage distribution transformer areas, comprising:

[0007] Step S1: Based on the voltage time series data of each user in the low-voltage distribution area, calculate the improved T-type grey correlation matrix of the same phase voltage between users according to phase, and perform high correlation processing on it to generate a high correlation matrix. Define the users involved in the high correlation matrix as high correlation users.

[0008] Step S2: Using the sliding window adaptive cumulative sum mutation point detection algorithm, extract the current mutation point set and voltage mutation point set of each highly correlated user, calculate the in-phase voltage mutation point matching degree matrix between users, and construct the high matching degree matrix;

[0009] Step S3: Take the non-zero intersection of corresponding elements of the high correlation degree matrix and the high matching degree matrix according to the phase to generate the confirmation connection relationship matrix; generate the correlation graph according to the phase of the confirmation connection relationship matrix, and decompose it according to the connected paths in the correlation graph to generate the user access line T-connection group set;

[0010] Step S4: Based on the known network topology information of the transformer area, calculate the electrical distance between each user pair within the T-connection group of each user's access line in step S3, and output suspected abnormal users by detecting abnormal electrical distance values.

[0011] Step S5: For each user connection line T-connection group in Step S3, identify the user connection sequence; calculate the time set of joint impact of user current mutations and the contribution rate of current mutations within the user connection line T-connection group, and classify users into active impact type and passive response type users based on the contribution rate of current mutations.

[0012] Secondly, the present invention provides a low-voltage distribution area user service line T-connection group identification device, comprising:

[0013] The high correlation matrix construction module is used to calculate the improved T-type grey correlation matrix of the same phase voltage between users based on the voltage time series data of each user in the low voltage distribution area, and to perform high correlation processing on it to generate a high correlation matrix. The users involved in the high correlation matrix are defined as high correlation users.

[0014] The high matching degree matrix construction module is used to extract the current mutation point set and voltage mutation point set of each highly correlated user by using the sliding window adaptive cumulative sum mutation point detection algorithm, calculate the matching degree matrix of in-phase voltage mutation points between users, and construct the high matching degree matrix.

[0015] The user connection line T-connection group generation module is used to take the non-zero intersection of corresponding elements of the high correlation degree matrix and the high matching degree matrix according to the phase to generate a confirmed connection relationship matrix; generate an association graph according to the confirmed connection relationship matrix according to the phase; and decompose the connected paths in the association graph to generate a user connection line T-connection group set.

[0016] The user access line T-connection group suspected connection anomaly identification module is used to calculate the electrical distance between each user pair in each user access line T-connection group based on the known network topology information of the transformer area, and output suspected connection anomaly users by detecting abnormal electrical distance values;

[0017] The user connection line T-connection group hanging sequence identification and role classification module is used to identify the user hanging sequence for each user connection line T-connection group; and calculate the time set of joint impact of user current mutations and the current mutation contribution rate within the user connection line T-connection group. Based on the current mutation contribution rate, users are divided into active influence type and passive response type users.

[0018] Thirdly, the present invention provides a low-voltage distribution area user service line T-connection group identification system, including a storage medium and a processor;

[0019] The storage medium is used to store instructions;

[0020] The processor is configured to operate according to the instructions to perform the method according to any one of the first aspects.

[0021] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0022] (1) This invention achieves accurate and automatic identification of T-connection relationship of user connection line in low-voltage distribution area, suspected abnormal connection user, and user role classification by fusing multi-stage data features such as high correlation matrix, high matching matrix, electrical distance, and current mutation contribution rate.

[0023] (2) This invention proposes to improve the T-type gray correlation matrix by using the same phase voltage between users, and simultaneously capture the voltage curve amplitude fit and trend synchronization, which makes up for the shortcomings of traditional indicators such as Pearson coefficient and Euclidean distance having a single dimension, and greatly improves the accuracy of T-connected user voltage correlation identification.

[0024] (3) This invention eliminates common sudden change points of busbars and transformer areas by detecting sudden change points, retains only the unique voltage sudden change characteristics of users, and comprehensively calculates the weighted matching degree of voltage sudden change points from four dimensions: time synchronization score, voltage change direction consistency score, voltage change amplitude ratio score and current sudden change verification score. This effectively distinguishes between true T-connection and false similarity between users in the same transformer area and improves the accuracy of identification.

[0025] (4) This invention can accurately segment T-connection groups and identify suspected abnormal users, ensuring the robustness of group identification. Specifically, the T-connection group of user connection lines is generated by the intersection of the high correlation matrix and the high matching matrix. Combined with electrical distance anomaly detection, suspected abnormal users with obvious deviations from the ledger topology are identified. The identification result serves as the basis for on-site verification and ledger correction, without denying their T-connection group membership determined by electrical characteristics.

[0026] (5) The present invention is simple to calculate and has a clear principle. It can realize the accurate and automatic identification of the T-connection relationship of user connection line and suspected abnormal users. It has strong anti-disturbance ability and high identification accuracy. It can be widely used in application scenarios such as low voltage distribution area topology verification and abnormal power consumption monitoring, and has good application prospects. Attached Figure Description

[0027] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the embodiments will be briefly described below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort, wherein:

[0028] Figure 1 This is a flowchart illustrating a method for identifying a group of users connected to a low-voltage distribution area via a T-connection in accordance with an embodiment of the present invention. Detailed Implementation

[0029] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all of them. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.

[0030] Furthermore, if the embodiments of this invention involve descriptions such as "first" or "second," these descriptions are for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined with "first" or "second" may explicitly or implicitly include at least one of those features. Additionally, the technical solutions of the various embodiments can be combined with each other, but this must be based on the ability of those skilled in the art to implement them. If the combination of technical solutions is contradictory or impossible to implement, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection claimed by this invention.

[0031] Example 1

[0032] This invention provides a method for identifying groups of users connected to T-junctions in low-voltage distribution areas, characterized by comprising:

[0033] Step S1: Based on the voltage time series data of each user in the low-voltage distribution area, calculate the improved T-type grey correlation matrix of the same phase voltage between users according to phase, and perform high correlation processing on it to generate a high correlation matrix. Define the users involved in the high correlation matrix as high correlation users.

[0034] Step S2: Using the sliding window adaptive cumulative sum mutation point detection algorithm, extract the current mutation point set and voltage mutation point set of each highly correlated user, calculate the in-phase voltage mutation point matching degree matrix between users, and construct the high matching degree matrix;

[0035] Step S3: Take the non-zero intersection of corresponding elements of the high correlation degree matrix and the high matching degree matrix according to the phase to generate the confirmation connection relationship matrix; generate the correlation graph according to the phase of the confirmation connection relationship matrix, and decompose it according to the connected paths in the correlation graph to generate the user access line T-connection group set;

[0036] Step S4: Based on the known network topology information of the transformer area, calculate the electrical distance between each user pair within the T-connection group of each user's access line in step S3, and output suspected abnormal users by detecting abnormal electrical distance values.

[0037] Step S5: For each user connection line T-connection group in Step S3, identify the user connection sequence; calculate the time set of joint impact of user current mutations and the contribution rate of current mutations within the user connection line T-connection group, and classify users into active impact type and passive response type users based on the contribution rate of current mutations.

[0038] The following describes in detail the low-voltage distribution area user connection line T-connection group identification method in an embodiment of the present invention with reference to a specific implementation method.

[0039] This embodiment takes a certain distribution area of ​​a power supply station in a certain province as an example to further illustrate the method for identifying the T-connection group of low-voltage distribution area user connection lines proposed in this invention.

[0040] In this example, Figure 1 This paper describes the application of a method for identifying T-connection groups of low-voltage transformer substation user service lines, including but not limited to the accurate and automatic identification of T-connection relationships and suspected abnormally connected users in low-voltage transformer substation user service lines. Figure 1A flowchart of a low-voltage distribution area user T-connection group identification method using this embodiment is provided. Taking a 10kV low-voltage distribution area TQ-05 in a rural power grid of a certain power supply station in a certain province as an example, the application of this low-voltage distribution area user T-connection group identification method is demonstrated. The low-voltage distribution area has 77 single-phase users and 3 three-phase users. The three-phase users are further divided into three single-phase users according to their three phases, totaling 86 users. They are further divided according to their access phase: 31 users in phase A, 27 users in phase B, and 28 users in phase C. The users are represented by codes U-A01 to U-A31, U-B01 to U-B27, and U-C01 to U-C28. The analysis time window was selected from 00:00 on May 11, 2026 to 23:45 on May 17, 2026, with a sampling interval of 15 minutes. Theoretically, each user will have 672 sampling points. After data integrity verification, the proportion of valid voltage points is 99.1%, and the proportion of valid current points is 98.4%, which meets the input requirements for subsequent user service line T-connection group identification.

[0041] The specific steps are given below:

[0042] Step S0: Obtain the busbar of the low-voltage distribution area, user ledger data under the distribution area, distribution area network topology information, user phase data, voltage measurement data and current measurement data.

[0043] In this example, the network topology data of the TQ-05 distribution area, including the transformer, low-voltage outgoing lines, poles, meter boxes, and user access points, is obtained from the PMS equipment asset system. This includes 1 low-voltage node on the transformer side, 31 low-voltage poles and branch nodes, 80 meter box nodes, 80 user access points, 31 line spans, and 80 service lines. User account numbers, electricity meter numbers, wiring methods, meter box numbers, and rated voltages are obtained from the marketing business system. User phase identification data is derived from the recognition results of existing phase identification algorithms. 15-minute voltage and current time-series curves and three-phase voltage time-series data for the distribution area are obtained from the electricity consumption information collection system. Voltage time-series data for the 10kV busbar is obtained from the D5000 system.

[0044] Step S1: Based on the voltage time series data of each user in the low-voltage distribution area, calculate the improved T-type grey relational degree matrix of the same phase voltage between users, and perform high relational degree processing on it to generate a high relational degree matrix. Define the users involved in the high relational degree matrix as high relational degree users, specifically including:

[0045] Using the voltage timing data and phase data of each user within the low-voltage distribution area as input, the same-phase voltage sequence is extracted and dimensionless processed; the details are as follows:

[0046] Since T-connection only occurs between in-phase connections, three-phase users are mapped to the three phase voltage timing data of phases A, B, and C according to their phase data, and single-phase users are mapped to the corresponding phase voltage timing data according to their phase data.

[0047] Assume that there are a total of [number] units under the same phase within the transformer area. For any user Extract its voltage time series ,in This represents the total number of sampling points within the analysis time window.

[0048] To eliminate the interference of different absolute voltage reference values ​​caused by differences in line voltage drop among different users on the correlation calculation, dimensionless processing is performed on the voltage time series of all users:

[0049] , ,

[0050] In the formula, Indicates user The Dimensionless sequence values ​​at each sampling point For users The rated voltage is given, and the values ​​at each moment represent the proportional changes relative to the rated voltage, thereby eliminating the difference in absolute amplitude reference while preserving the sequence morphology information.

[0051] The improved T-type grey relational degree matrix of the same phase voltage between users is calculated according to phase A, phase B, and phase C respectively.

[0052] Step S11: Assuming the current phase is A, define the reference sequence as user. The dimensionless sequence is denoted as: In the formula, Indicates user The Dimensionless sequence values ​​at each sampling point The total number of sampling points; the comparison sequence is defined as the user's. The dimensionless sequence is denoted as: In the formula, Indicates user In the Dimensionless sequence values ​​at each sampling point;

[0053] Step S12: Calculate the reference sequence and comparison sequence at the... The T-shaped two-stage absolute difference at each sampling point includes a first-stage difference. Second grade difference , ;

[0054] Among them, the first level difference The absolute difference in magnitude is used to measure the difference between two sequences on the 1st... The deviation of values ​​at each sampling point is calculated using the following formula:

[0055] ,

[0056] Second level difference The absolute difference in trend is used to measure the difference between two sequences on the 1st... At the sampling point relative to the first The formula for calculating the trend deviation at each sampling point is:

[0057] ,

[0058] Step S13: Calculate the global range, which includes the global minimum range and the global maximum range. The calculation formula is as follows:

[0059] ,

[0060] ,

[0061] In the formula, It is the global minimum range. This represents the global maximum range.

[0062] Step S14: Combine the first and second differences into a single correlation coefficient, and take the arithmetic mean of the first and second differences as the composite difference. The calculation formula is as follows:

[0063] ,

[0064] Step S15: Calculate the first... T-shaped grey relational coefficient at each sampling point The calculation formula is:

[0065] ,

[0066] in, The resolution coefficient is usually taken as... This is used to control the resolving power of the correlation coefficient within the range, preventing issues caused by... Excessively large values ​​lead to T-shaped grey relational coefficients Differences are compressed and lose their distinguishing power.

[0067] Step S16: For the first to The arithmetic mean of all T-shaped grey relational coefficients is used to obtain the user's... With users Improved T-shaped grey relational degree between The calculation formula is:

[0068] ,

[0069] in, The range of values ​​is The closer its value is to 1, the better it indicates the user's... With users The higher the overall similarity of voltage time series in both amplitude shape and trend change, the greater the probability of a T-connection relationship.

[0070] Step S17: For all phase-dependent components within the low-voltage distribution area... Individual users, build Improved T-type grey relational matrix of in-phase voltage between users Among them, the improved T-type grey relational matrix of in-phase voltage between users The elements are Improved T-type grey relational matrix of in-phase voltage between users It has symmetry, that is And all diagonal elements are 1.

[0071] Similarly, construct the improved T-shaped grey relational degree matrix for phases B and C.

[0072] In this example, the resolution coefficient is Taking users U-A17 and U-A18 in phase A as examples, the improved T-type grey relational degree is calculated. At the sampling point of 18:45 on May 13, 2026, the absolute difference of the dimensionless voltage amplitude between the two is |1.0082-1.0064|=0.0018; the difference in trend change relative to the previous sampling point is 0.0009. The amplitude difference and trend difference at this sampling point are combined into a comprehensive difference. The correlation coefficient for this sampling point was obtained by normalization using the global range, resulting in a value of 0.978. After averaging the 666 valid sampling points, the improved T-type grey correlation coefficient between U-A17 and U-A18 was 0.934. In contrast, the correlation coefficient between U-A17 and the same-phase ordinary user U-A29 was only 0.642, indicating that the voltage time series of U-A17 and U-A18 are significantly similar in both amplitude matching and trend synchronization. The resulting improved T-type grey correlation coefficient matrix for phase A is... 3D matrix.

[0073] Step S18: Improve the T-type grey relational matrix for in-phase voltages between users. Apply an association threshold to the diagonal elements of the non-Chinese side. ;like , If the element is set to zero, it indicates that the user... With users There is no significant voltage correlation between them, so they do not qualify as candidates for a T-connection relationship; if If so, set the element to 1 to indicate that the user... With users There is a high voltage correlation between them;

[0074] Step S19: Improve the T-type grey relational matrix for in-phase voltages between users. Performing the orphaned element removal operation specifically includes:

[0075] Improved T-type grey relational matrix for checking in-phase voltages between users In each row and corresponding column, if a user If all off-diagonal elements of the corresponding row vector are zero, it indicates that the user... No high-level connections have been established with any other users within the low-voltage distribution area, indicating that the user... For isolated nodes, their corresponding rows and columns are simultaneously derived from the improved T-type grey relational matrix of in-phase voltages between users. After deleting from the middle, a binarized high correlation matrix is ​​obtained. ;

[0076] Step S20: Define the binarized high correlation matrix Users whose values ​​are 1 are considered highly relevant users.

[0077] In this example, the correlation threshold is set to =0.86. Phase A 31×31 voltage improved T-type grey relational matrix After applying the correlation threshold, 27 isolated users who did not reach the correlation threshold with any other user were deleted, resulting in a 4×4 high correlation matrix for phase A, with the corresponding high correlation user set being {U-A17, U-A18, U-A19, U-A31}. The correlations between U-A17 and U-A18, U-A19, and U-A31 are 0.934, 0.918, and 0.879, respectively. Phase B, after the same processing, yielded a high correlation user set of {U-B06, U-B07, U-B08}. In phase C, no user formed a high correlation user set of at least two members.

[0078] In this example, Table 1 lists the local calculation results of the improved T-type grey relational degree matrix of phase A voltage. The closer the value is to 1, the more similar the amplitude shape and trend of the voltage curves of the two users are. Values ​​below the relational degree threshold are considered lower. Elements with a value of 0.86 are set to zero in subsequent processing.

[0079] Table 1. Local calculation results of the improved T-type grey relational matrix for phase A voltage.

[0080] ;

[0081] Step S2: Using a sliding window adaptive cumulative sum abrupt change detection algorithm, extract the current abrupt change point set and voltage abrupt change point set for each highly correlated user, calculate the in-phase voltage abrupt change point matching degree matrix among users, and construct a high matching degree matrix; the specific process includes:

[0082] Step S21: Using a sliding window adaptive cumulative sum abrupt change detection algorithm, extract the current abrupt change point set and voltage abrupt change point set for each highly correlated user; specifically including:

[0083] Step S211: Using a sliding window adaptive cumulative sum change point detection algorithm, extract the initial voltage change point set for each phase of the three-phase or single-phase voltage time series data of each highly correlated user, specifically including:

[0084] Since T-connections only occur between in-phase connections, three-phase users are mapped to the voltage time series of phases A, B, and C, respectively. Single-phase users are mapped to the voltage time series of a single phase. The voltage time series data for a specific phase of any user can be obtained. , ,in, This represents the total number of sampling points for the voltage time series data. No abrupt change detection is performed for sliding windows containing missing sampling points. The core parameters required to initialize the abrupt change detection algorithm with the adaptive cumulative sum of the sliding window include the baseline window length used for benchmark statistics. Detection window length for mutation detection and control limit thresholds used to determine mutations. Among them, the detection window length With baseline window length Maintain consistency and control threshold. Then set to , This is an empirical coefficient. To correspond to the standard deviation within the baseline window, this setting can be adaptively adjusted according to the voltage fluctuation characteristics of different transformer areas. The sliding window adaptive cumulative sum abrupt change detection algorithm traverses the entire voltage sequence in the form of a sliding window, starting from the beginning of the sequence and selecting a window of length... The initial baseline window, the corresponding data segment is denoted as The baseline mean within the baseline window is calculated using the following formula. and benchmark variance This will serve as a reference benchmark for subsequent testing.

[0085] ,

[0086] ,

[0087] Next, starting from the end position of this baseline window, a length of [length missing] is constructed. The detection window, and the corresponding data segment is denoted as , .

[0088] For the voltage at each sampling point within the detection window (in, First, calculate its mean relative to the benchmark. and the benchmark standard deviation Standardized deviation term As shown in the following formula:

[0089] ,

[0090] Based on standardized deviation term Further construct upper and lower cumulative sum statistics and These are used to capture two types of sudden events: voltage surge and voltage drop, respectively, and their recursive formulas are shown below:

[0091] ,

[0092] ,

[0093] In the above formula, The preset offset coefficient is used to control the algorithm's sensitivity to small deviations. Since the above-mentioned dimensionless processing has been performed, the control limit threshold is... Empirical coefficient In the initial state, and During the calculation process, if The value reaches or exceeds the control limit threshold. Then determine the sampling point This is the point of sudden voltage increase; if The value reaches or exceeds the control limit threshold. Then determine the sampling point This represents the voltage drop abrupt change point.

[0094] After completing the detection of the current baseline window and detection window, the sliding window is moved forward by one sampling point, and the positions of the baseline window and detection window are updated. For the updated detection window, the baseline mean and baseline variance are recalculated, and the upper and lower cumulative sum statistics of the previous sampling point are set to zero.

[0095] Repeat the above baseline statistics, deviation calculation, and cumulative statistics process until the entire voltage timing data has been traversed. During the traversal, the sampling time of all samples identified as abrupt change points will be recorded one by one. Finally, all recorded abrupt change points will be deduplicated and merged to obtain the user's result. Set of abrupt changes in voltage time series data , ,in, This represents the total number of mutation points.

[0096] After traversing the voltage time series of each phase for each highly correlated user under the area to be diagnosed, an initial set of voltage abrupt change points for each highly correlated user within the area is generated. .

[0097] In this example, when performing sliding window adaptive accumulation and abrupt change detection on the voltage time series data of each highly correlated user, the baseline window length is set. =12 sampling points, detection window length =12 sampling points, offset coefficient =0.5, normalized control limit The value is 5.0. Taking user U-A17 in phase A as an example, the mean voltage reference value within the baseline window before 18:45 on May 13, 2026 was 225.6V, and the standard deviation was 1.15V. The sampled voltage at that moment was 218.2V, and the standardized deviation term was (218.2-225.6) / 1.15=-6.43. The lower cumulative sum statistic of the previous moment was 4.34, and the lower cumulative sum statistic was updated to... =9.27, exceeding the control limit of 5.0, therefore recorded as a voltage drop inflection point; the initial voltage inflection point set for each highly correlated user within the area to be diagnosed is generated in this manner. .

[0098] Step S212: Using the sliding window adaptive cumulative sum abrupt change point detection algorithm, extract the set of bus voltage abrupt change points from the voltage time series data of the bus to which the low-voltage distribution area belongs and the three-phase voltage time series data of the low-voltage distribution area. Set of voltage mutation points in the transformer area ;

[0099] Step S213: Any sudden change that occurs simultaneously in both the bus voltage sudden change point set and the transformer area voltage sudden change point set is identified as a common sudden change point driven by the public power grid disturbance.

[0100] Step S214: Remove common abrupt changes from the initial voltage abrupt change point set for each user and each phase to obtain the voltage abrupt change point set for each user; specifically including the following:

[0101] Within the same low-voltage distribution area, voltage fluctuations from the upstream power grid will be transmitted to all users within the area with almost the same phase and amplitude, forming a "common mutation". Therefore, a set of common mutation points for a distribution area is defined. Set of bus voltage abrupt change points Set of voltage mutation points in the transformer area Simultaneous mutation moments.

[0102] For each user By using its initial voltage mutation point set After removing common abrupt changes, a set of voltage abrupt changes for each user is obtained. :

[0103] ,

[0104] The above elimination operation ensures that all subsequent matching calculations based on abrupt change points are performed only on voltage disturbance events that reflect changes in the user's own load characteristics, fundamentally eliminating the systemic interference of public power grid disturbances on the identification of T-connection relationships.

[0105] In this example, the detection results show that at 09:30 on May 14, 2026, the bus voltage briefly dropped from 10.42kV to 10.24kV, and the A-phase voltage of the transformer substation dropped from 228.6V to 224.7V. Therefore, this moment was included in the common sudden change point set. Statistically, throughout the entire 7-day window, there were a total of 113 voltage sudden change points in the initial voltage sudden change point set for user U-A17. Among these, 61 were common sudden change points that occurred simultaneously with the bus and transformer substation. After removing these, 52 voltage sudden change points unique to user U-A17 were obtained, constituting the user's voltage sudden change point set.

[0106] Step S215: Using the sliding window adaptive cumulative sum change point detection algorithm, extract the set of current change points for each highly correlated user from the current time series data of each highly correlated user.

[0107] In this example, when performing sliding window adaptive accumulation and abrupt change detection on the current time series data of each highly correlated user, the baseline window length is set. =12 sampling points, detection window length =12 sampling points, offset coefficient =0.5, normalized control limit The value is 5.0. Taking user U-A17 in phase A as an example, at 18:45 on May 13, 2026, the mean current within the current baseline window for this user was 4.2A, and the standard deviation was 0.6A. The sampled current at that time was 8.3A, and the standardized deviation term was (8.3-4.2) / 0.6=6.83. The lower cumulative sum statistic was updated to... =9.54, exceeding the current surge threshold of 5 set for this example, therefore it is synchronously recorded as a current surge point. A set of current surge points for each highly correlated user within the diagnostic area is generated in this manner. .

[0108] Step S22: For any highly correlated user pair , with users Using the set of voltage mutation points as a benchmark, in the user From the set of voltage abrupt change points, the abrupt change point with the best time match is found, generating a candidate matching pair set for time window matching of the abrupt change point; specifically including:

[0109] Step S221: For any highly correlated user pair , with users Set of voltage change points Each voltage change point in Based on the user Set of voltage change points In the process, find the point of voltage change. The closest voltage change point in time The absolute value of the time difference between the two must be less than or equal to the maximum permissible time deviation. The calculation formula used during the search is:

[0110] ,

[0111] In the formula, Represents the set of voltage abrupt change points Medium voltage change point At that moment, Represents the set of voltage abrupt change points Medium voltage change point The moment;

[0112] Step S222: If the maximum allowable time deviation is within the acceptable range... Internal capabilities for users Set of voltage change points Find the corresponding voltage change point Then This is identified as a candidate matching pair;

[0113] Step S223: If the maximum allowable time deviation is within the acceptable range... There are no voltage abrupt changes that meet the conditions. Then the voltage change point It is considered a no-match.

[0114] In this example, considering the data entry delay and slight clock drift in the 15-minute power consumption data collection, the maximum allowable time deviation τ is set to 2 sampling points, i.e., 30 minutes. Taking U-A17 and U-A18 as examples, U-A17 retains 52 unique voltage abrupt change points within the analysis window, while U-A18 retains 50 unique voltage abrupt change points. The system uses each abrupt change point of U-A17 as a benchmark and searches for the most recent abrupt change point in the set of unique abrupt change points of U-A18. At 18:45 on May 13, 2026, both U-A17 and U-A18 experienced voltage drops, forming a candidate matching pair. At 20:00 on May 15, 2026, U-A17 experienced a sudden change, and U-A18 experienced a corresponding sudden change at 20:15. The time deviation was 1 sampling point, and they were still included in the candidate matching pair. However, the sudden change point of U-A17 at 07:30 on May 16, 2026, had no corresponding sudden change point within 30 minutes before and after U-A18, and the single matching score for this point was recorded as 0.

[0115] Step S23: For any candidate matching pair in the candidate matching pair set, calculate the time synchronization score, voltage change direction consistency score, voltage change amplitude ratio score, and current surge verification score, and then perform a weighted sum of the time synchronization score, voltage change direction consistency score, voltage change amplitude ratio score, and current surge verification score to obtain the comprehensive score of the candidate matching pair; specifically including:

[0116] Step S231: Calculate the time synchronization score :

[0117] For candidate matching pairs Time synchronization score This reflects the proximity of the two voltage abrupt change points on the time axis; the smaller the time deviation, the higher the score. Time synchronization score The calculation formula is:

[0118] ,

[0119] When the voltage change point and When the times are completely consistent, As the time deviation increases, Linear decay; when the time deviation reaches hour, .

[0120] In this example, for the candidate matching pair U-A17 and U-A18 at 18:45 on May 13, 2026, the two mutation points are located at the same sampling time, with a time deviation Δk=0, and the time synchronization score is 1.00. For the candidate matching pair at 20:00 and 20:15 on May 15, 2026, the time deviation Δk=1, and with τ=2, the time synchronization score is 1-1 / 2=0.50. Through this calculation method, the system can retain nearest neighbor matches caused by sampling clock deviations, while reducing the confidence of mutation events that are not fully synchronized.

[0121] Step S232: Calculate the consistency score of voltage change direction. Consistency score for voltage change direction Determine whether the voltage changes at two matching abrupt change points are in the same direction. Under a T-connection, voltage changes triggered by the same physical event should exhibit the same direction (both a sudden rise or a sudden fall) at all users in the T-connection group. The calculation formula used is:

[0122] ,

[0123] in, For users Voltage mutation point exist The voltage change at any given time is represented by a positive value indicating a sudden increase and a negative value indicating a sudden decrease. For users Voltage mutation point exist The voltage change at any given time is represented by a positive value indicating a sudden increase and a negative value indicating a sudden decrease. For symbolic functions; if the user With users In candidate matching pairs If the voltage change at a point is in the opposite direction, then... If the user With users In candidate matching pairs If the voltage changes in the same direction at each location, then... .

[0124] In this example, U-A17 experiences a voltage change of -4.5V at 18:45 on May 13, 2026, while U-A18 experiences a voltage change of -4.1V at the same time. Both are voltage dips, and the sign function results are consistent, therefore the consistency score for the direction of voltage change is 1. In contrast, user U-A29 experiences a voltage surge of +1.6V at an adjacent time. Although the timing is close, its direction of change is opposite to that of U-A17, resulting in a consistency score of 0. This candidate relationship will not be mistakenly identified as a T-connection response due to accidental timing proximity.

[0125] Step S233: Calculate the proportional score of voltage change amplitude. :

[0126] Voltage change amplitude ratio score This assesses whether the relative proportions of voltage changes at two matching abrupt change points are similar. For T-connected users, since they share the same access point, the relative magnitudes of voltage changes (relative to their respective rated voltages) should theoretically be similar under the same physical event. First, calculate the relative magnitudes of voltage changes for both users at their respective rated voltage references:

[0127] ,

[0128] ,

[0129] in, , Representing users respectively With users The relative variation under their respective rated voltage references , users respectively and users The rated voltage (usually 220V). A high score is given if the relative amplitude difference between the two is close to 0; a higher score is given if the difference is large (exceeding the maximum permissible relative amplitude difference). If the voltage change amplitude is 0, then the score is 0; calculate the score based on the proportion of voltage change amplitude. The calculation formula is:

[0130] ,

[0131] in, This is the preset maximum allowable relative amplitude difference, used to control the strictness of amplitude consistency judgment.

[0132] In this example, both U-A17 and U-A18 have a rated voltage of 220V. Their relative voltage changes at 18:45 on May 13, 2026 are |-4.5| / 220 = 0.02045 and |-4.1| / 220 = 0.01864, respectively, with a relative amplitude difference of 0.00181. This example specifies the maximum permissible relative amplitude difference. If the value is set to 0.02, the amplitude ratio score of the candidate matching pair is 1 - 0.00181 / 0.02 = 0.9095. This result indicates that although the absolute drop amplitudes of the two users differ by 0.4V, their relative change ratios under the rated voltage reference are quite similar, which is consistent with the characteristic of a T-connected group of customers responding to the same disturbance.

[0133] Step S234: Calculate the current mutation verification score :

[0134] Current mutation verification score The physical basis is: if the user With users If a T-connection exists, then when the user or user When a current surge occurs, users located at the same physical access point A voltage drop will inevitably occur simultaneously. Therefore, whether there is an opposite current drop near the voltage drop point is key evidence to determine whether the physical source of the drop originates from the shared T-connection line.

[0135] For users in the candidate matching pairs At its voltage abrupt change point Time Neighborhood Inside, check the user Set of current abrupt change points and users Set of current abrupt change points Does the set of values ​​contain a sudden current surge point? , Allowable current-voltage time difference tolerance; current surge verification score. The calculation formula is:

[0136] ,

[0137] in, As an indicator function, determine the change in current. Direction and voltage change value If the directions are opposite, the value is 1; otherwise, it is 0. This is the time difference between the moment of current change and the moment of voltage change; For users and users Maximum permissible time deviation The set of abrupt changes in current within the set.

[0138] In this example, the current-voltage time difference tolerance Two sampling points were set, i.e., 30 minutes. For the candidate matching pair U-A17 and U-A18 at 18:45 on May 13, 2026, the voltage of U-A18 dropped, and at the same time, the current of U-A17 surged, satisfying the load causality law of "current increase - voltage decrease", so the current surge verification score is 1.00. For the candidate matching pair at 20:00 on May 15, 2026, the voltage drop of U-A18 occurred at 0:00, and the current surge of U-A17 occurred at 20:15, which is one sampling point different from the voltage drop of U-A18. The current verification score is 0.50 after linear decay; if there is no significant current surge in the neighborhood of the candidate matching point, the score for this dimension is recorded as 0.

[0139] Step S235: Calculate the overall score;

[0140] For candidate matching pairs The scores of the four sub-dimensions are weighted and summed to obtain the comprehensive score of the candidate matching pair:

[0141] ,

[0142] in, , , , All are weights, and each weight satisfies It is recommended to set the default weight to This weighting combination assigns the same highest weight to time synchronization and current surge verification, and the parameters can also be adjusted according to the data quality and application scenario in actual engineering applications.

[0143] In this example, the weights of the four sub-dimensions are set as time synchronization weights. =0.30, Consistency weight of voltage change direction =0.20, weighting of voltage change amplitude =0.20, Current Sudden Change Verification Weight =0.30. For the candidate matching pair U-A17 and U-A18 at 18:45 on May 13, 2026, the time synchronization score is 1.00, the voltage change direction consistency score is 1.00, the amplitude ratio score is 0.9095, and the current change verification score is 1.00. Therefore, the comprehensive matching score is 0.30×1.00+0.20×1.00+0.20×0.9095+0.30×1.00=0.982.

[0144] In this example, Table 2 further lists the four-dimensional scores and comprehensive scores of two typical candidate matching pairs to illustrate that the comprehensive matching score is not determined solely by time proximity, but is simultaneously constrained by direction, amplitude, and current mutation verification.

[0145] Table 2. Four-dimensional scores and overall scores of two typical candidate matching pairs

[0146] ;

[0147] Step S24: Based on the comprehensive score of all candidate matching pairs, calculate any highly relevant user pair. The average score, as a measure of highly relevant users'... The overall match score is as follows:

[0148] For users Calculate all voltage abrupt change points and the relationship between highly correlated users and... Overall matching score The calculation formula used is:

[0149] ,

[0150] in, The range of values ​​is The closer it is to 1, the more it indicates the user The voltage mutation point at the user A response that matches in all four dimensions of time, direction, amplitude, and current change can be found at any point, and the higher the confidence level of the T-connection relationship between the two, the higher the confidence level.

[0151] In this example, the system calculates the matching score of each of the 52 unique voltage abrupt change points in U-A17 within U-A18, resulting in a score sequence {0.982, 0.951, 0.936, ..., 0.876, 0.914, 0}, where the last 0 corresponds to an unmatched voltage abrupt change point at 07:30 on May 16, 2026. Averaging these 52 scores yields an overall abrupt change point matching degree of 42.64 / 52 = 0.820 between U-A17 and U-A18.

[0152] Step S25: Repeat steps S22-S24 until the overall matching score of all highly correlated user pairs is calculated, and construct the matching degree matrix of in-phase voltage mutation points among users.

[0153] Step S26: Apply a matching degree threshold to the elements of the inter-user in-phase voltage mutation point matching degree matrix to transform the inter-user in-phase voltage mutation point matching degree matrix into a high matching degree matrix, specifically including:

[0154] Apply a matching degree threshold to the matching degree matrix :like If, then the matrix elements are set to 1; if If the corresponding element is zero, it indicates that the fine-grained matching between the two users at the mutation point level is insufficient to support the determination of a T-connection relationship. After thresholding, a high-matching-degree binary matrix is ​​obtained. .

[0155] In this example, the matching threshold The threshold is set to 0.75. After calculating the overall matching degree pairwise for the high-relevance user set in phase A, the matching degrees of U-A17 with U-A18, U-A19, and U-A31 are 0.820, 0.792, and 0.781, respectively, and are all set to 1; the matching degree of U-A17 with U-A29 is 0.338, which is below the threshold and is set to zero. After thresholding, the high-matching degree matrix of phase A is... The matrix represents the high-matching users as {U-A17, U-A18, U-A19, U-A31}; the high-matching users in phase B are {U-B06, U-B07, U-B08}; and there are no high-matching users in phase C.

[0156] Step S3: For each phase, take the non-zero intersection of corresponding elements in the high correlation matrix and the high matching matrix to generate a confirmed connection matrix; generate an association graph for each phase based on the confirmed connection matrix, and decompose the graph according to the connected paths to generate a user connection line T-connection group set; specifically including:

[0157] Step S31: Perform an element-wise logical AND operation on the high correlation matrix and the high matching matrix to obtain the confirmed connection matrix. Confirm the connection matrix elements in The calculation formula is:

[0158] ,

[0159] In the formula, High correlation matrix The elements in High matching degree matrix The element in, that is, only when the user With users When the corresponding positions in both the high correlation matrix and the high matching matrix are non-zero, the connection relationship matrix is ​​confirmed. The value of 1 in this position indicates that the two users have a high-confidence T-connection relationship;

[0160] Construct confirmation connection relationship matrices for each phase to obtain confirmation connection relationship matrices for phases A, B, and C.

[0161] In this example, the system performs an element-wise logical AND operation on the binary matrix with high correlation degree between phase A and the binary matrix with high matching degree between phase A. For the user pair (U-A17, U-A18), its correlation degree is 0.934, which is higher than... The match score is 0.820, which is higher than... Therefore, the corresponding elements in the connection matrix are set to 1. For user pair (U-A17, U-A29), although both are users in phase A, their correlation degree (0.642) and matching degree (0.338) both fail to meet the thresholds, so the corresponding elements in the connection matrix are set to 0. After intersection operation, the connection matrix for phase A is... The B-phase confirmation connection matrix is ​​a 3D matrix. The C-dimensional matrix confirms that the connection relationship matrix is ​​an empty matrix.

[0162] In this example, Table 3 lists the confirmation results of some user pairs after taking the non-zero intersection of the "high relevance matrix" and the "high matching matrix". Only user pairs whose connection relationship is confirmed are those whose connection relationship is confirmed after both of them pass the threshold.

[0163] Table 3 shows the confirmation results from some users after taking the non-zero intersection of the "High Relevance Matrix" and the "High Matching Matrix".

[0164] ;

[0165] Step S32: Confirm the connection relationship matrix according to phase, extract the user pairs with element 1, and construct the association graph based on the extracted user pairs;

[0166] Step S33: If several users form a network with at least one connected path between them, then identify the set of users corresponding to the connected path as a user access line T-connection group; summarize all user access line T-connection groups into a user access line T-connection group set.

[0167] Step S34: For a certain three-phase user, if it exists in multiple different user connection line T-connection groups at the same time, then delete the three-phase user in the corresponding user connection line T-connection group. Each user connection line T-connection group shall have at least 2 users.

[0168] In this example, the system converts the confirmed connection matrix of phase A into an undirected graph, with users as nodes and confirmed connections as edges. The graph decomposition results show that phase A forms one connected component G-A1={U-A17,U-A18,U-A19,U-A31}, and phase B forms one connected component G-B1={U-B06,U-B07,U-B08}. Since the number of members in both connected components is 3 to 4 households, and no less than 2 households in each, the system includes them as suspected user connection line T-connection groups in the topology distance rationality verification; the remaining users are not included in the T-connection group set because no confirmed connection edges have been formed.

[0169] In this example, Table 4 summarizes the T-connected groups obtained by decomposing them by connected components. Subsequently, electrical distance verification will only be performed on groups with at least 2 members and confirmed connection edges.

[0170] Table 4 T-connection group

[0171] ;

[0172] Step S4: Based on the known network topology information of the transformer area, calculate the electrical distance between each user pair within the T-connection group of each user's access line in Step S3, and output suspected abnormal connection users through electrical distance anomaly detection, specifically including:

[0173] Step S41: For the identified T-connection group of user service lines, calculate the total shortest path conductor length between each user pair within the T-connection group based on the known network topology information of the transformer area, and use this as the electrical distance between users; specifically as follows:

[0174] Based on the acquired low-voltage network topology data, a directed weighted graph model of the low-voltage network in the transformer substation is constructed. , where: node set Includes the low-voltage side outgoing terminals of the transformer substation, each branch node (tower), and each user access point; edge set Includes trunk line segments and branch line segments; weight set The corresponding conductor lengths for each line segment.

[0175] Define any two users in the low-voltage network of the distribution area and electrical distance between For: In a directed weighted graph model, from the user access node To users access node The length of the conductor along the shortest path between them and the electrical distance. as follows:

[0176] ,

[0177] in: This represents the number of hops in the shortest path segment. For the first The length of the conductor in each line segment, It reflects the relative hierarchical position of the two users in the network topology.

[0178] For all user pairs in the T-connection group, calculate the electrical distance between each pair and construct the electrical distance matrix for the group.

[0179] In this example, the system constructs a directed weighted graph based on the low-voltage line topology in the PMS ledger. Nodes include the low-voltage outgoing terminal TQ-05-LV of the distribution transformer, low-voltage towers P01 to P31, meter boxes MB01 to MB18, and 86 user access points. The edge weights are the corresponding low-voltage line segment lengths. For the T-connection group G-A1, the ledger shows that U-A17, U-A18, U-A19, and U-A31 are all connected to the MB03 meter box near pole P07 and its adjacent branches. By calculating the shortest path length between each pair of users within the group, a 4×4 electrical distance matrix is ​​formed.

[0180] Step S42: For each user in the user service line T-connection group, calculate the minimum electrical distance between it and all other members in the user service line T-connection group, and use it as the user's nearest neighbor distance.

[0181] set up For the first Individual user connection line T-connection group. For the first The first in the group of users connecting the T-line One user, user The formula for calculating the nearest neighbor distance is:

[0182] ,

[0183] Step S43: Calculate the median nearest neighbor distance for all users, and set its... This multiple serves as the electrical distance reference for the T-connection group of the user's service line; specifically as follows:

[0184] Calculate the population within the T-connected population Median nearest neighbor distance for all users:

[0185] ,

[0186] The electrical distance reference for the T-connection group of the user's service line is:

[0187] ,

[0188] Step S44: Output users whose nearest neighbor distance exceeds the user's electrical distance reference as suspected abnormal connection users; the suspected abnormal connection users are still retained as members of the user's T-connection group.

[0189] A user is identified as a suspected user with abnormal account hijacking if they meet the following conditions:

[0190] ,

[0191] The physical meaning of this judgment criterion is: if a user in the user service line T-connection group is suspected of having an abnormal connection, it indicates that although the user has been included in the user service line T-connection group through electrical feature identification, its ledger topology location is significantly inconsistent with other members in the group, and there is a possibility that the access node, meter box number or pole connection location is incorrectly marked.

[0192] Users who meet the above criteria will be included in the list of suspected abnormal connection users, so that maintenance personnel can focus on checking whether there are any errors in the access node labeling, meter box ownership, or service line connection tower in their ledger files; such users will not be removed from the user service line T-connection group.

[0193] In this example, =3. In G-A1, the nearest neighbor distances of users U-A17, U-A18, U-A19, and U-A31 to other members of the group range from 40m to 532m. In this example, Table 5 lists the electrical distance verification results for each member within the T-connection group G-A1. Only members exceeding this reference benchmark are output as suspected abnormal connection users.

[0194] Table 5. Electrical distance verification results for each member within the T-connection group G-A1.

[0195] ;

[0196] In this example, after electrical distance verification, the four users in the T-connection group G-A1 are still output as the same user service line T-connection group, i.e., G-A1={U-A17,U-A18,U-A19,U-A31}. Among them, U-A31 is synchronously output as a user with suspected abnormal connection because its electrical distance exceeds the reference benchmark. The engineering implications of this result are: although U-A31 is highly similar to other members of G-A1 in terms of voltage curve and sudden change event, the connection point recorded in the ledger is significantly far away from other members in the group. On-site, the meter box number, service line connection tower, and file connection point of U-A31 should be checked for errors. For the B-phase T-connection group G-B1, the nearest neighbor distances of U-B06, U-B07, and U-B08 are 37m, 36m, and 36m respectively, and no suspected abnormal connection judgment is triggered.

[0197] Step S5: For each user connection line T-connection group in Step S3, identify the user connection sequence; and calculate the time set of joint impact of current mutations and the contribution rate of current mutations within the user connection line T-connection group. Based on the contribution rate of current mutations, classify users into active influence type and passive response type users, specifically including:

[0198] Step S51: For any user connection line T-connection group corresponding to the user set, iterate through each user. The absolute values ​​of the amplitudes at all voltage abrupt change points are counted and denoted as the set. ,in, This represents the total number of voltage inflection points for this user. For users At the mutation point The voltage change at that point;

[0199] Calculate users The average voltage fluctuation amplitude is calculated using the following formula:

[0200] ,

[0201] In the formula, For users The average voltage fluctuation amplitude;

[0202] Based on the average voltage fluctuation amplitude of each user For all users within the T-connection group of the user's service line, the average voltage fluctuation amplitude is calculated. The users are sorted in descending order; this order represents the topology connection order of each user within the group. Since users closer to the power supply side in a T-connection group have larger voltage fluctuation amplitudes and more obvious characteristics, users ranked higher can be identified as potential key power supply users in the T-connection group and given priority for on-site verification and topology rectification.

[0203] In this example, the mean absolute value of the unique voltage fluctuation amplitude of each member is calculated for the finally confirmed G-A1. The statistical results are: U-A17 is 4.36V, U-A18 is 4.11V, U-A19 is 3.87V, and U-A31 is 3.45V. Based on this, the system obtains the connection sequence of this T-connection group as U-A17→U-A18→U-A19→U-A31, and marks U-A17 and U-A18, which are ranked higher, as key power supply users that should be given priority during on-site verification.

[0204] Step S52: For any user set corresponding to a user connection T-connection group, iterate through each user, count all current mutation points, and extract the user whose absolute value of current mutation amplitude is greater than the current threshold. Corresponding time of sudden current change This is the set of significant current abrupt changes for users connected to the user's T-connection line.

[0205] The union of the sets of significant current abrupt changes for all users within the T-connection group yields the set of times of joint impact of current abrupt changes for all users within the T-connection group. :

[0206] ,

[0207] In the formula, This represents the union operation. For the first Individual user connection line T-connection group. For the first The first in the group of users connecting the T-line There are several users; among them, when performing the union operation, if the current change times of different users are the same, only one current change time is retained as the time of joint impact of the current change; if two current change times from different users are different... , The difference satisfies Therefore, the moment with the largest absolute value of the current surge amplitude is taken as the combined impact moment of the current surge, in order to avoid the same physical event being counted repeatedly due to acquisition errors, thus artificially increasing the size of the combined impact moment set. The time difference threshold is preferably a time difference threshold. Values ​​and Same, meaning no more than 5 sampling points.

[0208] In this example, the system sets the significant current surge threshold to |ΔI|≥8A and takes the union of the significant current surge times for the four users within G-A1. Initial statistics yielded 66 significant current surge times, some of which originated from the same physical load start-up / shutdown event but differed by one sampling point due to acquisition delay. After processing with a 15-minute merging tolerance, the time with the largest absolute value of the current surge amplitude was retained as representative, ultimately resulting in 62 times of combined impact. Typical times of combined impact include 18:45 on May 13, 2026, 06:30 on May 14, 2026, 20:15 on May 15, 2026, 12:00 on May 16, 2026, and 07:45 on May 17, 2026. These times all correspond to at least one member within the group experiencing a significant current surge that causes a synchronous voltage drop in multiple members.

[0209] Step S53: Set the time of joint influence of the user's T-connection group The combined effect of each merged current surge moment Check each user In the time window If there is a significant current abrupt change within the time frame, then record the user at that time. If a user makes a contribution, it is recorded as having made no contribution; define the user. The set of contribution moments for:

[0210] ,

[0211] Calculate users The combined impact of sudden changes in user current within the user's service connection T-connection group on the time set Current mutation contribution rate The calculation formula is:

[0212] ,

[0213] In the formula, Indicates the number of elements in the set; The physical meaning is: at the moment when the entire group jointly influences the population, the members... The proportion that can be covered by a significant current surge within the group. The higher this indicator, the more frequently the member initiates current disturbances within the group, and the stronger its active influence on the shared circuit.

[0214] Set contribution rate classification threshold ;

[0215] For user connection lines T-connection groups Each user Based on its current mutation contribution rate Classification threshold with contribution rate Based on the size relationship, the following role classification is applied:

[0216] ,

[0217] In the formula, Indicates user Role

[0218] The physical characteristics of active influence users are: their own high-power load start-up and shutdown behavior (significant current change) frequently occurs at the moment of joint influence of the group, and they are the main source of current disturbance on the shared line of the T-connection group. Their power consumption behavior has a significant active influence on the power quality (voltage fluctuation) of other members in the group.

[0219] The physical characteristics of passively responding users are: the overlap between the occurrence time of their own significant current surges and the time set of joint influence from the group is relatively low, indicating that these users rarely initiate large current disturbances and instead exhibit passive voltage responses to current disturbances from other members. Passively responding users are typically those with small loads and relatively stable electricity consumption behavior. The main evidence for their existence in T-connected groups comes from voltage surge matching rather than their own active current contributions.

[0220] In this example, using the 62 times of joint influence of the G-A1 group as the denominator, the number of times that significant current mutations of each member can cover is counted for each household. U-A17 covers 52 times, with a contribution rate of 52 / 62=83.9%; U-A31 covers 37 times, with a contribution rate of 59.7%; U-A18 covers 32 times, with a contribution rate of 51.6%; and U-A19 covers 26 times, with a contribution rate of 51.6%. In this example, the active influence threshold η is set to 75%, therefore U-A17 is classified as an active influence user, and U-A31, U-A18, and U-A19 are classified as passive response users; for G-B1, U-B06 is an active influence user, and U-B07 and U-B08 are passive response users.

[0221] In this example, Table 6 lists the coverage contribution rate and role classification results of each member of G-A1 to the time set of the group's joint influence. Members with a contribution rate of not less than η=75% are classified as active influence users.

[0222] Table 6. Coverage contribution rate and role classification results of each member of G-A1 to the time set of the group's joint influence.

[0223] .

[0224] Example 2

[0225] Based on the same inventive concept as Embodiment 1, this embodiment of the invention provides a low-voltage distribution area user service line T-connection group identification device, comprising:

[0226] The high correlation matrix construction module is used to calculate the improved T-type grey correlation matrix of the same phase voltage between users based on the voltage time series data of each user in the low voltage distribution area, and to perform high correlation processing on it to generate a high correlation matrix. The users involved in the high correlation matrix are defined as high correlation users.

[0227] The high matching degree matrix construction module is used to extract the current mutation point set and voltage mutation point set of each highly correlated user by using the sliding window adaptive cumulative sum mutation point detection algorithm, calculate the matching degree matrix of in-phase voltage mutation points between users, and construct the high matching degree matrix.

[0228] The user connection line T-connection group generation module is used to take the non-zero intersection of corresponding elements of the high correlation degree matrix and the high matching degree matrix according to the phase to generate a confirmed connection relationship matrix; generate an association graph according to the confirmed connection relationship matrix according to the phase; and decompose the connected paths in the association graph to generate a user connection line T-connection group set.

[0229] The user access line T-connection group suspected connection anomaly identification module is used to calculate the electrical distance between each user pair in each user access line T-connection group based on the known network topology information of the transformer area, and output suspected connection anomaly users by detecting abnormal electrical distance values;

[0230] The user connection line T-connection group hanging sequence identification and role classification module is used to identify the user hanging sequence for each user connection line T-connection group; and calculate the time set of joint impact of user current mutation within the user connection line T-connection group and the contribution rate of user current mutation. Based on the contribution rate of current mutation, users are divided into active influence type and passive response type users.

[0231] Example 3

[0232] This invention provides a low-voltage distribution area user service line T-connection group identification system, including a storage medium and a processor;

[0233] The storage medium is used to store instructions;

[0234] The processor is configured to operate according to the instructions to execute the method according to any one of Embodiment 1.

[0235] Those skilled in the art will understand that embodiments of the present invention can be provided as methods, systems, or computer program products. Therefore, the present invention can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present invention can take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0236] This invention is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart illustrations and / or block diagrams. Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.

[0237] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.

[0238] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.

[0239] The embodiments of the present invention have been described above with reference to the accompanying drawings. However, the present invention is not limited to the specific embodiments described above. The specific embodiments described above are merely illustrative and not restrictive. Those skilled in the art can make many other forms under the guidance of the present invention without departing from the spirit and scope of the claims. All of these forms are within the protection scope of the present invention.

[0240] The foregoing has shown and described the basic principles, main features, and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of the invention. Various changes and modifications can be made to the invention without departing from its spirit and scope, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of protection of this invention is defined by the appended claims and their equivalents.

Claims

1. A method for identifying groups of users connected to T-connections in low-voltage distribution transformer areas, characterized in that, include: Step S1: Based on the voltage time series data of each user in the low-voltage distribution area, calculate the improved T-type grey correlation matrix of the same phase voltage between users according to phase, and perform high correlation processing on it to generate a high correlation matrix. Define the users involved in the high correlation matrix as high correlation users. Step S2: Using the sliding window adaptive cumulative sum mutation point detection algorithm, extract the current mutation point set and voltage mutation point set of each highly correlated user, calculate the in-phase voltage mutation point matching degree matrix between users, and construct the high matching degree matrix; Step S3: Take the non-zero intersection of corresponding elements of the high correlation degree matrix and the high matching degree matrix according to the phase to generate the confirmation connection relationship matrix; generate the correlation graph according to the phase of the confirmation connection relationship matrix, and decompose it according to the connected paths in the correlation graph to generate the user access line T-connection group set; Step S4: Based on the known network topology information of the transformer area, calculate the electrical distance between each user pair within the T-connection group of each user's access line in step S3, and output suspected abnormal users by detecting abnormal electrical distance values. Step S5: For each user connection line T-connection group in Step S3, identify the user connection sequence; calculate the time set of joint impact of user current mutations and the contribution rate of current mutations within the user connection line T-connection group, and classify users into active impact type and passive response type users based on the contribution rate of current mutations. Specifically, step S1, which involves calculating the improved T-type grey relational degree matrix of voltage between users of the same phase based on the voltage time series data of each user within the low-voltage distribution area, includes: Step S11: Define the reference sequence as user The dimensionless sequence is denoted as: In the formula, Indicates user The Dimensionless sequence values ​​at each sampling point The total number of sampling points; the comparison sequence is defined as the user's. The dimensionless sequence is denoted as: In the formula, Indicates user In the Dimensionless sequence values ​​at each sampling point; Step S12: Calculate the reference sequence and comparison sequence at the... The T-shaped two-stage absolute difference at each sampling point includes a first-stage difference. Second grade difference , ; First level difference The absolute difference in magnitude is used to measure the difference between two sequences on the 1st... The deviation of values ​​at each sampling point is calculated using the following formula: , Second level difference The absolute difference in trend is used to measure the difference between two sequences on the 1st... At the sampling point relative to the first The deviation of the trend at each sampling point is calculated using the following formula: , Step S13: Calculate the global range, which includes the global minimum range and the global maximum range. The calculation formula is as follows: , , In the formula, It is the global minimum range. This represents the global maximum range. Step S14: Calculate the overall difference The calculation formula is: , Step S15: Calculate the first... T-shaped grey relational coefficient at each sampling point The calculation formula is: , In the formula, The resolution coefficient is used to control the resolution of the correlation coefficient within the range. Step S16: For the first to The arithmetic mean of all T-shaped grey relational coefficients is used to obtain the user's... With users Improved T-shaped grey relational degree between The calculation formula is: , In the formula, The range of values ​​is The closer its value is to 1, the better it indicates the user's... With users The higher the overall similarity of voltage time series data in both amplitude shape and trend change, the greater the probability of a T-connection relationship. Step S17: For all phase-dependent components within the low-voltage distribution area... Individual users, build Improved T-type grey relational matrix of in-phase voltage between users Among them, the improved T-type grey relational matrix of in-phase voltage between users The elements are Improved T-type grey relational matrix of in-phase voltage between users It has symmetry, that is And all diagonal elements are 1.

2. The method for identifying a group of users connected to a low-voltage distribution area via a T-connection as described in claim 1, characterized in that: Step S1 involves performing high-association processing on the improved T-shaped grey relational matrix to generate a high-association matrix. Users involved in the high-association matrix are defined as high-association users, specifically including: Step S18: Improve the T-type grey relational matrix for in-phase voltages between users. Apply an association threshold to the diagonal elements of the non-Chinese side. ;like , If the element is set to zero, it indicates that the user... With users There is no significant voltage correlation between them, so they do not qualify as candidates for a T-connection relationship; if If so, set the element to 1 to indicate that the user... With users There is a high voltage correlation between them; Step S19: Improve the T-type grey relational matrix for in-phase voltages between users. Performing the orphaned element removal operation specifically includes: Improved T-type grey relational matrix for checking in-phase voltages between users In each row and corresponding column, if a user If all off-diagonal elements of the corresponding row vector are zero, it indicates that the user... No high-level connection has been established with any other user in the low-voltage distribution area, indicating that the user... For isolated nodes, their corresponding rows and columns are simultaneously derived from the improved T-type grey relational matrix of in-phase voltages between users. After deleting from the middle, a binarized high correlation matrix is ​​obtained. ; Step S20: Define the binarized high correlation matrix Users whose values ​​are 1 are considered highly relevant users.

3. The method for identifying a group of users connected to a low-voltage distribution area via a T-connection as described in claim 1, characterized in that: Step S2: Using a sliding window adaptive cumulative summation abrupt change point detection algorithm, extract the current abrupt change point set and voltage abrupt change point set for each highly correlated user, calculate the in-phase voltage abrupt change point matching degree matrix among users, and construct a high matching degree matrix, specifically including: Step S21: Using the sliding window adaptive cumulative sum change point detection algorithm, extract the current change point set and voltage change point set for each highly correlated user; Step S22: For any highly correlated user pair , with users Using the set of voltage mutation points as a benchmark, in the user Find the time-matching mutation point in the set of voltage mutation points and generate a set of candidate matching pairs for mutation point time window matching; Step S23: For any candidate matching pair in the candidate matching pair set, calculate the time synchronization score, voltage change direction consistency score, voltage change amplitude ratio score, and current mutation verification score, and then perform a weighted summation of the time synchronization score, voltage change direction consistency score, voltage change amplitude ratio score, and current mutation verification score to obtain the comprehensive score of the candidate matching pair. Step S24: Based on the comprehensive score of all candidate matching pairs, calculate any highly relevant user pair. The average score, as a measure of highly relevant users'... Overall match score; Step S25: Repeat steps S22-S24 until the overall matching score of all highly correlated user pairs is calculated, and construct the matching degree matrix of in-phase voltage mutation points among users. Step S26: Apply a matching degree threshold to the elements in the matching degree matrix of the in-phase voltage mutation points between users, and transform the matching degree matrix of the in-phase voltage mutation points between users into a high matching degree matrix.

4. The method for identifying a group of users connected to a low-voltage distribution area via a T-connection as described in claim 3, characterized in that: Step S21: Using a sliding window adaptive cumulative sum abrupt change point detection algorithm, extract the current abrupt change point set and voltage abrupt change point set for each highly correlated user, specifically including: Step S211: Using the sliding window adaptive cumulative sum change point detection algorithm, extract the initial voltage change point set of each phase of each highly correlated user from the three-phase or single-phase voltage time series data of each user. Step S212: Using the sliding window adaptive cumulative sum change point detection algorithm, extract the bus voltage change point set and the distribution area voltage change point set from the voltage time series data of the bus to which the low-voltage distribution area belongs and the three-phase voltage time series data of the low-voltage distribution area. Step S213: Any sudden change that occurs simultaneously in both the bus voltage sudden change point set and the transformer area voltage sudden change point set is identified as a common sudden change point driven by the public power grid disturbance. Step S214: Remove common abrupt changes from the initial voltage abrupt change point set of each phase for each highly correlated user to obtain the voltage abrupt change point set of each highly correlated user; Step S216: Using the sliding window adaptive cumulative sum change point detection algorithm, extract the set of current change points for each highly correlated user from the current time series data of each highly correlated user.

5. The method for identifying a group of users connected to a low-voltage distribution area via a T-connection as described in claim 3, characterized in that: Step S22: For any highly correlated user pair , with users Using the set of voltage mutation points as a benchmark, in the user From the set of voltage abrupt change points, the abrupt change point with the best time match is found, and a candidate matching pair set for time window matching of the abrupt change point is generated, specifically including: Step S221: For any highly correlated user pair , with users Set of voltage change points Each voltage change point in Based on the user Set of voltage change points In the process, find the point of voltage change. The closest voltage change point in time The absolute value of the time difference between the two must be less than or equal to the maximum permissible time deviation. The calculation formula used during the search is: , In the formula, Represents the set of voltage abrupt change points Medium voltage change point At that moment, Represents the set of voltage abrupt change points Medium voltage change point The moment; Step S222: If the maximum allowable time deviation is within the acceptable range... Internal capabilities for users Set of voltage change points Find the corresponding voltage change point Then This is identified as a candidate matching pair; Step S223: If the maximum allowable time deviation is within the acceptable range... There are no voltage abrupt changes that meet the conditions. Then the voltage change point It is considered a no-match.

6. The method for identifying a group of users connected to a low-voltage distribution area via a T-connection as described in claim 5, characterized in that: Step S23: For any candidate matching pair in the candidate matching pair set, calculate the time synchronization score, voltage change direction consistency score, voltage change amplitude ratio score, and current surge verification score, and then perform a weighted sum of the time synchronization score, voltage change direction consistency score, voltage change amplitude ratio score, and current surge verification score to obtain the comprehensive score of the candidate matching pair, specifically including: Step S231: Calculate the time synchronization score : For candidate matching pairs Time synchronization score This reflects the proximity of the two voltage abrupt change points on the time axis; the smaller the time deviation, the higher the score. Time synchronization score The calculation formula is: , When the voltage change point and When the times are exactly the same, As the time deviation increases, Linear decay; when the time deviation reaches hour, ; Step S232: Calculate the consistency score of voltage change direction. The calculation formula used is: , in, For users Voltage mutation point exist The voltage change at any given time is represented by a positive value indicating a sudden increase and a negative value indicating a sudden decrease. For users Voltage mutation point exist The voltage change at any given time is represented by a positive value indicating a sudden increase and a negative value indicating a sudden decrease. For symbolic functions; if the user With users In candidate matching pairs If the voltage change at a point is in the opposite direction, then... If the user With users In candidate matching pairs If the voltage changes in the same direction at each location, then... ; Step S233: Calculate the proportional score of voltage change amplitude. : Calculate users With users The relative variation under their respective rated voltage references is calculated using the following formula: , , in, , Representing users respectively With users The relative variation under their respective rated voltage references , users respectively and users The rated voltage; Based on user With users Calculate the voltage change ratio score based on the relative change amplitude under their respective rated voltage references. The calculation formula is: , in, This is the preset maximum allowable relative amplitude difference, used to control the strictness of amplitude consistency judgment; Step S234: Calculate the current mutation verification score : For users in the candidate matching pairs At its voltage abrupt change point Time Neighborhood Inside, check the user Set of current abrupt change points and users Set of current abrupt change points Does the set of values ​​contain a sudden current surge point? , Allowable current-voltage time difference tolerance; current surge verification score. The calculation formula is: , in, As an indicator function, determine the change in current. Direction and voltage change value If the directions are opposite, the value is 1; otherwise, it is 0. This is the time difference between the moment of current change and the moment of voltage change; For users and users Maximum permissible time deviation Union of sets of current abrupt change points within; Step S235: Calculate the overall score; For candidate matching pairs The overall score of the matched pair The calculation formula is: , in, , , , All are weights, and the weights satisfy the following relationship: .

7. The method for identifying a group of users connected to a low-voltage distribution area via a T-connection as described in claim 6, characterized in that... include: Step S24: Based on the comprehensive score of all candidate matching pairs, calculate any highly relevant user pair. The average score, as a measure of highly relevant users'... The overall match score includes: For users Calculate all voltage abrupt change points and the relationship between highly correlated users and... Overall matching score The calculation formula used is: , in, The range of values ​​is The closer it is to 1, the more it indicates the user The voltage mutation point at the user A response that matches in all four dimensions of time, direction, amplitude, and current change can be found at any point, and the higher the confidence level of the T-connection relationship between the two, the higher the confidence level.

8. The method for identifying a group of users connected to a low-voltage distribution area via a T-connection as described in claim 1, characterized in that, include: Step S3: Take the non-zero intersection of corresponding elements of the high correlation matrix and the high matching matrix according to the phase, and generate a confirmation connection matrix; Generate an association graph for each phase based on the confirmed connection relationship matrix, and decompose the connected paths in the association graph to generate a set of user connection line T-connection groups, specifically including: Step S31: Perform an element-wise logical AND operation on the high correlation matrix and the high matching matrix to obtain the confirmed connection matrix. Confirm the connection matrix elements in The calculation formula is: , In the formula, High correlation matrix The elements in High matching degree matrix The element in, that is, only when the user With users When the corresponding positions in both the high correlation matrix and the high matching matrix are non-zero, the connection relationship matrix is ​​confirmed. The value of 1 at this position indicates that the two users have a high-confidence T-connection relationship; Step S32: Confirm the connection relationship matrix according to phase, extract the user pairs with element 1, and construct the association graph based on the extracted user pairs; Step S33: If several users form a network with at least one connected path between them, then identify the set of users corresponding to the connected path as a user access line T-connection group; summarize all user access line T-connection groups into a user access line T-connection group set. Step S34: For a certain three-phase user, if it exists in multiple different user connection line T-connection groups at the same time, then delete the three-phase user in the corresponding user connection line T-connection group. Each user connection line T-connection group shall have at least 2 users.

9. A method for identifying groups of users connected to a low-voltage distribution area via a T-connection as described in claim 1, characterized in that, Step S4: Based on the known network topology information of the transformer area, calculate the electrical distance between each user pair within each user connection T-connection group in step S3, and output suspected abnormal connection users through electrical distance anomaly detection; specifically including: Step S41: For the identified user connection T-connection group, calculate the total shortest path conductor length between each user pair within the user connection T-connection group based on the known network topology information of the transformer area, and use it as the electrical distance between users; Step S42: For each user in the user service line T-connection group, calculate the minimum electrical distance between it and all other members in the user service line T-connection group, and use it as the user's nearest neighbor distance; Step S43: Calculate the median nearest neighbor distance for all users, and set its... This multiple serves as the electrical distance reference for the T-connection group of the user's service line; Step S44: Output users whose nearest neighbor distance exceeds the electrical distance reference base of the user's service line T-connection group as suspected abnormal connection users.

10. A method for identifying groups of users connected to a low-voltage distribution area via a T-connection as described in claim 1, characterized in that, Step S5: For each user connection line T-connection group in step S3, identify the user connection sequence; and calculate the time set of joint impact of current mutations and the contribution rate of current mutations within the user connection line T-connection group. Based on the contribution rate of current mutations, users are divided into active influence type and passive response type users, specifically including: Step S51: For any user connection line T-connection group corresponding to the user set, iterate through each user. The absolute values ​​of the amplitudes at all voltage abrupt change points are counted and denoted as the set. ,in, This represents the total number of voltage inflection points for this user. For users At the mutation point The voltage change at that point; Calculate users The average voltage fluctuation amplitude is calculated using the following formula: , In the formula, For users The average voltage fluctuation amplitude; Based on the average voltage fluctuation amplitude of each user For all users within the T-connection group of the user's service line, the average voltage fluctuation amplitude is calculated. Sort in descending order, which is the order in which the topologies of each user in the group are connected; Step S52: For any user set corresponding to a user connection T-connection group, iterate through each user, count all current mutation points, and extract the user whose absolute value of current mutation amplitude is greater than the current threshold. Corresponding current change moment This is the set of significant current abrupt changes for users connected to the user's T-connection line. The union of the sets of significant current abrupt changes for all users within the T-connection group yields the set of times of joint impact of current abrupt changes for all users within the T-connection group. : , In the formula, This represents the union operation. For the first Individual user connection T-connection group. For the first The first in the group of users connecting the T-line There are several users; among them, when performing the union operation, if the current change times of different users are the same, only one current change time is retained as the time of joint impact of the current change; if two current change times from different users are different... , The difference satisfies Then, the moment with the largest absolute value of the current surge amplitude is taken as the moment of combined current surge impact after merging. The time difference threshold; Step S53: Set the time of joint influence of the user's T-connection group The combined effect of each merged current surge moment Check each user In the time window If there is a significant current abrupt change within the time frame, then record the user at that time. If a user makes a contribution, it is recorded as having made no contribution; define the user. The set of contribution moments for: , Calculate users The combined impact of sudden changes in user current within the user's service connection T-connection group on the time set Current mutation contribution rate The calculation formula is: , In the formula, Indicates the number of elements in the set; Set contribution rate classification threshold ; For user connection lines T-connection groups Each user Based on its current mutation contribution rate Contribution rate classification threshold Based on the size relationship, the following role classification is applied: , In the formula, Indicates user The role.

11. A group identification device for T-connection of user service lines in low-voltage distribution areas, characterized in that, include: The high correlation matrix construction module is used to calculate the improved T-type grey correlation matrix of the same phase voltage between users based on the voltage time series data of each user in the low voltage distribution area, and to perform high correlation processing on it to generate a high correlation matrix. The users involved in the high correlation matrix are defined as high correlation users. The high matching degree matrix construction module is used to extract the current mutation point set and voltage mutation point set of each highly correlated user by using the sliding window adaptive cumulative sum mutation point detection algorithm, calculate the matching degree matrix of in-phase voltage mutation points between users, and construct the high matching degree matrix. The user connection line T-connection group generation module is used to take the non-zero intersection of corresponding elements of the high correlation degree matrix and the high matching degree matrix according to the phase to generate a confirmed connection relationship matrix; generate an association graph according to the confirmed connection relationship matrix according to the phase; and decompose the connected paths in the association graph to generate a user connection line T-connection group set. The user access line T-connection group suspected connection anomaly identification module is used to calculate the electrical distance between each user pair in each user access line T-connection group based on the known network topology information of the transformer area, and output suspected connection anomaly users by detecting abnormal electrical distance values; The user connection line T-connection group hanging sequence identification and role classification module is used to identify the user hanging sequence for each user connection line T-connection group; and calculate the time set of joint impact of user current mutation within the user connection line T-connection group and the contribution rate of user current mutation. Based on the contribution rate of current mutation, users are divided into active influence type and passive response type users. Specifically, based on the voltage time-series data of each user within the low-voltage distribution area, an improved T-type grey relational degree matrix for the same phase voltage between users is calculated separately, including: Step S11: Define the reference sequence as user The dimensionless sequence is denoted as: In the formula, Indicates user The Dimensionless sequence values ​​at each sampling point The total number of sampling points; the comparison sequence is defined as the user's. The dimensionless sequence is denoted as: In the formula, Indicates user In the Dimensionless sequence values ​​at each sampling point; Step S12: Calculate the reference sequence and comparison sequence at the... The T-shaped two-stage absolute difference at each sampling point includes a first-stage difference. Second grade difference , ; First level difference The absolute difference in magnitude is used to measure the difference between two sequences on the 1st... The deviation of values ​​at each sampling point is calculated using the following formula: , Second level difference The absolute difference in trend is used to measure the difference between two sequences on the 1st... At the sampling point relative to the first The deviation of the trend at each sampling point is calculated using the following formula: , Step S13: Calculate the global range, which includes the global minimum range and the global maximum range. The calculation formula is as follows: , , In the formula, It is the global minimum range. This represents the global maximum range. Step S14: Calculate the overall difference The calculation formula is: , Step S15: Calculate the first... T-shaped grey relational coefficient at each sampling point The calculation formula is: , In the formula, The resolution coefficient is used to control the resolution of the correlation coefficient within the range. Step S16: For the first to The arithmetic mean of all T-shaped grey relational coefficients is used to obtain the user's... With users Improved T-shaped grey relational degree between The calculation formula is: , In the formula, The range of values ​​is The closer its value is to 1, the better it indicates the user's... With users The higher the overall similarity of voltage time series data in both amplitude shape and trend change, the greater the probability of a T-connection relationship. Step S17: For all phase-dependent components within the low-voltage distribution area... Individual users, build Improved T-type grey relational matrix of in-phase voltage between users Among them, the improved T-type grey relational matrix of in-phase voltage between users The elements are Improved T-type grey relational matrix of in-phase voltage between users It has symmetry, that is And all diagonal elements are 1.

12. A group identification system for T-connection of user service lines in low-voltage distribution areas, characterized in that, Including storage media and processor; The storage medium is used to store instructions; The processor is configured to operate according to the instructions to perform the method according to any one of claims 1-10.

Citation Information

Patent Citations

  • Active customer topology identification method based on quadratic programming and grey relational degree

    CN117874535A

  • Topology identification method, system and equipment for low-voltage power distribution network court and medium

    CN121749100A