Integrated performance environmental chamber structure and system
Patent Information
- Application Number
- CN202611241892.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-17
- Publication Date
- 2026-10-20
AI Technical Summary
但是,现有的气候环境模拟装置具有体积大、安装运输时间长、重量大、调整困难等缺陷,难以完成对整体建筑物的气候模拟,无法满足使用需求
[0014]本申请的有益效果是:本申请提供的整体性能环境模拟舱结构及系统通过利用主体支撑结构支撑行车系统吊运试验设备,并利用行车系统底部连接的吊挂机构驱动围护膜升降,使行车系统底部的风箱、围护膜与地面围合形成罩设在试验设备上的试验腔,并通过温湿度控制装置调节试验腔内温度、湿度和风力大小,通过雨雪制备装置调节试验腔内雨水和降雪情况,具有节约空间和方便调节空间大小、方便拆卸和运输的优点。
Smart Images

Figure FT_1 
Figure FT_2 
Figure FT_3
Abstract
Description
Technical Field
[0001] This application relates to the field of structural components for building cabins, and more specifically, to a structure and system for an overall performance environment simulation cabin. Background Technology
[0002] Climate environment simulation devices are used to test components by simulating natural wind, rain, and snow environments. However, existing climate environment simulation devices have drawbacks such as large size, long installation and transportation time, heavy weight, and difficulty in adjustment, making it difficult to complete the climate simulation of the entire building and failing to meet usage requirements. Summary of the Invention
[0003] The purpose of this application is to provide an overall performance environment simulation cabin structure and system, which has the advantages of saving space, convenient adjustment of space size, and convenient disassembly and transportation.
[0004] This application is implemented as follows: This application provides a structure for an overall performance environment simulation cabin, which includes: Main supporting structure; The driving system is connected to the top of the main support structure; The air box is connected to the bottom of the driving system. Multiple air outlets, multiple rain nozzles, and multiple snow nozzles are connected to the bottom of the air box. The enclosure membrane is located below the wind box. The wind box, the enclosure membrane and the ground enclose the test chamber. The air outlet, rain nozzle and snow nozzle are respectively connected to the test chamber. Multiple suspension mechanisms are connected to the vehicle system and the protective membrane respectively, and are used to drive the lifting and lowering of the protective membrane; The environmental control device includes a temperature and humidity control device and a rain and snow preparation device. The temperature and humidity control device is used to extract air from the bottom of the test chamber and deliver air with a preset temperature and humidity into the air box. The rain and snow preparation device is used to deliver water into the rain nozzle and pre-cooled water and air into the snow nozzle.
[0005] In some alternative implementations, the bottom of the traveling system is connected to a circular track, and the top of the suspension mechanism is movably connected to the circular track along the circular track.
[0006] In some alternative implementations, the bottom of the bellows is connected to a plurality of spaced-apart top irradiators.
[0007] In some alternative implementations, multiple spaced-apart lateral irradiation lamps are provided on both sides of the inner wall of the enclosure membrane.
[0008] In some alternative implementations, the temperature and humidity control device includes at least one temperature and humidity control box with an air inlet and an air outlet, a refrigeration unit and a closed cooling tower. Each temperature and humidity control box contains an evaporator, a heater, a humidifier and a blower located sequentially between the air inlet and the air outlet. The air inlet is connected to a return air duct extending to the bottom of the test chamber. The blower is connected to an air box through the air outlet. The condenser of the refrigeration unit is connected to the evaporator to form a refrigeration cycle, and the condenser is connected to the closed cooling tower to form a cooling cycle.
[0009] In some alternative implementations, the evaporator is connected to an electric defroster.
[0010] In some alternative implementations, the rain and snow preparation device includes a rain and snow preparation box and an air-cooled chiller, a cold water tank, a pure water tank and an air compressor disposed in the rain and snow preparation box. The air-cooled chiller and the cold water tank are connected to form a circulation system. The cold water tank is connected to each snow nozzle through a first pressurizing pump. The air compressor is connected to each snow nozzle respectively. The pure water tank is connected to each rain nozzle through a second pressurizing pump.
[0011] In some alternative implementations, side nozzles are provided on both sides of the inner wall of the enclosure membrane, and the pure water tank is connected to each side nozzle via a second pressurizing pump.
[0012] In some alternative implementations, the bottom of the bellows has multiple air outlet areas spaced apart along the width direction, and each air outlet area has multiple air inlets.
[0013] This application also provides an overall performance environment simulation system, which includes the above-described overall performance environment simulation chamber structure.
[0014] The beneficial effects of this application are: The overall performance environment simulation chamber structure and system provided by this application utilizes the main support structure to support the crane system to hoist the test equipment, and uses the hanging mechanism connected to the bottom of the crane system to drive the lifting and lowering of the enclosure membrane, so that the wind box and enclosure membrane at the bottom of the crane system are enclosed with the ground to form a test chamber covering the test equipment. The temperature, humidity and wind force inside the test chamber are adjusted by the temperature and humidity control device, and the rain and snow preparation device is used to adjust the rain and snow conditions inside the test chamber. It has the advantages of saving space, convenient adjustment of space size, and convenient disassembly and transportation. Attached Figure Description
[0015] To more clearly illustrate the technical solutions of the embodiments of this application, the accompanying drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of this application and should not be regarded as a limitation of the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.
[0016] Figure 1 A partial cross-sectional structural schematic diagram from a first-view perspective of the overall performance environment simulation cabin structure provided in the embodiments of this application; Figure 2 A schematic diagram of the air outlet area and air supply port on the bottom plate of the air box in the overall performance environment simulation cabin structure provided in this application embodiment; Figure 3 This is a partial cross-sectional view of the overall performance environment simulation cabin structure provided in the embodiments of this application, omitting the main support structure, driving system, and suspension mechanism.
[0017] In the diagram: 100. Main support structure; 110. Traveling system; 120. Air box; 121. Air outlet; 122. Rain nozzle; 123. Snow nozzle; 124. Air outlet area; 130. Enclosure membrane; 131. Test chamber; 140. Suspension mechanism; 150. Circular track; 160. Top irradiator; 170. Side irradiator; 180. Side nozzle; 190. Traveling track; 200. Environmental control device; 210. Temperature and humidity control device; 211. Temperature and humidity control box; 2 12. Air inlet; 213. Air outlet; 214. Evaporator; 215. Heater; 216. Humidifier; 217. Supply fan; 218. Return air duct; 219. Electric defroster; 220. Rain and snow preparation device; 221. Rain and snow preparation box; 222. Air-cooled chiller unit; 223. Cold water tank; 224. Pure water tank; 225. Air compressor; 226. First booster pump; 227. Second booster pump; 230. Refrigeration equipment; 231. Condenser; 240. Closed-circuit cooling tower. Detailed Implementation
[0018] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. The components of the embodiments of this application described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.
[0019] Therefore, the following detailed description of the embodiments of this application provided in the accompanying drawings is not intended to limit the scope of the claimed application, but merely to illustrate selected embodiments of the application. All other embodiments obtained by those skilled in the art based on the embodiments of this application without inventive effort are within the scope of protection of this application.
[0020] It should be noted that similar labels and letters in the following figures indicate similar items. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures.
[0021] In the description of this application, it should be noted that the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship commonly used when the product of this application is in use. They are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation on this application. In addition, the terms "first," "second," and "third," etc., are only used to distinguish descriptions and should not be construed as indicating or implying relative importance.
[0022] Furthermore, terms such as "horizontal," "vertical," and "sag" do not imply that components must be absolutely horizontal or suspended, but rather that they can be slightly tilted. For example, "horizontal" simply means that its direction is more horizontal relative to "vertical," and does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0023] In the description of this application, it should also be noted that, unless otherwise expressly specified and limited, the terms "set up," "install," "connect," and "link" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this application based on the specific circumstances.
[0024] In this application, unless otherwise expressly specified and limited, "above" or "below" the second feature can include direct contact between the first and second features, or contact between the first and second features through another feature between them. Furthermore, "above," "over," and "on top" of the second feature includes the first feature being directly above or diagonally above the second feature, or simply indicates that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature includes the first feature being directly below or diagonally below the second feature, or simply indicates that the first feature is at a lower horizontal level than the second feature.
[0025] The following detailed description of the features and performance of the overall performance environment simulation cabin structure and system of this application, in conjunction with embodiments, provides further insight into the specifics.
[0026] like Figure 1 , Figure 2 and Figure 3As shown, this application embodiment provides an overall performance environment simulation cabin structure, which includes a main support structure 100, a driving system 110 connected to the main support structure 100, a wind box 120 connected to the bottom of the driving system 110, an annular enclosure membrane 130, an annular track 150 connected to the bottom of the driving system 110, four spaced-apart suspension mechanisms 140 and an environmental control device 200. The main support structure 100 serves as the load-bearing frame of the overall performance environment simulation chamber and can be a steel frame. Two trolley tracks 190 are respectively installed at both ends of the top inner wall of the main support structure 100. The trolley system 110 is rotatably mounted on the two trolley tracks 190 at both ends, allowing it to move along the tracks for lifting test objects such as residences and other auxiliary equipment. The air box 120, as an air distribution static pressure box, is fixedly connected to the bottom of the trolley system 110 and can move with it. The bottom of the air box 120 is connected to spaced-apart air outlets 121, spaced-apart rain nozzles 122, and spaced-apart snow nozzles 123. The enclosure membrane 130 is made of a soft, airtight composite material with good thermal insulation properties (such as thermal insulation tarpaulin, aerogel composite membrane, etc.). The enclosure membrane 130 is located below the wind box 120, and its bottom edge can be sealed to the ground. Thus, the wind box 120, the enclosure membrane 130, and the ground together form a closed test chamber 131. The aforementioned air outlet 121, rain nozzle 122, and snow nozzle 123 are all connected to the top of the test chamber 131 to regulate the internal climate environment of the test chamber 131.
[0027] Four hanging mechanisms 140 (e.g., winches or electric hoists) are slidably connected at their upper ends to the annular track 150, and at their lower ends to the top edge of the enclosure membrane 130. The four hanging mechanisms 140 drive the enclosure membrane 130 to rise and fall. When installing or removing the test object, the hanging mechanisms 140 lift the enclosure membrane 130 upwards and fold or retract it. Simultaneously, the trolley system 110 carries the bellows 120, the hanging mechanisms 140, and the enclosure membrane 130 to the waiting area, thus creating unobstructed space for the hoisting of the test object and solving the problems of large volume and difficult transportation and installation of traditional rigid simulation chambers. The hanging mechanisms 140 can move circumferentially along the annular track 150 and the enclosure membrane 130, allowing the position of the hanging points of the hanging mechanisms 140 to be adjusted according to actual needs when retracting or unfolding the enclosure membrane 130. This makes the lifting and lowering of the enclosure membrane 130 more stable and controllable, and facilitates tensioning or folding of the enclosure membrane 130.
[0028] The environmental control device 200 includes a temperature and humidity control device 210 and a rain and snow preparation device 220. The temperature and humidity control device 210 extracts air with low temperature stratification and uniform humidity from the bottom of the test chamber 131, adjusts the temperature and humidity, and then sends it into the top air box 120, which is then evenly distributed into the test chamber 131 through the air outlet 121. The rain and snow preparation device 220 delivers pressurized water to the rain nozzle 122 to simulate rainfall, and delivers pre-cooled water and compressed air to the snow nozzle 123 to spray ice crystals to simulate snowfall.
[0029] In this embodiment, the temperature and humidity control device 210 includes two temperature and humidity control boxes 211, a refrigeration device 230, and a closed cooling tower 240. Two temperature and humidity control boxes 211 are respectively located on both sides of the enclosure membrane 130. Each temperature and humidity control box 211 has an air inlet 212 and an air outlet 213 at one end and the top, respectively. Inside the temperature and humidity control box 211, there is an evaporator 214, a heater 215, a humidifier 216, and a blower 217 arranged sequentially between the air inlet 212 and the air outlet 213. The air inlet 212 is connected to the bottom of the test chamber 131 through a return air pipe 218. The air outlet 213 of the blower 217 is connected to the air box 120 through a blower pipe. The air at the bottom of the test chamber 131 passes sequentially through the return air pipe 218, the air inlet 212, the evaporator 214, the heater 215, the humidifier 216, the blower 217, the air outlet 213, and the blower pipe into the air box 120. The condenser 231 of the refrigeration equipment 230 is connected to the evaporator 214 through a refrigerant pipeline to form a compression refrigeration cycle. The condenser 231 and the closed cooling tower 240 are connected by cooling water pipes to form a cooling water circulation to remove the heat of condensation. Considering that the evaporator 214 is prone to frosting under low temperature conditions (such as during snowfall simulation), an electric defroster 219 is also connected to the evaporator 214 for timed or automatic defrosting.
[0030] The snow and rain preparation device 220 includes a snow and rain preparation box 221 and an air-cooled chiller unit 222, a cold water tank 223, a pure water tank 224, and an air compressor 225 installed inside it. The air-cooled chiller unit 222 is connected to the cold water tank 223 to form a circulation system, used to pre-cool the water in the cold water tank 223 to near freezing point (e.g., 1°C). The outlet of the cold water tank 223 is connected to each snow nozzle 123 through a first pressurization pump 226 and insulated pipes. The air compressor 225 is connected to each snow nozzle 123 through high-pressure air pipes. After the pre-cooled water and high-pressure air are mixed in the snow nozzle 123, they rapidly expand, atomize, and crystallize to form artificial snow crystals that are sprayed out to simulate snowfall. The pure water tank 224 is connected to each snow nozzle 122 through a second pressurization pump 227 and pipes to provide pure water for simulating rainfall.
[0031] To simulate lateral rain (such as simultaneous wind and rain), lateral sprinklers 180 are also provided on both sides of the inner wall of the enclosure membrane 130. The pure water tank 224 is connected to each lateral sprinkler 180 through the second booster pump 227 to spray water laterally.
[0032] To ensure uniform airflow and prevent excessive local wind speed from affecting the heat exchange state of the test object surface, the bottom of the air box 120 is provided with air outlet areas 124 arranged at intervals along its width. Each air outlet area 124 is provided with air inlets 121 arranged at intervals. The air inlets 121 are preferably perforated plates or nozzles, while the bottom perimeter of the test chamber 131 or the ground is provided with return air inlets connected to return air pipes 218, forming an airflow organization mode of "top air supply and bottom return air", which ensures the uniformity of the temperature and humidity field in the test chamber 131, and the indoor wind speed can be controlled below 0.2m / s, without affecting the steady-state heat transfer of the test object surface.
[0033] When testing the overall performance environment simulation chamber structure provided in this application embodiment, the entire residential building or large building component to be tested is first hoisted to the working platform inside the main support structure 100 by the crane system 110. Then, the crane system 110 moves to the top of the test chamber 131, and the hoisting mechanism 140 is activated to slowly lower the protective membrane 130 gathered at the top to the ground and seal it to form a closed test chamber 131. The environmental control device 200 is activated according to the required simulated climatic conditions. The temperature and humidity control device 210 draws air from the bottom of the test chamber 131 through the return air pipe 218. After cooling and dehumidifying by the evaporator 214, precise heating by the heater 215, and humidification by the humidifier 216, the air with regulated temperature and humidity is sent into the air box 120 by the air supply fan 217 and evenly delivered into the test chamber 131 through the air outlet 121 at the bottom of the air box 120. When rain or snow is required, the rain / snow preparation device 220 is activated, supplying water to the top rain nozzle 122 and side nozzles 180 via the pure water tank 224 and the second pressurizing pump 227 to simulate rainfall; and supplying pre-cooled water and compressed air to the snow nozzle 123 via the cold water tank 223, the first pressurizing pump 226, and the air compressor 225 to simulate snowfall. When sunshine is required, the top irradiation lamp 160 and the side irradiation lamp 170 are turned on to simulate solar radiation at different angles. Through the above coordinated control, the complex natural environment of high temperature, low temperature, high humidity, dryness, rain, snowfall, solar radiation, and different wind speed combinations can be accurately reproduced within the test chamber 131. Throughout the entire test cycle, key parameters such as the temperature of the inner and outer surfaces of the building envelope, heat flux density, air tightness, condensation, energy consumption, temperature and humidity uniformity, and fresh air efficiency of the indoor air conditioning system can be monitored in real time. This enables a true and direct verification of the overall performance of the building. At the same time, it is convenient to use the hanging mechanism 140 to drive the lifting of the building envelope 130 and the moving and adjusting of the test chamber 131 by the accompanying vehicle system 110.
[0034] This application also provides an overall performance environment simulation system, which includes the overall performance environment simulation cabin structure described above.
[0035] The embodiments described above are some, but not all, of the embodiments of this application. The detailed description of the embodiments of this application is not intended to limit the scope of the claimed application, but merely to illustrate selected embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of this application without inventive effort are within the scope of protection of this application.
Claims
1. A structure for an overall performance environment simulation cabin, characterized in that, It includes: Main supporting structure; The driving system is connected to the top of the main support structure; A bellows is connected to the bottom of the driving system, and the bottom of the bellows is connected to multiple air outlets, multiple rain nozzles and multiple snow nozzles; An enclosure membrane is provided below the air box, and the air box, the enclosure membrane and the ground enclose the test chamber. The air outlet, the rain nozzle and the snow nozzle are respectively connected to the test chamber. Multiple suspension mechanisms are connected to the vehicle system and the enclosure membrane respectively, for driving the enclosure membrane to rise and fall; An environmental control device includes a temperature and humidity control device and a rain and snow preparation device. The temperature and humidity control device is used to extract air from the bottom of the test chamber and deliver air with a preset temperature and humidity into the air box. The rain and snow preparation device is used to deliver water into the rain nozzle and pre-cooled water and air into the snow nozzle.
2. The overall performance environment simulation cabin structure according to claim 1, characterized in that, The bottom of the traveling system is connected to a circular track, and the top of the suspension mechanism is movably connected to the circular track along the circular track.
3. The overall performance environment simulation cabin structure according to claim 1, characterized in that, The bottom of the bellows is connected to a plurality of spaced-apart top irradiation lamps.
4. The overall performance environment simulation cabin structure according to claim 1, characterized in that, The inner wall of the enclosure membrane is provided with multiple spaced-apart lateral irradiation lamps on both sides.
5. The overall performance environment simulation cabin structure according to claim 1, characterized in that, The temperature and humidity control device includes at least one temperature and humidity control box with an air inlet and an air outlet, a refrigeration device, and a closed cooling tower. Each temperature and humidity control box contains an evaporator, a heater, a humidifier, and a blower, which are located sequentially between the air inlet and the air outlet. The air inlet is connected to a return air duct extending to the bottom of the test chamber. The blower is connected to the air box through the air outlet. The condenser of the refrigeration device is connected to the evaporator to form a refrigeration cycle, and the condenser is connected to the closed cooling tower to form a cooling cycle.
6. The overall performance environment simulation cabin structure according to claim 5, characterized in that, The evaporator is connected to an electric defroster.
7. The overall performance environment simulation cabin structure according to claim 1, characterized in that, The snow and rain preparation device includes a snow and rain preparation box and an air-cooled chiller, a cold water tank, a pure water tank, and an air compressor installed in the snow and rain preparation box. The air-cooled chiller and the cold water tank are connected to form a circulation system. The cold water tank is connected to each of the snow nozzles through a first pressurizing pump. The air compressor is connected to each of the snow nozzles respectively. The pure water tank is connected to each of the rain nozzles through a second pressurizing pump.
8. The overall performance environment simulation cabin structure according to claim 7, characterized in that, The inner wall of the enclosure membrane is provided with side nozzles on both sides, and the pure water tank is connected to each of the side nozzles through the second pressurizing pump.
9. The overall performance environment simulation cabin structure according to claim 1, characterized in that, The bottom of the air box is provided with multiple air outlet areas arranged at intervals along the width direction, and each air outlet area is provided with multiple air inlets.
10. A comprehensive performance environment simulation system, characterized in that, It includes the overall performance environment simulation cabin structure as described in any one of claims 1 to 9.