Pre-charging control method and device of water chiller, water chiller and medium
Patent Information
- Application Number
- CN202611252966.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-18
- Publication Date
- 2026-10-16
AI Technical Summary
[0006]本发明实施例提供了一种冷水机组的预充控制方法、装置、冷水机组及介质,旨在解决现有变频螺杆式冷水机组在低温场景下的运行可靠性较低的问题
[0011] This invention provides a pre-charge control method, device, chiller unit, and medium for a chiller unit. The method includes: upon receiving a start command, acquiring the first refrigerant level in the inverter cooling pipe and determining whether the pre-charge conditions are met based on the first refrigerant level; if the pre-charge conditions are met, performing a first adjustment on the electronic expansion valve and compressor. This technical solution, upon receiving a start command, first acquires the first refrigerant level and determines whether the pre-charge conditions are met. If met, the electronic expansion valve and compressor are adjusted for the first time to replenish liquid refrigerant to the inverter cooling pipe before compressor startup. This fundamentally prevents the inverter from triggering over-temperature faults due to insufficient refrigerant, reduces start-up failures and operational shutdowns, and thus improves the operational reliability of existing variable frequency screw chiller units in low-temperature scenarios.
Smart Images

Figure CN122920720A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of chiller technology, and in particular to a pre-charge control method, device, chiller and medium for a chiller. Background Technology
[0002] Variable frequency screw chillers are widely used in low-temperature scenarios such as cold chain logistics and data centers. Their inverter power modules generate a lot of heat during operation, which needs to be dissipated by circulating liquid refrigerant in the cooling pipes to maintain normal operating temperature.
[0003] In existing technologies, when the chilled water outlet temperature is 2°C and the system is shut down, a significant refrigerant migration phenomenon occurs within the system: gaseous refrigerant migrates towards the low-pressure side evaporator driven by the pressure difference, while liquid refrigerant remains in the condenser and high-pressure pipelines, resulting in a severe shortage of liquid refrigerant in the inverter's cooling pipelines. When the chiller unit restarts, the inverter, lacking sufficient liquid refrigerant for heat dissipation, experiences a rapid temperature rise, frequently triggering over-temperature protection faults, causing the chiller unit to fail to start normally or to suddenly shut down during operation.
[0004] Currently, the industry commonly uses temporary parameter adjustment strategies after a fault occurs to address the above-mentioned problems. However, this approach has the following drawbacks: First, existing technical solutions only adjust parameters after an inverter over-temperature fault occurs, which is a passive response after startup, resulting in a very high rate of fault recurrence. Second, existing technical solutions can only temporarily alleviate the symptoms of insufficient cooling and cannot fundamentally solve the problem of refrigerant migration leading to liquid level loss after shutdown, resulting in a persistently high annual after-sales repair rate.
[0005] The aforementioned issues result in low operational reliability of existing variable frequency screw chiller units in low-temperature scenarios. Summary of the Invention
[0006] This invention provides a pre-charge control method, device, chiller unit, and medium for a chiller unit, aiming to solve the problem of low operational reliability of existing variable frequency screw chiller units in low-temperature scenarios.
[0007] In a first aspect, embodiments of the present invention provide a pre-charge control method for a chiller unit, comprising: If a start command is received, the first refrigerant level in the inverter cooling pipe is collected, and the pre-charge condition is checked based on the first refrigerant level. If the pre-charge conditions are met, the electronic expansion valve and compressor are adjusted for the first time.
[0008] Secondly, embodiments of the present invention also provide a pre-charge control device for a chiller unit, comprising: The acquisition and detection unit is used to acquire the first refrigerant level in the inverter cooling pipe if a start command is received, and to detect whether the pre-charge conditions are met based on the first refrigerant level. The first adjustment unit is used to perform a first adjustment on the electronic expansion valve and the compressor if the pre-charge conditions are met.
[0009] Thirdly, embodiments of the present invention also provide a chiller unit, the chiller unit including a memory and a processor, the memory storing a computer program, and the processor executing the computer program to implement the above-described method.
[0010] Fourthly, embodiments of the present invention also provide a computer-readable storage medium storing a computer program that, when executed by a processor, can implement the above-described method.
[0011] This invention provides a pre-charge control method, device, chiller unit, and medium for a chiller unit. The method includes: upon receiving a start command, acquiring the first refrigerant level in the inverter cooling pipe and determining whether the pre-charge conditions are met based on the first refrigerant level; if the pre-charge conditions are met, performing a first adjustment on the electronic expansion valve and compressor. This technical solution, upon receiving a start command, first acquires the first refrigerant level and determines whether the pre-charge conditions are met. If met, the electronic expansion valve and compressor are adjusted for the first time to replenish liquid refrigerant to the inverter cooling pipe before compressor startup. This fundamentally prevents the inverter from triggering over-temperature faults due to insufficient refrigerant, reduces start-up failures and operational shutdowns, and thus improves the operational reliability of existing variable frequency screw chiller units in low-temperature scenarios. Attached Figure Description
[0012] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the following description of the embodiments will be briefly introduced. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0013] Figure 1 A schematic flowchart of a pre-charge control method for a chiller unit provided in an embodiment of the present invention; Figure 2 This is a schematic diagram of the hardware architecture of a chiller unit provided in an embodiment of the present invention; Figure 3 This is a schematic diagram of the layered architecture of a chiller unit provided in an embodiment of the present invention; Figure 4 This is a schematic diagram of a sub-process of a pre-charge control method for a chiller unit provided in an embodiment of the present invention; Figure 5 This is a schematic diagram of another sub-process of a pre-charge control method for a chiller unit provided in an embodiment of the present invention; Figure 6 A schematic flowchart of a pre-charge control method for a chiller unit provided in another embodiment of the present invention; Figure 7 This is a schematic diagram of another sub-process of a pre-charge control method for a chiller unit provided in an embodiment of the present invention; Figure 8 This is a schematic diagram of closed-loop control of a chiller unit provided in an embodiment of the present invention; Figure 9 A simplified flowchart of a pre-charge control method for a chiller unit provided in an embodiment of the present invention; Figure 10 A schematic block diagram of a pre-charge control device for a chiller unit provided in an embodiment of the present invention; Figure 11 This is a schematic block diagram of a chiller unit provided for an embodiment of the present invention. Detailed Implementation
[0014] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0015] It should be understood that, when used in this specification and the appended claims, the terms "comprising" and "including" indicate the presence of the described features, integrals, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integrals, steps, operations, elements, components and / or collections thereof.
[0016] It should also be understood that the terminology used in this specification is for the purpose of describing particular embodiments only and is not intended to limit the invention. As used in this specification and the appended claims, the singular forms “a,” “an,” and “the” are intended to include the plural forms unless the context clearly indicates otherwise.
[0017] It should also be further understood that the term "and / or" as used in this specification and the appended claims refers to any combination of one or more of the associated listed items and all possible combinations, and includes such combinations.
[0018] As used in this specification and the appended claims, the term "if" may be interpreted, depending on the context, as "when," "once," "in response to determination," or "in response to detection." Similarly, the phrase "if determined" or "if [described condition or event] is detected" may be interpreted, depending on the context, as "once determined," "in response to determination," "once [described condition or event] is detected," or "in response to detection of [described condition or event]."
[0019] Currently, in the field of chiller technology, existing variable frequency screw chillers have low operational reliability in low-temperature scenarios. To address this issue, this invention proposes a pre-charge control method for chillers. Upon receiving a start command, this method first collects the first refrigerant level and determines whether the pre-charge conditions are met. If met, it performs an initial adjustment on the electronic expansion valve and compressor to replenish liquid refrigerant to the inverter cooling pipes before compressor startup. This fundamentally prevents the inverter from triggering over-temperature faults due to insufficient refrigerant, reduces start-up failures and operational shutdowns, thereby improving the operational reliability of existing variable frequency screw chillers in low-temperature scenarios. The invention will be described in detail below through specific embodiments.
[0020] Please see Figure 1 , Figure 1 This is a schematic flowchart of a pre-charge control method for a chiller unit provided in an embodiment of the present invention. Figure 1 As shown, the method includes the following steps S110-S120.
[0021] S110. If a start command is received, the first refrigerant level in the inverter cooling pipe is collected, and the pre-charge condition is checked based on the first refrigerant level.
[0022] In this embodiment of the invention, the variable frequency screw chiller unit is a widely used refrigeration equipment in low-temperature scenarios such as cold chain logistics and data centers. Its core function is to achieve heat exchange through refrigerant circulation, providing a stable low-temperature environment for the application scenario. The inverter power module of the unit generates a large amount of heat during operation, which needs to be dissipated by the circulation of liquid refrigerant in the cooling pipes to maintain the normal operating temperature. It should be noted that, for the sake of simplicity, the variable frequency screw chiller unit will be referred to as a chiller unit in this embodiment. It should also be noted that, in this embodiment, the chiller unit is an energy-saving unit, and its energy-saving advantages depend on the stable and reliable operation of the equipment.
[0023] Please see Figure 2 , Figure 2 This is a schematic diagram of the hardware architecture of a chiller unit provided in an embodiment of the present invention, as shown below. Figure 2As shown, the hardware system of the variable frequency screw chiller unit mainly includes a compressor, condenser, evaporator, electronic expansion valve, frequency converter, frequency converter cooling pipes, sensors, PLC controller, and human-machine interface (HMI). Interface); The compressor is a screw compressor, which is the core power component of the refrigeration system. Its operating frequency is controlled by a frequency converter; the condenser is used to condense the high-temperature and high-pressure gaseous refrigerant into liquid refrigerant; the evaporator is used to evaporate the liquid refrigerant and absorb heat to achieve the refrigeration effect; the electronic expansion valve is installed on the refrigerant pipeline between the condenser and the evaporator, and its opening degree can be continuously adjusted within the range of 0% to 100%, controlled by the analog output module of the PLC controller; the variable frequency screw chiller unit also includes the main circuit of the refrigeration system and the frequency converter cold plate. The frequency converter cooling pipeline is connected to the main circuit of the refrigeration system. When the liquid refrigerant flows through the frequency converter cold plate, it absorbs the heat generated by the power module to achieve effective heat dissipation; the sensor is installed at an appropriate position on the frequency converter cooling pipeline to collect the liquid level signal of the liquid refrigerant in the frequency converter cooling pipeline in real time. Its output terminal is electrically connected to the analog input module of the PLC controller, and the liquid level range corresponds to 0% to 100%. It should be noted that the appropriate location refers to the section of the inverter's cooling pipes where liquid refrigerant can be stably retained and the refrigerant level can be accurately measured. It should also be noted that the PLC controller is the core control unit, receiving sensor signals from sensors and outputting control commands to the electronic expansion valve and the inverter. The sensors are either level or pressure sensors; the sensing signals are either level or pressure signals. Furthermore, the human-machine interface (HMI) is used to display operating status, fault information, and parameter settings. Maintenance personnel can fine-tune parameters such as trigger thresholds, pre-charge time, and recovery target values through the HMI.
[0024] Please see Figure 3 , Figure 3 This is a schematic diagram of the layered architecture of a chiller unit provided in an embodiment of the present invention, as shown below. Figure 3As shown, the variable frequency screw chiller unit adopts a three-level collaborative layered architecture, including a data acquisition layer, a logic layer, and an execution layer. The data acquisition layer is responsible for acquiring sensor signals, mainly including a liquid level sensor or pressure sensor and an analog input module. The liquid level sensor directly acquires the liquid level signal in the inverter's cooling pipes, while the pressure sensor indirectly reflects the filling state of the liquid refrigerant through pressure signals. The analog input module converts the sensor signals into digital signals that can be processed by the PLC controller. The logic layer is the control core, mainly including a PLC central processing unit and a PLC pre-charge calculation unit. The PLC central processing unit executes the main control logic, and the PLC pre-charge calculation unit specifically executes the start-up pre-charge control algorithm, including liquid level judgment, pre-charge parameter calculation, and graded processing decision-making. The execution layer is responsible for instruction execution, mainly including an electronic expansion valve drive and an inverter drive. The electronic expansion valve drive receives PLC instructions to adjust the opening of the electronic expansion valve, and the inverter drive receives PLC instructions to adjust the compressor's operating frequency.
[0025] In one embodiment, such as this embodiment, the PLC controller receives a start command but does not immediately start the compressor. Instead, it first triggers a liquid level detection. Specifically, a liquid level sensor collects the liquid level signal in the inverter cooling pipe as the first refrigerant level; or a pressure sensor collects the pressure signal in the inverter cooling pipe and calculates the first refrigerant level according to a preset pressure-level conversion formula. It should be noted that the detection of the first refrigerant level in the inverter cooling pipe includes the following two implementation schemes: The first method is a direct detection method, where a liquid level sensor is installed in the inverter cooling pipe. The liquid level sensor collects the liquid refrigerant level signal in the pipe in real time and transmits the collected signal to the analog input module of the PLC controller. After signal processing, the signal is directly used as the first refrigerant level, with a level range corresponding to 0% to 100%. The second method is an indirect detection method, which uses a pressure sensor installed in the inverter's cooling pipes. The pressure sensor collects the pressure signal inside the pipes and transmits it to the PLC controller. The PLC controller calculates the liquid level according to a preset pressure-to-level conversion formula, and uses the calculated liquid level value as the first refrigerant level. The preset pressure-to-level conversion formula is: P = 0.005 × L + 1.1, where L is the liquid level percentage and P is the pressure. Actual testing verified that the measured pressure was 1.19 ± 0.03 bar when the liquid level was 20%. It should be noted that both detection methods can be flexibly selected according to the actual chiller unit configuration, and both can achieve accurate detection of the cooling pipe liquid level.
[0026] Among them, such as Figure 4 As shown, step S110 specifically includes steps S111-S112: S111. If the first refrigerant level is less than the first preset level threshold, then the pre-charge condition is satisfied. S112. If the first refrigerant level is not less than the first preset level threshold, then it is determined that the pre-charge condition is not met.
[0027] In this embodiment of the invention, the PLC controller compares the collected first refrigerant level with a first preset level threshold, where the first preset level threshold is 20% of the level range. When the first refrigerant level is less than the first preset level threshold, it indicates that there is insufficient liquid refrigerant in the inverter cooling pipes, posing a risk of overheating after startup. The pre-charge condition is deemed met, and a pre-charge procedure is required to replenish the liquid refrigerant. When the first refrigerant level is not less than the first preset level threshold, it indicates that there is sufficient liquid refrigerant in the cooling pipes, meeting the conditions for direct startup. The pre-charge condition is deemed not met, the pre-charge procedure is skipped, and the compressor is started according to the normal startup procedure.
[0028] S120. If the pre-charge conditions are met, the electronic expansion valve and compressor are adjusted for the first time.
[0029] In embodiments of the present invention, such as Figure 5 As shown, step S120 specifically includes steps S121-S122: S121, adjust the opening degree of the electronic expansion valve to the preset maximum opening degree value; S122. Adjust the compressor's loading frequency to a preset frequency. It should be noted that the PLC controller sends an opening adjustment command to the electronic expansion valve, adjusting its opening from the current value to a preset maximum opening value. The preset maximum opening value is 100% of the electronic expansion valve's maximum opening, maximizing the refrigerant flow cross-sectional area and creating a pathway for the rapid flow of liquid refrigerant from the high-pressure side to the cooling pipes. Simultaneously, the PLC controller sends a frequency adjustment command to the frequency converter, adjusting the compressor's loading frequency to a preset frequency of 1Hz, causing the compressor to operate at an extremely low speed. This low frequency drives the refrigerant to circulate slowly within the chiller's refrigeration system, replenishing the cooling pipes with liquid refrigerant retained in the condenser and high-pressure pipes, while also preventing excessive compressor speed from accelerating refrigerant vaporization, ensuring that the cooling pipes receive liquid refrigerant rather than gaseous refrigerant.
[0030] It should also be noted that, in other embodiments, the preset maximum opening value can be adjusted to any value between 90% and 100%, including but not limited to 90%, 95%, 98%, or 100%. The preset frequency can be adjusted to any value between 0.5Hz and 2Hz, including but not limited to 0.5Hz, 0.8Hz, 1Hz, 1.5Hz, or 2Hz. Specific parameter values can be adaptively adjusted according to factors such as unit capacity, refrigerant type, and operating conditions, as long as they effectively increase the liquid level in the cooling pipes. Furthermore, maintenance personnel can fine-tune the preset maximum opening value and preset frequency through the human-machine interface based on actual operating conditions to adapt to the differentiated needs of different unit models and application scenarios.
[0031] Figure 6 A flowchart illustrating a pre-charge control method for a chiller unit according to another embodiment of the present invention is shown below. Figure 6 As shown, in this embodiment, the method includes steps S210-S230. Steps S210-S220 are the same as steps S110-S120. In this embodiment, after step S220, step S230 is also included.
[0032] S230. After the preset pre-charge time, the electronic expansion valve and the compressor are adjusted a second time based on the collected second refrigerant level.
[0033] In this embodiment of the invention, after a pre-charge process of preset pre-charge time for the liquid refrigerant in the inverter cooling pipes, the PLC controller again collects the second refrigerant level in the inverter cooling pipes to verify the pre-charge effect. The pre-charge process aims to replenish the inverter cooling pipes with liquid refrigerant, solving the problem of insufficient liquid level caused by refrigerant migration after shutdown. The preset pre-charge time is dynamically adjusted according to the unit capacity, and the calculation formula is: pre-charge time = 10 seconds × [1 + 0.2 × (unit capacity - 500) / 500], where the unit capacity is in kilowatts. For a standard 500 kW chiller unit, the preset pre-charge time is 10 seconds; for large centrifugal chiller units, the preset pre-charge time can be extended to 15 to 20 seconds to ensure that the liquid refrigerant is fully replenished to the inverter cooling pipes, meeting the inverter's heat dissipation requirements and avoiding overheating faults during startup.
[0034] Among them, such as Figure 7 As shown, step S230 specifically includes steps S231-S234: S231. Collect the second refrigerant level and compare the second refrigerant level with a second preset level threshold, wherein the second preset level threshold is greater than the first preset level threshold; S232. If the second refrigerant level is not less than the second preset level threshold, the compressor loading frequency is controlled to gradually increase from the preset frequency to the target operating frequency, and the opening of the electronic expansion valve is adjusted from the preset maximum opening value to the preset normal operating opening value. S233. If the second refrigerant level is less than the second preset level threshold and not less than the third preset level threshold, then after running the preset delay pre-charge time, the electronic expansion valve and the compressor are adjusted for the third time according to the collected third refrigerant level and the number of extensions obtained. S234. If the second refrigerant level is less than the third preset level threshold, a fault alarm signal is output and the compressor is prohibited from starting.
[0035] In this embodiment of the invention, the second preset liquid level threshold is 80% of the liquid level range. This value has been experimentally verified to ensure that the inverter receives sufficient liquid refrigerant during subsequent normal startup and loading processes. The first preset liquid level threshold is 20% of the liquid level range, used to determine whether a pre-charge process needs to be initiated. If the second refrigerant level is not less than the second preset liquid level threshold, it indicates that the pre-charge process is effective, the liquid refrigerant in the cooling pipeline has been restored to a sufficient state, and the PLC controller controls the compressor's loading frequency to gradually increase from the preset frequency to the target operating frequency, avoiding frequency abrupt changes that could impact the system. Simultaneously, the opening of the electronic expansion valve is adjusted from the preset maximum opening value to the preset normal operating opening value. The preset normal operating opening value is dynamically adjusted according to the unit load and operating conditions, enabling the chiller unit to enter normal operating status. The electronic expansion valve returns to its normal adjustment logic, automatically adjusting its opening based on the evaporator outlet superheat, achieving precise control of the cooling capacity. If the second refrigerant level is lower than the second preset level threshold, it indicates that the pre-charging effect has not met expectations. There may be excessive refrigerant migration or other system abnormalities. The PLC controller will execute a graded processing strategy, including extending the pre-charging time or triggering an alarm to prevent startup.
[0036] In one embodiment, such as this embodiment, step S233 includes: acquiring the number of extensions and comparing the number of extensions with a preset number of extensions; if the number of extensions is not greater than the preset number of extensions, then the collected third refrigerant level is used as the second refrigerant level, and the process returns to the step of comparing the second refrigerant level with a second preset level threshold; if the number of extensions is greater than the preset number of extensions, the process returns to the step of outputting a fault alarm signal and prohibiting the compressor from starting. It should be noted that if the second refrigerant level is less than the second preset level threshold and not less than the third preset level threshold, it indicates that the pre-charging effect has not reached the expected level, but the refrigerant level has partially recovered, and there is value in continuing pre-charging. The PLC controller executes the extended pre-charging process in the graded processing strategy, where the third preset level threshold is 60% of the level range. This value is used to distinguish between slight and severe insufficient level.
[0037] It should also be noted that the PLC controller first controls the electronic expansion valve to maintain its preset maximum opening value and the compressor to continue operating at its preset frequency, then performs an additional 5 to 10 seconds of extended pre-charge operation to push more liquid refrigerant into the cooling pipes. After the extended pre-charge is completed, that is, after running the preset delayed pre-charge duration, the extension count increments by 1. The extension count is used to record the number of times the pre-charge process is repeated, with an initial value of zero. The extension count is compared with the preset extension count, which is 3 times. The preset extension count is calibrated based on a large amount of experimental data to ensure sufficient pre-charge while avoiding infinite loops that would waste system resources.
[0038] It should also be noted that if the number of extensions is not greater than the preset number of extensions, it indicates that there is still pre-charge space. The third refrigerant level in the inverter cooling pipe is collected again, and the third refrigerant level is used as the second refrigerant level. The process then returns to the step of comparing the second refrigerant level with the second preset level threshold, forming a loop detection mechanism.
[0039] It should be further explained that if the number of extensions exceeds the preset number of extensions, it indicates that the liquid level still cannot be restored to a safe level after multiple pre-charges. This may indicate excessive refrigerant migration, system leakage, or other serious abnormalities. The PLC controller will then return to the step of executing the output fault alarm signal and prohibiting the compressor from starting. The human-machine interface will display the fault code indicating insufficient coolant and requesting a check of the system. The unit will be locked and await manual troubleshooting and intervention to avoid forced startup that could cause the inverter to overheat and be damaged. This improves the startup reliability and operational safety of the chiller unit.
[0040] In one embodiment, such as this one, if the second refrigerant level is lower than the third preset refrigerant level threshold, it indicates a severe shortage of liquid refrigerant in the cooling pipes. This may indicate excessive refrigerant migration, system leakage, or other serious abnormalities, and continued pre-charging will not effectively improve the liquid level. The PLC controller immediately outputs a fault alarm signal and prohibits the compressor from starting to prevent forced start-up from triggering the over-temperature protection fault of the inverter due to insufficient heat dissipation, thus avoiding damage to the power module. It should be noted that the fault alarm signal displays the fault code of insufficient coolant on the human-machine interface, while simultaneously locking the unit's operating status and awaiting manual troubleshooting and intervention. Maintenance personnel need to check the refrigerant charge, pipe sealing, and sensor operating status. After troubleshooting, manual reset is required before restarting. Understandably, this protection mechanism forms a complete closed-loop control of detection, judgment, execution, and feedback, ensuring that the system has a clear safety response strategy in the case of severe liquid level shortage, avoiding equipment damage, improving the unit's start-up reliability and operational safety, and reducing the after-sales repair rate.
[0041] It should be noted that in this embodiment, the control parameters such as the first preset liquid level threshold, the preset maximum opening value, the preset frequency, the preset pre-charge duration, and the second preset liquid level threshold are all calibrated based on a large amount of historical fault data and low-temperature operating condition experiments. Under typical low-temperature and large temperature difference conditions with a chilled water outlet temperature of 2℃ and a cooling water inlet temperature of 25-30℃, after hundreds of start-stop cycle tests, this parameter combination can effectively raise the refrigerant level in the cooling pipeline from below the first preset liquid level threshold to no less than the second preset liquid level threshold within the preset pre-charge duration. This refrigerant level recovery capability is the technical basis for improving start-up reliability. At the same time, the PLC controller has an online parameter adjustment function. Maintenance personnel can fine-tune the first preset liquid level threshold, the preset pre-charge duration, and the second preset liquid level threshold through the human-machine interface according to the actual operating conditions to adapt to the differentiated needs of different unit models, different refrigerant types, and different application scenarios, ensuring good adaptability and robustness under all operating conditions.
[0042] Please see Figure 8 , Figure 8 This is a schematic diagram of closed-loop control of a chiller unit provided in an embodiment of the present invention, as shown below. Figure 8 As shown, the PLC controller collects sensor signals from the inverter's cooling pipes in real time through sensors, and sends adjustment commands to the electronic expansion valve and inverter based on the sensor signals. The adjustment commands include opening adjustment commands and frequency adjustment commands. After the adjustment is completed, the liquid level signal is collected by the liquid level sensor for feedback verification, forming a complete closed-loop control of detection, judgment, execution and feedback.
[0043] Please see Figure 9 , Figure 9 A simplified flowchart of a pre-charge control method for a chiller unit according to an embodiment of the present invention is shown below. Figure 9 As shown, after receiving the start command, the PLC controller collects the refrigerant level in the inverter's cooling pipes. If the refrigerant level is below 20%, it is determined that the pre-charge condition is met, and a pre-charge coordinated operation is executed simultaneously: the electronic expansion valve is adjusted to 100% fully open, the compressor runs continuously at a low frequency of 1Hz, maintaining the pre-charge condition for 10 seconds, pushing liquid refrigerant to replenish the cooling pipes. If the refrigerant level is not lower than 20%, it indicates that the cooling pipes have sufficient refrigerant, and the compressor's normal start-up procedure is executed directly.
[0044] After pre-charging is complete, the refrigerant level in the cooling pipes is collected again for a secondary judgment. If the refrigerant level is greater than or equal to 80%, it indicates successful pre-charging, the refrigerant level has recovered to a safe state, the pre-charging mode is exited, the compressor gradually starts running, and the process ends. If the refrigerant level is below 80%, the next judgment is initiated: If the refrigerant level is greater than or equal to 60%, it indicates partial recovery of the refrigerant level, and there is still value in continuing pre-charging. Pre-charging is extended by 5 to 10 seconds, and the cycle count is incremented by 1. If the number of cycles is less than 3, the refrigerant level is collected again for judgment; if the number of cycles reaches 3, the unit is locked, and a message indicating insufficient coolant is displayed on the HMI, requesting system inspection. If the refrigerant level is below 60%, it indicates severe refrigerant deficiency, the unit is locked directly, a fault message is displayed, and manual intervention is required. This process forms a complete closed-loop control system of detection, judgment, execution, and feedback, ensuring the safe and reliable start-up of the chiller unit and preventing over-temperature faults triggered by insufficient refrigerant in the inverter from the root cause.
[0045] It should be noted that 20%, 60%, and 80% are all percentage thresholds for the refrigerant level in the inverter's cooling pipes.
[0046] In summary, the pre-charge control method for chiller units in this invention automatically detects the refrigerant level and executes a pre-charge process after receiving the start command but before the compressor is officially loaded. This adjusts the system to a safe start-up state before executing the start-up procedure. Compared to the passive response mechanism of existing technologies that only adjust parameters after a fault occurs, this fundamentally avoids over-temperature faults triggered by insufficient refrigerant in the inverter. Furthermore, by using a first preset liquid level threshold to determine whether pre-charge is necessary, a second preset liquid level threshold to determine whether pre-charge is successful, and a third preset liquid level threshold to determine whether start-up is prohibited, a complete closed loop of detection, judgment, execution, and feedback is formed, ensuring that the system has clear control under any liquid level condition. The system employs precise response strategies; if the refrigerant level reaches the target after pre-charging, it will start normally; otherwise, the pre-charging process will be extended or startup will be prohibited. A maximum of three pre-charging cycles can be repeated to avoid infinite loops that waste system resources and prevent forced startup from damaging the equipment. Deployment requires only a software upgrade of the existing PLC controller, without hardware modifications. It is suitable for on-site upgrades of existing units and pre-installation integration of new equipment, reducing modification costs and deployment time. Under low-temperature conditions such as chilled water outlet temperature of 2℃, it significantly reduces the number of startup failures caused by inverter overheating, greatly reducing the annual after-sales repair rate, effectively extending equipment lifespan, and lowering the total life-cycle cost of the equipment.
[0047] Figure 10 This is a schematic block diagram of a pre-charge control device 200 for a chiller unit provided in an embodiment of the present invention. Figure 10 As shown, corresponding to the above-described pre-charge control method for chillers, the present invention also provides a pre-charge control device 200 for chillers. This pre-charge control device 200 includes a unit for executing the above-described pre-charge control method for chillers, and this device can be configured in the PLC controller of the chiller. Specifically, please refer to... Figure 10 The pre-charge control device 200 of the chiller unit includes a data acquisition and detection unit 201 and a first adjustment unit 202. The functional modules are described in detail below: The acquisition and detection unit 201 is used to acquire the first refrigerant level in the inverter cooling pipe if a start command is received, and to detect whether the pre-charge conditions are met based on the first refrigerant level. The first adjustment unit 202 is used to perform a first adjustment on the electronic expansion valve and the compressor if the pre-charge conditions are met.
[0048] In some embodiments, such as this one, the acquisition and detection unit 201 is specifically used for: The liquid level signal in the inverter cooling pipe is collected by a liquid level sensor as the first refrigerant level; or The pressure signal of the inverter cooling pipe is collected by a pressure sensor, and the first refrigerant level is calculated according to the preset pressure-level conversion formula. If the first refrigerant level is less than the first preset level threshold, then the pre-charge condition is determined to be met. If the first refrigerant level is not less than the first preset level threshold, then the pre-charge condition is not met.
[0049] In some embodiments, such as this one, the first adjustment unit 202 is specifically used for: Adjust the opening of the electronic expansion valve to the preset maximum opening value; Adjust the compressor's loading frequency to a preset frequency.
[0050] In some embodiments, such as this one, the pre-charge control device 200 for the chiller unit further includes: The second adjustment unit is used to adjust the electronic expansion valve and the compressor a second time based on the collected second refrigerant level after the preset pre-charge time has elapsed.
[0051] In some embodiments, such as this one, the second adjustment unit is specifically used for: The second refrigerant level is collected and compared with a second preset level threshold, wherein the second preset level threshold is greater than the first preset level threshold; If the second refrigerant level is not less than the second preset level threshold, the compressor's loading frequency is controlled to gradually increase from the preset frequency to the target operating frequency, and the opening of the electronic expansion valve is adjusted from the preset maximum opening value to the preset normal operating opening value. If the second refrigerant level is less than the second preset level threshold and not less than the third preset level threshold, then after running the preset delay pre-charge time, the electronic expansion valve and the compressor are adjusted for the third time according to the collected third refrigerant level and the number of extensions obtained. If the second refrigerant level is lower than the third preset level threshold, a fault alarm signal is output and the compressor is prohibited from starting.
[0052] In some embodiments, such as this one, the second adjustment unit is further configured to: The number of extensions is obtained and compared with a preset number of extensions; If the number of extensions is not greater than the preset number of extensions, the collected third refrigerant level is taken as the second refrigerant level, and the process returns to the step of comparing the second refrigerant level with the second preset level threshold. If the number of extensions exceeds the preset number of extensions, then return to the step of executing the output fault alarm signal and preventing the compressor from starting.
[0053] The pre-charge control device for the aforementioned chiller unit can be implemented as a computer program, which can, for example... Figure 11 The chiller unit shown is in operation.
[0054] Please see Figure 11 , Figure 11 This is a schematic block diagram of a chiller unit provided in an embodiment of the present invention. The chiller unit 300 is a device capable of pre-charge control.
[0055] See Figure 11 The chiller unit 300 includes a processor 302, a memory, and a network interface 305 connected via a system bus 301. The memory may include a non-volatile storage medium 303 and internal memory 304.
[0056] The non-volatile storage medium 303 may store an operating system 3031 and a computer program 3032. When the computer program 3032 is executed, it causes the processor 302 to execute a pre-charge control method for a chiller unit.
[0057] The processor 302 provides computing and control capabilities to support the operation of the entire chiller unit 300.
[0058] The internal memory 304 provides an environment for the operation of the computer program 3032 in the non-volatile storage medium 303. When the computer program 3032 is executed by the processor 302, the processor 302 can execute a pre-charge control method for a chiller unit.
[0059] This network interface 305 is used for network communication with other devices. Those skilled in the art will understand that... Figure 11 The structure shown is merely a block diagram of a portion of the structure related to the present invention and does not constitute a limitation on the chiller unit 300 to which the present invention is applied. The specific chiller unit 300 may include more or fewer components than shown in the figure, or combine certain components, or have different component arrangements.
[0060] The processor 302 is used to run a computer program 3032 stored in a memory to implement any embodiment of the pre-charge control method for the chiller unit described above.
[0061] It should be understood that, in this embodiment of the invention, the processor 302 may be a Central Processing Unit (CPU), or it may be other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or any conventional processor.
[0062] It will be understood by those skilled in the art that all or part of the processes in the methods of the above embodiments can be implemented by a computer program instructing related hardware. The computer program can be stored in a storage medium, which is a computer-readable storage medium. The computer program is executed by a processor in the computer system to implement the process steps of the embodiments of the above methods.
[0063] Therefore, the present invention also provides a storage medium. This storage medium can be a computer-readable storage medium. The storage medium stores a computer program. When executed by a processor, the computer program causes the processor to perform any embodiment of the pre-charge control method for the chiller unit described above.
[0064] The storage medium can be any computer-readable storage medium capable of storing program code, such as a USB flash drive, portable hard drive, read-only memory (ROM), magnetic disk, or optical disk.
[0065] Those skilled in the art will recognize that the units and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of both. To clearly illustrate the interchangeability of hardware and software, the components and steps of the various examples have been generally described in terms of functionality in the foregoing description. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementations should not be considered beyond the scope of this invention.
[0066] In the several embodiments provided by this invention, it should be understood that the disclosed apparatus and methods can be implemented in other ways. For example, the apparatus embodiments described above are merely illustrative. For example, the division of each unit is merely a logical functional division, and there may be other division methods in actual implementation. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed.
[0067] The steps in the method of this invention can be adjusted, merged, or reduced in order according to actual needs. The units in the device of this invention can be merged, divided, or reduced according to actual needs. Furthermore, the functional units in the various embodiments of this invention can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit.
[0068] If the integrated unit is implemented as a software functional unit and sold or used as an independent product, it can be stored in a storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a chiller unit to execute all or part of the steps of the methods described in the various embodiments of the present invention.
[0069] In the above embodiments, the descriptions of each embodiment have different focuses. For parts that are not described in detail in a certain embodiment, please refer to the relevant descriptions in other embodiments.
[0070] Obviously, those skilled in the art can make various modifications and variations to this invention without departing from its spirit and scope. Since these modifications and variations fall within the scope of the claims and their equivalents, this invention also intends to include these modifications and variations.
[0071] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any person skilled in the art can easily conceive of various equivalent modifications or substitutions within the technical scope disclosed in the present invention, and these modifications or substitutions should all be covered within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.
Claims
1. A pre-charge control method for a chiller unit, characterized in that, include: If a start command is received, the first refrigerant level in the inverter cooling pipe is collected, and the pre-charge condition is checked based on the first refrigerant level. If the pre-charge conditions are met, the electronic expansion valve and compressor are adjusted for the first time.
2. The method according to claim 1, characterized in that, The step of determining whether the pre-charge conditions are met based on the first refrigerant level detection includes: If the first refrigerant level is less than the first preset level threshold, then the pre-charge condition is determined to be met. If the first refrigerant level is not less than the first preset level threshold, then the pre-charge condition is not met.
3. The method according to claim 2, characterized in that, The step of making the first adjustment to the electronic expansion valve and the compressor includes: Adjust the opening of the electronic expansion valve to the preset maximum opening value; Adjust the compressor's loading frequency to a preset frequency.
4. The method according to claim 3, characterized in that, After the initial adjustment of the electronic expansion valve and compressor, the following steps are also included: After the preset pre-charge time is completed, the electronic expansion valve and the compressor are adjusted a second time based on the collected second refrigerant level.
5. The method according to claim 4, characterized in that, The step of adjusting the electronic expansion valve and the compressor a second time based on the collected second refrigerant level includes: The second refrigerant level is collected and compared with a second preset level threshold, wherein the second preset level threshold is greater than the first preset level threshold; If the second refrigerant level is not less than the second preset level threshold, the compressor's loading frequency is controlled to gradually increase from the preset frequency to the target operating frequency, and the opening of the electronic expansion valve is adjusted from the preset maximum opening value to the preset normal operating opening value. If the second refrigerant level is less than the second preset level threshold and not less than the third preset level threshold, then after running the preset delay pre-charge time, the electronic expansion valve and the compressor are adjusted for the third time according to the collected third refrigerant level and the number of extensions obtained. If the second refrigerant level is lower than the third preset level threshold, a fault alarm signal is output and the compressor is prohibited from starting.
6. The method according to claim 5, characterized in that, The step of adjusting the electronic expansion valve and the compressor for the third time based on the collected third refrigerant level and the obtained extension number includes: The number of extensions is obtained and compared with a preset number of extensions; If the number of extensions is not greater than the preset number of extensions, the collected third refrigerant level is taken as the second refrigerant level, and the process returns to the step of comparing the second refrigerant level with the second preset level threshold. If the number of extensions exceeds the preset number of extensions, then return to the step of executing the output fault alarm signal and preventing the compressor from starting.
7. The method according to any one of claims 1 to 6, characterized in that, The step of collecting the first refrigerant level in the inverter cooling pipe includes: The liquid level signal in the inverter cooling pipe is collected by a liquid level sensor as the first refrigerant level; or The pressure signal of the inverter cooling pipe is collected by a pressure sensor, and the first refrigerant level is calculated according to a preset pressure-level conversion formula.
8. A pre-charge control device for a chiller unit, characterized in that, include: The acquisition and detection unit is used to acquire the first refrigerant level in the inverter cooling pipe if a start command is received, and to detect whether the pre-charge conditions are met based on the first refrigerant level. The first adjustment unit is used to perform a first adjustment on the electronic expansion valve and the compressor if the pre-charge conditions are met.
9. A chiller unit, characterized in that, The chiller unit includes a memory and a processor. The memory stores a computer program, and the processor executes the computer program to implement the method as described in any one of claims 1-7.
10. A computer-readable storage medium, characterized in that, The storage medium stores a computer program that, when executed by a processor, can implement the method as described in any one of claims 1-7.