Deep water composite permanent water retaining support structure for lake bottom tunnel construction

CN122942485APending Publication Date: 2026-10-20ANHUI HIGHWAY BRIDGE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611182860.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-05
Publication Date
2026-10-20

AI Technical Summary

Technical Problem

[0002]在针对湖底隧道进行施工时,传统的施工方式为采用两排钢板桩,中间填筑(4-6m)黏土,形成临时挡水结构,仅承担施工期隔水挡土的作用,隧道完工后通常会拆除回收,抽干围堰内的湖水、清理湖底淤泥后,必须在围堰内部的干作业面里,再单独打设桩基、粉喷桩,作为隧道两侧的永久支护支撑,永久支撑施工完成后,才能开挖基坑、浇筑隧道主体结构,将会增加总工期,结构安全性不足

Benefits of technology

本发明通过钢板桩、第一桩针、长钢管、螺纹杆等结构之间的相互配合,可实现第一桩针和第二桩针的插入位置则是后续钢板桩的放置位置,因此若是需要将两个钢板桩之间的距离进行调整时,则需要提前针对第一桩针和第二桩针的位置进行调整,先对第二桩针插入到湖底土壤深处,再将第一桩针放置在相邻的第二桩针一侧,然后将活动管套在第一桩针表面,活动管在第一桩针表面向下移动,直到活动管表面的插杆移动到第一桩针上的第一通孔处,从而对活动管进行限位,将螺纹杆与驱动机构连接,驱动机构带动螺纹杆进行转动,螺纹杆带动连接板进行上下移动,连接板带动活动管进行左右移动,活动管通过插杆带动第一桩针进行左右移动,当第一桩针和第二桩针的位置确定后,此时第一桩针和第二桩针均插入到湖底土壤深处,随后将钢板桩向下移动,钢板桩上的固定管套在第二桩针表面,活动管一侧的第一T型板进入到钢板桩上的第一T型槽内部,从而完成对钢板桩的定位安装,防止钢板桩在安装中发生倾斜,通过外部器械将钢板桩插入到湖底土壤深处,在两排钢板桩均安装完成后,将中间的两个第一桩针进行拆卸,在两排钢板桩之间的中间区域采用水下成槽设备开挖沟槽,在挖槽的同时持续向沟槽内注入膨润土泥浆,膨润土泥浆的密度比湖水大,约1.05~1.15g/cm³,泥浆的侧压力大于外侧土体的侧压力,相当于液体支撑,顶住槽壁不让土体坍塌,再将钢筋笼放置在两排钢板桩之间,在钢筋笼放稳后,将长钢管放置在钢筋笼的空档里,长钢管配合限位板与吊装机构连接,浇铸混凝土的钢管放置在第四钢管顶部的夹板处,四个夹板配合L形板和第二弹簧对浇铸混凝土的钢管进行夹紧限位,混凝土将顺着第四钢管、第三钢管、第二钢管和第一钢管进入到沟槽中,混凝土面平稳上升,长钢管底端里沟底距离30-50cm,在浇铸过程中,吊装机构带动长钢管向上移动,实现边浇边拔,长钢管的长度根据实际工作需要能进行调整,在浇铸完成后,钢筋混凝土连续墙结构成型,墙体两侧与两侧钢板桩紧密粘结,形成整体。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure FT_1
    Figure FT_1
  • Figure FT_2
    Figure FT_2
  • Figure FT_3
    Figure FT_3
Patent Text Reader

Abstract

This invention discloses a deep-water composite permanent water-retaining support structure for lake-bottom tunnel construction, relating to the field of lake-bottom tunnel construction technology. It includes two sheet piles arranged side-by-side, with three connecting plates between them. Grooves are formed on both sides of each connecting plate, and a swing plate is hinged within each groove. The insertion positions of the first and second pile pins determine the placement positions of subsequent sheet piles. Therefore, if the distance between the two sheet piles needs to be adjusted, the positions of the first and second pile pins must be adjusted beforehand. First, the second pile pin is inserted deep into the lake-bottom soil. Then, the first pile pin is placed next to the adjacent second pile pin. A movable tube is then fitted onto the surface of the first pile pin, and the movable tube moves downwards until the insertion rod on the surface of the movable tube moves to the first through hole on the first pile pin, thereby limiting the movement of the movable tube.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of lakebed tunnel construction technology, specifically to a deep-water composite permanent water-retaining support structure for lakebed tunnel construction. Background Technology

[0002] When constructing a lake-bottom tunnel, the traditional construction method involves using two rows of steel sheet piles with 4-6m of clay filling in between to form a temporary water-retaining structure. This structure only serves to prevent water from entering and to retain soil during the construction period. After the tunnel is completed, it is usually dismantled and recycled. After the lake water inside the cofferdam is drained and the silt at the bottom of the lake is cleared, it is necessary to separately drive pile foundations and jet grouting piles in the dry working face inside the cofferdam to serve as permanent support for both sides of the tunnel. Only after the permanent support construction is completed can the foundation pit be excavated and the main tunnel structure be poured, which will increase the overall construction period and compromise the structural safety. Summary of the Invention

[0003] In view of the above-mentioned shortcomings of the existing technology, the purpose of this invention is to provide a deep-water composite permanent water-retaining support structure for lake bottom tunnel construction.

[0004] To achieve the above objectives, the present invention provides the following technical solution: a deep-water composite permanent water-retaining support structure for lakebed tunnel construction, comprising two sheet piles arranged side by side, three connecting plates shared between the two sheet piles, grooves on both sides of the connecting plates, swing plates hinged within the grooves, U-shaped blocks hinged to the side of the swing plates away from the connecting plates, movable pipes fixedly connected to the side of the U-shaped blocks away from the connecting plates, and first T-shaped plates fixedly connected to the side of the movable pipes near the sheet piles, three first T-shaped slots on corresponding sides of the two sheet piles, the first T-shaped plates being movably connected within adjacent first T-shaped slots.

[0005] Preferably, a number of fixing pipes are fixedly connected to the side of the steel sheet pile away from the connecting plate, and a second pile needle is provided through the inner cavity of each fixing pipe.

[0006] Preferably, each of the movable tubes has a first stake penetrating through its inner cavity, and each of the first stakes has a first through hole near its bottom. Each of the movable tubes has a second through hole on its front side, and each of the second through holes has a rod penetrating through it. The rear end of each rod penetrates through an adjacent first through hole, and each rod has a connecting plate fixedly connected to its front end.

[0007] Preferably, the bottom of the insertion rod is inclined near the rear side, and a first spring is sleeved on the outer edge of the insertion rod. The rear end of the first spring is fixedly connected to the outer edge of the movable tube, and the front end of the first spring is fixedly connected to the rear side of the connecting plate.

[0008] Preferably, each of the connecting plates has a first threaded hole at its center, and a threaded rod is threaded into each of the first threaded holes, with a fixed plate fixedly connected to the bottom end of each threaded rod.

[0009] Preferably, two long steel pipes are provided between the two sheet piles. The long steel pipes include a first steel pipe, a second steel pipe attached to the top of the first steel pipe, a third steel pipe attached to the top of the second steel pipe, and a fourth steel pipe attached to the top of the third steel pipe.

[0010] Preferably, four limiting plates are fixedly connected to the outer edge of the first steel pipe near the bottom. Each limiting plate has a second threaded hole. Four adjusting plates are fixedly connected to the outer edge of the first steel pipe near the top, the outer edge of the second steel pipe near the top and bottom, the outer edge of the third steel pipe near the top and bottom, and the outer edge of the fourth steel pipe near the bottom. Each adjusting plate has a third threaded hole. A bolt is threaded into two adjacent third threaded holes.

[0011] Preferably, the inner cavity of the fourth steel pipe is provided with four clamping plates near the top. Each clamping plate is fixedly connected to an L-shaped plate on the side away from the center of the fourth steel pipe. Each L-shaped plate is fixedly connected to a second spring on one side. The end of the second spring away from the L-shaped plate is fixedly connected to the outer edge of the fourth steel pipe.

[0012] Preferably, a first vertical plate is fixedly connected to the side of the sheet pile away from the connecting plate near the front side, and a second T-shaped groove is opened on each of the first vertical plates.

[0013] Preferably, a second vertical plate is fixedly connected to the side of the sheet pile away from the connecting plate near the rear side, and a second T-shaped plate is fixedly connected to the rear side of the second vertical plate.

[0014] Compared with the prior art, the beneficial effects of the present invention are: This invention utilizes the interplay between sheet piles, a first pile pin, a long steel pipe, and a threaded rod to ensure that the insertion positions of the first and second pile pins determine the placement positions of subsequent sheet piles. Therefore, if the distance between two sheet piles needs adjustment, the positions of the first and second pile pins must be adjusted beforehand. First, the second pile pin is inserted deep into the lakebed soil. Then, the first pile pin is placed next to the adjacent second pile pin. Next, a movable tube is fitted over the surface of the first pile pin, and the movable tube moves downwards until the insertion rod on the movable tube reaches the first through hole on the first pile pin, thus aligning the movable tube... Limiting is performed by connecting the threaded rod to the drive mechanism. The drive mechanism drives the threaded rod to rotate, which in turn moves the connecting plate up and down. The connecting plate then moves the movable tube left and right, which in turn moves the first pile pin left and right via the insertion rod. Once the positions of the first and second pile pins are determined, both are inserted deep into the lakebed soil. The sheet pile is then moved downwards, and the fixing tube on the sheet pile is fitted onto the surface of the second pile pin. The first T-shaped plate on one side of the movable tube enters the first T-shaped groove on the sheet pile, thus completing the positioning and installation of the sheet pile and preventing it from tilting during installation. External equipment inserts sheet piles deep into the lakebed soil. After both rows of sheet piles are installed, the two middle first piles are removed. An underwater trenching device is used to excavate a trench in the middle area between the two rows of sheet piles. Simultaneously, bentonite slurry is continuously injected into the trench. The bentonite slurry has a higher density than lake water, approximately 1.05~1.15 g / cm³. The lateral pressure of the slurry is greater than the lateral pressure of the outer soil, acting as a liquid support to hold the trench walls and prevent soil collapse. A reinforcing cage is then placed between the two rows of sheet piles. After the reinforcing cage is stable, a long steel pipe is placed in the gaps within the cage. The long steel pipe, along with a limiting plate,... The hoisting mechanism is connected, and the steel pipe for pouring concrete is placed at the clamping plate on top of the fourth steel pipe. The four clamping plates, together with the L-shaped plate and the second spring, clamp and limit the steel pipe for pouring concrete. The concrete will enter the trench along the fourth, third, second, and first steel pipes. The concrete surface rises steadily, and the bottom of the long steel pipe is 30-50cm from the bottom of the trench. During the pouring process, the hoisting mechanism drives the long steel pipe to move upward, realizing simultaneous pouring and pulling. The length of the long steel pipe can be adjusted according to actual work needs. After the pouring is completed, the reinforced concrete continuous wall structure is formed, and the two sides of the wall are tightly bonded to the steel sheet piles on both sides to form an integral whole. Attached Figure Description

[0015] Figure 1 This is a perspective view of the present invention; Figure 2 This is a top view of the steel sheet pile component of the present invention; Figure 3 This is a schematic diagram of the threaded rod structure of the component of the present invention; Figure 4This is an exploded view of the first pile needle of the component of this invention; Figure 5 This is a left view of the insertion rod of the component of the present invention; Figure 6 This is a diagram illustrating the installation of multiple steel sheet piles according to the present invention; Figure 7 This is a schematic diagram of the long steel pipe structure of the component of the present invention; Figure 8 This is a schematic diagram of the clamping plate structure of the component of the present invention; Figure 9 This is a schematic diagram of the second T-shaped plate structure of the component of the present invention.

[0016] Labels in the diagram: 1. Sheet pile; 2. Movable pipe; 3. First T-shaped plate; 4. First pile pin; 5. Fixed pipe; 6. Second pile pin; 7. Fixed plate; 8. Connecting plate; 9. Swinging plate; 10. U-shaped block; 11. Insert rod; 12. Connecting plate; 13. First spring; 14. First vertical plate; 15. Long steel pipe; 151. First steel pipe; 152. Second steel pipe; 153. Third steel pipe; 154. Fourth steel pipe; 155. Limiting plate; 156. Adjusting plate; 157. Bolt; 158. Clamping plate; 159. L-shaped plate; 1510. Second spring; 16. Second vertical plate; 17. Second T-shaped plate; 18. Threaded rod. Detailed Implementation

[0017] Please see Figure 1-9This invention provides a technical solution: a deep-water composite permanent water-retaining support structure for lakebed tunnel construction, comprising two sheet piles 1, arranged side-by-side, with three connecting plates 8 between them. Grooves are formed on both sides of the connecting plates 8, and swing plates 9 are hinged within each groove. A U-shaped block 10 is hinged to the side of the swing plate 9 away from the connecting plate 8. A movable pipe 2 is fixedly connected to the side of the U-shaped block 10 away from the connecting plate 8. A first T-shaped plate 3 is fixedly connected to the side of the movable pipe 2 closest to the sheet pile 1. Three first T-shaped slots are formed on corresponding sides of the two sheet piles 1, and the first T-shaped plates 3 are movably connected within adjacent first T-shaped slots. Several fixed pipes 5 are fixedly connected to the side of the sheet pile 1 away from the connecting plate 8. A second pile needle 6 penetrates the inner cavity of each fixed pipe 5. A first pile needle 4 penetrates the inner cavity of each movable pipe 2. A first pile needle 4 is formed near the bottom of the inner cavity of each first pile needle 4. A second through hole is provided on the front side of the movable tube 2. A rod 11 is inserted through the second through hole. The rear end of the rod 11 passes through the adjacent first through hole. A connecting plate 12 is fixedly connected to the front end of the rod 11. The bottom of the rod 11 is inclined near the rear side. A first spring 13 is sleeved on the outer edge of the rod 11. The rear end of the first spring 13 is fixedly connected to the outer edge of the movable tube 2. The front end of the first spring 13 is fixedly connected to the rear side of the connecting plate 12. A first threaded hole is provided at the center of the connecting plate 8. A threaded rod 18 is threadedly connected in the first threaded hole. A fixed plate 7 is fixedly connected to the bottom end of the threaded rod 18. A first vertical plate 14 is fixedly connected to the side of the steel sheet pile 1 away from the connecting plate 8 near the front side. A second T-slot is provided on the first vertical plate 14. A second vertical plate 16 is fixedly connected to the side of the steel sheet pile 1 away from the connecting plate 8 near the rear side. A second T-slot 17 is fixedly connected to the rear side of the second vertical plate 16. Two long steel pipes 15 are provided between the two sheet piles 1. The long steel pipe 15 includes a first steel pipe 151, a second steel pipe 152 attached to the top of the first steel pipe 151, a third steel pipe 153 attached to the top of the second steel pipe 152, and a fourth steel pipe 154 attached to the top of the third steel pipe 153. Four limiting plates 155 are fixedly connected to the outer edge of the first steel pipe 151 near the bottom. Each limiting plate 155 has a second threaded hole. The outer edges of the first steel pipe 151 near the top, the outer edges of the second steel pipe 152 near the top and bottom, and the outer edges of the third steel pipe 153 near the bottom are fixedly connected to the fourth steel pipe 154. Four adjusting plates 156 are fixedly connected to the top and bottom, and to the outer edge of the fourth steel pipe 154 near the bottom. Each adjusting plate 156 has a third threaded hole. Two adjacent third threaded holes are connected to a bolt 157 by a common thread. Four clamping plates 158 are provided in the inner cavity of the fourth steel pipe 154 near the top. An L-shaped plate 159 is fixedly connected to the side of the clamping plate 158 away from the center of the fourth steel pipe 154. A second spring 1510 is fixedly connected to one side of the L-shaped plate 159. The end of the second spring 1510 away from the L-shaped plate 159 is fixedly connected to the outer edge of the fourth steel pipe 154.

[0018] Working principle: During construction, the insertion positions of the first pile 4 and the second pile 6 are the placement positions of the subsequent sheet piles 1. Therefore, if it is necessary to adjust the distance between the two sheet piles 1, the positions of the first pile 4 and the second pile 6 need to be adjusted in advance. First, the second pile 6 is inserted deep into the lake bottom soil. Then, the first pile 4 is placed on the side of the adjacent second pile 6. Then, the movable tube 2 is fitted onto the surface of the first pile 4. The movable tube 2 moves downward on the surface of the first pile 4 until the insertion rod 11 on the surface of the movable tube 2 moves to the first through hole on the first pile 4, thereby limiting the movable tube 2. At this time, the threaded rod 18 is connected to the drive mechanism. The drive mechanism drives the threaded rod 18 to rotate. The threaded rod 18 drives the connecting plate 8 to move up and down. The connecting plate 8 drives the swing plate 9 to swing. The swing plate 9 drives the movable tube 2 to move left and right through the U-shaped block 10. The movable tube 2 drives the first pile 4 to move left and right through the insertion rod 11. When the positions of the first pile 4 and the second pile 6 are... Once determined, the first pile 4 and the second pile 6 are both inserted deep into the lakebed soil. Then, the sheet pile 1 is moved downwards, and the fixing tube 5 on the sheet pile 1 is fitted onto the surface of the second pile 6. The first T-shaped plate 3 on one side of the movable tube 2 enters the first T-shaped groove on the sheet pile 1, thus completing the positioning and installation of the sheet pile 1 and preventing it from tilting during installation. The sheet pile 1 is then inserted deep into the lakebed soil using external instruments. After both rows of sheet piles 1 are installed, the threaded rod in the middle is moved upwards. 18. The threaded rod 18 in the middle drives the intermediate connecting plate 8, the intermediate swing plate 9, the intermediate U-shaped block 10 and the intermediate movable tube 2 to move upward through the intermediate fixed plate 7. The intermediate movable tube 2 drives the intermediate first pile pin 4 to move upward through the intermediate insert rod 11. The two intermediate first pile pins 4 are disassembled. In the middle area between the two rows of steel sheet piles 1, an underwater trenching device is used to excavate a trench. While excavating the trench, bentonite slurry is continuously injected into the trench. The density of the bentonite slurry is greater than that of lake water, about 1.05~1.The lateral pressure of the mud is 15g / cm³, which is greater than the lateral pressure of the outer soil, acting as a liquid support to hold the trench wall in place and prevent the soil from collapsing. The reinforcing cage is then placed between the two rows of sheet piles 1. After the reinforcing cage is stable, the long steel pipe 15 is placed in the gap of the reinforcing cage. The long steel pipe 15, together with the limiting plate 155, is connected to the hoisting mechanism. The steel pipe with the cast concrete is placed at the clamping plate 158 at the top of the fourth steel pipe 154. The four clamping plates 158, together with the L-shaped plate 159 and the second spring 151, form a powerful combination. 0. The steel pipes for pouring concrete are clamped and limited. The concrete will flow into the trench along the fourth steel pipe 154, the third steel pipe 153, the second steel pipe 152, and the first steel pipe 151. The concrete surface rises steadily, and the bottom of the long steel pipe 15 is 30-50cm from the bottom of the trench. During the pouring process, the hoisting mechanism moves the long steel pipe 15 upward, achieving simultaneous pouring and pulling. During the upward movement, the second steel pipe 152 or the third steel pipe 153 can be disassembled by rotating bolt 1. 57 is sufficient, thus ensuring that the bottom end of the long steel pipe 15, i.e., the first steel pipe 151, remains buried in the cement. After casting to the top, the long steel pipe 15 is completely pulled out. The length of the long steel pipe 15 can be adjusted according to actual work needs, with the addition of a second steel pipe 152 and a third steel pipe 153. After casting, the reinforced concrete continuous wall structure is formed, and the two sides of the wall are tightly bonded to the two side steel sheet piles 1, forming a whole. If it is necessary to connect multiple steel sheet piles 1, the second T-shaped plate 17 on the rear side of another steel sheet pile 1 is moved to the second T-shaped groove in the first vertical plate 14 on the front side of one of the steel sheet piles 1, thereby completing the connection and installation of multiple steel sheet piles 1. After each section of the trench is excavated and the subsequent reinforced concrete continuous wall is formed, the remaining first pile needle 4 can be disassembled, and the threaded rod 18 is moved upward. The threaded rod 18, in conjunction with the connecting plate 8, the swing plate 9, the movable pipe 2, and the insertion rod 11, drives the first pile needle 4 upward, allowing construction of the next section of the trench to proceed.

Claims

1. A deep-water composite permanent water-retaining support structure for lakebed tunnel construction, comprising two steel sheet piles (1), characterized in that: Two sheet piles (1) are arranged side to side, and three connecting plates (8) are provided between the two sheet piles (1). The connecting plates (8) have grooves on both sides, and swing plates (9) are hinged in the grooves. U-shaped blocks (10) are hinged on the side of the swing plates (9) away from the connecting plates (8). Movable tubes (2) are fixedly connected on the side of the U-shaped blocks (10) away from the connecting plates (8). First T-shaped plates (3) are fixedly connected on the side of the movable tubes (2) close to the sheet piles (1). Three first T-shaped slots are provided on the corresponding side of the two sheet piles (1). The first T-shaped plates (3) are movably connected in the adjacent first T-shaped slots.

2. The deep-water composite permanent water-retaining support structure for lakebed tunnel construction according to claim 1, characterized in that: The sheet pile (1) is fixedly connected to several fixed pipes (5) on the side away from the connecting plate (8), and the inner cavity of each fixed pipe (5) is provided with a second pile needle (6).

3. The deep-water composite permanent water-retaining support structure for lakebed tunnel construction according to claim 1, characterized in that: The inner cavity of each movable tube (2) is provided with a first pile needle (4), and the inner cavity of each first pile needle (4) is provided with a first through hole near the bottom. The front side of each movable tube (2) is provided with a second through hole, and a rod (11) is provided through each second through hole. The rear end of the rod (11) passes through the adjacent first through hole, and the front end of the rod (11) is fixedly connected to a connecting plate (12).

4. The deep-water composite permanent water-retaining support structure for lakebed tunnel construction according to claim 3, characterized in that: The bottom of the insertion rod (11) is inclined near the rear side. The outer edge of the insertion rod (11) is fitted with a first spring (13). The rear end of the first spring (13) is fixedly connected to the outer edge of the movable tube (2), and the front end of the first spring (13) is fixedly connected to the rear side of the connecting plate (12).

5. The deep-water composite permanent water-retaining support structure for lakebed tunnel construction according to claim 1, characterized in that: Each of the connecting plates (8) has a first threaded hole at its center, and each of the first threaded holes is threaded with a threaded rod (18), and each of the threaded rods (18) is fixedly connected to a fixed plate (7) at its bottom end.

6. The deep-water composite permanent water-retaining support structure for lakebed tunnel construction according to claim 1, characterized in that: Two long steel pipes (15) are provided between the two sheet piles (1). The long steel pipes (15) include a first steel pipe (151), a second steel pipe (152) attached to the top of the first steel pipe (151), a third steel pipe (153) attached to the top of the second steel pipe (152), and a fourth steel pipe (154) attached to the top of the third steel pipe (153).

7. The deep-water composite permanent water-retaining support structure for lakebed tunnel construction according to claim 6, characterized in that: Four limiting plates (155) are fixedly connected to the outer edge of the first steel pipe (151) near the bottom. Each limiting plate (155) has a second threaded hole. Four adjusting plates (156) are fixedly connected to the outer edge of the first steel pipe (151) near the top, the outer edge of the second steel pipe (152) near the top and bottom, the outer edge of the third steel pipe (153) near the top and bottom, and the outer edge of the fourth steel pipe (154) near the bottom. Each adjusting plate (156) has a third threaded hole. A bolt (157) is threaded into two adjacent third threaded holes.

8. A deep-water composite permanent water-retaining support structure for lakebed tunnel construction according to claim 7, characterized in that: The inner cavity of the fourth steel pipe (154) is provided with four clamping plates (158) near the top. Each clamping plate (158) is fixedly connected to an L-shaped plate (159) on the side away from the center of the fourth steel pipe (154). Each L-shaped plate (159) is fixedly connected to a second spring (1510) on one side. The end of the second spring (1510) away from the L-shaped plate (159) is fixedly connected to the outer edge of the fourth steel pipe (154).

9. A deep-water composite permanent water-retaining support structure for lakebed tunnel construction according to claim 1, characterized in that: The sheet pile (1) is fixedly connected to a first vertical plate (14) on the side away from the connecting plate (8) near the front side, and a second T-shaped groove is opened on the first vertical plate (14).

10. A deep-water composite permanent water-retaining support structure for lakebed tunnel construction according to claim 1, characterized in that: The sheet pile (1) is fixedly connected to a second vertical plate (16) on the side away from the connecting plate (8) near the rear side, and a second T-shaped plate (17) is fixedly connected to the rear side of the second vertical plate (16).