Communication base station power supply scheduling method based on load prediction

By using a load prediction-based power supply scheduling method for communication base stations, a load timing matrix and similarity coefficient are generated using historical data. The charging and discharging timing of the energy storage device is adjusted in conjunction with the power supply line loss, which solves the problems of load prediction deviation and dynamic changes in line loss, and improves the stability and energy efficiency of the power supply system.

CN122908183BActive Publication Date: 2026-11-24SHANXI COMM ENG DESIGN INST
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611402205.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2026-09-10
Publication Date
2026-11-24
Estimated Expiration
2046-09-10

AI Technical Summary

Technical Problem

Existing power supply scheduling methods for communication base stations cannot effectively capture the detailed characteristics of load waveforms, resulting in large load prediction deviations. Furthermore, the charging and discharging decisions of energy storage devices fail to consider the dynamic changes in power line losses, affecting energy efficiency.

Method used

By collecting historical operating data, a load timing matrix is ​​generated, the dominant frequency component is extracted, the similarity coefficient is calculated to screen candidate scheduling schemes, and the charging and discharging timing of the energy storage device is adjusted in combination with the power line loss increment to generate the final power supply scheduling instruction.

Benefits of technology

It improves the accuracy of load forecasting and the energy efficiency of energy storage systems, reduces power line losses, and achieves stability and economy in base station power supply systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122908183B_ABST
    Figure CN122908183B_ABST
Patent Text Reader

Abstract

This invention discloses a power supply scheduling method for communication base stations based on load prediction, belonging to the field of power supply scheduling technology for communication base stations. The method includes collecting historical operating data of communication base stations, performing periodic slicing of the historical operating data to generate a load time-series matrix on a daily basis, extracting the dominant frequency components from the load time-series matrix and calculating the similarity coefficient between each load time-series matrix and a reference load vector, selecting historical time periods matching the current load waveform based on the similarity coefficient to generate a candidate scheduling scheme set, calculating the power line loss increment for each scheme in the candidate scheduling scheme set under the current grid conditions, and adjusting the charging and discharging timing of energy storage devices based on the power line loss increment to generate the final power supply scheduling command. This method uses frequency domain feature matching for load prediction and dynamically adjusts the charging and discharging timing of energy storage devices in conjunction with the line loss increment, which can improve the scheduling's adaptability to load changes and grid conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power supply scheduling technology for communication base stations, specifically a power supply scheduling method for communication base stations based on load prediction. Background Technology

[0002] Power supply scheduling methods for communication base stations typically predict future load demand based on the statistical average of historical load data or simple time-series extrapolation, and control energy storage devices to perform peak shaving and valley filling according to a preset charging and discharging schedule. This scheduling method is applicable when base station load fluctuations exhibit a periodic pattern.

[0003] The shortcomings of existing technical solutions are that statistical averaging methods smooth out the detailed features of load waveforms, failing to capture the instantaneous fluctuations and waveform changes of daytime loads, resulting in significant deviations between the generated predicted load and the actual load. Time-series extrapolation methods require high continuity of historical data; when data is missing or anomalies occur, the prediction results are prone to divergence, making it difficult to stably output usable scheduling reference sequences. Furthermore, the charging and discharging decisions of energy storage devices only consider the matching relationship between load power and mains power supply capacity, ignoring the dynamic changes in the power line's own losses under different load levels. This allows the energy storage system to still perform charging operations during periods of high loss, leading to a decrease in energy efficiency.

[0004] The power grid environment in which communication base stations are located is complex, and the impedance of power supply lines changes with equipment operating status and external conditions. Simply relying on load forecasting results without considering changes in line losses makes it difficult to formulate a dispatching scheme that balances power quality and energy efficiency. It is necessary to address how to effectively utilize historical load waveform information in the load forecasting process to improve the accuracy of predicting future load power, and how to introduce a dynamic response mechanism for line losses into energy storage dispatching to optimize charging and discharging timing to adapt to real-time grid conditions. Summary of the Invention

[0005] The purpose of this invention is to provide a power supply scheduling method for communication base stations based on load prediction, so as to solve the problem that the existing power supply scheduling method has large load prediction deviation due to ignoring the characteristics of load waveform, and at the same time solves the problem that energy storage charging and discharging scheduling cannot respond to the dynamic changes in power line losses.

[0006] To achieve the above objectives, the present invention provides the following technical solution: The present invention provides a power supply scheduling method for communication base stations based on load prediction, comprising the following steps:

[0007] Collect historical operating data of communication base stations, including base station load power and voltage and current parameters of power supply lines for each time period;

[0008] The historical operating data is periodically sliced ​​to generate a load time series matrix in days.

[0009] Extract the dominant frequency components from the load time series matrix and calculate the similarity coefficient between each load time series matrix and the baseline load vector;

[0010] Based on the similarity coefficient, historical time periods that match the current load waveform are selected to generate a set of candidate scheduling schemes;

[0011] For each of the candidate scheduling schemes in the set, calculate its power line loss increment under the current power grid condition;

[0012] Based on the incremental loss of the power supply line, the charging and discharging timing of the energy storage device is adjusted to generate the final power supply scheduling instruction.

[0013] Preferably, the process of collecting historical operating data of the communication base station includes: recording the real-time active and reactive power at the main incoming line of the base station using smart meters at fixed sampling intervals to generate a timestamped raw power sequence; acquiring the branch current data of each power supply branch within the base station, wherein the branch current data includes the effective current values ​​of the main equipment power supply branch and the backup equipment power supply branch; aligning the raw power sequence and branch current data according to a unified time reference to generate a composite dataset containing load power and branch current; performing missing value imputation and outlier replacement operations on the composite dataset to output a complete historical operating data matrix. This collection method can ensure the integrity and temporal consistency of the data, providing high-quality basic data for load characteristic analysis.

[0014] As a preferred embodiment of the present invention, the periodic slicing process includes: selecting historical operating data for 30 consecutive days, taking 00:00 each day as the slicing starting point, and dividing the historical operating data matrix into 30 daily load sub-matrices along the time axis; calculating the hourly average load power in each daily load sub-matrix to generate 30 24-dimensional daily load average vectors; calculating the arithmetic mean of all daily load average vectors to generate a benchmark load vector, wherein the benchmark load vector has a dimension of 24. By constructing the benchmark load vector, the typical load change trend of the base station within a complete daily cycle can be accurately reflected, providing a reliable reference benchmark for subsequent similarity comparison.

[0015] In the step of extracting the dominant frequency components, as a preferred approach, a discrete cosine transform is performed on each daily load submatrix to convert the time-domain load sequence to the frequency domain, obtaining a set of frequency domain coefficients. The top three frequency components in terms of amplitude are selected from this set and marked as the dominant frequency components. The frequency value and phase angle corresponding to the dominant frequency components are extracted to generate a frequency feature descriptor for each daily load submatrix. This allows the main periodic characteristics of load changes to be separated from noise, reducing the interference of random fluctuations on matching accuracy.

[0016] Furthermore, in the step of extracting the dominant frequency components from the load time-series matrix, the frequency domain coefficients after discrete cosine transform can be sorted by energy from largest to smallest. The frequency component with the minimum cumulative energy percentage required to reach 85% can be selected as the dominant frequency component, while noise components with amplitudes lower than 10% of the global average amplitude can be discarded. This method can adaptively determine the number of dominant components based on the signal's own characteristics, further suppressing secondary fluctuations and measurement noise while retaining the main characteristics of load changes, thus improving the reliability of subsequent similarity calculations.

[0017] In this invention, the process of calculating the similarity coefficient specifically includes: calculating the absolute value of the difference between the daily average load vector and the baseline load vector at each time point to generate a difference vector; assigning a weight coefficient to each element in the difference vector, wherein the weight coefficient is dynamically set according to the user's active and inactive periods to highlight the impact of key periods of base station load changes on the matching results; summing the weighted difference vectors to obtain the cumulative deviation value between the daily average load vector and the baseline load vector; and normalizing the cumulative deviation value to the interval between zero and one to generate the similarity coefficient. This coefficient can quantitatively measure the consistency between the historical daily and current daily load waveforms, providing a clear criterion for selecting matching periods.

[0018] As a further improvement of the present invention, when filtering historical periods that match the current load waveform based on the similarity coefficient, a similarity threshold is set, and vectors with similarity coefficients greater than the similarity threshold are selected from all daily load average vectors to generate a candidate daily load set; the original daily load sub-matrix corresponding to each daily load average vector in the candidate daily load set is obtained; the load power data for the next six hours corresponding to the current time point in the original daily load sub-matrix is ​​extracted to generate a preliminary scheduling reference sequence. Using historical similar load waveforms to predict short-term future load can effectively take into account the impact of user behavior periodicity on base station power consumption, improving the timeliness and relevance of scheduling plans.

[0019] After generating the preliminary scheduling reference sequence, the steps for calculating the power supply line loss increment include: obtaining the real-time power supply voltage and line impedance parameters of the current power grid, wherein the line impedance parameters include line resistance and reactance values; for each load power value in the preliminary scheduling reference sequence, and in conjunction with the line impedance parameters, calculating the active power loss of the power supply line under the load power value; integrating and summing all active power losses for the next six hours to generate the total line loss value corresponding to each preliminary scheduling reference sequence; and subtracting the total line loss value from the current line loss value to obtain the power supply line loss increment. This loss increment directly reflects the difference in energy loss caused by additional line heating under different scheduling plans, providing an economic basis for energy storage scheduling decisions.

[0020] When adjusting the charging and discharging sequence of an energy storage device based on the increase in power line losses, the increase in power line losses is first multiplied by a preset conversion factor to obtain the energy adjustment amount of the energy storage device. Based on the energy adjustment amount and the current state of charge of the energy storage device, the charging start time and charging end time are calculated. Based on the charging start time and charging end time, the switching time point for the energy storage device to switch from discharging to charging is determined. A charging and discharging sequence control table for the energy storage device is generated based on the switching time point. By converting the change in line losses into energy storage throughput requirements, the energy storage device can absorb mains energy during low-load periods and release energy during peak-load periods, reducing line losses while shaving off peak loads and filling valleys, thus improving overall power supply efficiency.

[0021] The final process of generating power supply dispatch instructions is as follows: The charging and discharging timing control table of the energy storage device is aligned with the preliminary dispatch reference sequence along the time axis to generate a joint load power-energy storage power dispatch table; the power difference at each time point is extracted from the joint load power-energy storage power dispatch table, where the power difference is the algebraic sum of the load power and the energy storage power; based on the sign and magnitude of the power difference, power adjustment instructions for the mains power supply branch are generated; the power adjustment instructions and the charging and discharging timing control table are merged into the final power supply dispatch instruction set. This instruction set achieves coordinated cooperation among the mains power, energy storage, and load, ensuring that the total power supply line loss is minimized while meeting the power demand of the base station, and smoothing fluctuations in the mains power input, thereby improving the economy and stability of the power supply system.

[0022] The technical effects and advantages provided by the present invention in the above technical solution are as follows:

[0023] From the daily load time-series matrix, the time-domain load sequence is transformed to the frequency domain using discrete cosine transform. Dominant frequency components are selected from the set of frequency domain coefficients to generate frequency feature descriptors for each daily load submatrix. A similarity coefficient is generated using the weighted cumulative deviation between the daily average load vector and the baseline load vector at each time point. Based on this similarity coefficient, historical time periods matching the current load waveform are selected, and load power data for future time periods are extracted from the corresponding original daily load submatrix as preliminary scheduling reference sequences. By combining frequency domain dominant component extraction and waveform similarity matching, the periodic structure and significant waveform variation characteristics in the load time-series data can be preserved, avoiding the weakening of waveform details caused by averaging. Furthermore, it does not rely on continuous data extrapolation, thus achieving relatively stable load prediction results based on the structural similarity of historical waveforms even under conditions of partial data anomalies or missing data.

[0024] After obtaining the set of candidate scheduling schemes, the active power loss resulting from applying the load power to the power supply line is calculated for each scheme. Combined with the current real-time power supply voltage and line impedance parameters including line resistance and reactance values, the total line loss over the future time period is integrated and subtracted from the current line loss to obtain the power supply line loss increment. This power supply line loss increment is used as the decision-making basis for adjusting the charging and discharging sequence of the energy storage device. Multiplying it by a conversion factor yields the energy adjustment amount, and based on this, the charging start time, charging end time, and charging / discharging state switching time points of the energy storage device are re-determined, generating a corresponding charging and discharging sequence control table. By directly incorporating the line loss increment into the decision-making process for the energy storage operation period, the energy storage device reduces charging or prioritizes discharging during high-loss periods and schedules charging compensation during low-loss periods. The charging and discharging sequence is dynamically adjusted according to changes in the grid state, reducing additional energy consumption caused by changes in line losses. Attached Figure Description

[0025] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in this invention. For those skilled in the art, other drawings can be obtained based on these drawings.

[0026] Figure 1 This is a flowchart of a communication base station power supply scheduling method based on load prediction;

[0027] Figure 2 This is a flowchart of the process for generating a historical operational data matrix for communication base stations;

[0028] Figure 3 This is a flowchart of the communication base station reference load vector generation process;

[0029] Figure 4This is a schematic diagram of the discrete cosine transform frequency domain coefficients and dominant frequency components of the daily load power sequence of a communication base station;

[0030] Figure 5 The distribution of the similarity coefficient between the average load vector and the baseline load vector for the day. Detailed Implementation

[0031] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0032] See Figure 1 This invention provides a power supply scheduling method for communication base stations based on load prediction, comprising the following steps: collecting historical operating data of communication base stations, the historical operating data including the base station load power and voltage and current parameters of power supply lines for each time period; performing periodic slicing processing on the historical operating data to generate a load time series matrix on a daily basis; extracting the dominant frequency components in the load time series matrix and calculating the similarity coefficient between each load time series matrix and the reference load vector; selecting historical time periods that match the current load waveform based on the similarity coefficient to generate a candidate scheduling scheme set; calculating the power supply line loss increment of each scheme in the candidate scheduling scheme set under the current power grid state; adjusting the charging and discharging timing of the energy storage device based on the power supply line loss increment to generate a final power supply scheduling instruction.

[0033] In specific implementation, please refer to Figure 2 The system uses smart meters to record real-time active and reactive power at the main incoming line of a communication base station at fixed sampling intervals, generating a timestamped raw power sequence. The smart meters are installed at the main incoming line of the base station's low-voltage distribution cabinet, with a sampling interval set to 1 minute and a measurement accuracy of 0.5 class. Each sampling generates a data record containing a Coordinated Universal Time (UTC) timestamp, the total three-phase active power value, and the total three-phase reactive power value. The unit for the total three-phase active power is watts, and the unit for the total three-phase reactive power is volts (vars). All data records obtained from continuous sampling are arranged chronologically by timestamp to form the raw power sequence.

[0034] Acquire the branch current data of each power supply branch within the base station. Install open-type current transformers at the outgoing terminals of each power supply branch within the base station's distribution cabinet, with the range selected to be 1.2 times the branch's rated current. Install the first current transformer on the main equipment power supply branch and the second current transformer on the standby equipment power supply branch. The secondary side of the current transformer outputs a 0-5V AC voltage signal, which, after processing by the RMS conversion module, outputs a DC voltage signal proportional to the RMS current value. The signal acquisition module performs analog-to-digital conversion on the DC voltage signal at the same sampling interval as a smart meter, and adds a Coordinated Universal Time (UTC) timestamp to obtain the RMS current values ​​of the main equipment power supply branch and the standby equipment power supply branch, both in amperes. These timestamped RMS current values ​​constitute the branch current data.

[0035] The original power sequence and shunt current data are aligned according to a unified time base to generate a composite dataset. The unified time base uses Coordinated Universal Time (UTC) synchronized via the Network Time Protocol (NTP), with a time resolution of 1 second. The alignment process is as follows: a time grid with a step size of 1 second is established, covering the time range of the original power sequence and shunt current data. The time grid is the smallest time unit used for the unified time base, and each time grid has a unique sequence number and a corresponding timestamp, used to carry the aligned running data under that timestamp. For each 1-second time grid, all data records in the original power sequence whose timestamps fall within the range of the preceding 30 seconds to the following 30 seconds are retrieved. If multiple records exist, the arithmetic mean of active power and reactive power of the multiple records are calculated as the active power value and reactive power value of that time grid; if no records exist, the most recent valid value is filled forward to form the active power value and reactive power value. Using the same method, data records in the branch current data whose timestamps fall within the range of 30 seconds before and after the current are retrieved. These records are then processed to obtain the effective values ​​of the main equipment power supply branch current and the standby equipment power supply branch current for each time grid. The timestamp, active power value, reactive power value, effective value of the main equipment branch current, and effective value of the standby equipment branch current corresponding to each time grid are combined into a single record. All records constitute a composite dataset.

[0036] Perform missing value imputation and outlier replacement operations on the composite dataset, outputting a complete historical data matrix. Missing value imputation is performed linearly for any variable in the composite dataset where the number of raster cells missing in consecutive time intervals does not exceed 5. The linear interpolation is calculated as follows:

[0037]

[0038] in, Indicates in time grid Variable interpolated values, variables It can be any one of the following: active power value, reactive power value, effective value of main equipment branch current, or effective value of standby equipment branch current; For time grid The timestamp value; The sequence number of the most recent raster cell containing valid data before the missing segment. The sequence number of the most recent time raster containing valid data after the missing segment; For variables In the time grid The effective value at that point, For variables In the time grid The valid value at the specified location. If the number of consecutive missing time grid cells exceeds 5, the missing segment will not be interpolated and will be directly retained as a blank marker.

[0039] Outlier replacement is performed variable-wise using a sliding window. The sliding window length is set to 60 time grids, covering 60 minutes of data, with a sliding step of 1 time grid. Within each sliding window, the variable is calculated... The average of all valid values ​​within the window and standard deviation ,in This represents the sliding window number. For the variable value of the time grid at the center of the window, if... Then If an outlier is detected, a replacement is performed. The replacement method is: using a time grid. Linear interpolation is performed on adjacent non-outlier values ​​to obtain replacement values. The form of linear interpolation is the same as the missing value imputation formula. Take time grid The most recent non-abnormal time raster sequence number, Take time grid The next most recent non-abnormal time grid number. When the number of valid data points in the sliding window is less than 30, no outlier determination is made for the center time grid.

[0040] The composite dataset that has completed the missing value imputation and outlier replacement operations serves as a complete historical operation data matrix. Each row of the matrix represents a time grid, and the columns are, in order, timestamp, active power value, reactive power value, effective value of main equipment branch current, and effective value of standby equipment branch current.

[0041] In specific implementation, please refer to Figure 3The system selects 30 consecutive days of historical operational data from a complete historical operational data matrix. The starting point is midnight on the day containing the first time grid in the complete historical operational data matrix, and the ending point is the last time grid corresponding to the 23rd hour and 59th minute of the 30th day. The 30-day time window covers a complete monthly operational cycle, reflecting the periodic fluctuations in base station load between weekdays and weekends.

[0042] Starting at midnight each day, the 30-day historical operating data is divided into 30 daily load sub-matrices along the time axis. Each calendar day begins at 00:00:00 and ends at 23:59:59. The slicing operation filters the timestamp column in the historical operating data matrix by interval, grouping all time raster records whose timestamps belong to the same calendar day into a single daily load sub-matrix. Each daily load sub-matrix has 1440 rows. When the historical operating data matrix sampling interval is 1 minute, each row represents a 1-minute time raster, containing five columns of data: timestamp, active power value, reactive power value, effective value of main equipment branch current, and effective value of standby equipment branch current. If a time raster with a blank mark due to missing value imputation exists within a calendar day, the corresponding row's active power value position will be empty.

[0043] In a daily load submatrix, time periods are divided by the hour. The first hour is from 00:00 to 01:00, the second hour is from 01:00 to 02:00, and so on, with the twenty-fourth hour being from 23:00 to 24:00. For each hourly period, the active power values ​​corresponding to all time grids within that hourly period are extracted. Blank entries are excluded, and the arithmetic mean of the remaining active power values ​​is calculated as the average load power for that hourly period. For a given daily load submatrix, the above operation is repeated for all twenty-four hours, generating a daily load average vector containing twenty-four elements. Each dimension of the vector corresponds to the average load power for one hour, with the unit being watts, consistent with the active power values ​​in the historical operating data matrix. This process is repeated for all thirty daily load submatrices, resulting in thirty twenty-four-dimensional daily load average vectors.

[0044] When the active power values ​​of all time grids within a certain hourly period are all blank, the average load power of that hourly period is recorded as a blank mark.

[0045] Calculate the arithmetic mean of all daily load average vectors to generate a baseline load vector. The baseline load vector has a dimension of 24, the same as the daily load average vector. The values ​​of each dimension are derived from the thirty daily load average vectors in the th dimension. The arithmetic mean of the significant values ​​in each dimension is determined, where Indicates the hourly dimension number. Integers ranging from 1 to 24 Corresponding to the hourly period from midnight to 1 a.m. This corresponds to the hourly time period from 11 PM to midnight. The baseline load vector is... Dimensional value The calculation method is as follows:

[0046]

[0047] in, Indicates the reference load vector at the th Values ​​in the hourly dimension; The index of the thirty daily load average vectors. Increasing sequentially from 1 to 30; Indicates the first The daily load average vector at the th th Average load power over an hourly timeframe; For an effective marker, when When it is a valid value The value is 1, when When it is a blank mark The value is 0; The thirty-day load average vector at the th The number of vectors with valid values ​​in the hour dimension. .like If it is zero, then This is marked as a blank marker. The baseline load vector reflects the typical level of hourly load power of the communication base station during the thirty-day operating cycle.

[0048] In practice, load power sequences are extracted one by one from the thirty daily load sub-matrices. For a single daily load sub-matrix, the active power values ​​in each row are extracted in timestamp order to form an original sequence of length 1440, with each position in the sequence corresponding to a 1-minute time grid. When blank markers exist in the original sequence, linear interpolation is used for filling: if the blank marker is located inside the sequence, the linear interpolation result of the two nearest valid values ​​is taken as the filling value; if the blank marker is located at the beginning of the sequence, the first valid value in the sequence is used for forward filling; if the blank marker is located at the end of the sequence, the last valid value in the sequence is used for backward filling. After filling, a load power sequence without missing values ​​is obtained.

[0049] For each daily load submatrix, a discrete cosine transform (DCT) is performed on the load power sequence to convert the time-domain load sequence to the frequency domain, resulting in a set of frequency-domain coefficients. The DCT uses a second-type transformation, and the transformation formula is as follows:

[0050]

[0051] in, Indicates the first in the load power sequence The active power value at each sampling point This is a time-domain index, with a value range of [value range missing]. to Integers; The length of the load power sequence is fixed at 1440. This is a frequency domain index, with a value range of [value range missing]. to Integers; Indicates the first Discrete cosine transform coefficients; As the normalization factor, when hour ,when hour Through the above transformation, we obtain The discrete cosine transform coefficients form a set of frequency domain coefficients.

[0052] The first method for selecting the dominant frequency component from the set of frequency domain coefficients is to sort all discrete cosine transform coefficients from largest to smallest by their absolute amplitude values, where the absolute amplitude value is the absolute value of the discrete cosine transform coefficient. After sorting, the three discrete cosine transform coefficients with the largest absolute amplitude values ​​are selected, and the frequency components corresponding to these three discrete cosine transform coefficients are determined as the dominant frequency components.

[0053] The second method for selecting the dominant frequency component from the set of frequency domain coefficients is as follows: First, calculate the energy value of each discrete cosine transform coefficient. The energy value is the square of the discrete cosine transform coefficient. Calculate the total energy of the set of frequency domain coefficients; the total energy is the sum of all... The sum of the energy values ​​of each discrete cosine transform coefficient. The discrete cosine transform coefficients are sorted in descending order of energy value, starting with the coefficient with the highest energy value, and the energy values ​​are accumulated sequentially, calculating the percentage of the accumulated energy to the total energy. The minimum number of discrete cosine transform coefficients required to first reach 85% of the total energy is selected as the initial screening result. Simultaneously, the global average amplitude of the frequency domain coefficient set is calculated, which is the sum of the energy values ​​of all coefficients. The noise amplitude is the arithmetic mean of the absolute values ​​of the discrete cosine transform coefficients. The noise amplitude threshold is set to 10% of the global average amplitude. For each discrete cosine transform coefficient in the initial screening results, check whether its absolute amplitude is less than the noise amplitude threshold. If it is, remove the discrete cosine transform coefficient from the initial screening results. The frequency components corresponding to the remaining discrete cosine transform coefficients after removal are marked as dominant frequency components.

[0054] Extract the frequency value and phase angle corresponding to the dominant frequency component. For the discrete cosine transform coefficients labeled as the dominant frequency component... Its corresponding frequency value Frequency domain index Load power sequence length and sampling interval Determined jointly, the calculation method is as follows: The sampling interval It lasts for 60 seconds. The frequency value is 1440. The unit is Hertz. Phase angle. From the discrete cosine transform coefficients The sign determines: when hour, radians; when hour, Radians. For each dominant frequency component, the frequency value, phase angle, and absolute value of the amplitude of the discrete cosine transform coefficients are combined into a triplet. All triplets of the dominant frequency components constitute the frequency feature descriptor for that daily load submatrix. Repeat the above operation to generate the corresponding frequency feature descriptor for each daily load submatrix.

[0055] See Figure 4 In the graph, the horizontal axis represents frequency in Hertz, ranging from 0 to approximately 0.0006 Hertz, and the vertical axis represents the absolute value of the discrete cosine transform coefficients, in dimensionless amplitude. The solid curve in the graph depicts the trend of the discrete cosine transform coefficient amplitude at all frequency points, while the dashed horizontal line represents the noise amplitude threshold, which is 10% of the arithmetic mean of the absolute values ​​of all discrete cosine transform coefficient amplitudes.

[0056] As can be seen from the curve trend, the amplitude of the coefficients in the low-frequency band (approximately 0 to 0.00005 Hz) is significantly higher than the noise threshold, exhibiting multiple distinct peaks, indicating the presence of a strong low-frequency dominant frequency component in the load power sequence. The dominant frequency components are marked with orange dots in the figure, corresponding to the three discrete cosine transform coefficients with the largest absolute amplitude values. The amplitudes of the dominant frequency components are much higher than the noise amplitude threshold, distributed at approximately 0.000015 Hz, 0.00003 Hz, and 0.00005 Hz, showing that these frequency components have a dominant influence on the overall waveform of the load power sequence.

[0057] The amplitude of the curve drops rapidly at high frequencies, approaching the noise threshold level, indicating that the energy of the high-frequency components is low and the load power sequence has no obvious high-frequency fluctuations, which is consistent with the stationarity characteristics of the load power sequence of a communication base station.

[0058] In practice, the absolute value of the difference between each daily average load vector and the baseline load vector at each point in time is calculated to generate a difference vector. For each of the thirty daily average load vectors, the difference is calculated with the baseline load vector dimension by dimension. The difference vector corresponding to a single daily average load vector contains twenty-four absolute difference elements, each element corresponding to an hourly dimension. At each point in time, among them For point-in-time index, Take integers from 1 to 24, and the absolute value of the difference. The calculation method is as follows: take the daily load average vector at the th... The average load power of the dimension and the reference load vector in the th dimension The absolute value of the numerical difference between the dimensions. The daily load average vector is in the _th ... The average load power of dimension is marked as blank, or the reference load vector is in the 1st dimension. When the value of a dimension is blank, the absolute value of the difference at that time point is also marked as blank and does not participate in subsequent weighted summation calculations. The absolute values ​​of the differences at all twenty-four time points are then calculated as follows: The numbers from 1 to 24 are arranged in order to form a difference vector.

[0059] Each element in the difference vector is assigned a weight coefficient. These weight coefficients are dynamically set based on user activity and inactivity periods. User activity periods are defined as 18 hours daily, from 6:00 AM to 12:00 AM, corresponding to a specific time point index. The interval is from 7 to 24. User inactivity periods are defined as from midnight to 6:00 AM daily, a total of six hours, corresponding to the time index. The range is from 1 to 6. Weighting coefficients are applied during user activity periods. Set to 1.5; during periods of user inactivity, the weighting coefficient... Set to 0.5. Weighting coefficient. The basis for setting the weight is as follows: the load of communication base stations fluctuates more drastically during user activity periods, and the impact of load power changes on power supply scheduling is more significant, so a higher weight needs to be given to highlight the contribution of load deviation during this period; during user inactivity periods, the base station load level is lower and relatively stable, and the impact of load deviation on scheduling decisions is weaker, so a lower weight is given.

[0060] Elements marked with blank labels in the difference vector do not participate in the weighted summation operation, and their corresponding weight coefficients are considered to be zero.

[0061] The weighted difference vectors are summed to obtain the cumulative deviation between the daily average load vector and the baseline load vector. (Cumulative deviation value) The calculation method is as follows:

[0062]

[0063] in, This represents the cumulative deviation value, in watts. For point-in-time index, Iterate through all integer values ​​from 1 to 24; For the first The weighting coefficient for each time point is 1.5 during periods of user activity and 0.5 during periods of user inactivity. For the difference vector at the th The absolute value of the difference between the daily average load vector and the baseline load vector at the nth time point, i.e., the daily average load vector and the baseline load vector at the nth time point. The absolute value of the difference between the average load power of the dimensions; For effective marker quantity, when the first The absolute value of the difference at each time point When it is a valid value The value is 1, when When it is a blank mark The value is set to 0. For each daily load average vector, a cumulative deviation value is calculated in the manner described above. A total of thirty cumulative deviation values ​​were obtained.

[0064] The cumulative deviation values ​​are normalized to the range of 0 to 1 to generate a similarity coefficient. The normalization operation processes thirty cumulative deviation values ​​and identifies the maximum value among them. and minimum value For a given daily load average vector, the cumulative deviation value... Similarity coefficient The calculation method is as follows: when hour, Take 1.0; when hour, The similarity coefficient calculated in this way The value range is from 0 to 1. The closer the value is to 1, the higher the similarity between the daily average load vector and the baseline load vector. The closer to 0, the lower the similarity. Each of the thirty daily load average vectors corresponds to a similarity coefficient.

[0065] In practice, a similarity threshold is set. Vectors with a similarity coefficient greater than the threshold are selected from all daily load average vectors to generate a candidate daily load set. The similarity threshold is set to 0.75, based on the following: among the thirty daily load average vectors, the historical days corresponding to vectors with a similarity coefficient greater than 0.75 show a strong consistency in load power change trends with typical load patterns. Including these historical days in the candidate set can filter out abnormal days where the load waveform deviates significantly from the typical pattern while retaining sufficient historical reference samples. The thirty similarity coefficients are iterated through, and each similarity coefficient is compared with the threshold of 0.75, retaining those that meet the threshold. The daily load average vectors are given as conditions, and these daily load average vectors constitute the candidate daily load set. The number of elements in the candidate daily load set is denoted as . indivual, Less than or equal to 30.

[0066] Obtain the original daily load submatrix corresponding to each daily load average vector in the candidate daily load set. This is done based on the index of the daily load average vector. Tracing its origin, the corresponding daily load submatrix was extracted from the thirty daily load submatrixes. The extracted daily load submatrix contains 1440 rows of active power data and other columns of data, which are retained in the candidate daily load set. One-to-one correspondence of daily load average vector Each day load submatrix.

[0067] Extract the load power data for the next six hours corresponding to the current time point from the original daily load submatrix to generate a preliminary scheduling reference sequence. The current time point is the real-time moment when the power supply scheduling method is executed, and the extraction interval is the six consecutive hourly time periods following the hourly time period in which the current time point is located. The extraction operation is performed separately for the daily load submatrix corresponding to each candidate daily load set: First, determine the position number of the current time point on the time axis of the candidate daily load submatrix, and then take the active power values ​​of all time grids contained in the six hourly time periods following that position number. There are a total of 360 one-minute time grids in the six hourly time periods, and the 360 ​​active power values ​​are extracted to form a load power sequence of length 360. Each candidate day load submatrix generates a load power sequence of length 360. The load power sequences together form the initial scheduling reference sequence set.

[0068] See Figure 5In the graph, the vertical axis represents the similarity coefficient, and the horizontal axis represents the day number (0 to 30). The curves connected by diamond symbols show the trend of similarity changes between the thirty daily average load vectors and the baseline load vector. The red dashed line in the graph indicates a similarity threshold of 0.75. The day numbers marked with dots in the graph correspond to candidate daily load elements with a similarity greater than 0.75.

[0069] As shown in the figure, the similarity coefficients of most daily load average vectors are below the threshold of 0.75, ranging from 0.1 to 0.7, indicating a significant deviation between these daily loads and the baseline load. The daily load average vectors numbered 2, 11, and 12 have significantly higher similarity coefficients than 0.75, reaching approximately 0.8 to 1.0 respectively, showing that their load waveforms are highly consistent with the baseline load, and they have been selected as candidate daily loads. These candidate daily load points are highlighted with red dots.

[0070] In practical implementation, the real-time power supply voltage and line impedance parameters of the current power grid are obtained. The line impedance parameters include line resistance and reactance values. The real-time power supply voltage is read from the smart meter installed at the main incoming line of the communication base station. The reading time is the current time point when the power supply dispatching method is executed. The reading object is the effective value of the three-phase AC voltage, and the arithmetic mean of the effective values ​​of the three-phase voltage is taken as the real-time power supply voltage. The unit is volts. Circuit resistance value. and reactance value These are preset parameters, derived from the unit length resistance and reactance marked in the design drawings of the communication base station power distribution line, multiplied by the actual length of the line laid from the low-voltage side of the distribution transformer to the main incoming line of the base station, to obtain the line resistance value. The unit is ohms, and the line reactance value is... The unit is ohms. The line resistance and reactance values ​​are verified through offline measurement before the base station is put into operation, and then stored as fixed parameters in the parameter storage module of the power supply dispatching system.

[0071] For each preliminary scheduling reference sequence, extract its 360 load power values ​​sequentially. Each load power value corresponds to a 1-minute time grid within the next six hours. For the first... A time grid, in which Obtain the load power value corresponding to the given time grid by taking an integer from 1 to 360. The unit is watts. Calculate the active power loss of the power supply line under this time grid, taking into account the line impedance parameters. The calculation method is as follows: The load power value... Divide by real-time supply voltage The square of the effective value of the current flowing through the power supply line is obtained, and then multiplied by the line resistance value. Considering the impact of reactive power on current, in the absence of an accurate value for reactive power at the current moment, the reactive power value at the corresponding moment in the load submatrix of the candidate day to which this time grid belongs is used. To correct the current calculation, the square of the effective value of the line current is expressed as the square root of the sum of the squares of active power and reactive power divided by the square of the voltage. Specifically, active power loss... The calculation formula is:

[0072]

[0073] in, For the first The active power loss of the power supply line corresponding to each time grid is expressed in watts. This is the line resistance value, in ohms. For the initial scheduling reference sequence of the first The active power value of the load in each time grid, in watts; In order to be with the first The reactive power value, in volt-amperes, of a time grid belonging to the same candidate day load submatrix and at the same relative time, is extracted from the reactive power column in the candidate day load submatrix. This is the real-time power supply voltage, measured in volts.

[0074] Active power loss corresponding to all 360 time grids for the next six hours. Perform integration and summation, the integration method being to integrate the values ​​of each time grid. Multiply by the duration of a single time grid (60 seconds), and then sum them up to obtain the total line loss value corresponding to this preliminary scheduling reference sequence. , , The unit is joules. For the initial scheduling reference sequence set... Each of the initial scheduling reference sequences performs the above operations to generate... Total line loss value.

[0075] To obtain the current line loss value, calculate the single-time grid loss using the average load power and reactive power within the minute preceding the current time point, then multiply by 60 seconds. The unit is joules. Subtract the current line loss value from each total line loss value to obtain... The increase in loss for each power supply line The value is a positive or negative number in joules.

[0076] In practice, the increase in power line losses is multiplied by a preset conversion factor to obtain the energy adjustment amount of the energy storage device. The preset conversion factor... The value is set to 1.18, based on the following: Communication base station energy storage devices use lithium iron phosphate batteries with a nominal charging efficiency of 92% and a nominal discharging efficiency of 92%. The energy efficiency of a complete charge-discharge cycle is the product of these two values, approximately 84.6%. When the energy storage device needs to absorb or compensate for the energy corresponding to the increase in power line losses, considering energy losses during the charging and discharging process, the actual energy to be stored or released should be the increase in power line losses divided by the cycle efficiency, i.e. Rounded to two decimal places, it is 1.18. Energy adjustment amount. The unit is joules. A positive value indicates that the energy storage device needs to increase discharge or decrease charging to compensate for the increase in power line losses, while a negative value indicates that the energy storage device needs to increase charging or decrease discharge to utilize the decrease in line losses.

[0077] Based on the energy adjustment amount and the current state of charge of the energy storage device, calculate the charging start and end times of the energy storage device. (The current state of charge of the energy storage device is then considered.) Read from the battery management system, expressed as a percentage, the rated capacity of the energy storage device. The unit is joules. The permissible charging power of the energy storage device. Set as a fixed value, taking 80% of the rated power of the energy storage device, in watts. If the energy adjustment amount... A positive value indicates that additional discharge is required, and no charging process needs to be scheduled. The charging start and end times are both marked as invalid. If the energy adjustment amount... A negative value indicates that more energy is needed for charging. Calculate charging time The unit is seconds. The allowed charging period is defined as from 00:00 to 06:00 daily. The charging start time is from 00:00 on the current calendar day. Within the allowed charging period, a search is performed to find the first time that consecutive charging starts from that time. The charging start time is defined as the moment when the charging duration is still within the permitted charging period and the energy storage device's state of charge has not exceeded its upper limit. The charging start time is then added to the charging duration. The charging deadline is obtained. If the current time has passed the permitted charging period for the day, the charging start time will be postponed to midnight of the next day.

[0078] Based on the charging start and end times, the switching time point for the energy storage device to transition from discharging to charging is determined. The energy storage device defaults to standby or discharging mode, and the switching time point is the charging start time. At the charging end time, the energy storage device switches back from charging to discharging or standby mode. A charging / discharging sequence control table is generated based on the switching time point. This table uses a 1-minute time step, covering 360 time grids for the next six hours. Each time grid indicates the operating status and power value of the energy storage device: during the charging period, the power value is set to... Outside of charging periods, if there is no discharge demand, the power value is set to 0; if additional discharge is required, the discharge power and discharge period are calculated based on the positive value of the energy adjustment, and marked as follows. Discharge power Take 80% of the rated discharge power of the energy storage device.

[0079] In practical implementation, the charging and discharging timing control table of the energy storage device is aligned with the preliminary scheduling reference sequence on the time axis to generate a joint scheduling table of load power and energy storage power. The time axis alignment starts from the current time point as the zero moment and arranges 360 time grids continuously with a step size of 1 minute. The preliminary scheduling reference sequence is the load power sequence extracted from the candidate day load submatrix, and the charging and discharging timing control table is the energy storage power sequence. The two sequences are merged according to the time grid number. Each row contains the load power value and energy storage power value of one time grid. The energy storage power value is positive to indicate charging and negative to indicate discharging. The unit is watts.

[0080] The power difference for each time grid is extracted from the load power-energy storage power joint scheduling table. The power difference is the algebraic sum of the load power value and the energy storage power value. If the energy storage power value is a positive charging value, the power difference equals the load power value minus the absolute value of the energy storage power; if the energy storage power value is a negative discharging value, the power difference equals the load power value plus the absolute value of the energy storage power. The sign and magnitude of the power difference reflect the power required by the mains power supply branch: a positive power difference indicates that the mains power needs to supply power to the base station, and a negative power difference indicates that the base station is feeding power back to the mains power.

[0081] Based on the sign and magnitude of the power difference, a power adjustment command for the mains power supply branch is generated. For each time grid, if the power difference is positive, a mains power supply command is generated, and the target output power of the mains rectifier equals the power difference. If the power difference is negative and its absolute value exceeds the reverse power supply allowable threshold, a power limiting adjustment command for the mains power supply branch is generated, adjusting the charging power of the energy storage device to prevent backfeeding, and simultaneously setting the target mains power supply power for that time grid to zero. The reverse power supply allowable threshold is the maximum absolute value of active power allowed for the base station to feed to the mains side, preset according to the accuracy of the grid-connected metering device and the grid access protocol.

[0082] The power regulation command for the mains power supply branch includes the time grid number, the target value of the mains power supply, and whether the power limiting flag is enabled.

[0083] The power adjustment instructions and charging / discharging timing control tables of the generated mains power supply branches are merged into the final power supply dispatch instruction set. The power supply dispatch instruction set is output in the form of a structured data table, which contains 360 dispatch instruction entries. Each entry contains three fields: time offset, energy storage charging / discharging power, and mains power supply power. The instructions are then sent to the base station energy management controller for execution.

[0084] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any changes or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application.

Claims

1. A power supply scheduling method for communication base stations based on load prediction, characterized in that, Includes the following steps: Collect historical operating data of communication base stations, including base station load power and voltage and current parameters of power supply lines for each time period; The historical operating data is periodically sliced ​​to generate a load time series matrix in days. Extract the dominant frequency components from the load time series matrix and calculate the similarity coefficient between each load time series matrix and the baseline load vector; Based on the similarity coefficient, historical time periods that match the current load waveform are selected to generate a set of candidate scheduling schemes; For each of the candidate scheduling schemes in the set, calculate its power line loss increment under the current power grid condition; Based on the power supply line loss increment, the charging and discharging timing of the energy storage device is adjusted to generate the final power supply scheduling command. The calculation of the power supply line loss increment under the current power grid conditions specifically includes: Obtain the real-time power supply voltage and line impedance parameters of the current power grid, wherein the line impedance parameters include line resistance and reactance values; For each load power value in the preliminary scheduling reference sequence, the active power loss of the power supply line under the load power value is calculated in combination with the line impedance parameters. Integrate and sum all active power losses for the next six hours to generate the total line loss value corresponding to each preliminary scheduling reference sequence; The difference between the total line loss value and the current line loss value is used to obtain the power supply line loss increment. The adjustment of the charging and discharging timing of the energy storage device based on the incremental loss of the power supply line specifically includes: Multiply the incremental loss of the power supply line by a preset conversion factor to obtain the energy adjustment amount of the energy storage device; Based on the energy adjustment amount and the current state of charge of the energy storage device, calculate the charging start time and charging end time of the energy storage device; Based on the charging start time and charging end time, determine the switching time point when the energy storage device switches from the discharging state to the charging state. A charging and discharging timing control table for the energy storage device is generated based on the switching time points.

2. The communication base station power supply scheduling method based on load prediction according to claim 1, characterized in that, The historical operational data of the collected communication base stations specifically includes: The real-time active and reactive power at the main incoming line of the base station is recorded by smart meters at fixed sampling intervals to generate a timestamped raw power sequence. Obtain the branch current data of each power supply branch in the base station, wherein the branch current data includes the effective current values ​​of the main equipment power supply branch and the backup equipment power supply branch; The original power sequence and branch current data are aligned according to a unified time base to generate a composite dataset containing load power and branch current. The composite dataset is subjected to missing value imputation and outlier replacement operations to output a complete historical running data matrix.

3. The communication base station power supply scheduling method based on load prediction according to claim 2, characterized in that, The periodic slicing process for the historical operational data specifically includes: Select historical operating data for 30 consecutive days, and use 00:00 each day as the starting point for slicing. Divide the historical operating data matrix into 30 daily load sub-matrices according to the time axis. Calculate the average load power per hour in each daily load submatrix to generate thirty 24-dimensional daily load average vectors; Calculate the arithmetic mean of all daily load average vectors to generate a baseline load vector with a dimension of twenty-four.

4. The communication base station power supply scheduling method based on load prediction according to claim 3, characterized in that, The extraction of the dominant frequency component from the load time-series matrix specifically includes: Perform a discrete cosine transform on each daily load submatrix to convert the time-domain load sequence to the frequency domain, resulting in a set of frequency domain coefficients; The top three frequency components in terms of amplitude are selected from the set of frequency domain coefficients and marked as the dominant frequency components. Extract the frequency value and phase angle corresponding to the dominant frequency component to generate a frequency feature descriptor for each daily load submatrix.

5. The communication base station power supply scheduling method based on load prediction according to claim 4, characterized in that, The calculation of the similarity coefficient between each load time series matrix and the baseline load vector specifically includes: Calculate the absolute value of the difference between the daily average load vector and the baseline load vector at each time point, and generate the difference vector. Each element in the difference vector is assigned a weight coefficient, which is dynamically set according to the user's active and inactive periods. The weighted difference vectors are summed to obtain the cumulative deviation between the daily average load vector and the baseline load vector. The cumulative deviation value is normalized to the range of 0 to 1 to generate a similarity coefficient.

6. The communication base station power supply scheduling method based on load prediction according to claim 5, characterized in that, The step of filtering historical time periods that match the current load waveform based on the similarity coefficient specifically includes: Set a similarity threshold, select vectors with similarity coefficients greater than the similarity threshold from all daily load average vectors, and generate a candidate daily load set; Obtain the original daily load submatrix corresponding to each daily load average vector in the candidate daily load set; Extract the load power data for the next six hours corresponding to the current time point from the original daily load submatrix to generate a preliminary scheduling reference sequence.

7. The communication base station power supply scheduling method based on load prediction according to claim 6, characterized in that, The generation of the final power supply scheduling instruction specifically includes: Align the charging and discharging timing control table of the energy storage device with the preliminary scheduling reference sequence on the time axis to generate a joint scheduling table of load power and energy storage power. The power difference at each time point is extracted from the load power-energy storage power joint scheduling table, where the power difference is the algebraic sum of the load power and the energy storage power; Based on the sign and magnitude of the power difference, a power adjustment command for the mains power supply branch is generated; The power regulation command and the charge / discharge timing control table are combined into a final power supply scheduling command set.

8. The communication base station power supply scheduling method based on load prediction according to claim 1, characterized in that, In the step of extracting the dominant frequency component in the load time-series matrix, the frequency domain coefficients after discrete cosine transform are sorted from largest to smallest energy, and the minimum frequency component required to achieve a cumulative energy ratio of 85% is selected as the dominant frequency component, while noise components with amplitudes lower than 10% of the global average amplitude are discarded.

Citation Information

Patent Citations

  • Electric power networking type resource allocation intelligent system

    CN121073125A

  • Comprehensive energy station optimization regulation and control method and system

    CN122418727A