Load testing machine system and method of operation
Patent Information
- Application Number
- CN202411459477.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-18
- Publication Date
- 2026-10-09
AI Technical Summary
[0005]针对现有技术的不足,本发明提供了一种负载测试机系统及操作方法,解决了现有的负载测试机虽能采集参数判断故障并报警,但不能对故障进行预估,导致工作人员未提前准备工具,影响维修效率及系统运作和整体工作效率的问题
[0023]1、本发明通过设置有故障预测模块,能够根据历史的故障信息,通过计算和评估的方式,对后续容易出现的故障问题和发生时间进行预测,从而在故障发生前就提醒工作人员做好维护准备,进一步保证了故障发生时,维护的整体效率和保持系统的正常运作。
Smart Images

Figure CN122882772A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of chemical production technology, specifically to a load testing machine system and its operating method. Background Technology
[0002] With the continuous development of industrial production, the quality inspection requirements for various products are becoming increasingly stringent. Among the many product tests, load testing is a key step in evaluating product performance and reliability. For example, in industries such as machinery manufacturing, automotive parts production, and electronic equipment manufacturing, products need to withstand different levels of load forces during actual use. Therefore, accurately simulating and testing the performance of products under load conditions is crucial.
[0003] During use, existing load testing machines typically collect various parameters of the load testing machine through data acquisition, determine whether there is a fault in the load testing machine based on the parameters, and promptly issue an alarm to remind the staff to handle the problem when a fault is found.
[0004] Furthermore, considering that the staff did not make corresponding preparations after receiving the fault report in the first instance, they had to select the appropriate tools based on the fault before carrying out the repair work. This affected the efficiency of the repair work, delayed the operation time of the load testing machine system, and reduced the overall work efficiency. Summary of the Invention
[0005] To address the shortcomings of existing technologies, this invention provides a load testing machine system and operating method, which solves the problem that while existing load testing machines can collect parameters to identify faults and issue alarms, they cannot predict faults, leading to staff not having the necessary tools in advance, thus affecting maintenance efficiency, system operation, and overall work efficiency.
[0006] To achieve the above objectives, the present invention provides the following technical solution: a load testing machine system, comprising a main interface module and a workstation monitoring module. The main interface module, as the core operating interface of the system, provides a comprehensive control and information display platform for the entire load testing machine system. It integrates the entry points for various functional modules. A recipe setting module is connected to the main interface module, responsible for setting various parameters of the load test. These parameters determine the specific behaviors and requirements of the testing process. A data acquisition module is connected to the main interface module, responsible for real-time acquisition of various data related to the load test during the testing process. A data export module is connected to the main interface module, responsible for exporting the system data. Data collected and stored during testing is exported to an external storage device. An alarm monitoring module is connected to the main interface module, which monitors the system's operating status in real time, promptly detecting and reporting any abnormalities or fault information. A historical alarm information storage module is also connected to the alarm monitoring module, storing faults and alarm information that occur in the load testing machine system for later analysis. A fault prediction module is connected to the historical alarm information storage module. An IO monitoring module is connected to the main interface module, monitoring the status information of the system's input and output points, helping users understand the system's electrical connection status and signal transmission, and providing real-time IO status display.
[0007] Preferably, the workstation monitoring module is connected to a workstation manual control module. The workstation monitoring module, acting as a monitoring and management center for a specific workstation, provides comprehensive monitoring and operation control functions for individual workstations. The workstation manual control module provides manual operation functions for the workstations. When manual intervention is required, the workstation monitoring module is connected to a workstation function selection module. This module allows users to select different function settings at the workstation level to meet different testing needs and operating habits. The workstation monitoring module is also connected to a workstation data acquisition monitoring module. This module collects and monitors data related to load testing in real time at the workstation level, focusing on data changes at individual workstations and providing functions for analyzing and visualizing the collected data. Finally, the workstation monitoring module is connected to a workstation data query and export module, which is responsible for exporting the data collected and stored at the workstation during the testing process to an external storage device.
[0008] Preferably, the fault prediction module includes: a data processing module, which maps the time of the fault occurrence to the specific problem of the fault; a formula calculation module connected to the data processing module, which substitutes various fault data and performs simulation, estimation, and calculation based on the operating values of the load testing machine system to determine and predict the time and specific cause of the fault; and a prediction result module connected to the formula calculation module, which transmits the fault assessment results to the staff. The specific calculation formula in the formula calculation module is: 1. Overall fault probability formula: Where: P total P represents the overall probability that the system will fail within a certain period of time in the future; historical F is the base failure probability calculated based on historical data. weight The weights of current system operating factors (including the influence weights of factors such as load size, running time, and ambient temperature on the probability of failure); T interval 1. The average time interval between two alarms; N is the number of recent alarms; 2. Fault time prediction formula: T failure =T current +T mean ×F weight +ΔT adjust , where: T failure T represents the estimated time of failure. current T represents the current time; mean ΔT represents the average time interval between historical failures. adjust 3. Basic Failure Probability Calculation Formula: (This is to account for the time deviation after adjustments based on current system operating factors.) Where: n total T represents the number of times a failure has occurred in history. total This represents the total system runtime.
[0009] Preferably, the parameters in the configuration settings module are as follows: test enable / disable control, used to determine whether to start the test; thrust / pull mode selection to adapt to different types of product testing; load size and compensation settings to ensure the accuracy of the test load; test stroke settings to determine the stroke range of the product test; and settings for other related parameters such as speed, current, pressure relief upon arrival, rest time upon arrival, and protection current.
[0010] Preferably, the specific function settings of the workstation function selection module include: buzzer enable / disable, test completion sound prompt, barcode operation conditions, buzzer alarm time setting, test completion buzzer time setting, whole machine reset timeout time, thrust extension system load compensation, thrust retraction system load compensation, tension extension system load compensation, and tension retraction system load compensation settings.
[0011] An operating method for a load testing machine system includes the following steps:
[0012] S1. Preparatory work before system operation: Other equipment needs to be adjusted before the system is run;
[0013] S2. System startup and operation: Start the system and operate it, including specific control operations such as control cabinet operation, touch screen operation and workstation operation;
[0014] S201. Control cabinet operation: The operation procedure of the control cabinet includes: power on, start, pause and reset;
[0015] S202. Touchscreen Operation: Operators control and manage the system via a touchscreen, including: recipe settings, manual interface operation, alarm monitoring, and I / O monitoring;
[0016] S203. Workstation Operation: View and control each workstation through the system;
[0017] S3. Negative pressure test: After the system is ready, operate the load testing machine to perform a load test on the items.
[0018] Preferably, in step S1, the specific adjustments include: ventilation: opening the main air inlet valve of the equipment and adjusting the pressure to ensure that the pressure is above 0.6MPa; power supply: connecting the main power plug of the equipment, closing the air switch inside the control cabinet, and rotating the power switch outside the control cabinet to the ON position; product installation and wiring: correctly installing the product to be tested on the corresponding test station and correctly connecting the wires; setting parameters and function modes: setting the formula parameters on the touch screen according to the test requirements and selecting the appropriate function mode.
[0019] Preferably, in step S201, the specific power-on procedure is as follows: close all the air switches in the control cabinet from left to left in sequence to ensure that the power conversion switch is in the ON state; the specific start-up procedure is as follows: press the green start button. If the start indicator light is constantly on, the system will run automatically; if the indicator light is not on, check whether the system is in normal operation, waiting to be reset, or in the process of resetting; the specific pause procedure is as follows: to pause, press and release the stop button; to stop, press and hold the stop button; the specific reset procedure is as follows: press and hold the reset button to reset the system. After the reset is completed, proceed with subsequent operations; manual control: when the equipment is in manual mode, the extension / retraction of the load cylinder is controlled by the telescopic switch.
[0020] Preferably, in step S202, the specific formula setting process is as follows: Enter the formula setting interface, set various parameters according to the requirements of the test product, select to measure the full stroke or a specified length for the measurement stroke, save the parameters and make them effective after setting; The specific manual interface operation process is as follows: When the equipment is in manual mode, enter the manual interface, perform cylinder extension / retraction operation to control the lifting and lowering of the load cylinder, product extension / retraction operation to control the product position, and also perform rapid zeroing, slow zeroing, positioning accuracy test, loading / unloading operation, and mode switching through the manual / automatic switch button; Data acquisition and monitoring: During the test, the data acquisition module collects load size, current, and position data in real time, and views the real-time data on the data acquisition monitoring interface to understand the test situation; The specific alarm monitoring process is as follows: During the test, the alarm monitoring module monitors the system status in real time. If an alarm occurs, view the alarm information on the real-time alarm interface, historical alarm interface, or real-time alarm pop-up window, and handle it by using the corresponding clear alarm button to restore the system to normal; The specific IO monitoring process is as follows: The IO monitoring interface can monitor the status information of the system input and output points.
[0021] Preferably, step S203 includes: entering the workstation monitoring module: accessing the corresponding workstation monitoring interface from the main interface to view the main status information and data of the workstation; manual control of the workstation: when manual intervention is required, entering the workstation manual interface to perform cylinder extension / retraction, product extension / retraction, rapid zeroing, slow zeroing, positioning accuracy testing, and loading / unloading operations, the operation results will be fed back to the workstation monitoring interface; workstation function selection: entering the workstation function selection interface, setting the buzzer enable / disable, test completion sound prompt, barcode running conditions, buzzer alarm time setting, test completion buzzer time setting, whole machine reset timeout time, thrust extension system load compensation, thrust retraction system load compensation, tension extension system load compensation, and tension retraction system load compensation functions according to test requirements, and saving the parameters after setting to make them effective; workstation data acquisition monitoring: during the test, data related to the load test is collected and monitored in real time through the workstation data acquisition monitoring interface, focusing on the data changes of individual workstations and viewing relevant statistical data.
[0022] This invention provides a load testing machine system and its operating method. It has the following beneficial effects:
[0023] 1. This invention, by incorporating a fault prediction module, can predict potential future faults and their timing based on historical fault information through calculation and evaluation. This allows staff to be alerted to prepare for maintenance before a fault occurs, further ensuring overall maintenance efficiency and maintaining normal system operation when a fault does occur.
[0024] 2. This invention integrates the main interface module as the core, which serves as the entry point for various functional modules, such as recipe setting, data acquisition, data export, alarm monitoring, and IO monitoring. Operators can complete multiple operations on one platform without frequently switching between different interfaces, greatly improving operational efficiency.
[0025] 3. This invention, through the formulation module, allows for the setting of various parameters, including test enable / disable, thrust / pull mode, load size and compensation, test stroke and speed, current, pressure relief upon arrival, rest time upon arrival, and protection current. These rich parameter setting options enable the system to adapt to the testing requirements of different types of products, ensuring that the testing process accurately simulates the load conditions of the product under actual operating conditions. Attached Figure Description
[0026] Figure 1 This is a system flowchart of the present invention;
[0027] Figure 2 This is a flowchart of the fault prediction module of the present invention;
[0028] Figure 3 This is a flowchart illustrating the method of using the present invention. Detailed Implementation
[0029] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0030] Example:
[0031] Please see the appendix Figure 1 - Appendix Figure 3This invention provides a load testing machine system, including a main interface module and a workstation monitoring module. The main interface module, as the core operating interface of the system, provides a comprehensive control and information display platform for the entire load testing machine system. It integrates the entry points for various functional modules, facilitating user switching and execution of different operations. A recipe setting module is connected to the main interface module, responsible for setting various parameters of the load test. These parameters determine the specific behavior and requirements of the testing process. Specific parameters include: test enable / disable control to determine whether to start the test; push / pull mode selection to adapt to different types of product testing; load size and compensation settings to ensure the accuracy of the test load; and test stroke settings. The system determines the travel range for product testing and sets parameters such as speed, current, pressure relief upon arrival, rest time upon arrival, and protection current. A data acquisition module is connected to the main interface module, responsible for collecting various data related to the load test in real time during the test, including key information such as load size, current, and location. A data export module is also connected to the main interface module, responsible for exporting the data collected and stored during the test to an external storage device for subsequent data analysis and processing. An alarm monitoring module is also connected to the main interface module, monitoring the system's operating status in real time, promptly detecting and reporting any abnormalities or fault information to ensure the safe and stable operation of the system.
[0032] The alarm monitoring module is connected to a historical alarm information storage module, which stores faults and alarm information that occur in the load testing machine system for later analysis. This historical alarm information storage module is also connected to a fault prediction module. The fault prediction module uses a special calculation formula to input historical alarm information data to calculate specific prediction results, identifying potential future faults and problems in the system. This allows staff to be prepared and address corresponding predicted issues promptly. The fault prediction module includes: an organization module, which maps the time of fault occurrence to the specific problem, improving the accuracy of subsequent predictions; a formula calculation module, which inputs various fault data and performs simulations and calculations based on the operating values of the load testing machine system to determine and predict the timing and specific cause of the fault; and a prediction result module, which transmits the fault assessment results to staff, reminding them to prepare for and repair the fault.
[0033] The specific calculation formula in the formula calculation module is as follows:
[0034] 1. Overall failure probability formula:
[0035]
[0036] in:
[0037] P total P represents the overall probability that the system will fail within a certain period of time in the future; historical F is the base failure probability calculated based on historical data. weight The weights of current system operating factors (including the influence weights of factors such as load size, running time, and ambient temperature on the probability of failure); T interval The average time interval between two alarms; N is the number of recent alarms;
[0038] 2. Failure time estimation formula:
[0039] T failure =T current +T mean ×F weight +ΔT adjust
[0040] Wherein: T failure T represents the estimated time of failure. current T represents the current time. mean ΔT represents the average time interval between historical failures. adjust The time deviation is adjusted to take into account current system operating factors;
[0041] 3. Basic Failure Probability Calculation Formula:
[0042]
[0043] Where: n total T represents the number of times a failure has occurred in history. total Represents the total system uptime;
[0044] The main interface module is connected to an IO monitoring module, which monitors the status information of the system's input / output (IO) points, helps users understand the electrical connection status and signal transmission of the system, and provides real-time IO status display, making it convenient for users to view and understand the system.
[0045] The workstation monitoring module is connected to a workstation manual control module. As a monitoring and management center for specific workstations, the workstation monitoring module provides comprehensive monitoring and operational control functions for individual workstations. The workstation manual control module provides manual operation functions for the workstations, allowing for manual intervention when necessary. Specific manual interventions include adjusting the lifting and lowering of the load cylinder, and extending and retracting the product. The workstation monitoring module is also connected to a workstation function selection module. This module allows users to select different function settings at the workstation level to meet different testing needs and operating habits. Specific function settings include: buzzer enable / disable, test completion sound prompt, barcode operation conditions, and buzzer alarm time. The system allows for the setting of various functions, including buzzer timer settings, machine reset timeout, load compensation for thrust extension system, load compensation for thrust retraction system, load compensation for tension extension system, and load compensation for tension retraction system. The workstation monitoring module is connected to a workstation data acquisition and monitoring module. This module collects and monitors data related to the load test in real time at the workstation level, focusing on data changes at individual workstations. It also provides analysis and visualization capabilities for the collected data, facilitating observation by staff. Furthermore, the workstation monitoring module is connected to a workstation data query and export module, which exports the data collected and stored at the workstation during the test to an external storage device.
[0046] An operating method for a load testing machine system includes the following steps:
[0047] S1. Preparations before system operation: Other equipment needs to be adjusted before system operation. Specific adjustments include: Air supply: Open the main compressed air inlet valve of the equipment and adjust the pressure to ensure it is above 0.6MPa; Power supply: Connect the main power plug of the equipment (AC220V), close the air switch inside the control cabinet, and rotate the external power switch of the control cabinet to the ON position; Product installation and wiring: Correctly install the products to be tested on the corresponding test stations and connect the wires correctly; Parameter and function mode settings: According to the test requirements, set the formula parameters on the touch screen and select the appropriate function mode;
[0048] S2. System startup and operation: Start the system and operate it, including specific control operations such as control cabinet operation, touch screen operation and workstation operation;
[0049] S201. Control cabinet operation: The operation procedure of the control cabinet includes: power on, start, pause and reset;
[0050] The specific power-on procedure is as follows: Close all the air switches in the control cabinet from left to left in sequence, and ensure that the power conversion switch is in the ON position.
[0051] The specific startup procedure is as follows: Press the green start button. If the start indicator light is constantly on, the system will start automatically. If the indicator light is not on, check whether the system is in normal working condition, waiting to be reset, or in the process of resetting.
[0052] The specific steps for pausing are as follows: To pause, press and release the stop button; to stop, press and hold the stop button for 2 seconds.
[0053] The specific reset procedure is as follows: Press and hold the reset button for 2 seconds to reset the system. After the reset is completed, subsequent operations can be performed. Manual control: When the equipment is in manual mode, the extension / retraction of the load cylinder can be controlled by the telescopic switch.
[0054] S202. Touchscreen Operation: Operators control and manage the system via a touchscreen, including: recipe settings, manual interface operation, alarm monitoring, and I / O monitoring;
[0055] The specific formula setting process is as follows: Enter the formula setting interface (which can be accessed from the main interface), set various parameters according to the requirements of the test product, and select to measure the full stroke or a specified length (check the box for specified length). After setting, you can save the parameters and make them effective.
[0056] The example is as follows: 0 is the input for enabling the test, and 1 is the input for disabling it; 1 is the input for the thrust / pull mode to measure the pull force, and 0 is the input for the thrust force; the load size is the input for the weight value to be tested; and the load compensation is set to 0.
[0057] The specific manual interface operation process is as follows: When the equipment is in manual mode, entering the manual interface allows for cylinder extension / retraction to control the lifting and lowering of the load cylinder, product extension / retraction to control the product position, rapid zeroing, slow zeroing, positioning accuracy testing, loading / unloading operations, and mode switching via the manual / automatic switch button; Data acquisition and monitoring: During the test, the data acquisition module collects load size, current, and position data in real time. Real-time data can be viewed on the data acquisition and monitoring interface to understand the test status;
[0058] The specific alarm monitoring process is as follows: During the test, the alarm monitoring module monitors the system status in real time. If an alarm occurs, the alarm information can be viewed in the real-time alarm interface, the historical alarm interface, or the real-time alarm pop-up window, and the system can be restored to normal by using the corresponding clear alarm button.
[0059] The specific IO monitoring process is as follows: The IO monitoring interface can monitor the status information of the system's input and output points in order to understand the electrical connections and signal transmission of the system.
[0060] S203. Workstation Operation: View and control each workstation through the system;
[0061] Accessing the workstation monitoring module: Access the corresponding workstation monitoring interface from the main interface to view the main status information and data of the workstation.
[0062] Manual control of workstations: When manual intervention is required at a workstation, enter the manual interface of the workstation to perform operations such as cylinder extension / retraction, product extension / retraction, rapid zeroing, slow zeroing, positioning accuracy testing, and loading / unloading. The operation results will be fed back to the workstation monitoring interface.
[0063] Workstation Function Selection: Enter the workstation function selection interface and set the following functions according to the test requirements: enable / disable buzzer, sound prompt upon test completion, barcode operation conditions, buzzer alarm time setting, buzzer time setting upon test completion, machine reset timeout, load compensation for thrust extension system, load compensation for thrust retraction system, load compensation for tension extension system, and load compensation for tension retraction system. After setting, save the parameters to make them effective.
[0064] Workstation Data Acquisition Monitoring: During the testing process, the workstation data acquisition monitoring interface collects and monitors data related to the load test in real time, focusing on the data changes of individual workstations and allowing users to view relevant statistical data.
[0065] S3. Negative pressure test: After the system is ready, operate the load testing machine to perform a load test on the items.
[0066] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A load testing machine system, characterized in that, The system includes a main interface module and a workstation monitoring module. The main interface module, as the core operating interface, provides a comprehensive control and information display platform for the entire load testing machine system. It integrates the entry points for various functional modules. A recipe setting module is connected to the main interface module, responsible for setting various parameters of the load test. These parameters determine the specific behavior and requirements of the testing process. A data acquisition module is connected to the main interface module, responsible for collecting various data related to the load test in real time during the test. A data export module is also connected to the main interface module, responsible for exporting the data collected and stored by the system during the test to... In the external storage device, the main interface module is connected to an alarm monitoring module, which monitors the system's operating status in real time, promptly detects and reports any abnormalities or fault information. The alarm monitoring module is also connected to a historical alarm information storage module, which stores faults and alarm information that occur in the load tester system for later summarization. The historical alarm information storage module is also connected to a fault prediction module. The main interface module is connected to an IO monitoring module, which monitors the status information of the system's input and output points, helps users understand the system's electrical connection status and signal transmission status, and provides real-time IO status display.
2. The load testing machine system according to claim 1, characterized in that, The workstation monitoring module is connected to a workstation manual control module. As a monitoring and management center for specific workstations, the workstation monitoring module provides comprehensive monitoring and operation control functions for individual workstations. The workstation manual control module provides manual operation functions for the workstations. When manual intervention is required, the workstation monitoring module is connected to a workstation function selection module. This module allows users to select different function settings at the workstation level to meet different testing needs and operating habits. The workstation monitoring module is also connected to a workstation data acquisition monitoring module. This module collects and monitors data related to load testing in real time at the workstation level, focusing on data changes at individual workstations and providing functions for analyzing and visualizing the collected data. Finally, the workstation monitoring module is connected to a workstation data query and export module, which is responsible for exporting the data collected and stored at the workstation during the testing process to an external storage device.
3. The load testing machine system according to claim 2, characterized in that, The fault prediction module includes: a data processing module, which maps the time of fault occurrence to the specific problem of the fault; a formula calculation module connected to the data processing module, which substitutes various fault data and performs simulations and calculations based on the operating values of the load testing machine system to determine and predict the time and specific cause of the fault; and a prediction result module connected to the formula calculation module, which transmits the fault assessment results to the staff. The specific calculation formula in the formula calculation module is:
1. Overall fault probability formula: Where: P total P represents the overall probability that the system will fail within a certain period of time in the future; historical F is the base failure probability calculated based on historical data. weight The weights of current system operating factors (including the influence weights of factors such as load size, running time, and ambient temperature on the probability of failure); T interval 1. The average time interval between two alarms; N is the number of recent alarms; 2. Fault time prediction formula: T failure =T current +T mean ×F weight +ΔT adjust , where: T failure The estimated time of failure; T current T represents the current time. mean ΔT represents the average time interval between historical failures. adjust 3. Basic Failure Probability Calculation Formula: (This is to account for the time deviation after adjustments based on current system operating factors.) Where: n total T represents the number of times a failure has occurred in history. total This represents the total system runtime.
4. The load testing machine system according to claim 1, characterized in that, The specific parameters in the formula setting module are as follows: test enable / disable control, used to determine whether to start the test; thrust / pull mode selection to adapt to different types of product testing; load size and compensation settings to ensure the accuracy of the test load; test stroke settings to determine the stroke range of the product test; and settings for other related parameters such as speed, current, pressure relief upon arrival, rest time upon arrival, and protection current.
5. The load testing machine system according to claim 2, characterized in that, The specific function settings of the workstation function selection module include: buzzer enable / disable, test completion sound prompt, barcode operation conditions, buzzer alarm time setting, test completion buzzer time setting, whole machine reset timeout time, thrust extension system load compensation, thrust retraction system load compensation, tension extension system load compensation, and tension retraction system load compensation settings.
6. A method of operating a load testing machine system according to any one of claims 1-5, characterized in that, Includes the following steps: S1. Preparatory work before system operation: Other equipment needs to be adjusted before the system is run; S2. System startup and operation: Start the system and operate it, including specific control operations such as control cabinet operation, touch screen operation and workstation operation; S201. Control cabinet operation: The operation procedure of the control cabinet includes: power on, start, pause and reset; S202. Touchscreen Operation: Operators control and manage the system via a touchscreen, including: recipe settings, manual interface operation, alarm monitoring, and I / O monitoring; S203. Workstation Operation: View and control each workstation through the system. S3. Negative pressure test: After the system is ready, operate the load testing machine to perform a load test on the items.
7. The operation method of the load testing machine system according to claim 6, characterized in that, In step S1, the specific adjustments include: Ventilation: Open the main air inlet valve of the equipment and adjust the pressure to ensure it is above 0.6 MPa; Powering on: Connect the main power plug of the equipment, close the air switch inside the control cabinet, and rotate the external power switch of the control cabinet to the ON position; Product installation and wiring: Correctly install the product to be tested on the corresponding test station and connect the wires correctly; Setting parameters and function modes: According to the test requirements, set the formula parameters on the touch screen and select the appropriate function mode.
8. The operation method of the load testing machine system according to claim 6, characterized in that, In step S201, the specific power-on procedure is as follows: close all the air switches in the control cabinet from left to left in sequence to ensure that the power conversion switch is in the ON position; the specific start-up procedure is as follows: press the green start button. If the start indicator light is constantly on, the system will run automatically; if the indicator light is not on, check whether the system is in normal operation, waiting to be reset, or in the process of resetting; the specific pause procedure is as follows: to pause, press and release the stop button; to stop, press and hold the stop button; the specific reset procedure is as follows: press and hold the reset button to reset the system. After the reset is completed, proceed with subsequent operations; manual control: when the equipment is in manual mode, the extension / retraction of the load cylinder is controlled by the telescopic switch.
9. The operation method of the load testing machine system according to claim 6, characterized in that, In step S202, the specific formula setting process is as follows: Enter the formula setting interface, set various parameters according to the requirements of the test product, select full stroke or specified length for the measurement stroke, save the parameters and make them effective after setting; The specific manual interface operation process is as follows: When the equipment is in manual mode, enter the manual interface, perform cylinder extension / retraction operation to control the lifting and lowering of the load cylinder, product extension / retraction operation to control the product position, and also perform rapid zeroing, slow zeroing, positioning accuracy test, loading / unloading operation, and mode switching via the manual / automatic switch button; Data acquisition and monitoring: During the test, the data acquisition module collects load size, current, and position data in real time, and the real-time data can be viewed on the data acquisition monitoring interface to understand the test situation; The specific alarm monitoring process is as follows: During the test, the alarm monitoring module monitors the system status in real time. If an alarm occurs, the alarm information can be viewed on the real-time alarm interface, historical alarm interface, or real-time alarm pop-up window, and the corresponding alarm clearing button can be used to handle the situation and restore the system to normal; The specific IO monitoring process is as follows: The status information of the system input and output points can be monitored on the IO monitoring interface.
10. The operation method of the load testing machine system according to claim 6, characterized in that, Step S203 includes: entering the workstation monitoring module: accessing the corresponding workstation monitoring interface from the main interface to view the main status information and data of the workstation; manual control of the workstation: when manual intervention is required, entering the workstation manual interface to perform cylinder extension / retraction, product extension / retraction, rapid zeroing, slow zeroing, positioning accuracy testing, and loading / unloading operations, the operation results will be fed back to the workstation monitoring interface; workstation function selection: entering the workstation function selection interface, setting the buzzer enable / disable, test completion sound prompt, barcode running conditions, buzzer alarm time setting, test completion buzzer time setting, whole machine reset timeout time, thrust extension system load compensation, thrust retraction system load compensation, tension extension system load compensation, and tension retraction system load compensation functions according to test requirements, and saving the parameters after setting to make them effective; workstation data acquisition and monitoring: during the test, data related to the load test is collected and monitored in real time through the workstation data acquisition and monitoring interface, focusing on the data changes of individual workstations and viewing relevant statistical data.