Pipeline construction planning method and system based on soil erosion risk
Patent Information
- Application Number
- CN202610948011.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-06-29
- Publication Date
- 2026-10-16
AI Technical Summary
[0005]本说明书实施例提供了一种基于水土流失风险的管线施工规划方法与系统,解决了传统管线施工规划中水土流失管控滞后、被动且难以量化的问题,通过将水土流失风险量化评估与施工轨迹的多目标协同优化前置于规划阶段,实现了在源头上主动、精准地降低环境风险,并达成工程经济性与生态效益的平衡
[0050] This method integrates multi-source environmental data such as digital elevation models, soil, and vegetation, and constructs a quantitative model for soil and water loss risk during the construction period. It can provide accurate and comparable soil and water loss risk values for any candidate construction trajectory, thereby enabling an objective comparison of the real environmental impact of different route options during the planning stage. This overcomes the limitations of traditional reliance on macro-level qualitative judgments and realizes the transformation from qualitative experience-based judgments to data-driven quantitative assessments.