Cement test block curing box, curing pool and curing system

CN122914339APending Publication Date: 2026-10-16KUNMING JIANLIN TESTING TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510432086.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-04-08
Publication Date
2026-10-16

AI Technical Summary

Technical Problem

[0004]现有的水泥试块养护箱和养护池,热量传递不均匀,温度很难达到标准要求的20℃±1℃,不仅需要额外设置空调为其保持温度至20℃,还常常需要人工干预,使得养护效率和养护过程中的温度、湿度控制较为困难

Benefits of technology

[0031] This invention utilizes a water tank surrounding the cement block curing chamber to provide circulating water at a set temperature. Nozzles supply water at the same temperature as the circulating water, which in turn drives the flow of air around the mold, generating circulating airflow. The circulating air and water, driven by the water spray, transfer heat more evenly, maintaining the mold in an environment with a temperature of 20℃±1℃ and humidity ≥90%RH. In the cement block curing pool, a circulating water tank surrounds the pool, using the circulating water to transfer heat and maintain the water temperature within the block assembly at 20℃±1℃. This achieves uniform and stable curing temperature and humidity for the cement blocks, unaffected by changes in room temperature or the heat generated by the blocks, effectively improving the accuracy of cement strength testing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122914339A_ABST
    Figure CN122914339A_ABST
Patent Text Reader

Abstract

The application discloses a cement test block curing box, a curing pool and a curing system, and relates to the field of cement test block curing equipment. The curing box comprises a curing box body; a plurality of water tank groups are sequentially fixed in the curing box body from top to bottom; one end of each water tank group is provided with a nozzle, and adjacent two water tank groups are connected; a test mold support is movably arranged in the water tank group; a forming test mold for placing cement test blocks is arranged on the test mold support; one end of a circulating pool is fixedly arranged at the bottom of the curing box body; the circulating pool is connected with the plurality of nozzles through pipelines connected with a circulating pump; the nozzles can spray water in the circulating pool into the corresponding water tank groups; the water flowing in the water tank groups does not contact the test mold; and the water in the water tank group at the bottom can fall into the circulating pool; the circulating pool is connected with a temperature control module, and the temperature control module can control the temperature of the water in the circulating pool. The temperature and humidity control during the curing process is relatively accurate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of cement test block curing equipment technology, and in particular to a cement test block curing box, curing pool and curing system. Background Technology

[0002] In cement product quality testing, cement samples need to be prepared into specimens and cured in a specified temperature and humidity environment until the designated age. The uniformity and stability of the curing temperature affect the accuracy of the test results.

[0003] After the cement test blocks are formed, before demolding, they need to be placed in a curing chamber at a temperature of 20℃±1℃ and a humidity of ≥90%RH for 24 hours. Then, they are demolded and placed in a curing pool at 20℃±1℃ for 3 to 28 days. The heat of hydration of the cement test blocks and the humid air in the curing chamber increase the difficulty of temperature and humidity control.

[0004] Existing cement block curing boxes and curing pools suffer from uneven heat transfer, making it difficult to reach the standard requirement of 20℃±1℃. This not only requires additional air conditioning to maintain the temperature at 20℃, but also often necessitates manual intervention, making curing efficiency and temperature and humidity control during the curing process quite difficult.

[0005] Therefore, there is an urgent need to design a scheme for more precise temperature and humidity control during the maintenance process. Summary of the Invention

[0006] The purpose of this invention is to provide a cement test block curing box, curing pool and curing system to solve the problems existing in the prior art, and to achieve more precise control of temperature and humidity during the curing process.

[0007] To achieve the above objectives, the present invention provides the following solution:

[0008] This invention provides a cement test block curing box, comprising:

[0009] The curing box body, the interior of which is sealable;

[0010] A water tank assembly, wherein multiple water tank assemblies are fixed sequentially from top to bottom within the curing box body, each water tank assembly has a nozzle at one end, and adjacent water tank assemblies are connected to each other;

[0011] A mold support is movably mounted within the water tank assembly, and the horizontality of the mold support within the water tank assembly is adjustable; the mold support is used to place the forming mold for cement test blocks.

[0012] A circulating water tank is fixed at one end to the bottom of the curing chamber. The circulating water tank is connected to multiple nozzles via pipelines connected to a circulating pump. The nozzles can spray water from the circulating water tank into the corresponding water tank groups, and the water flowing in the water tank groups does not come into contact with the mold. The water in the bottommost water tank group can fall into the circulating water tank. The circulating water tank is connected to a temperature control module, which can regulate the temperature of the water in the circulating water tank.

[0013] Preferably, the water tank assembly includes an inclined water tank and a flat water tank. The inclined water tank is arranged at an angle above the flat water tank, and the mold support is disposed on the flat water tank. The nozzle is located at the lower end of the inclined water tank. One end of the flat water tank is connected to the lower end of the inclined water tank, and the other end of the flat water tank is connected to the higher end of the inclined water tank of the adjacent water tank assembly below it. The flat water tank at the bottom of the water tank assembly is connected to the circulating water pool.

[0014] Preferably, the inclined water tank has a flow guide channel on its upper inclined surface, the flow guide channel is located in front of the nozzle, the flow guide channel has an inlet at one end near the nozzle that is directly opposite the outlet of the nozzle, the flow guide channel has multiple outlets at the other end away from the nozzle, multiple channel plates are provided in the inlet of the flow guide channel, the channel plates divide the inlet of the flow guide channel into multiple inlet areas, and the multiple inlet areas correspond one-to-one with the multiple outlets, the inlet areas and the corresponding outlets are connected by multiple bends in the airflow channel.

[0015] Preferably, the mold support is provided with a groove, and the side wall of the groove of the mold support is provided with a plurality of ventilation holes.

[0016] The present invention also provides a cement test block curing tank, comprising:

[0017] The curing tank body, the interior of which is sealable;

[0018] A circulating water tank, wherein multiple circulating water tanks are fixed in sequence from top to bottom within the maintenance pool body, and multiple drain outlets are provided on one side of the bottom of the circulating water tank. The drain outlets are connected to another circulating water tank adjacent to the bottom of the circulating water tank, and the axes of the drain outlets of two adjacent circulating water tanks are arranged in a staggered manner.

[0019] A flow guide bracket is fixedly installed inside the circulating water tank, and a flow guide groove is formed between the bottom of the flow guide bracket and the inner bottom of the circulating water tank.

[0020] The test block assembly is used to support cement test blocks. The test block assembly can be placed on the flow guide support, and the water in the circulating water tank does not come into contact with the test block assembly.

[0021] As described above, the end of the circulating water tank furthest from the cement test block curing box is located at the bottom of the curing tank body; the circulating water tank is connected to the water inlet at the top of the curing tank body through a pipeline connected to a circulating pump, and the water inlet is connected to the uppermost circulating water tank, allowing water in the lowermost circulating water tank to fall into the circulating water tank; the circulating water tank is connected to the temperature control module described above, which can regulate the temperature of the water in the circulating water tank.

[0022] Preferably, the test block assembly includes a water tank with an open top, a test block support is provided inside the water tank, and a cement test block is placed on the test block support; a partition is provided on the test block support, the partition is located on both sides of the cement test block, and the height of the partition is greater than the height of the cement test block; a pre-water addition mark and a curing water mark are provided on the partition; since the top of the water tank is open, the relative position of the water surface with respect to the pre-water addition mark and the curing water mark can be seen from the top of the water tank.

[0023] Preferably, the bottom of the flow guide bracket is provided with multiple partitions, which divide the circulating water tank into multiple circulating water channels, and the multiple drain outlets are located at different locations in the circulating water channels.

[0024] The present invention also provides a cement test block curing system, including a box, wherein a partition plate is provided inside the box, the partition plate dividing the box into a first compartment and a second compartment; the first compartment is formed as a cement test block curing box as described above, and the second compartment is formed as a cement test block curing pool as described above.

[0025] The bottom of the enclosure is provided with a temperature control zone, and the temperature control module is installed in the temperature control zone.

[0026] Each of the first and second compartments is hinged with a door, and the temperature control zone has two symmetrically arranged temperature control zone doors hinged to one side.

[0027] A door groove is provided on the outside of the temperature control zone door; after the two temperature control zone doors are closed, the two door grooves are arranged coaxially, and rod-shaped door bolts can be placed in the two door grooves after the temperature control zone doors are closed.

[0028] Preferably, the temperature control module includes a temperature controller, a refrigeration unit, a cold water storage tank, a cooling water pump, and a circulating water pump; an electric heater is provided in the circulating water tank, and the cold water storage tank is connected to the refrigeration unit; a temperature sensor is provided on the inner top of the cement block curing box or in the circulating water tank, and the temperature sensor is electrically connected to the temperature controller; the temperature controller is electrically connected to the electric heater and the cooling water pump respectively, the inlet of the cooling water pump is connected to the cold water storage tank through a pipeline, and the outlet of the cooling water pump is connected to the circulating water tank through a pipeline.

[0029] Preferably, the temperature control zone is provided with a temperature control base plate, the temperature control module is fixedly mounted on the temperature control base plate, and multiple detachable transport brackets are connected to the temperature control base plate, the ends of which can be fixedly connected to the bottom of the box.

[0030] The present invention achieves the following technical effects compared to the prior art:

[0031] This invention utilizes a water tank surrounding the cement block curing chamber to provide circulating water at a set temperature. Nozzles supply water at the same temperature as the circulating water, which in turn drives the flow of air around the mold, generating circulating airflow. The circulating air and water, driven by the water spray, transfer heat more evenly, maintaining the mold in an environment with a temperature of 20℃±1℃ and humidity ≥90%RH. In the cement block curing pool, a circulating water tank surrounds the pool, using the circulating water to transfer heat and maintain the water temperature within the block assembly at 20℃±1℃. This achieves uniform and stable curing temperature and humidity for the cement blocks, unaffected by changes in room temperature or the heat generated by the blocks, effectively improving the accuracy of cement strength testing. Attached Figure Description

[0032] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0033] Figure 1 This is a side view of the cement test block curing box in one or more embodiments of the present invention;

[0034] Figure 2 This is a side view of the cement test block curing pool in one or more embodiments of the present invention;

[0035] Figure 3 This is a front view of the cement test block curing system in one or more embodiments of the present invention;

[0036] Figure 4 for Figure 3 A partial sectional view;

[0037] Figure 5 This is a schematic diagram of the internal structure of the cement test block curing tank in one or more embodiments of the present invention;

[0038] Figure 6 for Figure 5 Another angle diagram;

[0039] Figure 7This is a schematic diagram of the horizontal water tank, the test mold support, and the test mold structure in one or more embodiments of the present invention;

[0040] Figure 8 for Figure 7 Another perspective illustration;

[0041] Figure 9 This is a schematic diagram of an inclined water tank in one or more embodiments of the present invention;

[0042] Figure 10 for Figure 9 Side view;

[0043] Figure 11 for Figure 9 Top view.

[0044] In the diagram: 1-Box body, 11-Box door, 12-Temperature control zone door, 13-Door bolt, 14-Transportation bracket, 15-Temperature control base plate, 2-Cement block curing tank, 21-Water inlet, 22-Circulating water tank, 23-Water pool, 231-Test block bracket, 24-Flow guide bracket, 241-Spacer, 25-Circulating water pool, 26-Temperature sensor, 27-Electric heater, 3-Cement block curing box, 31-Test mold, 32-Nozzle, 33-Slanted water tank, 331-Flow guide channel, 34-Test mold bracket, 341-Ventilation hole, 342-Height adjustment device, 35-Flat water tank, 4-Temperature control zone, 41-Temperature controller, 42-Refrigeration unit, 43-Cold water storage tank, 44-Circulating water pump, 45-Cooling water pump, 5-Pre-fill water mark, 6-Cure water mark, 7-Cement block. Detailed Implementation

[0045] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0046] The purpose of this invention is to provide a cement test block curing box, curing pool and curing system to solve the problems existing in the prior art, and to achieve more precise control of temperature and humidity during the curing process.

[0047] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.

[0048] Heat transfer occurs in three ways: conduction, radiation, and convection. A temperature difference is a prerequisite for heat transfer; the smaller the temperature difference, the slower the conduction and radiation heat transfer. This is the main reason for the uneven temperature distribution within cement block curing boxes and curing tanks. Convection heat transfer, however, is not affected by the size of the temperature difference. Based on this, the present invention provides a cement block curing box, such as… Figure 1 , Figure 7 , Figure 8 , Figure 9 , Figure 10 , Figure 11 As shown, the system includes a curing box body with an insulation layer on the side walls, and the interior of the curing box body is sealable; multiple water tank groups are fixed to the curing box body from top to bottom, each water tank group has a nozzle 32 at one end, and adjacent water tank groups are connected; a test mold support 34 is movably disposed in the water tank group, and the level of the test mold support 34 in the water tank group is adjustable; a test mold 31 for placing cement test blocks is placed on the test mold support 34; a circulating water tank 25 is fixed to the bottom of the curing box body at one end, and the circulating water tank 25 is connected to multiple nozzles 32 through a pipeline connected to a circulating pump. The nozzles 32 can spray water in the circulating water tank 25 into the corresponding water tank group, and the water flowing in the water tank group does not contact the test mold 31. The water in the bottom water tank group can fall into the circulating water tank 25; the circulating water tank 25 is connected to a temperature control module, which can regulate the temperature of the water in the circulating water tank 25. This invention uses a circulating water pump 44 and nozzles 32 to spray water at a set temperature from the circulating water tank 25 into the water tank assembly. This causes the water to circulate at the bottom area of ​​the mold support 34. The small distance between the water in the water tank assembly and the mold support 34 reduces the conduction heat transfer distance. The top-to-bottom circulation of the water increases the convective heat transfer path, improves the heat transfer rate, and achieves uniform temperature. The airflow generated by the water jets from the nozzles 32, combined with the water circulation and air circulation, ensures that each mold 31 is in a constant-temperature water and air circulation environment, achieving convective heat transfer and ensuring uniform heat conduction among the molds 31.

[0049] To ensure smoother water circulation, in one embodiment, the water tank assembly includes an inclined water tank 33 and a flat water tank 35. The inclined water tank 33 is inclined above the flat water tank 35, and the mold support 34 is mounted on the flat water tank 35. The nozzle 32 is located at the lower end of the inclined water tank 33. One end of the flat water tank 35 is connected to the lower end of the inclined water tank 33. Condensed water droplets on the lower surface of the inclined water tank 33 slide down the inclined surface to the lower end and then fall into the adjacent flat water tank 35 below, without dripping onto the mold 31. The other end of the flat water tank 35 is connected to the water tank below it. The higher end of the inclined water tank 33 of the trough group is connected, so the water falling into the horizontal water tank 35 will flow from one end of the horizontal water tank 35 to the other end, and then fall to the higher end of the inclined water tank 33 of the adjacent water tank group below. The higher end of the inclined water tank 33 of the adjacent water tank group below receives the circulating water falling from above and combines it with the water sprayed from the corresponding nozzle 32 of the inclined water tank 33, and then slides down to the lower end of the inclined water tank 33. The horizontal water tank 35 of the bottom water tank group is connected to the circulating water pool 25, and the water circulates in sequence. Finally, the water flows into the circulating water pool 25, forming a reciprocating circulation of circulating water.

[0050] To facilitate gas flow, in one embodiment, a guide channel 331 is provided on the inclined surface of the inclined water tank 33. The guide channel 331 is located in front of the nozzle, and one end of the guide channel 331 near the nozzle 32 has an inlet directly facing the water outlet direction of the nozzle 32. The guide channel 331 has multiple outlets at the other end away from the nozzle 32. The bottom of the guide channel 331 is connected to the inclined water tank 33. Multiple channel plates are provided inside the inlet of the guide channel 331, dividing the inlet into multiple inlet areas. Each inlet area of ​​the guide channel 331 corresponds to one of the multiple outlets, and the inlet areas and corresponding outlets are connected by a multi-bend airflow channel. Nozzle 3... The sprayed circulating water increases air humidity and drives airflow, forming a wind circulation. The water flow from nozzle 32 drives the airflow in the guide channel. The sprayed water and flowing air enter the guide channel 331 through the inlet. The water flow enters the inclined water tank 33 from the bottom of the guide channel 331. The flowing air changes direction continuously along the bending structure of the airflow channel and flows continuously. During this period, water droplets in the air will adhere to the bending structure of the airflow channel, thereby separating the water droplets contained in the flowing air and finally flowing out from the outlet of the channel plate away from nozzle 32. Together with the airflow outside the guide channel 331, it drives the airflow around the test mold 31, making the temperature distribution inside the box 1 more uniform.

[0051] Multiple ventilation holes 341 are provided on the side wall of the groove of the mold support 34 to facilitate heat exchange between the mold 31 and the circulating water in the flat water tank 35 below. The ventilation holes 341 are provided on the side wall of the groove, but no ventilation holes 341 are provided at the bottom of the groove to prevent residue brought in by the mold 31 from falling into the flat water tank 35 and contaminating the circulating water. The water spray from the nozzle 32 replaces the easily malfunctioning electric fan and humidifier, ensuring reliable operation. In this embodiment, the guide channel 331 collects the water spray from the nozzle 32 and also divides the airflow driven by the water spray into inner and outer parts. The airflow inside the guide channel 331 flows out after separating the water droplets, forming a combined force with the airflow outside the guide channel 331, enhancing the air circulation around the mold 31, and preventing the circulating air from carrying water droplets. The bottom of the mold support 34 is equipped with a height adjustment device 342, which can be a bolt or a screw. The height adjustment device 342 can adjust the level of the mold support 34 to keep the mold 31 level and prevent the mold 31 from tilting and causing the mortar to flow in the early stage of molding, thus damaging the shape of the cement block 7.

[0052] A circulating water pump 44 is connected to the outlet of the circulating water tank 25 via a hose. The outlet of the circulating water pump 44 is connected to a nozzle 32, which sprays circulating water. The inclined water tank 33 and the guide channel 331 collect the sprayed water and the drainage from the upper flat water tank 35, and discharge it from the lower end of the inclined water tank 33. The rear end of the lower flat water tank 35 collects the drainage from the lower end of the inclined water tank 33, and discharges it from the front end of the flat water tank 35, entering the next layer of inclined water tank 33, and finally flowing into the circulating water tank 25. At the same time, the spraying water from the nozzle 32 causes the air above the inclined water tank 33 to flow. Since there is a gap between the rear end of the inclined water tank 33, i.e., the lower end, and the back plate of the cement test block curing box 3, the air above the test mold support 34 can circulate through this gap.

[0053] The second objective of this invention is to provide a cement test block curing tank 2, such as... Figure 2 , Figure 5 , Figure 6As shown, the system includes a curing tank body with an insulation layer on its side walls, and the interior of the curing tank body is sealable; multiple circulating water tanks 22 are fixed to the curing tank body from top to bottom, and multiple drain outlets are provided on one side of the bottom of each circulating water tank 22. These drain outlets are connected to another circulating water tank 22 adjacent to the bottom of the first circulating water tank 22, and the axes of the drain outlets of adjacent circulating water tanks 22 are arranged in a staggered manner; a flow guide bracket 24 is fixedly installed inside the circulating water tank 22, and a flow guide channel is formed between the bottom of the flow guide bracket 24 and the inner bottom of the circulating water tank 22; a test block assembly is used to support cement test blocks. The test block assembly can be placed on the flow guide bracket 24, and the water in the circulating water tank 22 does not come into contact with the test block assembly; the end of the circulating water pool 25 away from the cement test block curing box 3 is located at the bottom of the curing pool body; the circulating water pool 25 is connected to the water inlet 21 at the top of the curing pool body through a pipeline connected to a circulating pump, and the water inlet 21 is connected to the uppermost circulating water tank 22, and the water in the bottommost circulating water tank 22 can fall into the circulating water pool 25; the circulating water pool 25 is connected to the above-mentioned temperature control module, which can regulate the temperature of the water in the circulating water pool 25. The test block assembly of this embodiment includes a water tank 23 with an open top. A test block support 231 is provided inside the water tank 23, on which a cement test block 7 is placed. The test block support 231 has partitions located on both sides of the cement test block 7. The height of the partitions is greater than the height of the cement test block 7 and also greater than the curing water level. The partitions have pre-filling water markings 5 ​​and curing water markings 6. In one embodiment, four vertically and parallel partitions are used, and multiple horizontally arranged bottom and side strips are used to connect the four partitions sequentially to form the test block support 231. A cement test block 7 is placed between two adjacent partitions, with the bottom of the cement test block 7 located on the bottom strip. The partitions, bottom strips, and side strips maintain the required spacing around the cement test block 7. The partitions and bottom of the test block support 231 both adopt a mesh structure, which facilitates heat exchange between the cement test block and the water in the water tank 23. The test block support 231 can be placed in or removed from the water tank 23 along with the cement test block, making operation convenient.

[0054] The bottom of the flow guide bracket 24 is provided with multiple partitions 241, which divide the circulating water tank 22 into multiple circulating water channels. Multiple drain outlets are located in different circulating water channels. In the cement test block curing pool 2, the temperature of the circulating water will fluctuate continuously when the temperature is adjusted. By increasing the height of the partitions 241, the depth of the circulating water channel in the circulating water tank 22 can be increased, and the pool 23 will be separated from the circulating water, so that the water temperature in the pool is not affected by the temperature adjustment of the circulating water.

[0055] The outlet of the circulating water tank 25 is connected to a circulating water pump 44 via a hose. This circulating water pump 44 is not the same as the circulating water pump 44 connected to the nozzle 32 inside the cement block curing box 3. The two circulating water pumps 44 are set up independently and will not interfere with each other's operation. The outlet of the circulating water pump 44 is connected to the inlet 21 at the top of the cement block curing tank 2. The circulating water enters the rear end of the top-level circulating water tank 22 through the inlet 21. The partition bar 241 includes short partition bars and long partition bars. The end of the long partition bar away from the inlet 21 is fixedly connected to the front side of the circulating water tank 22. Therefore, the long partition bar of the guide bracket 24 divides the circulating water into left and right parts. The short partition bars are distributed on the left and right sides of the long partition bar. The short partition bars are spaced from the front side of the circulating water tank 22, guiding the circulating water to flow through the front end of the circulating water tank 22, then turning around and being discharged through the drain outlet at the rear end of the circulating water tank 22, entering the next layer of circulating water tank 22, and finally being discharged into the circulating water tank 25.

[0056] During operation, first, add curing water to the water tank 23 according to the pre-filled water level line of the test block support 231. Then, push the water tank 23 into the upper part of the corresponding circulating water tank 22 along the guide support 24. After the water temperature reaches 20℃, pull out the water tank 23 and take out the test block support 231. Place the cement test block into the test block support 231 and put it into the water tank 23 together. The curing water level should just rise to the required curing water level line to avoid insufficient curing water level and to avoid excessive water spilling into the circulating water tank 22 and polluting the circulating water. Then, push the water tank 23 into the upper part of the corresponding circulating water tank 22 along the guide support 24 again for curing for the set time.

[0057] A third objective of this invention is to provide a cement test block curing system, such as... Figure 3 , Figure 4 As shown, the container includes a housing 1, which is equipped with a partition plate that divides the housing 1 into a first compartment and a second compartment. The first compartment is formed as a cement block curing box 3 as described above, and the second compartment is formed as a cement block curing pool 2 as described above. In one embodiment, an opening can be provided at the bottom of the partition plate to connect the circulating water pool 25 of the cement block curing box 3 and the cement block curing pool 2, that is, the two share a circulating water pool 25 to provide circulating water for the cement block curing box 3 and the cement block curing pool 2. A temperature control zone 4 is provided at the bottom of the housing 1, and a temperature control module is provided in the temperature control zone 4. A door 11 is hinged to one side of the first compartment and one side of the second compartment, and two symmetrically arranged temperature control zone doors 12 are hinged to one side of the temperature control zone 4.

[0058] In one embodiment, the temperature control module includes a temperature controller 41, a refrigeration unit 42, a cold water storage tank 43, a cooling water pump 45, and a circulating water pump 44. An electric heater 27 is installed inside the circulating water tank 25, and the cold water storage tank 43 is connected to the refrigeration unit 42. A temperature sensor 26 is installed on the top of the cement block curing chamber 3 or inside the circulating water tank 25, and the temperature sensor 26 is electrically connected to the temperature controller 41. The temperature controller 41 is electrically connected to both the electric heater 27 and the cooling water pump 45. The inlet 21 of the cooling water pump 45 is connected to the cold water storage tank 43 via a pipe, and the outlet of the cooling water pump 45 is connected to the circulating water tank 25 via a pipe. When the temperature controller 41 detects a low temperature through the temperature sensor 26, it activates the electric heater 27 to heat the circulating water in the circulating water tank 25 until it reaches 20°C. When the temperature controller detects a high temperature, it activates the cooling water pump 45 to add low-temperature water from the cold water storage tank 43 into the circulating water pool 25 until the temperature reaches 20°C. The evaporator of the refrigeration unit 42 is located inside the cold water storage tank 43. The refrigeration unit 42 operates according to its own schedule, unaffected by the constant temperature control of the circulating water, thus avoiding frequent start-ups and shutdowns of the refrigeration unit 42.

[0059] In one embodiment, a temperature control base plate 15 is provided in the temperature control zone 4, and the temperature control module is fixedly mounted on the temperature control base plate 15. Multiple detachable transport brackets 14 are connected to the temperature control base plate 15. The two ends of the transport brackets 14 are fixed to the mounting holes on the bottom side wall of the box 1 by screws. By installing the transport brackets 14, the box 1 and the temperature control base plate 15 become one unit, which facilitates the overall movement and transportation of the equipment. When in use, the transport brackets 14 are removed, the box 1 and the temperature control base plate 15 are separated, and the split structure is restored, so as to prevent the vibration of the refrigeration unit on the temperature control base plate 15 from being transmitted to the box 1.

[0060] In this embodiment, a door groove is provided on the outside of the temperature control zone door 12; after the two temperature control zone doors 12 are closed, the two door grooves are arranged coaxially, and after the temperature control zone doors 12 are closed, rod-shaped door bolts 13 can be placed in the two door grooves, so that the temperature control zone 4 is closed.

[0061] Specific examples have been used to illustrate the principles and implementation methods of this invention. The descriptions of the above embodiments are only for the purpose of helping to understand the method and core ideas of this invention. Furthermore, those skilled in the art will recognize that, based on the ideas of this invention, there will be changes in the specific implementation methods and application scope. Therefore, the content of this specification should not be construed as a limitation of this invention.

Claims

1. A cement test block curing box, characterized in that: include: The curing box body, the interior of which is sealable; A water tank assembly, wherein multiple water tank assemblies are fixed sequentially from top to bottom within the curing box body, each water tank assembly has a nozzle at one end, and adjacent water tank assemblies are connected to each other; A test mold support is movably disposed within the water tank assembly, and the horizontality of the test mold support within the water tank assembly is adjustable; the test mold is used to place the cement test block on the test mold support. A circulating water tank is fixed at one end to the bottom of the curing chamber. The circulating water tank is connected to multiple nozzles via pipelines connected to a circulating pump. The nozzles can spray water from the circulating water tank into the corresponding water tank groups, and the water flowing in the water tank groups does not come into contact with the mold. The water in the bottommost water tank group can fall into the circulating water tank. The circulating water tank is connected to a temperature control module, which can regulate the temperature of the water in the circulating water tank.

2. The cement test block curing box according to claim 1, characterized in that: The water tank assembly includes an inclined water tank and a flat water tank. The inclined water tank is arranged at an angle above the flat water tank, and the mold support is set on the flat water tank. The nozzle is located at the lower end of the inclined water tank. One end of the flat water tank is connected to the lower end of the inclined water tank, and the other end of the flat water tank is connected to the higher end of the inclined water tank of the adjacent water tank assembly below it. The flat water tank at the bottom of the water tank assembly is connected to the circulating water pool.

3. The cement test block curing box according to claim 2, characterized in that: The inclined water tank has a flow guide channel on its upper inclined surface. The flow guide channel is located in front of the nozzle. The flow guide channel has an inlet at one end near the nozzle that is directly opposite the outlet of the nozzle. The flow guide channel has multiple outlets at the other end away from the nozzle. Multiple channel plates are installed inside the inlet of the flow guide channel, and the channel plates divide the inlet of the flow guide channel into multiple inlet areas. Each of the multiple inlet areas corresponds to one of the multiple outlets. The inlet areas and the corresponding outlets are connected by multiple bends in the airflow channel.

4. The cement test block curing box according to claim 1, characterized in that: The test mold support is provided with a groove, and multiple ventilation holes are provided on the side wall of the groove.

5. A cement test block curing tank, characterized in that: include: The curing tank body, the interior of which is sealable; A circulating water tank, wherein multiple circulating water tanks are fixed in sequence from top to bottom within the maintenance pool body, and multiple drain outlets are provided on one side of the bottom of the circulating water tank. The drain outlets are connected to another circulating water tank adjacent to the bottom of the circulating water tank, and the axes of the drain outlets of two adjacent circulating water tanks are arranged in a staggered manner. A flow guide bracket is fixedly installed inside the circulating water tank, and a flow guide groove is formed between the bottom of the flow guide bracket and the inner bottom of the circulating water tank. A test block assembly is used to support cement test blocks. The test block assembly can be placed on the flow guide support, and the water in the circulating water tank does not come into contact with the test block assembly. As described in claim 1, one end of the circulating water tank is located at the bottom of the curing tank body; the circulating water tank is connected to the water inlet at the top of the curing tank body through a pipeline connected to a circulating pump, the water inlet is connected to the uppermost circulating water tank, and water in the lowermost circulating water tank can fall into the circulating water tank; the circulating water tank is connected to the temperature control module as described in claim 1, and the temperature control module can regulate the temperature of the water in the circulating water tank.

6. The cement test block curing tank according to claim 5, characterized in that: The test block assembly includes a water tank with an open top, a test block support is provided in the water tank, and a cement test block is placed on the test block support; a partition is provided on the test block support, the partition is located on both sides of the cement test block, and the height of the partition is greater than the height of the cement test block; a pre-watering scale line and a curing water scale line are provided on the partition.

7. The cement test block curing tank according to claim 5, characterized in that: The bottom of the flow guide bracket is provided with multiple partitions, which divide the circulating water tank into multiple circulating water channels, and the multiple drain outlets are located at different locations in the circulating water channels.

8. A cement test block curing system, characterized in that: The box includes a housing, and a partition plate is provided inside the housing to divide the housing into a first sub-box and a second sub-box; the first sub-box is formed as a cement test block curing box as described in any one of claims 1 to 4, and the second sub-box is formed as a cement test block curing pool as described in any one of claims 5 to 7. The bottom of the enclosure is provided with a temperature control zone, and the temperature control module is installed in the temperature control zone. Each of the first and second compartments is hinged with a door, and the temperature control zone has two symmetrically arranged temperature control zone doors hinged to one side. A door groove is provided on the outside of the temperature control zone door; after the two temperature control zone doors are closed, the two door grooves are arranged coaxially, and rod-shaped door bolts can be placed in the two door grooves after the temperature control zone doors are closed.

9. The cement test block curing system according to claim 8, characterized in that: The temperature control module includes a temperature controller, a refrigeration unit, a cold water storage tank, a cooling water pump, and a circulating water pump; an electric heater is installed in the circulating water tank, and the cold water storage tank is connected to the refrigeration unit; a temperature sensor is installed on the top of the cement block curing box or in the circulating water tank, and the temperature sensor is electrically connected to the temperature controller; the temperature controller is electrically connected to the electric heater and the cooling water pump respectively, the inlet of the cooling water pump is connected to the cold water storage tank through a pipeline, and the outlet of the cooling water pump is connected to the circulating water tank through a pipeline.

10. The cement test block curing system according to claim 9, characterized in that: The temperature control zone is equipped with a temperature control base plate, the temperature control module is fixedly mounted on the temperature control base plate, and multiple detachable transport brackets are connected to the temperature control base plate. The ends of the transport brackets can be fixedly connected to the bottom of the box.