Device for butt joint construction of wind power tower drum

CN122880679APending Publication Date: 2026-10-09POWER CHINA KUNMING ENG CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610972378.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-01
Publication Date
2026-10-09

AI Technical Summary

Technical Problem

[0004]本公开实施例涉及风电塔筒对接施工的装置,其具有塔筒吊运单元、控制检测单元、连接定位单元、活动限位单元和吊运警示单元;当右侧的连接定位杆未与连接定位框连接到位时,四个圆形检测板的内侧在四个螺旋弹簧a的作用下与两个弧形吊运框架的内侧接触,使两个弧形吊运框架与待吊运的风电塔筒自动脱落,有利于施工人员得知右侧的连接定位杆未与连接定位框连接到位;当两个控制开关处于通路状态时,两个警示报警器持续发出警示报警声音,能提示附近施工人员注意;解决了吊运结构未与风电塔筒连接准确时不利于施工人员得知和无法在风电塔筒吊运过程中持续发出报警声音的问题

Benefits of technology

1、本发明中,因两个控制检测架滑动安装在两个弧形吊运框架上,且四个橡胶防滑套固定安装在两个控制检测架的外部,方便施工人员通过四个橡胶防滑套控制两个弧形吊运框架的位置,有利于两个弧形吊运框架与待吊运的风电塔筒连接;又因两个吊运连接板固定安装在两个弧形吊运框架的顶部,便于外部吊运机械上的挂钩连接;

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122880679A_ABST
    Figure CN122880679A_ABST
Patent Text Reader

Abstract

The application provides a device for butt joint construction of a wind power tower drum, relates to the technical field of butt joint construction of wind power tower drums, and comprises a tower drum hoisting unit, a control detection unit, a connecting and positioning unit, a movable limiting unit and a hoisting warning unit. The connecting and positioning unit is installed on two groups of tower drum hoisting units. The control detection unit is provided with two groups, and the two groups of control detection units are installed on the two groups of tower drum hoisting units. The movable limiting unit is installed on the top of the connecting and positioning unit. The hoisting warning unit is provided with two groups, and the two groups of hoisting warning units are installed on the connecting and positioning unit. When two control switches are in an on state, the two warning alarms continuously emit warning alarm sounds, which can prompt nearby constructors to pay attention. The application solves the problems that there is no automatic warning alarm structure, no alarm sound can be continuously emitted during the hoisting of the wind power tower drum, and nearby constructors of the wind power tower drum cannot be warned.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of wind turbine tower docking construction technology, and more specifically, relates to a device for wind turbine tower docking construction. Background Technology

[0002] When developing wind power in low-to-medium wind speed areas on land, large-diameter, tall towers are generally required to capture more wind energy. If a 6-meter diameter tower is used as a single structure, it exceeds the size limits of conventional road and rail transport, and is even more difficult to pass through mountainous areas with complex road conditions. By adopting a segmented design with multiple connecting sections, the entire tower can be disassembled into multiple arc-shaped lobes. The size and weight of each section are suitable for standard transport vehicles, eliminating the need for special transport. This can significantly reduce transportation costs and shorten the transportation cycle, making it the mainstream technical solution to solve the transportation problem of large-diameter towers. Therefore, hoisting structures are required during the construction of wind turbine tower connections.

[0003] Currently, the following problems still exist in the hoisting process of wind turbine towers: 1. When the hoisting structure is not accurately connected to the wind turbine tower, it is not easy for construction personnel to know, which makes it easy for the wind turbine tower to fall off during subsequent hoisting; 2. There is a lack of automatic warning and alarm structure, which cannot continuously emit alarm sounds during the hoisting process of the wind turbine tower, which is not conducive to warning construction personnel near the wind turbine tower. Summary of the Invention

[0004] This disclosure relates to a device for the installation of wind turbine towers, comprising a tower hoisting unit, a control and detection unit, a connection and positioning unit, an activity limit unit, and a hoisting warning unit. When the right-side connection and positioning rod is not properly connected to the connection and positioning frame, the inner sides of the four circular detection plates, under the action of four helical springs a, contact the inner sides of the two arc-shaped hoisting frames, causing the two arc-shaped hoisting frames to automatically detach from the wind turbine tower to be hoisted. This facilitates the construction personnel's awareness that the right-side connection and positioning rod is not properly connected to the connection and positioning frame. When the two control switches are in the on state, the two warning alarms continuously emit warning alarm sounds, alerting nearby construction personnel. This solves the problems of construction personnel not being able to be aware when the hoisting structure is not accurately connected to the wind turbine tower and the inability to continuously emit alarm sounds during the hoisting of the wind turbine tower.

[0005] This invention provides a device for the construction of wind turbine tower docking, comprising: a tower hoisting unit, a control and detection unit, a connection and positioning unit, a movable limiting unit, and a hoisting warning unit; the tower hoisting unit comprises two sets, which are symmetrically arranged; the connection and positioning unit is installed on the two sets of tower hoisting units and is used to connect the two sets of tower hoisting units; the control and detection unit comprises two sets, which are installed on the two sets of tower hoisting units and are used to control the two sets of tower hoisting units, and are also used to detect the connection status of the connection and positioning unit; the movable limiting unit is installed on the top of the connection and positioning unit and is used to limit the connection and positioning unit after connection; the hoisting warning unit comprises two sets, which are installed on the connection and positioning unit and are used to continuously issue warnings during tower hoisting.

[0006] In at least some embodiments, the tower hoisting unit includes: an arc-shaped hoisting frame and a hoisting connecting plate; the arc of the arc-shaped hoisting frame is the same as the arc of the tower to be hoisted; the hoisting connecting plate is fixedly installed on the top of the arc-shaped hoisting frame.

[0007] In at least some embodiments, the control and detection unit includes: a control and detection frame and rubber anti-slip sleeves; the control and detection frame is slidably mounted on an arc-shaped hoisting frame; two rubber anti-slip sleeves are provided, and the two rubber anti-slip sleeves are fixedly mounted on the outside of the control and detection frame.

[0008] In at least some embodiments, the control detection unit further includes: a circular detection plate and a helical spring a; there are two circular detection plates, and the two circular detection plates are fixedly installed on the inner side of the control detection frame; there are two helical springs a, and the two helical springs a are sleeved on the outside of the control detection frame, and the two helical springs a are located between the arc-shaped hoisting frame and the two circular detection plates.

[0009] In at least some embodiments, the connecting positioning unit includes: a connecting positioning rod and a connecting positioning frame; there are two connecting positioning rods, and the two connecting positioning rods are fixedly installed on two hoisting connecting plates, and the inner ends of the two connecting positioning rods are chamfered; the connecting positioning frame is fixedly installed on the left connecting positioning rod, and the right connecting positioning rod is inserted into the right end of the connecting positioning frame.

[0010] In at least some embodiments, the movable limiting unit includes: a movable limiting seat and a movable limiting pin; the movable limiting seat is fixedly installed on the top of the connecting positioning frame; the movable limiting pin is slidably installed on the movable limiting seat and the connecting positioning frame, and the bottom end of the movable limiting pin is inserted into the connecting positioning rod on the right side, and the bottom of the movable limiting pin is provided with a chamfer.

[0011] In at least some embodiments, the movable limiting unit further includes: a circular anti-detachment plate a and a helical spring b; the circular anti-detachment plate a is fixedly installed outside the movable limiting pin, and the bottom of the circular anti-detachment plate a contacts the connecting positioning frame; the helical spring b is sleeved outside the movable limiting pin, and the helical spring b is located between the movable limiting seat and the circular anti-detachment plate a.

[0012] In at least some embodiments, the hoisting warning unit includes: a tower detection rod, a circular anti-detachment plate b, and a circular anti-detachment plate c; the tower detection rod is slidably mounted on a connecting positioning rod, and the bottom end of the tower detection rod is provided with rounded corners; the circular anti-detachment plate b is fixedly mounted on the top end of the tower detection rod, and the bottom of the circular anti-detachment plate b is in contact with the connecting positioning rod; the circular anti-detachment plate c is fixedly mounted on the outside of the tower detection rod, and the circular anti-detachment plate c is located below the connecting positioning rod.

[0013] In at least some embodiments, the hoisting warning unit further includes: a helical spring c, a lithium battery, and a warning alarm; the helical spring c is sleeved on the outside of the tower detection rod, and the helical spring c is located between the connecting positioning rod and the circular anti-detachment plate c; the lithium battery is fixedly installed on the top of the connecting positioning rod; the warning alarm is fixedly installed on the top of the connecting positioning rod, and the lithium battery is electrically connected to the warning alarm.

[0014] In at least some embodiments, the hoisting warning unit further includes: a control switch and a pressing protrusion; the control switch is fixedly installed inside the tower detection rod and is electrically connected to the lithium battery and the warning alarm; the pressing protrusion is fixedly installed outside the control switch.

[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. In this invention, since two control and detection frames are slidably installed on two arc-shaped hoisting frames, and four rubber anti-slip sleeves are fixedly installed on the outside of the two control and detection frames, it is convenient for construction personnel to control the position of the two arc-shaped hoisting frames through the four rubber anti-slip sleeves, which is beneficial for the connection between the two arc-shaped hoisting frames and the wind turbine tower to be hoisted; and since two hoisting connection plates are fixedly installed on the top of the two arc-shaped hoisting frames, it is convenient for the hooks on the external hoisting machinery to be connected. Furthermore, since the four circular detection plates are fixedly installed on the inner side of the two control detection frames, the four circular detection plates have a sliding effect; and since the four helical springs a are sleeved on the outside of the two control detection frames, and the four helical springs a are located between the two arc-shaped hoisting frames and the four circular detection plates, the four helical springs a can be compressed when the four circular detection plates are subjected to force.

[0016] 2. In this invention, since the two connecting positioning rods are fixedly installed on the two hoisting connecting plates, and the connecting positioning frame is fixedly installed on the left connecting positioning rod, and the right connecting positioning rod is inserted into the right end of the connecting positioning frame, the two hoisting connecting plates are connected; and since the movable limiting pin is slidably installed on the movable limiting seat and the connecting positioning frame, and the bottom end of the movable limiting pin is inserted into the right connecting positioning rod, and the bottom of the movable limiting pin is chamfered, the two connecting positioning rods can be firmly connected to the two connecting positioning frames; Furthermore, when the connecting positioning rod on the right is not connected to the connecting positioning frame, the inner sides of the four circular detection plates contact the inner sides of the two arc-shaped hoisting frames under the action of the four helical springs a, causing the two arc-shaped hoisting frames to automatically detach from the wind turbine tower to be hoisted. This helps construction personnel to know that the connecting positioning rod on the right is not connected to the connecting positioning frame. Also, because the circular anti-detachment plate a is fixedly installed outside the movable limit pin, and the helical spring b is sleeved outside the movable limit pin, and the helical spring b is located between the movable limit seat and the circular anti-detachment plate a, it plays an elastic positioning role for the movable limit pin, preventing the movable limit pin from falling off.

[0017] 3. In this invention, because the two tower detection rods are slidably installed on the two connecting positioning rods, and the two helical springs c are sleeved on the outside of the two tower detection rods, and the two helical springs c are located between the two connecting positioning rods and the two circular anti-detachment plates c, they play an elastic positioning role for the two tower detection rods. Under normal conditions, the two tower detection rods will not slide arbitrarily; when the two arc-shaped hoisting frames are connected to the wind turbine tower, the wind turbine tower can push the two tower detection rods to slide upward a certain distance. Furthermore, since the two control switches are fixedly installed inside the two tower detection rods, and the two pressing protrusions are fixedly installed outside the two control switches, when the wind turbine tower pushes the two tower detection rods to slide upward a certain distance, the two connecting positioning rods can push the two pressing protrusions to move inward, so that the two control switches are in the open state; and since the two lithium batteries are electrically connected to the two warning alarms, and the two control switches are electrically connected to the two lithium batteries and the two warning alarms, when the two control switches are in the open state, the two warning alarms will continuously emit warning alarm sounds, which can alert nearby construction personnel. Attached Figure Description

[0018] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings of the embodiments will be briefly described below.

[0019] The accompanying drawings described below are only related to some embodiments of the invention and are not intended to limit the invention.

[0020] In the attached diagram: Figure 1 A three-dimensional structural schematic diagram of the present invention is shown; Figure 2 A schematic diagram of the tower hoisting unit and control and detection unit of the present invention is shown; Figure 3 The present invention is shown. Figure 2 A magnified schematic diagram of a portion of region A in the middle; Figure 4 A schematic diagram of the structure of the positioning unit of the present invention is shown; Figure 5 The present invention is shown. Figure 4 A magnified schematic diagram of a portion of region B in the middle; Figure 6 The present invention is shown. Figure 1 A schematic diagram of the central cross-section structure; Figure 7 The present invention is shown. Figure 6 A magnified schematic diagram of a portion of region C in the middle; Figure 8 The present invention is shown. Figure 1 A schematic diagram of the bottom view structure; Figure 9 The present invention is shown. Figure 8 A magnified schematic diagram of a portion of region D in the middle; Figure 10 The present invention is shown. Figure 6 A magnified schematic diagram of a portion of region E in the middle.

[0021] List of reference numerals in the attached diagram: 100. Tower hoisting unit; 101. Arc-shaped hoisting frame; 102. Hoisting connecting plate; 200. Control and detection unit; 201. Control and detection frame; 202. Rubber anti-slip sleeve; 203. Circular detection plate; 204. Helical spring a; 300. Connect the positioning unit; 301. Connect the positioning rod; 302. Connect the positioning frame; 400. Movable limit unit; 401. Movable limit seat; 402. Movable limit pin; 403. Circular anti-detachment plate a; 404. Helical spring b; 500. Lifting warning unit; 501. Tower detection rod; 502. Circular anti-detachment plate b; 503. Circular anti-detachment plate c; 504. Helical spring c; 505. Lithium battery; 506. Warning alarm; 507. Control switch; 508. Pressing protrusion. Detailed Implementation

[0022] To make the objectives, solutions, and advantages of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Unless otherwise stated, the terms used herein have their ordinary meanings in the art. The same reference numerals in the drawings represent the same parts.

[0023] Example: Please refer to Figures 1 to 10 As shown: This invention provides a device for the construction of wind turbine tower docking, comprising: a tower hoisting unit 100, a control and detection unit 200, a connection and positioning unit 300, a movement limit unit 400, and a hoisting warning unit 500; two sets of tower hoisting units 100 are provided, and the two sets of tower hoisting units 100 are symmetrically arranged; the connection and positioning unit 300 is installed on the two sets of tower hoisting units 100, and is used to connect the two sets of tower hoisting units 100; two sets of control and detection units 200 are provided, and the two sets of control and detection units 200 are installed on the two sets of towers. On the hoisting unit 100, two sets of control and detection units 200 are used to control the two sets of tower hoisting units 100, and the two sets of control and detection units 200 are also used to detect the connection status of the connecting positioning unit 300; the movable limit unit 400 is installed on the top of the connecting positioning unit 300, and the movable limit unit 400 is used to limit the connecting positioning unit 300 after connection; there are two sets of hoisting warning units 500, and the two sets of hoisting warning units 500 are installed on the connecting positioning unit 300, and the two sets of hoisting warning units 500 are used to continuously issue warnings during the tower hoisting process.

[0024] In this embodiment of the disclosure, such as Figure 2 and Figure 3 As shown, the tower hoisting unit 100 includes: an arc-shaped hoisting frame 101 and a hoisting connecting plate 102; the arc of the arc-shaped hoisting frame 101 is the same as the arc of the tower to be hoisted; the hoisting connecting plate 102 is fixedly installed on the top of the arc-shaped hoisting frame 101.

[0025] The control and detection unit 200 includes: a control and detection frame 201 and rubber anti-slip sleeves 202; the control and detection frame 201 is slidably mounted on the arc-shaped hoisting frame 101; two rubber anti-slip sleeves 202 are provided, and the two rubber anti-slip sleeves 202 are fixedly mounted on the outside of the control and detection frame 201; the control and detection unit 200 also includes: a circular detection plate 203 and a helical spring a204; two circular detection plates 203 are provided, and the two circular detection plates 203 are fixedly mounted on the inside of the control and detection frame 201; two helical springs a204 are provided, and the two helical springs a204 are sleeved on the outside of the control and detection frame 201, and the two helical springs a204 are located between the arc-shaped hoisting frame 101 and the two circular detection plates 203.

[0026] The specific functions of the two sets of tower hoisting units 100 and the two sets of control and detection units 200 are as follows: Since the two control and detection frames 201 are slidably installed on the two arc-shaped hoisting frames 101, and the four rubber anti-slip sleeves 202 are fixedly installed on the outside of the two control and detection frames 201, it is convenient for construction personnel to control the position of the two arc-shaped hoisting frames 101 through the four rubber anti-slip sleeves 202, which is conducive to the connection between the two arc-shaped hoisting frames 101 and the wind turbine tower to be hoisted; and since the two hoisting connection plates 102 are fixedly installed on the top of the two arc-shaped hoisting frames 101, it is convenient to connect the hooks on the external hoisting machinery. Furthermore, since the four circular detection plates 203 are fixedly installed on the inner side of the two control detection frames 201, the four circular detection plates 203 have a sliding effect; and since the four helical springs a204 are sleeved on the outside of the two control detection frames 201, and the four helical springs a204 are located between the two arc-shaped hoisting frames 101 and the four circular detection plates 203, the four helical springs a204 can be compressed when the four circular detection plates 203 are subjected to force.

[0027] In this embodiment of the disclosure, such as Figure 4 , Figure 5 and Figure 7 As shown, the connecting positioning unit 300 includes: a connecting positioning rod 301 and a connecting positioning frame 302; there are two connecting positioning rods 301, and the two connecting positioning rods 301 are fixedly installed on the two hoisting connecting plates 102, and the inner ends of the two connecting positioning rods 301 are chamfered; the connecting positioning frame 302 is fixedly installed on the left connecting positioning rod 301, and the right connecting positioning rod 301 is inserted into the right end of the connecting positioning frame 302.

[0028] The movable limiting unit 400 includes: a movable limiting seat 401 and a movable limiting pin 402; the movable limiting seat 401 is fixedly installed on the top of the connecting positioning frame 302; the movable limiting pin 402 is slidably installed on the movable limiting seat 401 and the connecting positioning frame 302, and the bottom end of the movable limiting pin 402 is inserted into the connecting positioning rod 301 on the right side, and the bottom of the movable limiting pin 402 is chamfered; the movable limiting unit 400 also includes: a circular anti-detachment plate a403 and a coil spring b404; the circular anti-detachment plate a403 is fixedly installed on the outside of the movable limiting pin 402, and the bottom of the circular anti-detachment plate a403 contacts the connecting positioning frame 302; the coil spring b404 is sleeved on the outside of the movable limiting pin 402, and the coil spring b404 is located between the movable limiting seat 401 and the circular anti-detachment plate a403.

[0029] The specific functions of the connecting positioning unit 300 and the movable limiting unit 400 are as follows: Since the two connecting positioning rods 301 are fixedly installed on the two hoisting connecting plates 102, and the connecting positioning frame 302 is fixedly installed on the left connecting positioning rod 301, and the right connecting positioning rod 301 is inserted into the right end of the connecting positioning frame 302, the two hoisting connecting plates 102 are connected; and since the movable limiting pin 402 is slidably installed on the movable limiting seat 401 and the connecting positioning frame 302, and the bottom end of the movable limiting pin 402 is inserted into the right connecting positioning rod 301, and the bottom of the movable limiting pin 402 is chamfered, the two connecting positioning rods 301 can be firmly connected to the two connecting positioning frames 302. Furthermore, when the connecting positioning rod 301 on the right is not connected to the connecting positioning frame 302, the inner sides of the four circular detection plates 203 contact the inner sides of the two arc-shaped hoisting frames 101 under the action of the four helical springs a204, causing the two arc-shaped hoisting frames 101 to automatically detach from the wind turbine tower to be hoisted. This helps construction personnel to know that the connecting positioning rod 301 on the right is not connected to the connecting positioning frame 302. Also, because the circular anti-detachment plate a403 is fixedly installed on the outside of the movable limit pin 402, and the helical spring b404 is sleeved on the outside of the movable limit pin 402, and the helical spring b404 is located between the movable limit seat 401 and the circular anti-detachment plate a403, it plays an elastic positioning role for the movable limit pin 402, preventing the movable limit pin 402 from falling off.

[0030] In this embodiment of the disclosure, such as Figure 9 and Figure 10As shown, the hoisting warning unit 500 includes: a tower detection rod 501, a circular anti-detachment plate b502, and a circular anti-detachment plate c503; the tower detection rod 501 is slidably mounted on the connecting positioning rod 301, and the bottom end of the tower detection rod 501 is rounded; the circular anti-detachment plate b502 is fixedly mounted on the top end of the tower detection rod 501, and the bottom of the circular anti-detachment plate b502 is in contact with the connecting positioning rod 301; the circular anti-detachment plate c503 is fixedly mounted on the outside of the tower detection rod 501, and the circular anti-detachment plate c503 is located below the connecting positioning rod 301; the hoisting warning unit 500 also includes: a helical spring c504, a lithium battery 505, and a warning alarm 506; the helical spring c504... Spring C504 is sleeved on the outside of tower detection rod 501, and helical spring C504 is located between connecting positioning rod 301 and circular anti-detachment plate C503; lithium battery 505 is fixedly installed on the top of connecting positioning rod 301; warning alarm 506 is fixedly installed on the top of connecting positioning rod 301, and lithium battery 505 is electrically connected to warning alarm 506; hoisting warning unit 500 also includes: control switch 507 and pressing protrusion 508; control switch 507 is fixedly installed inside tower detection rod 501, and control switch 507 is electrically connected to lithium battery 505 and warning alarm 506; pressing protrusion 508 is fixedly installed on the outside of control switch 507.

[0031] The specific functions of the two sets of hoisting warning units 500 are as follows: Since the two tower detection rods 501 are slidably installed on the two connecting positioning rods 301, and the two helical springs c504 are sleeved on the outside of the two tower detection rods 501, and the two helical springs c504 are located between the two connecting positioning rods 301 and the two circular anti-detachment plates c503, they play an elastic positioning role for the two tower detection rods 501. Under normal conditions, the two tower detection rods 501 will not slide arbitrarily; when the two arc-shaped hoisting frames 101 are connected to the wind turbine tower, the wind turbine tower can push the two tower detection rods 501 to slide upward a certain distance. Furthermore, since the two control switches 507 are fixedly installed inside the two tower detection rods 501, and the two pressing protrusions 508 are fixedly installed outside the two control switches 507, when the wind turbine tower pushes the two tower detection rods 501 to slide upward a certain distance, the two connecting positioning rods 301 can push the two pressing protrusions 508 to move inward, so that the two control switches 507 are in the open state; and since the two lithium batteries 505 are electrically connected to the two warning alarms 506, and the two control switches 507 are electrically connected to the two lithium batteries 505 and the two warning alarms 506, when the two control switches 507 are in the open state, the two warning alarms 506 continuously emit warning alarm sounds, which can alert nearby construction personnel.

[0032] The specific usage and function of this embodiment are as follows: In use, two construction workers first adjust the positions of the two arc-shaped hoisting frames 101 appropriately using four rubber anti-slip sleeves 202, aligning the two arc-shaped hoisting frames 101 with the two ends of the wind turbine tower to be hoisted. Then, the construction workers first pull up the movable limit pin 402, and then push the two arc-shaped hoisting frames 101 inwards, so that the right-side connecting positioning rod 301 is accurately inserted into the connecting positioning frame 302, thus connecting the two hoisting connecting plates 102. When the right-side connecting positioning rod 301 is not fully connected to the connecting positioning frame 302, the inner sides of the four circular detection plates 203 contact the inner sides of the two arc-shaped hoisting frames 101 under the action of four helical springs a204, causing the two arc-shaped hoisting frames... 101 automatically detaches from the wind turbine tower to be hoisted, allowing construction personnel to know that the right-side connecting positioning rod 301 is not properly connected to the connecting positioning frame 302. Then, the construction personnel loosen the movable limit pin 402, allowing its bottom end to insert into the right-side connecting positioning rod 301. When the wind turbine tower pushes the two tower detection rods 501 upwards a certain distance, the two connecting positioning rods 301 can push the two pressing protrusions 508 inwards, putting the two control switches 507 in the open state. When the two control switches 507 are in the open state, the two warning alarms 506 continuously emit warning alarm sounds, alerting nearby construction personnel. Then, the hooks on the hoisting machinery are connected to the two hoisting connecting plates 102.

[0033] The following points should be noted in this article: 1. The accompanying drawings of the embodiments disclosed herein only relate to the structures involved in the embodiments disclosed herein; other structures can be referred to in general design.

[0034] 2. Where there is no conflict, the embodiments of this disclosure and the features in the embodiments can be combined with each other to obtain new embodiments.

[0035] The above are merely specific embodiments of this disclosure, but the scope of protection of this disclosure is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this disclosure should be included within the scope of protection of this disclosure. Therefore, the scope of protection of this disclosure should be determined by the scope of the claims.

Claims

1. Equipment for wind turbine tower docking construction, including: The system comprises a tower hoisting unit (100), a control and detection unit (200), a connection and positioning unit (300), a movement limit unit (400), and a hoisting warning unit (500). The tower hoisting unit (100) consists of two sets, symmetrically arranged. The connection and positioning unit (300) is installed on both sets of tower hoisting units (100) and is used to connect the two sets of tower hoisting units (100). The control and detection unit (200) consists of two sets, installed on both sets of tower hoisting units (100). The two sets of control and detection units (200) are used to control the two sets of tower hoisting units (100), and the two sets of control and detection units (200) are also used to detect the connection status of the connecting positioning unit (300); the movable limit unit (400) is installed on the top of the connecting positioning unit (300), and the movable limit unit (400) is used to limit the connecting positioning unit (300) after connection; there are two sets of hoisting warning units (500), and the two sets of hoisting warning units (500) are installed on the connecting positioning unit (300), and the two sets of hoisting warning units (500) are used to continuously issue warnings during tower hoisting.

2. The apparatus for connecting wind turbine towers according to claim 1, characterized in that, The tower hoisting unit (100) includes: an arc-shaped hoisting frame (101) and a hoisting connecting plate (102); the arc of the arc-shaped hoisting frame (101) is the same as the arc of the tower to be hoisted; the hoisting connecting plate (102) is fixedly installed on the top of the arc-shaped hoisting frame (101).

3. The apparatus for wind turbine tower docking construction according to claim 2, characterized in that, The control and detection unit (200) includes: a control and detection frame (201) and a rubber anti-slip sleeve (202); the control and detection frame (201) is slidably mounted on the arc-shaped hoisting frame (101); there are two rubber anti-slip sleeves (202), and the two rubber anti-slip sleeves (202) are fixedly mounted on the outside of the control and detection frame (201).

4. The apparatus for connecting wind turbine towers according to claim 3, characterized in that, The control detection unit (200) further includes: a circular detection plate (203) and a helical spring a (204); there are two circular detection plates (203), and the two circular detection plates (203) are fixedly installed on the inner side of the control detection frame (201); there are two helical springs a (204), and the two helical springs a (204) are sleeved on the outside of the control detection frame (201), and the two helical springs a (204) are located between the arc-shaped hoisting frame (101) and the two circular detection plates (203).

5. The apparatus for connecting wind turbine towers according to claim 2, characterized in that, The connection positioning unit (300) includes: The connection positioning rod (301) and the connection positioning frame (302) are provided; there are two connection positioning rods (301), and the two connection positioning rods (301) are fixedly installed on two hoisting connection plates (102), and the inner ends of the two connection positioning rods (301) are chamfered; the connection positioning frame (302) is fixedly installed on the left connection positioning rod (301), and the right connection positioning rod (301) is inserted into the right end of the connection positioning frame (302).

6. The apparatus for connecting wind turbine towers according to claim 5, characterized in that, The movable limiting unit (400) includes: a movable limiting seat (401) and a movable limiting pin (402); the movable limiting seat (401) is fixedly installed on the top of the connecting positioning frame (302); the movable limiting pin (402) is slidably installed on the movable limiting seat (401) and the connecting positioning frame (302), and the bottom end of the movable limiting pin (402) is inserted into the connecting positioning rod (301) on the right side, and the bottom of the movable limiting pin (402) is provided with a chamfer.

7. The apparatus for wind turbine tower docking construction according to claim 6, characterized in that, The movable limiting unit (400) further includes: a circular anti-detachment plate a (403) and a helical spring b (404); the circular anti-detachment plate a (403) is fixedly installed on the outside of the movable limiting pin (402), and the bottom of the circular anti-detachment plate a (403) is in contact with the connecting positioning frame (302); the helical spring b (404) is sleeved on the outside of the movable limiting pin (402), and the helical spring b (404) is located between the movable limiting seat (401) and the circular anti-detachment plate a (403).

8. The apparatus for connecting wind turbine towers according to claim 5, characterized in that, The hoisting warning unit (500) includes: a tower detection rod (501), a circular anti-detachment plate b (502), and a circular anti-detachment plate c (503); the tower detection rod (501) is slidably mounted on the connecting positioning rod (301), and the bottom end of the tower detection rod (501) is provided with rounded corners; the circular anti-detachment plate b (502) is fixedly mounted on the top end of the tower detection rod (501), and the bottom end of the circular anti-detachment plate b (502) is in contact with the connecting positioning rod (301); the circular anti-detachment plate c (503) is fixedly mounted on the outside of the tower detection rod (501), and the circular anti-detachment plate c (503) is located below the connecting positioning rod (301).

9. The apparatus for connecting wind turbine towers according to claim 8, characterized in that, The hoisting warning unit (500) further includes: a helical spring c (504), a lithium battery (505), and a warning alarm (506); the helical spring c (504) is sleeved on the outside of the tower detection rod (501), and the helical spring c (504) is located between the connecting positioning rod (301) and the circular anti-detachment plate c (503); the lithium battery (505) is fixedly installed on the top of the connecting positioning rod (301); the warning alarm (506) is fixedly installed on the top of the connecting positioning rod (301), and the lithium battery (505) is electrically connected to the warning alarm (506).

10. The apparatus for connecting wind turbine towers according to claim 9, characterized in that, The hoisting warning unit (500) further includes: a control switch (507) and a pressing protrusion (508); the control switch (507) is fixedly installed inside the tower detection rod (501), and the control switch (507) is electrically connected to the lithium battery (505) and the warning alarm (506); the pressing protrusion (508) is fixedly installed on the outside of the control switch (507).