A large screen system and its construction and installation method
Patent Information
- Application Number
- CN202610924498.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-06-25
- Publication Date
- 2026-10-16
AI Technical Summary
[0004]本发明的目的是提供一种大型屏风系统及其施工安装方法,要解决的技术问题是框架强度有限,高度超过3m时容易出现中部下垂;金属杆因悬浮式安装结构存在间隙,在海风吹动或人员接触后容易晃动,出现振动声响甚至安全隐患
整体结构稳定性显著提高。通过顶部固定装置(第一连接杆+第二连接杆+斜撑)与底部撑杆、预埋角码的协同连接,使受力路径形成上下双向固定体系,可有效避免高位屏风在大风、气流扰动下的晃动与偏移。外框架与第一内框架采用不锈钢矩形钢管构成刚性主体,使整体抗弯刚度增强,避免传统大尺寸屏风易出现中部下垂的问题。
Smart Images

Figure CN122911272A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of screen system structure and installation technology, and in particular relates to a large screen system and its construction and installation method. Background Technology
[0002] In the interior design of five-star and ultra-five-star hotels, the lobby is often considered the core area that best reflects the project's level, aesthetic preferences, and brand character. Among these elements, large screens, as one of the most important spatial dividers and visual focal points in the lobby, have extremely high requirements in terms of design, material quality, structural performance, and long-term stability. For large screens exceeding 3 meters in height, their structural stability, resistance to deformation, and installation precision directly affect safety and lifespan.
[0003] In existing technologies, hotels commonly use a screen structure with a "304 stainless steel outer frame + carbon steel inner frame + wood veneer + suspended metal rod + ordinary glass brick inlay" as the main solution. However, when such screens are used in seaside hotels, environmental factors will significantly amplify the weaknesses of traditional structures. The technical problems with existing technologies are: lobby areas are often places with high concentrations of people and strong airflow; vibrations caused by sea breezes entering the room also require screens with higher structural stability, maintaining their appearance without deformation or swaying over long-term use. Traditional solutions can basically meet decorative requirements in ordinary indoor environments, but in seaside projects, due to the limited strength of the frame, sagging is likely to occur in the middle when the height exceeds 3 meters; the metal rods are suspended installations with no fixed connection between the ends and the frame (5-8mm gap), making them prone to swaying after being blown by sea breezes or touched by people, causing vibrations, noise, and even safety hazards. Summary of the Invention
[0004] The purpose of this invention is to provide a large-scale screen system and its construction and installation method. The technical problem to be solved is that the frame has limited strength and is prone to sagging in the middle when the height exceeds 3m; the metal rods have gaps due to the suspended installation structure, and are prone to swaying when blown by sea winds or touched by people, resulting in vibration noise and even safety hazards.
[0005] The technical solution of the present invention to solve the above-mentioned technical problems is as follows: A large-scale screen system and its construction and installation method, comprising: The outer frame of the screen is a rectangular structure; The first inner frame is fixed to the inside of the outer frame of the screen. The second inner frame is fixed to the inside of the outer frame of the screen; the first inner frame and the second inner frame form a brick installation space; the glass brick is fixed in the brick installation space; The top fixing device includes a first connecting rod, a second connecting rod, an outer sleeve, diagonal braces, and transverse connecting rods. The lower ends of the first connecting rods are respectively connected to both sides of the top of the screen's outer frame. The upper ends of the first connecting rods and the lower ends of the second connecting rods are connected by the outer sleeve and fastening bolts. The upper end of the second connecting rod is fixedly connected to the roof concrete structure. The lower end of the diagonal brace is fixedly connected to the second connecting rod, and the upper end of the diagonal brace is fixedly connected to the roof concrete structure. The bottom fixing device includes a bottom support rod, a transition square steel and a pre-embedded angle bracket. The pre-embedded angle bracket is fixedly connected to the bottom building structure by bottom fixing bolts and is embedded in the bottom concrete layer. The transition square steel is connected to the pre-embedded angle bracket by angle bracket connecting bolts. The bottom support rod is connected between the bottom of the screen's outer frame and the top of the transition square steel.
[0006] The large screen system described above further includes a horizontal connecting rod, which is fixedly connected between two first connecting rods; the height of the screen's outer frame is greater than or equal to 3 meters.
[0007] The large screen system of the present invention, as described above, further includes the following: the first inner frame includes vertical columns and horizontal beams that are perpendicularly fixed to each other on the inner side of the outer frame of the screen, and two adjacent vertical columns and horizontal beams form a rectangular structure; the second inner frame includes horizontal fixing rods and vertical fixing rods that are perpendicularly fixed to each other on the inner side of the outer frame of the screen, and two adjacent vertical fixing rods and horizontal fixing rods form a grid-shaped segmentation structure, the segmentation structure being located within the rectangular structure, and forming four brick installation spaces at the four apex positions of the rectangular structure.
[0008] In the large screen system described above, the second inner frame's horizontal and vertical fixing rods are stainless steel round tubes. Mounting holes for installing the stainless steel round tubes are provided on the inner wall of the outer frame of the screen. The ends of the stainless steel round tubes are inserted into the mounting holes, and the mounting holes are coated with anaerobic anti-corrosion adhesive.
[0009] The large screen system described above further includes an outer frame and a first inner frame made of stainless steel rectangular steel tubes. An aluminum profile is fixed to the outer wall of the rectangular steel tube. The outer surface of the aluminum profile is covered with a wood veneer layer by a hot-pressing composite process. The joints of the wood veneer layer are made at a 45° bevel and sealed with UV weather-resistant adhesive at the bevel joint.
[0010] The large screen system described above further includes a stainless steel baseboard fixedly installed on the outer wall of the bottom support rod.
[0011] The large screen system described above further includes a lamp mounting plate, which is fixed to the lower end of the first connecting rod, and a lighting fixture is installed inside the lamp mounting plate.
[0012] The present invention also provides a construction and installation method for a large screen system, wherein the large screen system is any one of the large screen systems described above; The manufacturing process includes the following steps: the outer frame, the first inner frame, and the second inner frame of the screen are made of 316L stainless steel. They are first pickled and passivated, and then coated with primer and fluorocarbon topcoat respectively; the aluminum profiles are anodized and coated with primer; the outer frame of the screen is welded using argon arc welding, and after welding, it is treated with stainless steel polishing paste and then coated with fluorocarbon topcoat. Factory pre-assembly steps: Step 1: Assemble the frame. The outer frame of the screen is fixed to the first inner frame with bolts, and the verticality is calibrated with a laser line projector. Step 2: Install the decorative surface. The aluminum profile wood veneer assembly is fixed to the outer wall of the outer frame and the first inner frame of the screen. The flatness of the wood veneer surface is checked. Step 3: Assemble the functional components. The horizontal and vertical fixing rods of the second inner frame are inserted into the mounting holes on the inner wall of the outer frame of the screen for fixation. The glass bricks are embedded in the brick installation space and positioned with adhesive strips. The spacing between the horizontal and vertical fixing rods and the offset of the glass bricks are checked to be within the predetermined range. Step 4: Simulate environmental testing. The pre-assembled screen system is placed in a high temperature and high humidity chamber for 72 hours. After checking for no deformation or cracking, it is disassembled into frame modules, decorative modules, and functional component modules and transported. On-site installation steps: Assemble the frame module, decorative module and functional component module separately on the construction site.
[0013] The construction and installation method of the screen system described above, preferably, includes the following on-site installation steps: S1 Positioning: Use a laser line projector to display the installation baseline of the screen's outer frame; S2 Fixing: Connect and install the screen's outer frame using a top fixing device and a bottom fixing device; S3 Surface Module Installation: Fix the surface modules formed by aluminum profiles and wood veneer layers to the outer frame of the screen and the outer wall of the first inner frame according to the pre-assembly markings; S4 Metal Rod Installation: Insert the horizontal and vertical fixing rods of the second inner frame into the installation holes on the inner wall of the screen's outer frame according to their numbers, and reinforce them with anaerobic adhesive; S5 Glass Brick Installation: After the glass bricks are installed into the brick installation space, fill the gap between the glass bricks and the adjacent frame with transparent weather-resistant silicone sealant.
[0014] The construction and installation method of the screen system described above, preferably, includes a finishing step after the S5 glass brick installation step: cleaning, wiping the wood veneer layer, horizontal fixing rods and vertical fixing rods, and glass bricks with a neutral detergent to remove glue residue and dust; anti-corrosion inspection, inspecting the anti-corrosion coating of weld joints and bolt holes, and applying fluorocarbon topcoat to any damaged areas of the anti-corrosion coating.
[0015] The beneficial effects of this invention are: The overall structural stability is significantly improved. Through the coordinated connection of the top fixing device (first connecting rod + second connecting rod + diagonal brace) with the bottom support rod and pre-embedded corner brackets, a two-way fixing system is formed along the force path, effectively preventing the high-positioned screen from swaying and shifting under strong winds and airflow disturbances. The outer frame and the first inner frame are constructed with stainless steel rectangular tubing to form a rigid main body, enhancing the overall bending stiffness and avoiding the problem of sagging in the middle that is common in traditional large-size screens.
[0016] This invention solves the technical problems of limited frame strength, which can easily cause the middle part to sag when the height of the screen exceeds 3m; and the gaps in the metal rod due to the suspended installation structure, which can easily sway when blown by sea wind or touched by people, resulting in vibration, noise, or even safety hazards. Attached Figure Description
[0017] The advantages of the present invention, both above and / or other aspects, will become clearer and more readily understood through the following detailed description taken in conjunction with the accompanying drawings, which are merely illustrative and do not limit the invention, wherein: Figure 1 This is a front view of a large screen system according to an embodiment of the present invention; Figure 2 for Figure 1 A magnified view of the upper part; Figure 3 for Figure 1 A magnified view of the central section; Figure 4 This is a schematic diagram of the left side of a large screen system according to an embodiment of the present invention; Figure 5 for Figure 4 A magnified view of the upper part; Figure 6 This is a magnified view of the central part of section 4; Figure 7 This is a magnified view of the bottom part of 4.
[0018] The attached diagram lists the components represented by each number as follows: 10. Screen outer frame; 11. Rectangular steel pipe; 12. Aluminum profile; 13. Wood veneer layer; 20. Top fixing device; 21. First connecting rod; 22. Second connecting rod; 23. Outer sleeve; 24. Diagonal brace; 25. Top connecting plate; 26. Top fixing bolt; 27. Horizontal connecting rod; 28. Lighting fixture mounting plate; 29. Lighting fixture; 30. Bottom fixing device; 31. Bottom support rod; 32. Adapter square steel; 33. Embedded corner bracket; 34. Bottom fixing bolt; 35. Corner bracket connecting bolt; 36. Stainless steel skirting board; 40. First inner frame; 41. Vertical column; 42. Horizontal beam; 50. Second inner frame; 51. Horizontal fixing rod; 52. Vertical fixing rod; 60. Glass brick. Detailed Implementation
[0019] In the following description, embodiments of the large-scale screen system and its construction and installation method of the present invention will be described with reference to the accompanying drawings.
[0020] The embodiments described herein are specific implementations of the present invention, used to illustrate the concept of the invention, and are illustrative and exemplary, and should not be construed as limiting the implementation or scope of the invention. In addition to the embodiments described herein, those skilled in the art can employ other obvious technical solutions based on the content disclosed in the claims and specification of this application. These technical solutions include those that make any obvious substitutions and modifications to the embodiments described herein.
[0021] The accompanying drawings in this specification are schematic diagrams to aid in illustrating the concept of the invention, and schematically show the shapes of the various parts and their interrelationships. Please note that, in order to clearly demonstrate the structure of the components in the embodiments of the invention, the drawings are not drawn to the same scale. The same reference numerals are used to indicate the same parts.
[0022] The following combination Figures 1 to 7 This invention describes a large-scale screen system according to an embodiment of the present invention, which includes: The outer frame 10 of the screen is a rectangular structure. For the construction of lobbies in high-end hotels, tall screens are required due to the functional needs of the building. In a preferred embodiment, the height of the outer frame 10 is greater than or equal to 3 meters. For screens exceeding 3 meters in height, the screens must not sag or sway under slight impacts or sea breeze vibrations.
[0023] The first inner frame 40 is fixed to the inside of the outer frame 10 of the screen. The second inner frame 50 is fixed to the inner side of the outer frame 10 of the screen. In a preferred embodiment of the large screen system, the horizontal fixing rod 51 and the vertical fixing rod 52 of the second inner frame 50 are stainless steel round tubes. Mounting holes for installing the stainless steel round tubes are provided on the inner wall of the outer frame 10 of the screen. The ends of the stainless steel round tubes are inserted into the mounting holes, and the mounting holes are coated with anaerobic anti-corrosion adhesive. Preferably, the anaerobic adhesive is Loctite 638 or an industrial adhesive of equivalent strength to form a long-term fixed connection.
[0024] The first inner frame 40 and the second inner frame 50 constitute a brick installation space; glass bricks 60 are fixed within the brick installation space; in a preferred embodiment of the large screen system, the outer frame 10 and the first inner frame 40 are rectangular steel pipes 11 made of stainless steel, and aluminum profiles 12 are fixed to the outer wall of the rectangular steel pipes 11. The outer surface of the aluminum profiles 12 is covered with a wood veneer layer 13 by a hot-pressing composite process. The joints of the wood veneer layer 13 are made at a 45° bevel and sealed with UV weather-resistant adhesive at the bevel joints. As a further preferred embodiment, to prevent the wood veneer layer from warping, a fiber base layer can be added to the back of the wood veneer layer.
[0025] Combination Figure 3 As shown, in a preferred embodiment of a large screen system, the first inner frame 40 includes vertical columns 41 and horizontal beams 42 that are perpendicularly fixed to each other inside the outer frame 10 of the screen. Two adjacent vertical columns 41 and horizontal beams 42 form a rectangular structure. The second inner frame 50 includes horizontal fixing rods 51 and vertical fixing rods 52 that are perpendicularly fixed to each other inside the outer frame 10 of the screen. Two adjacent vertical fixing rods 52 and horizontal fixing rods 51 form a grid-like segmentation structure. This segmentation structure is located within the rectangular structure, forming four brick installation spaces at the four apex positions of the rectangular structure. By forming a rectangular unit structure with the first inner frame and then creating a grid-like segmentation with the second inner frame, a multi-point support and positioning space is constructed for the glass bricks, significantly improving the flatness, interlocking stability, and vibration resistance of the brick installation.
[0026] The top fixing device 20 includes a first connecting rod 21, a second connecting rod 22, an outer sleeve 23, a diagonal brace 24, and a transverse connecting rod 27. The lower ends of the first connecting rod 21 are respectively connected to both sides of the top of the outer frame 10 of the screen. The upper ends of the first connecting rod 21 and the lower ends of the second connecting rod 22 are connected by the outer sleeve 23 and fastening bolts. The upper end of the second connecting rod 22 is fixedly connected to the roof concrete structure. The lower end of the diagonal brace 24 is fixedly connected to the second connecting rod 22, and the upper end of the diagonal brace 24 is fixedly connected to the roof concrete structure. Figures 1 to 4 As shown, there are three diagonal braces 24, which are respectively set on the three outer walls of the second connecting rod 22 (the cross section is a square tube), forming a spatial triangular support system to resist the lateral disturbance of the screen by the sea wind.
[0027] Preferably, the upper ends of the second connecting rod and the diagonal brace are connected to the roof concrete structure in the following manner: the top connecting plate 25 is fixedly connected to the roof concrete structure by top fixing bolts 26, and the upper ends of the second connecting rod and the diagonal brace are respectively welded to or bolted to the corresponding top connecting plates. The thickness of the top connecting plate is preferably 3-6mm, and stiffening ribs can be welded according to the structural height to improve tensile stability. In a preferred embodiment of a large screen system, such as Figure 2 As shown, the top fixing device 20 also includes a transverse connecting rod 27, which is fixedly connected between the two first connecting rods 21; The bottom fixing device 30 includes a bottom support rod 31, a transition square steel 32, and a pre-embedded angle bracket 33. The pre-embedded angle bracket 33 is fixedly connected to the bottom building structure by bottom fixing bolts 34 and is embedded in the bottom concrete layer. The transition square steel 32 is connected to the pre-embedded angle bracket 33 by angle bracket connecting bolts 35. The bottom support rod 31 is connected between the bottom of the outer frame 10 of the screen and the top of the transition square steel 32. The pre-embedded angle bracket 33 is provided with vertical strip holes, for example, the strip holes are 20mm long, to allow for ±10mm height adjustment of the transition square steel, improving the accuracy of on-site leveling and installation and the efficiency of leveling construction.
[0028] In a preferred embodiment of the large screen system, a stainless steel baseboard 36 is fixedly installed on the outer wall of the bottom support rod 31. The baseboard height can be 60-150mm, serving to protect, prevent dirt, and visually define the space.
[0029] In a preferred embodiment of the large screen system, a lighting mounting plate 28 is further included. The lighting mounting plate 28 is fixed to the lower end of the first connecting rod 21, and a lighting fixture 29 is installed inside the lighting mounting plate 28. The lighting can be a warm white LED linear light, an RGB ambient light, or a custom floodlight.
[0030] This invention also provides a construction and installation method for a large-scale screen system, wherein the large-scale screen system is any of the large-scale screen systems described in the above embodiments; I. Manufacturing Steps: The outer frame 10, the first inner frame 40, and the second inner frame 50 of the screen are made of 316L stainless steel. They are first pickled and passivated, then coated with primer and fluorocarbon topcoat respectively. The aluminum profile 12 is anodized and then coated with primer. The outer frame 10 of the screen is welded using argon arc welding, and after welding, it is treated with stainless steel polishing paste and then coated with fluorocarbon topcoat. Through the above methods, the large screen system can adapt to long-term use environments such as coastal areas, high humidity, and public spaces. The multiple anti-corrosion system, including 316L stainless steel, fluorocarbon topcoat, and anaerobic anti-corrosion adhesive, achieves comprehensive rust prevention, reduces the risk of structural fatigue and appearance aging caused by salt spray corrosion, and extends service life.
[0031] II. Factory Pre-assembly Steps: Step 1: Assemble the frame. The outer frame 10 of the screen is fixed to the first inner frame 40 with bolts, and the verticality is calibrated with a laser line projector. Step 2: Install the decorative surface. The aluminum profile 12 and wood veneer layer 13 components are fixed to the outer walls of the outer frame 10 and the first inner frame 40 of the screen. The flatness of the wood veneer surface is checked. Step 3: Assemble the functional components. The horizontal fixing rods 51 and vertical fixing rods 52 of the second inner frame 50 are inserted into the mounting holes on the inner wall of the outer frame 10 of the screen for fixation. The glass bricks 60 are embedded in the brick installation space and positioned with adhesive strips. The spacing between the horizontal fixing rods 51 and the vertical fixing rods 52 and the offset of the glass bricks 60 are checked to be within the predetermined range. Step 4: Simulate environmental testing. The pre-assembled screen system is placed in a high temperature and high humidity chamber for 72 hours. After checking for no deformation or cracking, it is disassembled into frame modules, decorative surface modules, and functional component modules and transported. In one embodiment, the test conditions are 60℃ and 95%RH to simulate the long-term coastal use environment. Modular pre-assembly design shortens the on-site installation cycle and improves construction accuracy. By pre-assembling in the factory and verifying in a simulated environment before disassembly and transportation, on-site installation only requires positioning, assembly, and plug-in, resulting in minimal construction errors and reducing the risks of high-altitude installation.
[0032] III. On-site Installation Steps: The frame modules, decorative modules, and functional component modules are assembled separately on-site. The specific on-site installation steps are as follows: S1 Positioning: Use a laser line projector to mark the installation baseline of the outer frame 10 of the screen; S2 Fixing: The outer frame 10 of the screen is connected and installed through the top fixing device 20 and the bottom fixing device 30; S3 Decorative Module Installation: The decorative modules formed by the aluminum profile 12 and the wood veneer layer 13 are fixed to the outer frame 10 of the screen and the outer wall of the first inner frame 40 according to the pre-assembly markings; S4 Metal Rod Installation: The horizontal fixing rods 51 and vertical fixing rods 52 of the second inner frame 50 are inserted into the installation holes on the inner wall of the outer frame 10 of the screen according to their numbers, and anaerobic adhesive is applied for reinforcement; S5 Glass Brick 60 Installation: After the glass brick 60 is installed into the brick installation space, transparent weather-resistant silicone sealant is filled between the glass brick 60 and the adjacent frame.
[0033] IV. Finishing steps: Cleaning: Wipe the wood veneer layer 13, horizontal fixing rod 51 and vertical fixing rod 52, and glass brick 60 with a neutral detergent to remove glue residue and dust; Anti-corrosion inspection: Inspect the anti-corrosion coating of the weld joints and bolt holes, and apply fluorocarbon topcoat to any damaged areas of the anti-corrosion coating.
[0034] The technical features disclosed above are not limited to the combinations of the disclosed features with other features. Those skilled in the art can also make other combinations of the technical features according to the purpose of the invention to achieve the purpose of the invention.
Claims
1. A large-scale screen system, characterized in that, include: The screen consists of an outer frame (10), a first inner frame (40), a second inner frame (50), a top fixing device (20), and a bottom fixing device (30). The outer frame (10) is rectangular. The first inner frame (40) is fixed to the inner side of the outer frame (10). The second inner frame (50) is fixed to the inner side of the outer frame (10). The first inner frame (40) and the second inner frame (50) form a brick installation space. Glass bricks (60) are fixed in the brick installation space. The top fixing device (20) includes a first connecting rod (21), a second connecting rod (22), an outer sleeve (23), a diagonal brace (24), and a transverse connecting rod (27). The lower ends of the first connecting rod (21) are connected to the two sides of the top of the outer frame (10), and the upper ends of the first connecting rod (21) are connected to the lower ends of the outer frame (10). The lower end of the first connecting rod (22) and the lower end of the second connecting rod (22) are connected by an outer sleeve (23) and fastening bolts; the upper end of the second connecting rod (22) is fixedly connected to the roof concrete structure; the lower end of the diagonal brace (24) is fixedly connected to the second connecting rod (22), and the upper end of the diagonal brace (24) is fixedly connected to the roof concrete structure; the bottom fixing device (30) includes a bottom support rod (31), a transition square steel (32) and a pre-embedded corner bracket (33), the pre-embedded corner bracket (33) is fixedly connected to the bottom building structure by a bottom fixing bolt (34), and the pre-embedded corner bracket (33) is embedded in the bottom concrete layer; the transition square steel (32) is connected to the pre-embedded corner bracket (33) by a corner bracket connecting bolt (35); the bottom support rod (31) is connected between the bottom of the screen outer frame (10) and the top of the transition square steel (32).
2. The large-scale screen system according to claim 1, characterized in that, It also includes a transverse connecting rod (27), which is fixedly connected between two first connecting rods (21); the height of the screen outer frame (10) is greater than or equal to 3 meters.
3. The large-scale screen system according to claim 1, characterized in that, The first inner frame (40) includes vertical columns (41) and horizontal beams (42) that are perpendicularly fixed to each other inside the outer frame (10) of the screen. Two adjacent vertical columns (41) and horizontal beams (42) form a rectangular structure. The second inner frame (50) includes horizontal fixing rods (51) and vertical fixing rods (52) that are perpendicularly fixed to each other inside the outer frame (10) of the screen. Two adjacent vertical fixing rods (52) and horizontal fixing rods (51) form a grid-shaped segmentation structure. The segmentation structure is located inside the rectangular structure, and four brick installation spaces are formed at the four apex positions of the rectangular structure.
4. The large-scale screen system according to claim 3, characterized in that, The horizontal fixing rod (51) and vertical fixing rod (52) of the second inner frame (50) are stainless steel round tubes. The inner wall of the outer frame (10) of the screen is provided with mounting holes for installing stainless steel round tubes. The end of the stainless steel round tube is inserted into the mounting hole, and the mounting hole is coated with anaerobic anti-corrosion glue.
5. The large-scale screen system according to claim 1, characterized in that, The outer frame (10) and the first inner frame (40) of the screen are rectangular steel pipes (11) made of stainless steel. An aluminum profile (12) is fixed on the outer wall of the rectangular steel pipe (11). The outer surface of the aluminum profile (12) is covered with a wood veneer layer (13) by a hot-pressing composite process. The joints of the wood veneer layer (13) are made with a 45° bevel joint and the bevel joint is sealed with UV weather-resistant glue.
6. The large-scale screen system according to claim 1, characterized in that, A stainless steel skirting board (36) is fixedly installed on the outer wall of the bottom support rod (31).
7. The large-scale screen system according to claim 1, characterized in that, It also includes a lamp mounting plate (28), which is fixed at the lower end of the first connecting rod (21), and a lighting lamp (29) is installed inside the lamp mounting plate (28).
8. A construction and installation method for a large-scale screen system, characterized in that, The large-scale screen system is the large-scale screen system according to any one of claims 1 to 7; The preparation steps include: the outer frame (10), the first inner frame (40), and the second inner frame (50) of the screen are made of 316L stainless steel. They are first pickled and passivated, and then coated with primer and fluorocarbon topcoat respectively; the aluminum profile (12) is anodized and coated with primer; the outer frame (10) of the screen is welded by argon arc welding, and after welding, it is treated with stainless steel polishing paste and then coated with fluorocarbon topcoat. Factory pre-assembly steps: Step 1: Assemble the frame. The outer frame (10) of the screen is fixed to the first inner frame (40) with bolts. The verticality is calibrated with a laser line projector. Step 2: Install the decorative surface. The aluminum profile (12) and wood veneer (13) components are fixed to the outer wall of the outer frame (10) and the first inner frame (40). The flatness of the wood veneer surface is checked. Step 3: Assemble the functional components. The horizontal fixing rod (51) and vertical fixing rod (52) of the second inner frame (50) are inserted into the mounting holes on the inner wall of the outer frame (10) of the screen and fixed. The glass brick (60) is embedded in the brick installation space and positioned with adhesive strips. The spacing between the horizontal fixing rod (51) and the vertical fixing rod (52) and the offset of the glass brick (60) are checked to be within the predetermined range. Step 4: Simulate environmental testing. The pre-assembled screen system is placed in a high temperature and high humidity chamber for 72 hours. After checking that there is no deformation or cracking, it is disassembled into frame modules, decorative modules and functional component modules and transported. On-site installation steps: Assemble the frame module, decorative module and functional component module separately on the construction site.
9. The construction and installation method of the screen system according to claim 8, characterized in that, The on-site installation steps are as follows: S1 Positioning: Use a laser line projector to pop up the installation baseline of the screen outer frame (10); S2 Fixing: The screen outer frame (10) is connected and installed through the top fixing device (20) and the bottom fixing device (30); S3 Surface module installation: The surface module formed by aluminum profile (12) and wood veneer layer (13) is fixed to the screen outer frame (10) and the outer wall of the first inner frame (40) according to the pre-assembly mark; S4 Metal rod installation: The horizontal fixing rod (51) and vertical fixing rod (52) of the second inner frame (50) are inserted into the installation holes on the inner wall of the screen outer frame (10) according to the number, and anaerobic glue is applied for reinforcement; S5 Glass brick (60) installation: After the glass brick (60) is installed into the brick installation space, transparent weather-resistant silicone glue is filled in the gap between the glass brick (60) and the adjacent frame.
10. The construction and installation method of the screen system according to claim 9, characterized in that, The S5 glass brick (60) installation step includes finishing steps: cleaning, wiping the wood veneer (13), horizontal fixing rod (51) and vertical fixing rod (52), and glass brick (60) with a neutral detergent to remove glue residue and dust; anti-corrosion inspection, inspecting the anti-corrosion coating of weld joints and bolt holes, and applying fluorocarbon topcoat to any damaged anti-corrosion coating areas.