Technical Problem
[0003]本申请实施例提供一种管路组件、空调管路组件及空调系统,以解决现有技术中空调管路安装效率较低的问题
Benefits of technology
[0045]本申请提供一种管路组件、空调管路组件及空调系统,所述空调管路组件包括:第一供水干管、第二供水干管、第一供水支管、第二供水支管、第一供水主管、第一回水干管、第二回水干管、第一回水支管、第二回水支管和第一回水主管;所述第一供水支管的第一端与所述第一供水干管连通,所述第一供水支管的第二端与所述第一供水主管连通,所述第一供水主管的第一端与第一设备的供水端连接,所述第一供水主管的第二端与第二设备的供水端连接,所述第二供水支管的第一端与所述第二供水干管连通,所述第二供水支管的第二端与所述第一供水主管连通;所述第一回水支管的第一端与所述第一回水干管连通,所述第一回水支管的第二端与所述第一回水主管连通,所述第一回水主管的第一端与所述第一设备的回水端连接,所述第一回水主管的第二端与所述第二设备的回水端连接,所述第二回水支管的第一端与所述第二供水干管连通,所述第二供水支管的第二端与所述第一回水主管连通。本申请中设置了两路供水干管和两路回水干管,两路供水干管和两路回水干管分别通过供水支管和回水支管连接到第一供水主管和第二回水主管中,实现了通过两路供水干管和两路回水干管同时为两个设备进行供回水的效果,并且本申请中的结构均可以通过预制装配技术进行安装,大幅度减少了现场安装的接口数量,从而提高了空调管路的安装效率。
✦ Generated by Eureka AI based on patent content.
Abstract
The application provides a pipeline assembly, an air conditioner pipeline assembly and an air conditioner system. The pipeline assembly comprises a first water supply main pipe, a second water supply main pipe, a first water supply branch pipe, a second water supply branch pipe, a first water supply main pipe, a first water return main pipe, a second water return main pipe, a first water return branch pipe, a second water return branch pipe and a first water return main pipe. Two water supply main pipes and two water return main pipes are arranged in the application. The two water supply main pipes and the two water return main pipes are connected to the first water supply main pipe and the second water return main pipe through the water supply branch pipe and the water return branch pipe, so that the effect of simultaneously supplying and returning water to two devices through the two water supply main pipes and the two water return main pipes is achieved. The structures in the application can be installed through prefabricated assembly technology, the number of interfaces for on-site installation is greatly reduced, and the installation efficiency of the air conditioner pipeline is improved.